Attachment 1 Revised Bid Schedule 20120823.xls

XLS spreadsheet 148 KB Posted

Attached to
Airfield Pavements/Systems Federal contract opportunity
Solicitation number
LRAFB-FA4460-12-R-0006
Issued by
Department of the Air Force Air Mobility Command

About this file

Attachment 1 Revised Bid Schedule 23 Aug 12

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total NKAK 10-1091(B+1-4)

AIRFIELD PAVEMENTS SYSTEM IDIQ
Project:NKAK 10-1091(1-4) Basic + 4 Option Years
ProjectSection B TotalPages
Base YearNKAK 10-10913
Option Year 1NKAK 10-1091-13
Option Year 2NKAK 10-1091-23
Option Year 3NKAK 10-1091-33
Option Year 4NKAK 10-1091-43
TOTAL15

&C&"Times New Roman,Bold"&11FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104&R

Solicitation No.: FA4460-12-R-0006 &LAttachment 1 Revised Bid Schedule Overall Total 23 Aug 12

&C&"Times New Roman,Bold"&11

FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104

Base Year NKAK 10-1091

AIRFIELD PAVEMENTS SYSTEMS
BASE YEAR
(Contract Award - 1 May 2013)
ALL LINE ITEMS MUST FILLED IN TO BE CONSIDER RESPONSIVE
PRIMARYESTSource: Option Year 4 Pricing from NKAK 04-1009
ITEMSUPPLIES/SERVICESSPECQTYUNITUNIT PRICEUNIT PRICEAMOUNT
Source Bold Items: Last Year of NKAK 04-1009 the EPA was applied which was option year 2
0001FURNISH ALL PLANT, LABOR, MATERIAL NECESSARY TO PERFORM ALL ALTERATIONS AS OUTLINED IN SPECIFICATIONS AND PLANS NKAK 10-1091
0001AAGIS AND AS-BUILT01 11 00 & 01 33 002EA
0001ABDOWNTIME01 14 195HR$1,335.00
0001ACROCK EXCAVATION01 50 0030CY$198.11
0001ADADEQ NOTICE OF INTENT PERMIT FEE01 57 232EA$400.00
0001AESTORMWATER POLLUTION PREVENTION PLAN01 57 232EA$1,000.00
0001AFEROSION CONTROL PLAN01 57 232EA$1,000.00
0001AGSILT FENCE BARRIER01 57 232000LF$4.37
0001AHSTRAW BALE BARRIER01 57 23200LF$6.33
0001AICOARSE ROCK DITCH CHECK01 57 2320CY$113.55
0001AJGRAVEL STORM INLET FILTER01 57 2310EA$356.53
0001AKASPHALT REMOVAL02 60 00200SY$5.44
0001ALTEMPORARY LIGHTING26 01 502EA$26,556.95
0001AMBLANKING EDGE LIGHTS26 01 5030EA$122.83
0001ANDISTANCE TO GO MARKER26 01 5012EA$234.00
0001AOAIRFIELD LIGHTING CABLE SPLICE26 56 205EA$128.68
0001AP5KV-#8-L824 CABLE26 56 2015CLF$401.00
0001AQ#4 CU B.C. COUNTERPOISE26 56 2015CLF$418.22
0001ARRUNWAY EDGE LIGHT26 56 201EA$1,520.81
0001ASCOMBINATION RUNWAY EDGE LIGHT AND THRESHOLD LIGHT26 56 201EA$4,011.17
0001ATTHRESHOLD LIGHT26 56 201EA$2,702.37
0001AUTAXIWAY EDGE LIGHT26 56 2010EA$1,755.00
0001AVL-867 BASE26 56 202EA$2,105.75
0001AWL-868 BASE26 56 202EA$2,573.68
0001AXLIGHT BASE EXTENSION FROM 1/8" TO 3"26 56 204EA$514.73
0001AYLIGHT BASE EXTENSION FROM 3-1/8" TO 6"26 56 204EA$935.88
0001AZLIGHT BASE EXTENSION FROM 6-1/8" TO 9"26 56 204EA$1,228.35
0001BAISOLATION TRANSFORMER 200 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$584.92
0001BBISOLATION TRANSFORMER 150 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$584.92
0001BCISOLATION TRANSFORMER 100 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$584.92
0001BDISOLATION TRANSFORMER 30-45 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$526.43
0001BEISOLATION TRANSFORMER 10-15 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$526.43
0001BFL-823 CONNECTORS26 56 2012EA$128.67
0001BGOBSTRUCTION LIGHT, SINGLE26 56 202EA$2,189.97
0001BHOBSTRUCTION LIGHT, DOUBLE26 56 202EA$2,033.21
0001BIHOLD SIGN26 56 201EA$6,408.48
0001BJGUIDANCE SIGN26 56 201EA$6,408.48
0001BKADDITIONAL SIGN EXTENSION26 56 202EA$6,061.03
0001BL2" PVC FOR CONCRETE ENCASEMENT26 56 20500LF$33.41
