This is a Performance Work Statement (PWS) for Back-up Crane Vessel Services issued by the U.S. Army Corps of Engineers (USACE), Seattle District, Navigation Section. The contract is for a self-propelled floating crane vessel to provide three primary missions: (1) scheduled equipment removal and installation at the Hiram M. Chittenden Locks, (2) on-call collection of floating debris in the Puget Sound area, and (3) emergency response services. The vessel must accommodate a maximum draft of seven feet, have a crane capable of lifting 10,000 lbs at 70 feet and 20,000 lbs at 40 feet, and have a minimum 30-foot beam with a deck capacity of at least 60 tons.

The contract is for a base year from February 1, 2026 to January 31, 2027, with two 12-month option years. Key requirements include safely performing missions according to EM 385-1-1 safety standards, collecting and offloading debris onto government barges at the Chittenden Locks, reporting debris tonnage and composition, and providing a backup crane vessel when the M/V PUGET is unavailable. The contractor will be required to respond to on-call debris collection with at least 30 days' notice and be available for emergency services with a 4-hour notification window. Emergency services will be compensated at a pre-negotiated daily rate, and the government reserves the right to seek alternative services if the contractor cannot meet response times.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

DRAFT

Back-up Crane Vessel Services

19 December 2025 Part 1

General Information

1. GENERAL: This is a non-personnel services contract to provide USACE, Seattle District, Navigation Section, a back-up crane vessel to fill in for the M/V PUGET when it is out of service, and assist M/V PUGET when requested, for the collection of floating debris within Puget Sound and its Tributary Waters.

The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The Contractor shall provide all management, personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and applicable licenses and permits necessary for crane services, as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract. Collected debris is to be off-loaded onto Government barges located at the Hiram M. Chittenden Locks, 3015 NW 54th St., Seattle, WA 98107. Crane services need to occur at this location and may occur throughout Puget Sound.

1.2 Scope and Services: The Contractor shall provide a self-propelled floating crane vessel and crew capable of three primary missions: (1) Scheduled equipment removal and installation work at the Hiram M.

Chittenden Locks, (2) On-call collection of floating debris in the Puget Sound area, and (3) Emergency Response Services.

1.2.1 Vessel and Crane Requirements:

• The required vessel must accommodate a maximum draft of seven (7) feet for navigating shallow waters. The vessel should be equipped with a crane capable of a minimum reach and lifting capacity of 10,000 lbs. at 70 feet and 20,000 lbs. at 40 feet from the crane's center. This vessel would primarily service the central Puget Sound area. Specific target locations include the Lake Washington Ship Canal, Coast Guard Sector Puget Sound, Pier 66, Bremerton, and the police ponds on Lake Washington, where debris concentrations are known to be high. On-site direction and oversight of the locations of work will be provided. General rigging equipment for various sizes to complete lifts in the above ranges will be the responsibility of the Contractor. Custom rigging or spreader bars for specific component lifts may be provided when deemed necessary by Government.

• The vessel shall have a minimum 30-foot beam, based on debris storage barge beam of 30 foot, to maximize storage capacity. Deck capacity shall be at least 60 tons to minimize mobilization and de-mobilization costs. Vessel must comply with EM 385-1-1 requirements.

• Crane shall have a minimum capacity of 20 tons after floating plant deductions. Crane must comply with EM 385-1-1 requirements.

• Government crews may be deployed with small craft in areas such as Everett, Tacoma, and Olympia to tow logs to designated secure storage locations or directly to Contractor vessel.

Once enough logs have accumulated, the derrick barge can be activated for removal.

Government will determine when derrick barges are at capacity. However, it should be noted that this collection method is less efficient, as "on the fly" debris removal accounts for approximately 90% of the total collection volume. Due to the specialized nature of the mission, the ability to predict debris locations is limited, making precise timing a significant factor. Continuous, daily operations are typically conducted across a broad area of the Sound.

