Lockhart Taylor Center Renovations
Solicitation number
76-76-20241213
Issued by
Alleghany County, North Carolina

About this file

This is a Request for Letters of Interest and SF-254s from South Piedmont Community College for architectural design services for interior renovations of the Lockhart-Taylor Center in Wadesboro, NC. Responses are due by January 9th, 2025 at 4:00 pm EDT, with submissions required both in hard copy (2 copies) and searchable PDF format. The project involves comprehensive interior renovations including cosmetic updates, safety/security improvements, and infrastructure repairs. Key elements include new flooring, ceiling modifications, ADA compliance upgrades, technology infrastructure improvements, HVAC updates, and security enhancements. The selection criteria emphasize expertise in old building remodels, past performance, design approach, staff adequacy, current workload, construction administration capabilities, and familiarity with the region.

The project budget is $1,000,000, funded through State SCIF (State Capital and Infrastructure Fund). The scope notes that funding must be used for capital improvements with a minimum 10-year useful life or facility life extension. Specific improvements include installation of lactation/wellness rooms, LVT/LVP flooring throughout, ceiling modifications, foyer redesign, ADA compliance upgrades, security system enhancements, and infrastructure repairs including exterior ramp replacement and low-voltage system upgrades. The project requires a multiphase approach beginning with advance planning followed by schematic design, design development, and construction documents.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department/Agency South Piedmont Community College Project Name Lockhart-Taylor Center, Wadesboro, NC Invitation # Design Services Architectural Design Services

Scope Letters of Interest and SF-254s will be received until Thursday, January 9th, 2025, 4:00 pm. EDT at the Front Desk, A Building, OCH Campus, 4209 Old Charlotte Highway, Monroe, NC 28110, Attn: Erik Dagenhart, Construction Manager: The college is seeking architectural services for interior renovations of the building. Please see supplemental document for a list of wants and needs. It is meant to be exhaustive but not all inclusive. Advance planning and best use of funds will be crucial to the success of this project.

Contact Erik Dagenhart, Construction Manager and Capital Project Coordinator Telephone 704.290.1713 Email edagenhart@spcc.edu Project Budget: $1,000,000 Source of Funds State SCIF Publish Date December 10, 2024 Closing Date January 9, 2025

SELECTION CRITERIA

The pre-selection committee will take into consideration qualification information including the following factors (Please address each in your response):

1. Specialized or appropriate expertise in old building remodels

2. Past performance on similar projects

3. Proposed design approach

4. Adequate staff and proposed design or consultant team for the project

5. Current workload and/or current SCO projects

6. Construction administration capabilities and approach

7. Proximity to and familiarity with Anson County

8. Record of successfully completed projects without major legal or technical problems

9. Prior experience with SCO and NCCCS projects

10. Prior experience with South Piedmont Community College

No binders needed. A single staple in the top left corner is preferred. Thank you.

Submit two (2) copies of Letter of Interest not exceeding 10 pages (8.5” X 11”) double-sided.

The SF-254 and cover letter will not count in the maximum 10 pages.

Submit 2 copies of Letter of Interest and SF-254 to:

Submit a searchable PDF file of the same via email to:

South Piedmont Community College Attn: Erik Dagenhart, Construction Manager, CPC Physical Address:

South Piedmont Community College 4209 Old Charlotte Highway, A1106 Monroe, NC 28110 edagenhart@spcc.edu

AND

mailto:mjohnson@gtcc.edu

Lockhart Taylor, Meeting Notes Updated, 11/18/2024

Ideas COSMETIC / INTERIOR / non-ADA Related College wide lactation/wellness room typical, this has sort of been developed for A / Braswell / Main, one coming for ASEPTIC and the CENTER

Finishes, carpet, flooring, lighting LVT, LVP, is preferable to carpet Remodeling additional areas of the building Furniture is not in good shape and is a priority Maybe Anson County sales Tax for furniture?

Lowering or new ceilings Update the entire foyer / entrance interior Conference room and workroom adjacent needs updating Entire building has an open ceiling; sprinkler would need to be reengineered; acoustical ceiling tiles?

Additional sound deadening?

Additional vending area upstairs

LVT foyer, common hallways, classrooms, better quality carpet squares

Design ideas for the FOYER, currently efficient; needs more intentional purpose

BLET flooring for similar areas like the MATT ROOM, braswell?

SAFETY / SECURITY / ADA Related Access Control Exterior cameras, blue light cameras/phones, interior camera upgrades Do we need more DUKE owned lights, reposition existing?

ADA route outside to access other areas of the building. Is there space for an interior lift?

Portion of total budget to ADA compliance?

Upper-level restrooms need to be upgraded, ADA compliant?

DIRECT PROGRAM Related TECH in addition to the Anson County Sales Tax $25k

‘smartboards and displays’ (seven or eight?)

Focusing on classrooms Room certification will need to be maintained Multiphase approach, AP first and then SD-DD-CD Classroom 208 is not used? Not certified for use?

INFRASTRUCTURE REPAIR/UPGRADES

Water tower removal, cost dependent?

Metal building at the back of the property Conference room tech to make it a better meeting place HVAC improvements, ventilation, LIGHTING Entrance up the concrete stairs Interior staircase is the only way to move between floors and needs improvement

VAULT NEEDS TO REMAIN

IAQ needed at the end of the project?

Updating the entrance ramp and the stairs Breakroom near JAN is it utilized?

Need to invest in the low-voltage infrastructure; data closets need to be properly outfitted

The exterior ramp needs attention, replace not repair!

Awning and loading dock roof in bad shape

SO

U

TH

P

IE

D

M O

N T

CO

M

M U

N

IT

Y

CO

LL

EG

E | 2

M A

ST

ER

P

LA

N

1 100

N W a s h i n g t o n S t r e e t

E C a s w e l l S t r e e t

LOCKHART-TAYLOR CENTER - OPPORTUNITIES FOR IMPROVEMENTS

Screen water treatment & perform environmental assessment

SPCC planting pockets of concentrated colorful plantings

Enhance frontage, walkway improvements Enhance pedestrian circulation through parking Enhance key entry points, consider limiting vehicular access

Lockhart-Taylor Center

EVP-LTC-Renovations
CapitalProjectIdeas-11182024