0001BM4" PVC FOR CONCRETE ENCASEMENT26 56 20100LF$34.74
0001BN2" RIGID GALVANIZED STEEL CONDUIT26 56 20100LF$31.59
0001BO2" PVC CONDUIT RUN AT 24" DEPTH BETWEEN LIGHT FIXTURE BASE CANS26 56 202000LF$16.98
0001BPRELAMP EXISTING FIXTURE THRESHOLD OR EDGE LIGHT26 56 2012EA$245.67
0001BQBASE PLATE, LOAD INSTALLED, Jaquith Industries Inc., 46,000 PSI yield strength, corrosion resistant coating26 56 206EA$245.67
0001BRFRICTION TEST32 01 112EA
0001BSRUBBER REMOVAL32 01 12302000SF$51.67
0001BTPAINT REMOVAL32 01 123000SF
0001BUCONCRETE REPAIRS, LAYOUT32 01 152EA
0001BVREMOVAL AND DISPOSAL OF CONCRETE PAVEMENT AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE32 01 15600CY$368.79
0001BWCONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 15” THICK NON-REINFORCED CONCRETE PAVEMENT32 01 155200SF$19.03
0001BXCONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 17” THICK NON-REINFORCED CONCRETE PAVEMENT32 01 153700SF$19.62
0001BYCONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 22” THICK NON-REINFORCED CONCRETE PAVEMENT32 01 152500SF$22.63
0001BZNEW 1-1/4” X 20” DOWELS32 01 15250EA$14.03
0001CANEW 1-1/2” X 20” DOWELS32 01 15250EA$18.71
0001CBNEW 2” X 24” DOWELS32 01 15100EA$27.69
0001CCREINFORCEMENT / TIE BAR (#5 BAR)32 01 15100LF
0001CDFULL DEPTH, PARTIAL SLAB, EPOXY ON FACE OF CONCRETE SLAB TO BE TIED TO32 01 15200SF
0001CECONCRETE REPAIR, PARTIAL DEPTH, SPALL REPAIR32 01 151800SF$46.78
0001CFCONCRETE REPAIR, PARTIAL DEPTH, WHEN GOVERNMENT ELECTS TO GO FULL DEPTH AFTER CONCRETE REMOVAL32 01 15300SF
0001CGCOLD MILLING ASPHALT PVMTS32 01 1615000SY$5.77
0001CHHAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED ASPHALT MILLINGS32 01 16200CY
0001CIREMOVAL OF CONCRETE PAVEMENT AND CRUSHED TO SPECIFICATIONS AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE32 01 1750CY
0001CJHAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED CRUSHED CONCRETE32 01 17500CY
0001CKASPHALT PAVING FABRIC32 01 18500SY$3.65
0001CLCRACK ROUTING AND SEALING32 01 192000LF$6.73
0001CMJOINT CLEANING AND SEALING32 01 1910531LF$3.00
0001CNHOT-APPLIED SEALANT FOR ASPHALT CRACK REPAIR32 01 20500LF
0001COBITUMINOUS REJUVENATOR32 01 228,000GAL$0.00
0001CPGROOVING FOR AIRFIELD PAVEMENTS32 01 2645000SY$3.00
0001CQGRADED-CRUSHED AGGREGATE BASE COURSE32 11 231000TON$36.00
0001CRLIME SOIL STABILIZATION32 11 306000SY$9.00
0001CSLOW COMPRESSION CONCRETE (INCLUDES POLYETHELENE SHEETING)32 11 361400SY$51.44
0001CTBITUMINOUS PRIME AND TACK COAT32 12 102000GAL$3.65
0001CUHOT MIX ASPHALT GRADATION 132 12 15500TON$124.06
0001CVHOT MIX ASPHALT GRADATION 232 12 151000TON
0001CWHOT MIX ASPHALT GRADATION 332 12 15495TON
0001CXTEMPORARY PAVEMENT MARKINGS32 17 245000SF$3.33
0001CYBARRICADES32 17 2445EA$169.62
0001CZCLOTH OR PLYWOOD CROSSES32 17 246EA$1,528.00
0001DAPAVEMENT MARKINGS32 17 2415000SF$1.46
0001DBGRADING32 22 005000SY$10.00
0001DCFILL MATERIAL32 22 00500CY$33.41
0001DDFESCUE SOD32 92 23 & 32 22 004000SY
0001DEFESCUE HYDROSEEDING32 92 20 & 32 22 004000SY$5.00
0001DF6" PIPE UNDERDRAIN33 46 16500LF
0001DGFILTER FABRIC33 46 166000SY
0001DHEXCAVATION33 46 16100CY
0001DI1.5 INCH MINUS GRADATION POROUS BACKFILL33 46 16500CY
0001DJ2-3 INCH GRADATION POROUS BACKFILL33 46 16500CY
0001DKAIRCRAFT TIEDOWN AND GROUNDING ROD INSTALLED IN EXISTING PAVEMENT34 73 1330EA$584.92
0001DLAIRCRAFT TIEDOWN AND GROUNDING ROD INSTALLED IN NEW PAVEMENT34 73 1310EA$321.00
TOTAL NOT TO EXCEED AMOUNT FOR ITEMS 0001AA THROUGH 0001DL

