M_260421BAR942_Relocation_of_Portables_Tab._Sheet_Final.pdf
PDF 209 KB Posted
- Attached to
- Relocation of Portables
- Solicitation number
- 26-0421-B-AR942
- Issued by
- Florida
About this file
This is a bid tabulation sheet for the School Board of Lake County, Florida, documenting pricing responses for the Relocation of Portables contract (Bid #26-0421-B-AR942). The procurement solicits firm bid prices from qualified vendors to provide relocation services for portable classroom buildings, office buildings, and restrooms throughout the school district on an as-needed basis. The bid tabulation received four responsive bids from AJS Building Moving & Leveling, Inc./C&W Environmental Services, LLC; D & A Construction Group, Inc.; Design Build Engineers & Contractors (DBE&C); and an unnamed fourth bidder. The solicitation addresses three service categories: on-campus relocation, campus-to-campus relocation, and stairs/ramps installation. Line items encompass six types of portable structures, ranging from 24' X 40' stucco portables to concrete portables, with pricing for mobilization charges, per-unit relocation costs, and mileage rates. The bid due date was Thursday, April 21, 2026, at 2:00 PM, with the tabulation recorded on the same date. All four bidders submitted required documentation, including ITB forms, addendums, debarment certifications, non-collusion affidavits, and conflict of interest statements.
The total bid prices submitted ranged from $104,862.00 to $625,248.00, with pricing varying significantly across bidders for identical line items. For example, on-campus relocation mobilization charges for 24' X 40' stucco portables ranged from $800 to $5,000, and per-unit relocation costs for the same portable ranged from $3,850 to $32,923. Concrete portables represented the highest-cost items, with on-campus relocation mobilization charges reaching $10,000 and per-unit relocation costs up to $80,000. Campus-to-campus relocation mileage charges ranged from $9.50 to $100 per mile depending on portable type and bidder. Installation of building anchors, estimated at 26 anchors per building, was priced from $1,000 to $26,000 for the complete line item. No set-asides were identified in the bid tabulation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Title: Relocation of Portables
Bid #: 26-0421-B-AR942
Item Description UOM Est. Qty. Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price
1 24' X 40' Stucco Portable Each 1 $0.00 $0.00 $0.00 $0.00
1a On Campus Relocation Mobilization Charge each 1 $800 $800.00 $ 1,250.00 $1,250.00 $ 3,000.00 $3,000.00 $5,000.00 $5,000.00
1b On Campus Relocation per portable each 1 $ 9,500.00 $9,500.00 $ 3,850.00 $3,850.00 $ 32,923.00 $32,923.00 $28,900.00 $28,900.00
1c Campus to Campus Relocation Mobilization Charge each 1 $ 800.00 $800.00 $ 1,600.00 $1,600.00 $ 3,000.00 $3,000.00 $15,000.00 $15,000.00
1d Campus to Campus Relocation per portable each 1 $ 11,500.00 $11,500.00 $ 5,550.00 $5,550.00 $ 35,371.00 $35,371.00 $28,900.00 $28,900.00
1e Campus to Campus Relocation Mileage Charge, Rate per mile each 1 $ - $0.00 $ 14.50 $14.50 $ 100.00 $100.00 $7,280.00 $7,280.00
2 24' X 36' Mobile Home Type Classroom EA 1 $0.00 $0.00 $0.00
2a On Campus Relocation Mobilization Charge each 1 $ 800.00 $800.00 $ 1,250.00 $1,250.00 $ 3,000.00 $3,000.00 $5,000.00 $5,000.00
2b On Campus Relocation per portable each 1 $ 9,500.00 $9,500.00 $ 3,500.00 $3,500.00 $ 29,251.00 $29,251.00 $18,000.00 $18,000.00
2c Campus to Campus Relocation Mobilization Charge each 1 $ 800.00 $800.00 $ 1,600.00 $1,600.00 $ 3,000.00 $3,000.00 $15,000.00 $15,000.00
2d Campus to Campus Relocation per portable each 1 $ 11,500.00 $11,500.00 $ 5,300.00 $5,300.00 $ 29,251.00 $29,251.00 $18,000.00 $18,000.00
2e Campus to Campus Relocation Mileage Charge, Rate per mile each 1 $ - $0.00 14.50$ $14.50 100.00$ $100.00 $1,000.00 $1,000.00
3 24'X 36' Wood Portable EA 1 $0.00 $0.00 $0.00
3a On Campus Relocation Mobilization Charge each 1 $ 800.00 $800.00 1,100.00$ $1,100.00 3,000.00$ $3,000.00 $5,000.00 $5,000.00
3b On Campus Relocation per portable each 1 $ 9,500.00 $9,500.00 3,250.00$ $3,250.00 35,326.00$ $35,326.00 $28,900.00 $28,900.00
3c Campus to Campus Relocation Mobilization Charge each 1 $ 800.00 $800.00 1,350.00$ $1,350.00 3,000.00$ $3,000.00 $15,000.00 $15,000.00