1.2.2 Service and Personnel Requirements:

• On-call debris collection services require a minimum of one (1) month notice from the Government for activation. These service periods are estimated to span up to 30 non-consecutive days per year, typically allocated in 4-day consecutive increments Monday through Thursday or 1-day increments for specific work.

• Upon notification of an Emergency Service Request, the Contractor shall immediately (within four (4) hours) notify the Contracting Officer or designated representative of their availability.

If the Contractor is engaged in other priority work, they shall provide an estimated time of availability. The Government reserves the right to procure services from another source if the Contractor is unable to meet the required response time.

• Scheduled crane services should occur on a schedule agreed on between Government and Contrator and planned at least one (1) month in advance of work.Vessel Captain/Master must maintain a Merchant Mariner Credential for the vessel capacity operated IAW EM 385-1-1.

• Crane Operator must maintain a license for the type of crane operated IAW EM 385-1-1.

• Deckhands/riggers must be properly trained and designated in proper rigging and chainsaw operations IAW EM 385-1-1.

• Debris shall be cut into approximate 26-foot lengths, with all root balls removed.

• Collected debris shall be offloaded onto Government debris barges at the Hiram M.

Chittenden Locks, 3015 NW 54th St., Seattle WA 98107.

• The work area is Puget Sound and its Tributary Waters, WA. A map of the authorized operating area will be provided.

1.3 Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and two (2) 12-month option years. The Period of Performance reads as follows:

Base Year: 1 February 2026 – 31 January 2027 Option Year 1: 1 February 2027 – 31 January 2028 Option Year 2: 1 February 2028 – 31 January 2029

*Note: Period of Performance will be adjusted at award if necessary.

1.4 General Information

1.4.1 Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is the means by which they assure themselves that their work complies with the requirement of the contract. After acceptance of the quality control plan, the Contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to his QC system.

1.4.2 Quality Assurance: The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.4.3 Recognized Holidays: Contractor will not perform on the following holidays:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day

Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day

1.4.4 Hours of Operation: The Contractor is responsible for conducting business, between the hours of 0700 to 1730 Monday through Thursday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.4.4.1 Inclement Weather: If the Operations Project Manager cancels work for Federal employees at the Lake Washington Ship Canal Project due to inclement weather, the Contractor is excused from performing duties that day. If the Operations Project Manager allows Federal employees to leave work early due to inclement weather, the Contractor is excused from performing duties for the remainder of the day.

ContractorsStaff members scheduled to work will be paid for canceled work due to inclement weather.

1.4.5 Place of Performance: The work to be performed under this contract will be performed within Lake Washington Ship Canal, the Ballard Locks, and the Puget Sound and its Tributary Waters, WA.

1.4.6 Type of Contract: The Government will award a service contract for a base year with 2 option year awards.

1.4.7 Security Requirements:

1.4.7.1 General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)).

Contract personnel are critical to the overall security and safety of U.S. Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts.

The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five

(5) business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering Federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

1.4.7.2 Antiterrorism (AT) Level I training: All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).

1.4.7.3 Physical security and access control requirements: All contract personnel requiring physical access to a Federal installation or facility shall comply with the access control procedures of that location.

Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the U.S. shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to Government-owned property shall comply with key and lock control procedures of the

RA.

1.4.7.4 Suspicious Activity Reporting training (e.g. iWatch Corps Watch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

1.4.7.5 Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E- Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

1.4.9 Key Control: Not Applicable

1.4.10 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.4.11 Contracting Officer Representative / Contract Performance Specialist (COR/CPS): The COR/CPS will be identified by separate letter. The COR/CPS monitors all technical aspects of the contract and assists in contract administration. The COR/CPS is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements (including Government drawings, designs, specifications), monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR/CPS, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR/CPS, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR/CPS is not authorized to change any of the terms and conditions of the resulting order.

1.4.12 Key Personnel: The following personnel are considered key personnel by the Government. The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the Contracting Officer. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.

1.4.13 Identification of Contractor Employees: Not Applicable

1.4.14 Contractor Travel: Not Applicable

1.4.15 Other Direct Costs: Not Applicable

1.4.16 Data Rights: Not Applicable

1.4.17 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.4.18 PHASE IN/PHASE OUT PERIOD: Not Applicable.