&LAttachment 1 Revised Bid Schedule (BASE YEAR) 23 Aug 12

&CPage &P of &N

&"Times New Roman,Bold"&11FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104

Option Year 1 NKAK 10-1091-1

AIRFIELD PAVEMENTS SYSTEMS IDIQ
OPTION YEAR 1
(1 Jun 2013 - 31 May 2014)
ALL LINE ITEMS MUST FILLED IN TO BE CONSIDER RESPONSIVE
PRIMARYESTSource: Option Year 4 Pricing from NKAK 04-1009
ITEMSUPPLIES/SERVICESSPECQTYUNITUNIT PRICEUNIT PRICEAMOUNT
Source Bold Items: Last Year of NKAK 04-1009 the EPA was applied which was option year 2
1001FURNISH ALL PLANT, LABOR, MATERIAL NECESSARY TO PERFORM ALL ALTERATIONS AS OUTLINED IN SPECIFICATIONS AND PLANS NKAK 10-1091
1001AAGIS AND AS-BUILT01 11 00 & 01 33 002EA
1001ABDOWNTIME01 14 195HR$1,335.00
1001ACROCK EXCAVATION01 50 0030CY$198.11
1001ADADEQ NOTICE OF INTENT PERMIT FEE01 57 232EA$400.00
1001AESTORMWATER POLLUTION PREVENTION PLAN01 57 232EA$1,000.00
1001AFEROSION CONTROL PLAN01 57 232EA$1,000.00
1001AGSILT FENCE BARRIER01 57 232000LF$4.37
1001AHSTRAW BALE BARRIER01 57 23200LF$6.33
1001AICOARSE ROCK DITCH CHECK01 57 2320CY$113.55
1001AJGRAVEL STORM INLET FILTER01 57 2310EA$356.53
1001AKASPHALT REMOVAL02 60 00200SY$5.44
1001ALTEMPORARY LIGHTING26 01 502EA$26,556.95
1001AMBLANKING EDGE LIGHTS26 01 5030EA$122.83
1001ANDISTANCE TO GO MARKER26 01 5012EA$234.00
1001AOAIRFIELD LIGHTING CABLE SPLICE26 56 205EA$128.68
1001AP5KV-#8-L824 CABLE26 56 2015CLF$401.00
1001AQ#4 CU B.C. COUNTERPOISE26 56 2015CLF$418.22
1001ARRUNWAY EDGE LIGHT26 56 201EA$1,520.81
1001ASCOMBINATION RUNWAY EDGE LIGHT AND THRESHOLD LIGHT26 56 201EA$4,011.17
1001ATTHRESHOLD LIGHT26 56 201EA$2,702.37
1001AUTAXIWAY EDGE LIGHT26 56 2010EA$1,755.00
1001AVL-867 BASE26 56 202EA$2,105.75
1001AWL-868 BASE26 56 202EA$2,573.68
1001AXLIGHT BASE EXTENSION FROM 1/8" TO 3"26 56 204EA$514.73
1001AYLIGHT BASE EXTENSION FROM 3-1/8" TO 6"26 56 204EA$935.88
1001AZLIGHT BASE EXTENSION FROM 6-1/8" TO 9"26 56 204EA$1,228.35
1001BAISOLATION TRANSFORMER 200 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$584.92
1001BBISOLATION TRANSFORMER 150 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$584.92
1001BCISOLATION TRANSFORMER 100 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$584.92
1001BDISOLATION TRANSFORMER 30-45 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$526.43
1001BEISOLATION TRANSFORMER 10-15 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$526.43
1001BFL-823 CONNECTORS26 56 2012EA$128.67
1001BGOBSTRUCTION LIGHT, SINGLE26 56 202EA$2,189.97
1001BHOBSTRUCTION LIGHT, DOUBLE26 56 202EA$2,033.21
1001BIHOLD SIGN26 56 201EA$6,408.48
1001BJGUIDANCE SIGN26 56 201EA$6,408.48
1001BKADDITIONAL SIGN EXTENSION26 56 202EA$6,061.03
1001BL2" PVC FOR CONCRETE ENCASEMENT26 56 20500LF$33.41
1001BM4" PVC FOR CONCRETE ENCASEMENT26 56 20100LF$34.74
1001BN2" RIGID GALVANIZED STEEL CONDUIT26 56 20100LF$31.59
1001BO2" PVC CONDUIT RUN AT 24" DEPTH BETWEEN LIGHT FIXTURE BASE CANS26 56 202000LF$16.98
1001BPRELAMP EXISTING FIXTURE THRESHOLD OR EDGE LIGHT26 56 2012EA$245.67
1001BQBASE PLATE, LOAD INSTALLED, Jaquith Industries Inc., 46,000 PSI yield strength, corrosion resistant coating26 56 206EA$245.67
1001BRFRICTION TEST32 01 112EA
1001BSRUBBER REMOVAL32 01 12302000SF$51.67
1001BTPAINT REMOVAL32 01 123000SF
1001BUCONCRETE REPAIRS, LAYOUT32 01 152EA
1001BVREMOVAL AND DISPOSAL OF CONCRETE PAVEMENT AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE32 01 15600CY$368.79
1001BWCONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 15” THICK NON-REINFORCED CONCRETE PAVEMENT32 01 155200SF$19.03
1001BXCONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 17” THICK NON-REINFORCED CONCRETE PAVEMENT32 01 153700SF$19.62
1001BYCONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 22” THICK NON-REINFORCED CONCRETE PAVEMENT32 01 152500SF$22.63
1001BZNEW 1-1/4” X 20” DOWELS32 01 15250EA$14.03
1001CANEW 1-1/2” X 20” DOWELS32 01 15250EA$18.71
1001CBNEW 2” X 24” DOWELS32 01 15100EA$27.69
1001CCREINFORCEMENT / TIE BAR (#5 BAR)32 01 15100LF
1001CDFULL DEPTH, PARTIAL SLAB, EPOXY ON FACE OF CONCRETE SLAB TO BE TIED TO32 01 15200SF
1001CECONCRETE REPAIR, PARTIAL DEPTH, SPALL REPAIR32 01 151800SF$46.78
1001CFCONCRETE REPAIR, PARTIAL DEPTH, WHEN GOVERNMENT ELECTS TO GO FULL DEPTH AFTER CONCRETE REMOVAL32 01 15300SF
1001CGCOLD MILLING ASPHALT PVMTS32 01 1615000SY$5.77
1001CHHAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED ASPHALT MILLINGS32 01 16200CY
1001CIREMOVAL OF CONCRETE PAVEMENT AND CRUSHED TO SPECIFICATIONS AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE32 01 1750CY
1001CJHAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED CRUSHED CONCRETE32 01 17500CY
1001CKASPHALT PAVING FABRIC32 01 18500SY
1001CLCRACK ROUTING AND SEALING32 01 192000LF$3.65
1001CMJOINT CLEANING AND SEALING32 01 1910531LF$6.73
1001CNHOT-APPLIED SEALANT FOR ASPHALT CRACK REPAIR32 01 20500LF$3.00
1001COBITUMINOUS REJUVENATOR32 01 228,000GAL
1001CPGROOVING FOR AIRFIELD PAVEMENTS32 01 2645000SY$0.00
1001CQGRADED-CRUSHED AGGREGATE BASE COURSE32 11 231000TON$3.00
1001CRLIME SOIL STABILIZATION32 11 306000SY$36.00
1001CSLOW COMPRESSION CONCRETE (INCLUDES POLYETHELENE SHEETING)32 11 361400SY$9.00
1001CTBITUMINOUS PRIME AND TACK COAT32 12 102000GAL$51.44
1001CUHOT MIX ASPHALT GRADATION 132 12 15500TON$3.65
1001CVHOT MIX ASPHALT GRADATION 232 12 151000TON$124.06
1001CWHOT MIX ASPHALT GRADATION 332 12 15230TON
1001CXTEMPORARY PAVEMENT MARKINGS32 17 245000SF
1001CYBARRICADES32 17 2445EA$3.33
1001CZCLOTH OR PLYWOOD CROSSES32 17 246EA$169.62
1001DAPAVEMENT MARKINGS32 17 2415000SF$1,528.00
1001DBGRADING32 22 005000SY$1.46
1001DCFILL MATERIAL32 22 00500CY$10.00
1001DDFESCUE SOD32 92 23 & 32 22 004000SY$33.41
1001DEFESCUE HYDROSEEDING32 92 20 & 32 22 004000SY
1001DF6" PIPE UNDERDRAIN33 46 16500LF$5.00
1001DGFILTER FABRIC33 46 166000SY
1001DHEXCAVATION33 46 16100CY
1001DI1.5 INCH MINUS GRADATION POROUS BACKFILL33 46 16500CY
1001DJ2-3 INCH GRADATION POROUS BACKFILL33 46 16500CY
1001DKAIRCRAFT TIEDOWN AND GROUNDING ROD INSTALLED IN EXISTING PAVEMENT34 73 1330EA$584.92
1001DLAIRCRAFT TIEDOWN AND GROUNDING ROD INSTALLED IN NEW PAVEMENT34 73 1310EA$321.00
TOTAL NOT TO EXCEED AMOUNT FOR ITEMS 1001AA THROUGH 1001DL

