Summary

This is a Request for Quotes issued by the City of Fayetteville, North Carolina for lot cleaning, asbestos abatement, and demolition services at five residential and commercial properties. The City solicits sealed bids for comprehensive demolition and site restoration work at 104 Fleishman Street, 419 Hall Street, 429 Chatham Street, 1299 Bingham Drive, and 5329 Murchison Road. The scope of work includes demolition of primary and accessory structures, removal of personal property and debris, vegetation clearing, grading and restoration, hazardous materials identification and abatement, disposal of all materials at approved facilities, and completion within thirty calendar days from the Notice to Proceed. Sealed proposals are due by 2:00 p.m. EST on August 25, 2026, submitted to the City Purchasing Office at 433 Hay Street, Fayetteville, NC 28301, with bid opening held at City Hall on the same date. Bidders must submit individual quotes for each property location on the Bid Proposal Package Form. The City reserves the right to reject any or all bids and award to the lowest responsive, responsible bidder considering quality, performance, and project timeline.

All pricing must include North Carolina sales and use taxes. Asbestos-containing building materials were identified at three of the five properties (104 Fleishman Street, 419 Hall Street, and 1299 Bingham Drive Unit A), requiring that asbestos abatement be performed by North Carolina-licensed personnel in accordance with applicable regulations. The work is funded locally by the City of Fayetteville. Bidders must submit required documentation including North Carolina Secretary of State registration, valid Certificate of Insurance issued within 30 days, three business references, safety protocols, General Contracting License if the proposal exceeds $40,000, documented demolition projects from the past three years, and heavy equipment listings with ownership status. The contract includes liquidated damages of $500.00 per calendar day for delays beyond the completion date and requires comprehensive insurance coverage including $1,000,000 per occurrence general liability, workers' compensation, and automobile liability insurance.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF FAYETTEVILLE

REQUEST FOR QUOTES

Lot Cleaning, Asbestos Abatement & Demolition

Various Addresses (104 Fleishman St., 419 Hall St., 429 Chatham St., 1299 Bingham Dr., and 5329 Murchison Rd.)

COF1517018

ISSUED: July 22, 2026

DUE: August 25, 2026

The City of Fayetteville is soliciting bids for lot cleaning at:

104 Fleishman St., 419 Hall St., 429 Chatham St., 1299 Bingham Dr., and 5329 Murchison Rd.

Funding Source: Local

ISSUED BY:

CITY OF FAYETTEVILLE

PRIMARY CONTACT:

KIMBERLY TOON, PURCHASING MANGER

kimberlytoon@fayettevillenc.gov

(910) 433-1942 mailto:kimberlytoon@fayettevillenc.gov

OFFERORS ARE NOT REQUIRED TO RETURN THIS FORM.

FAYETTEVILLE�

AMERICA'S CAN DO CITY

A message from the Ci(v of Fayetteville City Manager, Dr. Douglas J. Hewett, ICMA-CM

The City of Fayetteville is fully committed to providing Small Local Business Enterprises (SLBEs) and small businesses an equal opportunity to participate in all aspects of City contracting, including but not limited to participation in the procurement of contracts relating to construction, professional services, equipment, supplies, and improvements to facilities throughout the City.

It is the policy of the City to prohibit discrimination against any person or business in pursuit of these opportunities on the basis of race, sex, color, religion, national origin, age, or disability, and to conduct its contracting and purchasing programs so as to prevent such discrimination. The City is committed to following all applicable federal, state, and local laws as they relate to procurement practices.

Small Business Participation Commitment

The City will actively seek and identify qualified small businesses, including SLBEs, and offer them the opportunity to participate in the procurement of contracts for all City purchasing and service contracts as well as construction and repair contracts. The City aspires to spend 40% of its eligible contract dollars with small local suppliers and contractors.