1.4.19 Environmental and Conservation Considerations: Contractor shall incorporate environmentally responsible practices into all operations where they are able. This includes the use of products/methods that minimize harm to human health and the environment. Efforts should be made to conserve water, energy, and materials wherever feasible.

1.4.20 Safety: All work, equipment and vehicles shall comply with applicable safety regulations as set forth in EM 385-1-1, “Safety and Health Requirements Manual.” A copy of this manual may be downloaded from the internet. EM 385-1-1 (latest edition) is public domain material.

https://www.usace.army.mil/Missions/Safety-and-Occupational-Health/Safety-and-Health-Requirements- Manual/ https://www.usace.army.mil/Missions/Safety-and-Occupational-Health/Safety-and-Health-Requirements-Manual/ https://www.usace.army.mil/Missions/Safety-and-Occupational-Health/Safety-and-Health-Requirements-Manual/

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE / CONTRACT PERFORMANCE

SPECIALIST (COR/CPS). An employee of the U.S. Government appointed by the Contracting Officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications.

This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the PWS.

2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.

2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12. WORK WEEK. Monday through Thursday, unless specified otherwise.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf CPS Contract Performance Specialist DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer LWSC Lake Washington Ship Canal OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: Moorage for a self-propelled floating crane vessel two (2) weeks prior and two (2) weeks after scheduled work.

3.2 Facilities: Docking area and debris barges at Lake Washington Ship Canal

3.3 Utilities: No utilities provided for moorage or otherwise.

3.4 Equipment: Not Applicable

3.5 Materials: Not Applicable

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all supplies, equipment, facilities, services, and personnel required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2 Secret Facility Clearance: Not Applicable

4.3. Materials: Not Applicable

4.4. Equipment: The Contractor shall provide needed equipment to meet the requirements in Section 5 of this PWS.

PART 5

SPECIFIC TASKS

5. Specific Tasks:

5.1. Task 1: Scheduled Lock Equipment Services. Provide crane vessel services for the scheduled removal and installation of equipment at the Hiram M. Chittenden Locks. The timeline below is for planning purposes; exact dates are subject to minor changes by the Government with notice.

5.1.1 Timeline and Scope:

Base Year Schedule

• February 2026: Pull four small lock south side floats (approx. 12,000 lbs each).

• March 2026: Reinstall the four small lock floats.

• April 2026: Install fish flume bulkheads (approx. 10,000 lbs each).

• May 2026: Install three (3) Small Bulkheads, one (1) Long Bulkhead, and one (1) Cofferdam (up to 14,000 lbs).

• September 2026: Remove fish flume bulkheads.

• November 2026: Large lock equipment installation/removal as necessary.

Option Year 1 Schedule

• February 2026: Pull four small lock north side floats (approx. 12,000lbs each).

• March 2027: Reinstall small lock floats

• April 2027: Install fish flume bulkheads (approx. 10,000lbs each).

• May 2027: Install 3 Small Bulkheads, 1 Long Bulkhead, and 1 Cofferdam (up to 14,000lbs)

• September 2027: Remove fish flume bulkheads.

• November 2027: Large lock equipment installation/removal as necessary.

NOTE: Option years 2: Follow a similar monthly schedule , with specific floats for removal/installation rotating annually.

5.2 Task 2: On-Call Back-Up Debris Collection. Provide on-call back-up crane vessel services for the collection of floating debris in Puget Sound and its tributary Waters.

5.2.1 Activation:

• The Government will provide a minimum of 30 days’ notice to activate on-call services.

• Upon activation, the Contractor will be tasked to collect debris from specified locations (e.g., Lake

Washington Ship Canal, Bremerton, etc.).

5.2.2 Operations:

• Retrieve floating debris, cut it to specified sizes (approx. 26-foot lengths), and transport it.

• Offload all collected debris onto Government-furnished barges at the Hiram M. Chittenden Locks.