Solicitations No.: FA4460-12-R-0006 &LAttachment 1 Revised Bid Schedule (OPTION YEAR 1)

SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104

Option Year 2 NKAK 10-1091-2

AIRFIELD PAVEMENTS SYSTEMS IDIQ
OPTION YEAR 2
(1 Jun 2014 - 31 May 2015)
ALL LINE ITEMS MUST FILLED IN TO BE CONSIDER RESPONSIVE
PRIMARYESTSource: Option Year 4 Pricing from NKAK 04-1009
ITEMSUPPLIES/SERVICESSPECQTYUNITUNIT PRICEUNIT PRICEAMOUNT
Source Bold Items: Last Year of NKAK 04-1009 the EPA was applied which was option year 2
2001FURNISH ALL PLANT, LABOR, MATERIAL NECESSARY TO PERFORM ALL ALTERATIONS AS OUTLINED IN SPECIFICATIONS AND PLANS NKAK 10-1091
2001AAGIS AND AS-BUILT01 11 00 & 01 33 002EA
2001ABDOWNTIME01 14 195HR$1,335.00
2001ACROCK EXCAVATION01 50 0030CY$198.11
2001ADADEQ NOTICE OF INTENT PERMIT FEE01 57 232EA$400.00
2001AESTORMWATER POLLUTION PREVENTION PLAN01 57 232EA$1,000.00
2001AFEROSION CONTROL PLAN01 57 232EA$1,000.00
2001AGSILT FENCE BARRIER01 57 232000LF$4.37
2001AHSTRAW BALE BARRIER01 57 23200LF$6.33
2001AICOARSE ROCK DITCH CHECK01 57 2320CY$113.55
2001AJGRAVEL STORM INLET FILTER01 57 2310EA$356.53
2001AKASPHALT REMOVAL02 60 00200SY$5.44
2001ALTEMPORARY LIGHTING26 01 502EA$26,556.95
2001AMBLANKING EDGE LIGHTS26 01 5030EA$122.83
2001ANDISTANCE TO GO MARKER26 01 5012EA$234.00
2001AOAIRFIELD LIGHTING CABLE SPLICE26 56 205EA$128.68
2001AP5KV-#8-L824 CABLE26 56 2015CLF$401.00
2001AQ#4 CU B.C. COUNTERPOISE26 56 2015CLF$418.22
2001ARRUNWAY EDGE LIGHT26 56 201EA$1,520.81
2001ASCOMBINATION RUNWAY EDGE LIGHT AND THRESHOLD LIGHT26 56 201EA$4,011.17
2001ATTHRESHOLD LIGHT26 56 201EA$2,702.37
2001AUTAXIWAY EDGE LIGHT26 56 2010EA$1,755.00
2001AVL-867 BASE26 56 202EA$2,105.75
2001AWL-868 BASE26 56 202EA$2,573.68
2001AXLIGHT BASE EXTENSION FROM 1/8" TO 3"26 56 204EA$514.73
2001AYLIGHT BASE EXTENSION FROM 3-1/8" TO 6"26 56 204EA$935.88
2001AZLIGHT BASE EXTENSION FROM 6-1/8" TO 9"26 56 204EA$1,228.35
2001BAISOLATION TRANSFORMER 200 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$584.92
2001BBISOLATION TRANSFORMER 150 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$584.92
2001BCISOLATION TRANSFORMER 100 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$584.92
2001BDISOLATION TRANSFORMER 30-45 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$526.43
2001BEISOLATION TRANSFORMER 10-15 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$526.43
2001BFL-823 CONNECTORS26 56 2012EA$128.67
2001BGOBSTRUCTION LIGHT, SINGLE26 56 202EA$2,189.97
2001BHOBSTRUCTION LIGHT, DOUBLE26 56 202EA$2,033.21
2001BIHOLD SIGN26 56 201EA$6,408.48
2001BJGUIDANCE SIGN26 56 201EA$6,408.48
2001BKADDITIONAL SIGN EXTENSION26 56 202EA$6,061.03
2001BL2" PVC FOR CONCRETE ENCASEMENT26 56 20500LF$33.41
2001BM4" PVC FOR CONCRETE ENCASEMENT26 56 20100LF$34.74
2001BN2" RIGID GALVANIZED STEEL CONDUIT26 56 20100LF$31.59
2001BO2" PVC CONDUIT RUN AT 24" DEPTH BETWEEN LIGHT FIXTURE BASE CANS26 56 202000LF$16.98
2001BPRELAMP EXISTING FIXTURE THRESHOLD OR EDGE LIGHT26 56 2012EA$245.67
2001BQBASE PLATE, LOAD INSTALLED, Jaquith Industries Inc., 46,000 PSI yield strength, corrosion resistant coating26 56 206EA$245.67
