FBO_Posting_Decon.pdf

PDF 18 KB Posted

Attached to
Radiological Decontamination Solutions
Solicitation number
LTP-7-13-15
Issued by

About this file

Radiological Decontamination Solutions

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

UNCLASSIFIED.

Notice for Federal Business Opportunities (Note: fields in bold purple below are mandatory within the FBO system.)

General Information

Document Type: Sources Sought

Solicitation Number: LTP-7/13/15 Title: Radiological Decontamination Solutions

Response Date: 1:00PM MST, Thursday, August 6th, 2015.

Classification Code: 68 Set Aside: N/A

NAICS: 562910

Is this a Recovery Act project? (select: Yes / No)

Contracting Office Address

Department of Energy, Los Alamos National Laboratory (DOE Contractor), PO Box 1663 MS D442, Los Alamos, NM 87545.

Description:

Los Alamos National Laboratory (LANL) is seeking qualified subcontractors to provide decontamination support (e.g., chemical solutions, technical direction, etc.) that results in reducing the waste classification of certain components (carbon steel vessels (Bolas Grande), metal glove boxes, kynar lined glove boxes) from transuranic waste levels down to low level waste (LLW) levels. The subcontractor shall provide a decontamination process and recommendations that are consistent with standard industry practices, health and safety, and environmental regulatory requirements. Specifically, the process shall identify a method of decontamination for metal surfaces and kynar lined surfaces (including removal of kynar lining if needed to reach LLW levels) which will minimize waste generation, will utilize to the extent possible non-hazardous chemicals, and will include a waste management plan that ensures any and all wastes generated in the process can be managed in compliance, and have an existing path forward for disposal in compliance with State and Federal regulations. The process shall also minimize worker exposure to the fullest extent possible utilizing industry practices for ALARA and in compliance with DOE requirements. The subcontractor shall provide a Technical Consultant to observe decontamination activities and dry runs performed by LANL decontamination personnel. Subcontractor Technical Consultant shall provide verbal and written technical advice and training on decontamination solution application, decontamination methods and techniques, solution removal and cleanup, and proper disposal of the solution after use. The subcontractor will not directly perform hands-on decontamination work other than the offsite preparation of appropriate decontamination solutions. The decontamination process will occur within existing LANL facilities (e.g., permacon structures) within an operational Category II nuclear facility.

UNCLASSIFIED

UNCLASSIFIED.

Point Of Contact:

Ashley Pryor Los Alamos National Security, LLC Los Alamos National Laboratory P.O. Box 1663, Mail Stop M992 Los Alamos, NM 87545-1663 Phone: (505) 665-9164 Email: apryor@lanl.gov

File details come from the government source that posted it. Updated .