3d Campus to Campus Relocation per portable each 1 $ 11,500.00 $11,500.00 5,650.00$ $5,650.00 13,294.00$ $13,294.00 $18,000.00 $18,000.00
3e Campus to Campus Relocation Mileage Charge, Rate per mile each 1 $ - $0.00 14.50$ $14.50 100.00$ $100.00 $1,000.00 $1,000.00
4 24' X 60' Stucco Portable $0.00 $0.00 $0.00
4a On Campus Relocation Mobilization Charge EA 1 $ 1,500.00 $1,500.00 1,700.00$ $1,700.00 3,000.00$ $3,000.00 $10,000.00 $10,000.00
4b On Campus Relocation per portable each 1 $ 16,000.00 $16,000.00 5,300.00$ $5,300.00 57,358.00$ $57,358.00 $28,000.00 $28,000.00
4c Campus to Campus Relocation Mobilization Charge each 1 $ 1,500.00 $1,500.00 2,600.00$ $2,600.00 3,000.00$ $3,000.00 $25,000.00 $25,000.00
4d Campus to Campus Relocation per portable each 1 $ 18,500.00 $18,500.00 9,300.00$ $9,300.00 62,254.00$ $62,254.00 $28,000.00 $28,000.00
4e Campus to Campus Relocation Mileage Charge, Rate per mile each 1 $ - $0.00 18.50$ $18.50 100.00$ $100.00 $2,000.00 $2,000.00
5 Restroom Rortables $0.00 $0.00 $0.00
5a On Campus Relocation Mobilization Charge each 1 $ 800.00 $800.00 1,300.00$ $1,300.00 3,000.00$ $3,000.00 $10,000.00 $10,000.00
5b On Campus Relocation per portable each 1 $ 7,000.00 $7,000.00 3,300.00$ $3,300.00 22,842.00$ $22,842.00 $16,000.00 $16,000.00
5c Campus to Campus Relocation Mobilization Charge each 1 $ 1,000.00 $1,000.00 1,650.00$ $1,650.00 3,000.00$ $3,000.00 $14,000.00 $14,000.00
5d Campus to Campus Relocation per portable each 1 $ 9,000.00 $9,000.00 5,750.00$ $5,750.00 22,842.00$ $22,842.00 $16,000.00 $16,000.00
5s Campus to Campus Relocation Mileage Charge, Rate per mile each 1 $ - $0.00 14.50$ $14.50 100.00$ $100.00 $4,720.00 $4,720.00
6 Concrete Portables $0.00 $0.00 $0.00
6a On Campus Relocation Mobilization Charge each 1 $ 5,000.00 $5,000.00 2,200.00$ $2,200.00 $ 3,000.00 $3,000.00 $10,000.00 $10,000.00
6b On Campus Relocation per portable each 1 $ 80,000.00 $80,000.00 6,450.00$ $6,450.00 75,645.00$ $75,645.00 $39,600.00 $39,600.00
6c Campus to Campus Relocation Mobilization Charge each 1 $ 10,000.00 $10,000.00 3,300.00$ $3,300.00 3,000.00$ $3,000.00 $25,000.00 $25,000.00
6d Campus to Campus Relocation per portable each 1 $ 80,000.00 $80,000.00 9,950.00$ $9,950.00 75,645.00$ $75,645.00 $39,600.00 $39,600.00
6e
Campus to Campus Relocation Mileage Charge, Rate per mile each 1 $ - $0.00 21.50$ $21.50 100.00$ $100.00 $7,600.00 $7,600.00
7 Mobilization Charge each 1 $ 1,500.00 $1,500.00 1,000.00$ $1,000.00 3,000.00$ $3,000.00 $10,000.00 $10,000.00
8 Relocation per portable Each 1 $ 13,000.00 $13,000.00 3,100.00$ $3,100.00 36,477.00$ $36,477.00 $18,000.00 $18,000.00
9 Mobilization Charge each 1 $ 1,500.00 $1,500.00 1,950.00$ $1,950.00 3,000.00$ $3,000.00 $12,000.00 $12,000.00
10 Relocation per portable each 1 $ 15,000.00 $15,000.00 5,800.00$ $5,800.00 38,925.00$ $38,925.00 $22,000.00 $22,000.00
11 Mileage Charge, Rate per mile each 1 $ 10.00 $10.00 14.50$ $14.50 100.00$ $100.00 $1,000.00 $1,000.00
12 Mobilization Charge each 1 800.00$ $800.00 675.00$ $675.00 3,000.00$ $3,000.00 $10,000.00 $10,000.00
13 Relocation per ramp/stair each 1 4,000.00$ $4,000.00 785.00$ $785.00 6,844.00$ $6,844.00 $18,000.00 $18,000.00
14 Mileage Charge, Rate per mile each 1 10.00$ $10.00 9.50$ $9.50 100.00$ $100.00 $1,000.00 $1,000.00
Installation of each anchor, including all labor -per anchor
(typically 26 anchors per building) each 26 200.00$ $5,200.00 130.00$ $3,380.00 200.00$ $5,200.00 $1,000.00 $26,000.00
Total Bid
Price $339,120.00 $104,862.00 $625,248.00 $603,500.00
ITB Form Y Y Y Y
AJS Building Moving &
Leveling, Inc/ C&W Environmental
Services, LLC
D & A Construvtion Group, Inc. Design Build Engineers &
Contractors (DBE&C)
LAKE COUNTY SCHOOLS
Procurement Services
Tabulation Sheet
Addendum (if applicable) Y Y Y Y
Debarment Form Y Y Y Y
References/Questionaire Y Y Y Y
Statement on Public Entity Crimes (NOTARIZED) Y Y Y Y
Non-Collusion Affidavit Y Y Y Y
Principal Place of Business (if applicable) Y Y Y Y
Conditions for Emergency/Hurricane or Disaster Y Y Y Y
As Needed Services:
On Campus Relocation
Campus to Campus Relocation
Stairs and Ramps
Installation
YLicenses if needed
Conflict of Interest (NOTARIZED) Y Y Y Y
Drug-Free Workplace Certification Form Y Y Y Y
Read by: Angelita Russell Date: 4/21/2026
Recorded by: Kimberly Kilmartin Date4/21/2026
Due Date: Thursday April 21, 2026 @2:00 PM