2001BRFRICTION TEST32 01 112EA
2001BSRUBBER REMOVAL32 01 12302000SF$51.67
2001BTPAINT REMOVAL32 01 123000SF
2001BUCONCRETE REPAIRS, LAYOUT32 01 152EA
2001BVREMOVAL AND DISPOSAL OF CONCRETE PAVEMENT AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE32 01 15600CY$368.79
2001BWCONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 15” THICK NON-REINFORCED CONCRETE PAVEMENT32 01 155200SF$19.03
2001BXCONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 17” THICK NON-REINFORCED CONCRETE PAVEMENT32 01 153700SF$19.62
2001BYCONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 22” THICK NON-REINFORCED CONCRETE PAVEMENT32 01 152500SF$22.63
2001BZNEW 1-1/4” X 20” DOWELS32 01 15250EA$14.03
2001CANEW 1-1/2” X 20” DOWELS32 01 15250EA$18.71
2001CBNEW 2” X 24” DOWELS32 01 15100EA$27.69
2001CCREINFORCEMENT / TIE BAR (#5 BAR)32 01 15100LF
2001CDFULL DEPTH, PARTIAL SLAB, EPOXY ON FACE OF CONCRETE SLAB TO BE TIED TO32 01 15200SF
2001CECONCRETE REPAIR, PARTIAL DEPTH, SPALL REPAIR32 01 151800SF$46.78
2001CFCONCRETE REPAIR, PARTIAL DEPTH, WHEN GOVERNMENT ELECTS TO GO FULL DEPTH AFTER CONCRETE REMOVAL32 01 15300SF
2001CGCOLD MILLING ASPHALT PVMTS32 01 1615000SY$5.77
2001CHHAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED ASPHALT MILLINGS32 01 16200CY
2001CIREMOVAL OF CONCRETE PAVEMENT AND CRUSHED TO SPECIFICATIONS AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE32 01 1750CY
2001CJHAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED CRUSHED CONCRETE32 01 17500CY
2001CKASPHALT PAVING FABRIC32 01 18500SY
2001CLCRACK ROUTING AND SEALING32 01 192000LF$3.65
2001CMJOINT CLEANING AND SEALING32 01 1910531LF$6.73
2001CNHOT-APPLIED SEALANT FOR ASPHALT CRACK REPAIR32 01 20500LF$3.00
2001COBITUMINOUS REJUVENATOR32 01 228,000GAL
2001CPGROOVING FOR AIRFIELD PAVEMENTS32 01 2645000SY$0.00
2001CQGRADED-CRUSHED AGGREGATE BASE COURSE32 11 231000TON$3.00
2001CRLIME SOIL STABILIZATION32 11 306000SY$36.00
2001CSLOW COMPRESSION CONCRETE (INCLUDES POLYETHELENE SHEETING)32 11 361400SY$9.00
2001CTBITUMINOUS PRIME AND TACK COAT32 12 102000GAL$51.44
2001CUHOT MIX ASPHALT GRADATION 132 12 15500TON$3.65
2001CVHOT MIX ASPHALT GRADATION 232 12 15770TON$124.06
2001CWHOT MIX ASPHALT GRADATION 332 12 15200TON
2001CXTEMPORARY PAVEMENT MARKINGS32 17 245000SF
2001CYBARRICADES32 17 2445EA$3.33
2001CZCLOTH OR PLYWOOD CROSSES32 17 246EA$169.62
2001DAPAVEMENT MARKINGS32 17 2415000SF$1,528.00
2001DBGRADING32 22 005000SY$1.46
2001DCFILL MATERIAL32 22 00500CY$10.00
2001DDFESCUE SOD32 92 23 & 32 22 004000SY$33.41
2001DEFESCUE HYDROSEEDING32 92 20 & 32 22 004000SY
2001DF6" PIPE UNDERDRAIN33 46 16500LF$5.00
2001DGFILTER FABRIC33 46 166000SY
2001DHEXCAVATION33 46 16100CY
2001DI1.5 INCH MINUS GRADATION POROUS BACKFILL33 46 16500CY
2001DJ2-3 INCH GRADATION POROUS BACKFILL33 46 16500CY
2001DKAIRCRAFT TIEDOWN AND GROUNDING ROD INSTALLED IN EXISTING PAVEMENT34 73 1330EA$584.92
2001DLAIRCRAFT TIEDOWN AND GROUNDING ROD INSTALLED IN NEW PAVEMENT34 73 1310EA$321.00
TOTAL NOT TO EXCEED AMOUNT FOR ITEMS 2001AA THROUGH 2001DL

&LAttachment 1 Revised Bid Schedule (OPTION YEAR 2)

SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104

Option Year 3 NKAK 10-1091-3

AIRFIELD PAVEMENTS SYSTEMS IDIQ
OPTION YEAR 3
(1 Jun 2015 - 31 May 2016)
ALL LINE ITEMS MUST FILLED IN TO BE CONSIDER RESPONSIVE
PRIMARYESTSource: Option Year 4 Pricing from NKAK 04-1009
ITEMSUPPLIES/SERVICESSPECQTYUNITUNIT PRICEUNIT PRICEAMOUNT
Source Bold Items: Last Year of NKAK 04-1009 the EPA was applied which was option year 2
3001FURNISH ALL PLANT, LABOR, MATERIAL NECESSARY TO PERFORM ALL ALTERATIONS AS OUTLINED IN SPECIFICATIONS AND PLANS NKAK 10-1091
3001AAGIS AND AS-BUILT01 11 00 & 01 33 002EA
3001ABDOWNTIME01 14 195HR$1,335.00
3001ACROCK EXCAVATION01 50 0030CY$198.11
3001ADADEQ NOTICE OF INTENT PERMIT FEE01 57 232EA$400.00
3001AESTORMWATER POLLUTION PREVENTION PLAN01 57 232EA$1,000.00
3001AFEROSION CONTROL PLAN01 57 232EA$1,000.00
3001AGSILT FENCE BARRIER01 57 232000LF$4.37
3001AHSTRAW BALE BARRIER01 57 23200LF$6.33
3001AICOARSE ROCK DITCH CHECK01 57 2320CY$113.55
3001AJGRAVEL STORM INLET FILTER01 57 2310EA$356.53
3001AKASPHALT REMOVAL02 60 00200SY$5.44
3001ALTEMPORARY LIGHTING26 01 502EA$26,556.95
3001AMBLANKING EDGE LIGHTS26 01 5030EA$122.83
3001ANDISTANCE TO GO MARKER26 01 5012EA$234.00
3001AOAIRFIELD LIGHTING CABLE SPLICE26 56 205EA$128.68
3001AP5KV-#8-L824 CABLE26 56 2015CLF$401.00
3001AQ#4 CU B.C. COUNTERPOISE26 56 2015CLF$418.22
3001ARRUNWAY EDGE LIGHT26 56 201EA$1,520.81
3001ASCOMBINATION RUNWAY EDGE LIGHT AND THRESHOLD LIGHT26 56 201EA$4,011.17
3001ATTHRESHOLD LIGHT26 56 201EA$2,702.37
3001AUTAXIWAY EDGE LIGHT26 56 2010EA$1,755.00
3001AVL-867 BASE26 56 202EA$2,105.75
3001AWL-868 BASE26 56 202EA$2,573.68
3001AXLIGHT BASE EXTENSION FROM 1/8" TO 3"26 56 204EA$514.73
3001AYLIGHT BASE EXTENSION FROM 3-1/8" TO 6"26 56 204EA$935.88
3001AZLIGHT BASE EXTENSION FROM 6-1/8" TO 9"26 56 204EA$1,228.35
3001BAISOLATION TRANSFORMER 200 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$584.92
3001BBISOLATION TRANSFORMER 150 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$584.92
3001BCISOLATION TRANSFORMER 100 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$584.92
3001BDISOLATION TRANSFORMER 30-45 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$526.43
3001BEISOLATION TRANSFORMER 10-15 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$526.43
3001BFL-823 CONNECTORS26 56 2012EA$128.67
3001BGOBSTRUCTION LIGHT, SINGLE26 56 202EA$2,189.97
3001BHOBSTRUCTION LIGHT, DOUBLE26 56 202EA$2,033.21
3001BIHOLD SIGN26 56 201EA$6,408.48
3001BJGUIDANCE SIGN26 56 201EA$6,408.48
3001BKADDITIONAL SIGN EXTENSION26 56 202EA$6,061.03
3001BL2" PVC FOR CONCRETE ENCASEMENT26 56 20500LF$33.41
3001BM4" PVC FOR CONCRETE ENCASEMENT26 56 20100LF$34.74
3001BN2" RIGID GALVANIZED STEEL CONDUIT26 56 20100LF$31.59
3001BO2" PVC CONDUIT RUN AT 24" DEPTH BETWEEN LIGHT FIXTURE BASE CANS26 56 202000LF$16.98
3001BPRELAMP EXISTING FIXTURE THRESHOLD OR EDGE LIGHT26 56 2012EA$245.67
3001BQBASE PLATE, LOAD INSTALLED, Jaquith Industries Inc., 46,000 PSI yield strength, corrosion resistant coating26 56 206EA$245.67
3001BRFRICTION TEST32 01 112EA
3001BSRUBBER REMOVAL32 01 12302000SF$51.67
3001BTPAINT REMOVAL32 01 123000SF
3001BUCONCRETE REPAIRS, LAYOUT32 01 152EA
3001BVREMOVAL AND DISPOSAL OF CONCRETE PAVEMENT AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE32 01 15600CY$368.79
3001BWCONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 15” THICK NON-REINFORCED CONCRETE PAVEMENT32 01 155200SF$19.03
3001BXCONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 17” THICK NON-REINFORCED CONCRETE PAVEMENT32 01 153700SF$19.62
3001BYCONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 22” THICK NON-REINFORCED CONCRETE PAVEMENT32 01 152500SF$22.63
3001BZNEW 1-1/4” X 20” DOWELS32 01 15250EA$14.03
3001CANEW 1-1/2” X 20” DOWELS32 01 15250EA$18.71
3001CBNEW 2” X 24” DOWELS32 01 15100EA$27.69
3001CCREINFORCEMENT / TIE BAR (#5 BAR)32 01 15100LF
3001CDFULL DEPTH, PARTIAL SLAB, EPOXY ON FACE OF CONCRETE SLAB TO BE TIED TO32 01 15200SF
3001CECONCRETE REPAIR, PARTIAL DEPTH, SPALL REPAIR32 01 151800SF$46.78
3001CFCONCRETE REPAIR, PARTIAL DEPTH, WHEN GOVERNMENT ELECTS TO GO FULL DEPTH AFTER CONCRETE REMOVAL32 01 15300SF
3001CGCOLD MILLING ASPHALT PVMTS32 01 1615000SY$5.77
3001CHHAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED ASPHALT MILLINGS32 01 16200CY
3001CIREMOVAL OF CONCRETE PAVEMENT AND CRUSHED TO SPECIFICATIONS AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE32 01 1750CY
3001CJHAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED CRUSHED CONCRETE32 01 17500CY
3001CKASPHALT PAVING FABRIC32 01 18500SY
3001CLCRACK ROUTING AND SEALING32 01 192000LF$3.65
3001CMJOINT CLEANING AND SEALING32 01 1910531LF$6.73
3001CNHOT-APPLIED SEALANT FOR ASPHALT CRACK REPAIR32 01 20500LF$3.00
3001COBITUMINOUS REJUVENATOR32 01 228,000GAL
3001CPGROOVING FOR AIRFIELD PAVEMENTS32 01 2645000SY$0.00
3001CQGRADED-CRUSHED AGGREGATE BASE COURSE32 11 231000TON$3.00
3001CRLIME SOIL STABILIZATION32 11 306000SY$36.00
3001CSLOW COMPRESSION CONCRETE (INCLUDES POLYETHELENE SHEETING)32 11 361400SY$9.00
3001CTBITUMINOUS PRIME AND TACK COAT32 12 102000GAL$51.44
3001CUHOT MIX ASPHALT GRADATION 132 12 15500TON$3.65
3001CVHOT MIX ASPHALT GRADATION 232 12 15500TON$124.06
3001CWHOT MIX ASPHALT GRADATION 332 12 15200TON
3001CXTEMPORARY PAVEMENT MARKINGS32 17 245000SF
3001CYBARRICADES32 17 2445EA$3.33
3001CZCLOTH OR PLYWOOD CROSSES32 17 246EA$169.62
3001DAPAVEMENT MARKINGS32 17 2415000SF$1,528.00
3001DBGRADING32 22 005000SY$1.46
3001DCFILL MATERIAL32 22 00500CY$10.00
3001DDFESCUE SOD32 92 23 & 32 22 004000SY$33.41
3001DEFESCUE HYDROSEEDING32 92 20 & 32 22 004000SY
3001DF6" PIPE UNDERDRAIN33 46 16500LF$5.00
3001DGFILTER FABRIC33 46 166000SY
3001DHEXCAVATION33 46 16100CY
3001DI1.5 INCH MINUS GRADATION POROUS BACKFILL33 46 16500CY
3001DJ2-3 INCH GRADATION POROUS BACKFILL33 46 16500CY
3001DKAIRCRAFT TIEDOWN AND GROUNDING ROD INSTALLED IN EXISTING PAVEMENT34 73 1330EA$584.92
3001DLAIRCRAFT TIEDOWN AND GROUNDING ROD INSTALLED IN NEW PAVEMENT34 73 1310EA$321.00
TOTAL NOT TO EXCEED AMOUNT FOR ITEMS 3001AA THROUGH 3001DL

