LRSCleaningGearPWS_20230307.docx
DOCX document 17 KB Posted
- Attached to
- Mobility Gear Laundry Service BPA Federal contract opportunity
- Solicitation number
- FA468623Q0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 Terms and Conditions.docx | DOCX document | |
| Laundry Service Measurements and Pictures.pdf | ||
| LRS Mobility Gear Cleaning Price List.docx | DOCX document | |
| RFQ Combo Mobility Gear Cleaning 1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9th Logistics Readiness Squadron
Lot 9 – Organizational Laundry- 9th Logistics Readiness Squadron
– Contractor Supplied
– Pick up and Deliver as needed to B1023, 19300 Lockheed Drive Beale AFB CA
Description of items needing cleaning:
CBRN Top - nylon and cotton main body, poplin main body, slide fastener and hook-pile fastener tape front, full lined, (pocket w/flap; hood w/drawcord closure; elbow patch; sleeve tab closures; drawcord bottom closure; non-flame resistant)
CBRN Bottoms - nylon and cotton main body, poplin main body, slide fastener and hook-pile fastener tape front, full lined, (pocket w/flap; hood w/drawcord closure; elbow patch; sleeve tab closures; drawcord bottom closure; non-flame resistant)
White Glove Inserts - 100% cotton, knitted, white
Sleeping Bag - rip stop nylon fabrics and insulation. (5 pcs) 1 patrol sleeping bag, foliage green or coyote brown ; 1 intermediate cold weather bag, 1 urban gray; 1 stuff stack, large, foliage green; 1 stuff stack, small, 1 foliage green; bivy cover, universal camouflage pattern
Table 1
Location: Bldg 1023, 19300 Lockheed Drive, Beale AFB, CA
| Description |
| Supplied by |
| Counted by |
| Method of Finish |
| CBRN Top |
| Government |
| Individual |
| WDF |
| CBRN Bottoms |
| Government |
| Individual |
| WDF |
| White Glove Inserts |
| Government |
| Weight (lbs) |
| WD |
| Sleeping Bag |
| Government |
| Individual |
| WDR |
General. The contractor shall accomplish laundry/linen services for the 9th LRS Mr. Charles Henry or Kirk Madgic are authorized Representatives for 9 LRS. Specific requirements as follows:
Pickup. The contractor shall pick up items listed in Table 1 above between 0700-1500 (PST), as requested from the locations listed in Table 1 above. Pickup and delivery should be accomplished per request. The contractor shall furnish a signed pickup/delivery ticket that summarizes all laundry/linen counted by weight (lbs.) and/or by article to the Authorized Caller
Delivery. The contractor shall deliver items stated in Table 1 between 0700-1500 (PST), as required to the same locations identified in Table 1 above. Delivery shall be accomplished no later than (NLT) fourteen (14) weekdays from the date of pickup. The contractor shall furnish a signed pickup/delivery ticket.
Pickup/Delivery Schedule. will be during the weekdays between 0700-1500 (PST). The contractor shall submit a pickup/delivery schedule for the approval by the Contracting Officer prior to start of performance. Modifications to the pickup/delivery schedule shall be submitted allowing no less than five (5) business days for approval.
Loss or Damage (Count-of-Articles). Equitable adjustment for lost or damaged items counted by ‘count of articles’ method shall be in accordance with DFARS clause 252.237-7014, Loss or Damage (Count-of-Articles). See contract clauses for full details.
Loss or damage (Weight of Articles). Equitable adjustment for lost or damaged items counted by “weight of article” method shall be in accordance with DFARS clause 252.237-7015, Loss or damage (weight of articles). See contract clauses for full details.
Carts Used to Transport Linen. The contractor shall supply all necessary carts, or similar conveyances, tubs, bags, or similar containers to transport laundry/linen during pickup and delivery. All items used for the transportation of laundry/linen shall be kept clean and serviceable at all times. These same clean containers shall be easily distinguishable by markings and shall never contain any items or laundry that have not been cleaned IAW this scope of work other directives described in the Performance Work Statement.
Item Finish. The contractor shall deliver laundry/linen in accordance with the methods of finish described in table below.
METHOD OF FINISH CODES
WDF Wash, dry, fold WP Wrap finished work in clear film seal I Pressed on flatwork ironing equipment WK Wrap finished work in kraft paper P Pressed on commercial pressing equip PB Return in plastic garment bag D Tumbled Dry W Wash in warm water T Tie items with twine/string R Roll S Starch F Fold NS No Starch WD Wash & Dry HS Heavy Starch BB Bleached MS Medium Starch NB No Bleach LS Light Starch FB Folded and bundled OH Return finished work on hanger SC Sorted by Color CF Clear film sealed DC Dry Cleaned
File details come from the government source that posted it. Updated .