• Report the estimated tonnage and composition of collected debris as specified in the Deliverables

Schedule (Technical Exhibit 2).

5.3 Task 3: Emergency Response Services (Not-To-Exceed/Hourly Rate). This task establishes a framework for providing crane vessel services for urgent or emergency situations that require a response in less than 24 hours. These services are considered outside the scope of the scheduled (Task 1) and standard on-call (Task 2) work.

5.3.1 Scope and Activation:

• The Government may request emergency services to address immediate and unforeseen operational needs, such as critical debris hazards, salvage assistance, or other urgent requirements as determined by the COR.

• Activation will be initiated by the COR via a direct phone call to the Contractor’s designated point of contact, followed by an e-mail confirmation.

5.3.2 Contractor Availability

• The Government acknowledges that the Contractor may have pre-existing commitments and cannot guarantee availability for every emergency request. The Contractor is not penalized for being unable to perform emergency work.

• Upon receiving a request, the Contractor shall have the “first right of refusal” and agrees to inform the COR of their availability status within four (4) hours of the initial call.

• If the Contractor accepts the task, they are expected to demonstrate a best-effort approach to mobilize and commence work as quickly as possible.

• The Government reserves the right to procure services from another source if the Contractor is unable to meet the required response time.

5.3.3 Pricing and Compensation

• Work performed under this task will be compensated at a pre-negotiated “Emergency Service Day Rate.”

This rate shall be inclusive of all personnel, equipment, and fuel, and will be paid as a day rate for each day the Contractor is engaged in emergency work with the Government.

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS):

6.1. The Contractor must abide by the requirements set forth in the USACE Safety Manual EM 385-1-1, with changes.

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. Attachment/Technical Exhibit List:

7.1. Attachment 1/Technical Exhibit 1 – Performance Requirements Summary

7.2. Attachment 2/Technical Exhibit 2 – Deliverables Schedule

TECHNICAL EXHIBIT 1

Performance Requirements Summary The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective (The Service required—usually a shall statement)

Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)

Method of Surveillance

PRS # 1.

The Contractor shall provide all personnel, equipment, supplies, transportation, tools, fuels, materials, supervision, licenses and permits necessary to provide back-up crane vessel services under this PWS.

Safely perform assigned missions IAW EM 385-1-1, with changes

Zero deviation from standard.

Random inspection by COR and debris vessel

M/V PUGET

Master.

PRS #2.

Collected debris is to be off-loaded onto Government barges located at the Hiram M. Chittenden Locks, 3015 NW 54 ST, and Seattle, WA 98107.

All collected debris is loaded onto debris storage barges.

Zero Deviation from Standard.

The CPS may perform inspections with the assistance of other USACE staff or subject area experts.

PRS #3

The Contractor shall report the tonnage and composition of the debris collected per service or weekly, dependent on job.

Provide reports of debris tonnage and composition collected to CPS.

Zero Deviation from Standard.

100% inspection by

CPS.

Electronic records are preferred.

PRS #4

The Contractor shall provide all management, personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and applicable licenses and permits necessary to remove and reinstall lock floats, bulkheads, and necessary lock equipment.

Provide USACE, Seattle District, Navigation Section, a back-up crane vessel to fill in for the M/V PUGET when it is out of service or unavailable to provide the service.

Zero Deviation from Standard.

The CPS may perform inspections with the assistance of other USACE staff or subject area experts.

TECHNICAL EXHIBIT 2

Deliverables Schedule

Deliverable Frequency # of Copies Medium/Format Submit to Quality Control Plan Once, prior to start of work 1 Digital (PDF) Contracting Officer (KO) and COR Proof of

Licenses/Credentials Annually and upon personnel change

1 Digital (PDF) COR

Debris Collection Report

Weekly during active debris collection periods

1 Digital (E-mail/Excel) COR

QASP Details Per assignment 1 Digital COR Lifting Plan?

AHA’s? Critical Lift Plans? Standard Lift Plans? Certificate of

Compliance? Not sure all what we need, but should make sure this is complete