&C&"Times New Roman,Bold"&11FOR OFFICIAL USE ONLY SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104&RSolicitation No.: FA4460-12-R-0006 &LAttachment 1 Revised Bid Schedule (OPTION YEAR 3)

SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104

Option Year 4 NKAK 10-1091-4

AIRFIELD PAVEMENTS SYSTEMS IDIQ
OPTION YEAR 4
(1 Jun 2016 - 31 May 2017)
ALL LINE ITEMS MUST FILLED IN TO BE CONSIDER RESPONSIVE
PRIMARYESTSource: Option Year 4 Pricing from NKAK 04-1009
ITEMSUPPLIES/SERVICESSPECQTYUNITUNIT PRICEUNIT PRICEAMOUNT
Source Bold Items: Last Year of NKAK 04-1009 the EPA was applied which was option year 2
4001FURNISH ALL PLANT, LABOR, MATERIAL NECESSARY TO PERFORM ALL ALTERATIONS AS OUTLINED IN SPECIFICATIONS AND PLANS NKAK 10-1091
4001AAGIS AND AS-BUILT01 11 00 & 01 33 002EA
4001ABDOWNTIME01 14 195HR$1,335.00
4001ACROCK EXCAVATION01 50 0030CY$198.11
4001ADADEQ NOTICE OF INTENT PERMIT FEE01 57 232EA$400.00
4001AESTORMWATER POLLUTION PREVENTION PLAN01 57 232EA$1,000.00
4001AFEROSION CONTROL PLAN01 57 232EA$1,000.00
4001AGSILT FENCE BARRIER01 57 232000LF$4.37
4001AHSTRAW BALE BARRIER01 57 23200LF$6.33
4001AICOARSE ROCK DITCH CHECK01 57 2320CY$113.55
4001AJGRAVEL STORM INLET FILTER01 57 2310EA$356.53
4001AKASPHALT REMOVAL02 60 00200SY$5.44
4001ALTEMPORARY LIGHTING26 01 502EA$26,556.95
4001AMBLANKING EDGE LIGHTS26 01 5030EA$122.83
4001ANDISTANCE TO GO MARKER26 01 5012EA$234.00
4001AOAIRFIELD LIGHTING CABLE SPLICE26 56 205EA$128.68
4001AP5KV-#8-L824 CABLE26 56 2015CLF$401.00
4001AQ#4 CU B.C. COUNTERPOISE26 56 2015CLF$418.22
4001ARRUNWAY EDGE LIGHT26 56 201EA$1,520.81
4001ASCOMBINATION RUNWAY EDGE LIGHT AND THRESHOLD LIGHT26 56 201EA$4,011.17
4001ATTHRESHOLD LIGHT26 56 201EA$2,702.37
4001AUTAXIWAY EDGE LIGHT26 56 2010EA$1,755.00
4001AVL-867 BASE26 56 202EA$2,105.75
4001AWL-868 BASE26 56 202EA$2,573.68
4001AXLIGHT BASE EXTENSION FROM 1/8" TO 3"26 56 204EA$514.73
4001AYLIGHT BASE EXTENSION FROM 3-1/8" TO 6"26 56 204EA$935.88
4001AZLIGHT BASE EXTENSION FROM 6-1/8" TO 9"26 56 204EA$1,228.35
4001BAISOLATION TRANSFORMER 200 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$584.92
4001BBISOLATION TRANSFORMER 150 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$584.92
4001BCISOLATION TRANSFORMER 100 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$584.92
4001BDISOLATION TRANSFORMER 30-45 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$526.43
4001BEISOLATION TRANSFORMER 10-15 WATT 20/6.6A OR 6.6/6.6A26 56 201EA$526.43
4001BFL-823 CONNECTORS26 56 2012EA$128.67
4001BGOBSTRUCTION LIGHT, SINGLE26 56 202EA$2,189.97
4001BHOBSTRUCTION LIGHT, DOUBLE26 56 202EA$2,033.21
4001BIHOLD SIGN26 56 201EA$6,408.48
4001BJGUIDANCE SIGN26 56 201EA$6,408.48
4001BKADDITIONAL SIGN EXTENSION26 56 202EA$6,061.03
4001BL2" PVC FOR CONCRETE ENCASEMENT26 56 20500LF$33.41
4001BM4" PVC FOR CONCRETE ENCASEMENT26 56 20100LF$34.74
4001BN2" RIGID GALVANIZED STEEL CONDUIT26 56 20100LF$31.59
4001BO2" PVC CONDUIT RUN AT 24" DEPTH BETWEEN LIGHT FIXTURE BASE CANS26 56 202000LF$16.98
4001BPRELAMP EXISTING FIXTURE THRESHOLD OR EDGE LIGHT26 56 2012EA$245.67
4001BQBASE PLATE, LOAD INSTALLED, Jaquith Industries Inc., 46,000 PSI yield strength, corrosion resistant coating26 56 206EA$245.67
