This is a project specification document for litter removal and mowing maintenance services on the Louie Nunn Parkway and related state routes in Kentucky, involving multiple counties across three transportation districts. The project encompasses mowing and litter removal operations across 135.664 total miles of roadway, with work concentrated on the Louie Nunn Parkway (spanning from I-65 Overpass in Barren County to US 27 in Pulaski County), as well as KY 80 and KY 461 routes in Pulaski, Rockcastle, and Laurel Counties. The project requires three mowing cycles annually across 1,719.50 acres, with litter removal conducted on 135.6 miles of roadway at five removal cycles per route. A batwing mower is permitted on all routes, and contractors must complete each cycle within a maximum of 15 working days. The work is organized by county and district, with District 3 covering 36.159 miles, District 8 covering 88.422 miles, and District 11 covering 11.083 miles.

The document provides detailed specifications for maintenance scope but does not include pricing information, set-asides, incumbent contractor details, response dates, due dates, bidder meeting information, or award dates. No information regarding contract term, renewal options, or funding sources is contained in this project specification sheet.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1 of 2 Litter

Project Type 3 Number Removal Number Route Project Length Mowing of Cntrln of

Number System County Number Begin End (Miles) Acres Cycles Miles Cycles

Louie Nunn PKWY Barren FE01 005 9008 I-65 Overpass Metcalfe Co. Line 22.357 287.5 3 22.4 5 Parkway* 000-023 (MP 0.000) (MP 22.357)

Louie Nunn PKWY Metcalfe FE01 085 9008 Barren Co. Line Adair Co. Line 13.802 177 3 13.8 5 Parkway* 022-037 (MP 22.357) (MP 36.159)

Subtotal (District 3) 36.159 464.5 36.2

Louie Nunn PKWY Adair FE01 001 9008 Metcalfe Co. Line Russell Co. Line 21.632 252 3 21.6 5 Parkway* 036-058 (MP 36.159) (MP 57.791)

Louie Nunn PKWY Russell FE01 104 9008 Adair Co. Line Pulaski Co. Line 14.296 242 3 14.3 5 Parkway* 057-073 (MP 57.791) (MP 72.087)

Louie Nunn PKWY Pulaski FE01 100-9008 Russell Co. Line US 27 16.128 329 3 16.1 5 Parkway* 072-089 (MP 72.087) (MP 88.215)

Ky 80* MP Pulaski FE01 100 0080 KY 80X Laurel Co. Line 18.521 220 3 18.5 5

021-040 (MP 21.161) (MP 39.682)

KY 461* MP Pulaski FE01 100 0461 KY 80 Rockcastle Co. Line 8.441 38 3 8.4 5

000-009 (MP 0.000) (MP 8.441)

KY 461* MP Rockcastle FE01 102 0461 Pulaski Co. Line US 25E 9.404 64 3 9.4 5

000-010 (MP 0.000) (MP 9.404)

Subtotal (District 8) 88.422 1,145 88.3

Sheet 2 of 2 Litter

Project Type 3 Number Removal Number Route Project Length Mowing of Cntrln of

Number System County Number Begin End (Miles) Acres Cycles Miles Cycles

KY 80* MP Laurel FE01 063 0080 Pulaski Co. Line US 25E 11.083 110 3 11.1 5

000-012 (MP 0.000) (MP 11.083)

Subtotal (District 11) 11.083 110 11.1

Grand Total 135.664 1,719.50 135.6

Limits of Project

Maximum time to complete a cycle: 15 working days.

A batwing mower will be allowed on all routes.

Limits of Project

Louie Nunn Parkway Mowing Work Location Sheet

A batwing mower will be allowed on all routes.