4001BRFRICTION TEST32 01 112EA
4001BSRUBBER REMOVAL32 01 12302000SF$51.67
4001BTPAINT REMOVAL32 01 123000SF
4001BUCONCRETE REPAIRS, LAYOUT32 01 152EA
4001BVREMOVAL AND DISPOSAL OF CONCRETE PAVEMENT AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE32 01 15600CY$368.79
4001BWCONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 15” THICK NON-REINFORCED CONCRETE PAVEMENT32 01 155200SF$19.03
4001BXCONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 17” THICK NON-REINFORCED CONCRETE PAVEMENT32 01 153700SF$19.62
4001BYCONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 22” THICK NON-REINFORCED CONCRETE PAVEMENT32 01 152500SF$22.63
4001BZNEW 1-1/4” X 20” DOWELS32 01 15250EA$14.03
4001CANEW 1-1/2” X 20” DOWELS32 01 15250EA$18.71
4001CBNEW 2” X 24” DOWELS32 01 15100EA$27.69
4001CCREINFORCEMENT / TIE BAR (#5 BAR)32 01 15100LF
4001CDFULL DEPTH, PARTIAL SLAB, EPOXY ON FACE OF CONCRETE SLAB TO BE TIED TO32 01 15200SF
4001CECONCRETE REPAIR, PARTIAL DEPTH, SPALL REPAIR32 01 151800SF$46.78
4001CFCONCRETE REPAIR, PARTIAL DEPTH, WHEN GOVERNMENT ELECTS TO GO FULL DEPTH AFTER CONCRETE REMOVAL32 01 15300SF
4001CGCOLD MILLING ASPHALT PVMTS32 01 1615000SY$5.77
4001CHHAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED ASPHALT MILLINGS32 01 16200CY
4001CIREMOVAL OF CONCRETE PAVEMENT AND CRUSHED TO SPECIFICATIONS AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE32 01 1750CY
4001CJHAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED CRUSHED CONCRETE32 01 17500CY
4001CKASPHALT PAVING FABRIC32 01 18500SY
4001CLCRACK ROUTING AND SEALING32 01 192000LF$3.65
4001CMJOINT CLEANING AND SEALING32 01 1910531LF$6.73
4001CNHOT-APPLIED SEALANT FOR ASPHALT CRACK REPAIR32 01 20500LF$3.00
4001COBITUMINOUS REJUVENATOR32 01 228,000GAL
4001CPGROOVING FOR AIRFIELD PAVEMENTS32 01 2645000SY$0.00
4001CQGRADED-CRUSHED AGGREGATE BASE COURSE32 11 231000TON$3.00
4001CRLIME SOIL STABILIZATION32 11 306000SY$36.00
4001CSLOW COMPRESSION CONCRETE (INCLUDES POLYETHELENE SHEETING)32 11 361400SY$9.00
4001CTBITUMINOUS PRIME AND TACK COAT32 12 102000GAL$51.44
4001CUHOT MIX ASPHALT GRADATION 132 12 15230TON$3.65
4001CVHOT MIX ASPHALT GRADATION 232 12 15500TON$124.06
4001CWHOT MIX ASPHALT GRADATION 332 12 15200TON
4001CXTEMPORARY PAVEMENT MARKINGS32 17 245000SF
4001CYBARRICADES32 17 2445EA$3.33
4001CZCLOTH OR PLYWOOD CROSSES32 17 246EA$169.62
4001DAPAVEMENT MARKINGS32 17 2415000SF$1,528.00
4001DBGRADING32 22 005000SY$1.46
4001DCFILL MATERIAL32 22 00500CY$10.00
4001DDFESCUE SOD32 92 23 & 32 22 004000SY$33.41
4001DEFESCUE HYDROSEEDING32 92 20 & 32 22 004000SY
4001DF6" PIPE UNDERDRAIN33 46 16500LF$5.00
4001DGFILTER FABRIC33 46 166000SY
4001DHEXCAVATION33 46 16100CY
4001DI1.5 INCH MINUS GRADATION POROUS BACKFILL33 46 16500CY
4001DJ2-3 INCH GRADATION POROUS BACKFILL33 46 16500CY
4001DKAIRCRAFT TIEDOWN AND GROUNDING ROD INSTALLED IN EXISTING PAVEMENT34 73 1330EA$584.92
4001DLAIRCRAFT TIEDOWN AND GROUNDING ROD INSTALLED IN NEW PAVEMENT34 73 1310EA$321.00
TOTAL NOT TO EXCEED AMOUNT FOR ITEMS 4001AA THROUGH 4001DL

&LAttachment 1 Revised Bid Schedule (OPTION YEAR 4) 23 Aug 12

&CPage &P of &N

SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104

File details come from the government source that posted it. Updated .