Small Business Enterprise Program

The City's Charter has been amended by the General Assembly (H.B. 198) to establish a small business enterprise program to promote the development of small local businesses. The City is authorized to establish bid and proposal specifications that include measures to enhance participation by small business enterprises located in Cumberland and Hoke Counties, including:

• Arranging solicitations, specifications, and contract requirements to facilitate small business participation

• Providing technical assistance and capacity building programs

• Carrying out information and communication programs on contracting procedures and opportunities

• Implementing outreach programs to identify and engage qualified small businesses

• Offering supportive services to help small businesses compete effectively

• Ensuring prompt payment to subcontractors

• Simplifying bonding and insurance requirements where appropriate

Federal and State-Funded Projects - Important Notice

In accordance with state directive following the U.S. Department of Transportation's October 3, 2025 Interim Final Rule to 49 CFR Part 26:

NOTICE TO BIDDERS

Pursuant to N.C.G.S. 143-129 sealed proposals will be received by the City of Fayetteville, until 2:00 p.m., August 25, 2026, at City Hall, 433 Hay Street, Fayetteville, North Carolina, at which time they will be considered for the purchase of the following:

Demolition, Asbestos Abatement & Lot Cleaning

(104 Fleishman St., 419 Hall St., 429 Chatham St., 1299 Bingham Dr., and 5329 Murchison Rd. Fayetteville, NC)

Bids may be mailed to the City Purchasing Office, Attn: Kimberly Toon, 433 Hay Street Fayetteville, NC 2830l, or may be delivered in person or by express mail to 433 Hay Street, Fayetteville, NC 28301.

The bid opening will be held at 2:00 p.m. on August 25, 2026, at City Hall, 433 Hay Street, Fayetteville, NC 2830 I, for the project entitled, " Demolition, Asbestos Abatement & Lot Cleaning:

(104 Fleishman St., 419 Hall St., 429 Chatham St., 1299 Bingham Dr., and 5329 Murchison Rd.

Fayetteville, NC)."

Plans, specifications and bid documents may be obtained in the Purchasing Office of the City of Fayetteville, 2nd floor, City Hall, 433 Hay Street, Fayetteville, North Carolina, between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday or by email request to kimberlytoon@fayettevillenc.gov

The City reserves the right to reject any or all bids and to waive all informalities concerning bid or award bid to the lowest, responsive, responsible bidder or bidders, taking into consideration quality, performance and the time specified in the proposals for the performance of the contract.

City of Fayetteville

Kimberly Toon, CLGPO Purchasing Manager mailto:kimberlytoon@fayettevillenc.gov

Lot Cleaning, Asbestos Abatement & Demolition Bid Request

7/10/2026 The City of Fayetteville Housing and Code Enforcement Division is requesting lot cleaning, demolition & asbestos abatement bids to include, if necessary, all costs to conduct noted work on the properties listed below.

Scope of Work – Demolition Services The Contractor shall furnish all labor, materials, equipment, and supervision necessary to complete the demolition and site restoration work described herein. The bid price shall include, but not be limited to, the following:

1. Demolition The Contractor shall demolish and remove all primary and accessory structures on the property, including but not limited to wells, pump houses, fences, walls, signs, sign poles, foundations, basements, footings, pools, walkways, steps, and slabs, where applicable.

2. Removal of Personal Property and Debris The Contractor shall remove and properly dispose of all items remaining on site, including trailers, box trailers, junk vehicles, storage containers, construction materials, and fencing.

3. Pavement Unless otherwise specified in writing, all existing asphalt and concrete parking areas and driveways shall remain undisturbed.

4. Grading and Restoration All disturbed areas shall be graded smooth and stabilized to ensure proper drainage. Excavated areas shall be backfilled with approved material to match existing grades. All disturbed and former slab areas shall be seeded and mulched with straw.

5. Vegetation Clearing The Contractor shall remove all rubbish, debris, and overgrowth from the site, including tall grass, weeds, underbrush, limbs, logs, fallen trees, and organic debris piles. Vegetation shall be cut to property lines. All trees and saplings measuring less than three (3) inches in diameter shall be removed. No other large trees shall be disturbed.

Failure to fully clear vegetation may result in rejection of demolition work.

6. Disposal All materials and debris shall be transported and disposed of at approved landfills or recycling/processing facilities. Documentation of disposal (dump tickets or receipts) shall be submitted prior to final payment.

7. Safety and Site Requirements The Contractor shall install and maintain demolition security fencing as required (5329 MURCHISON RD). Where applicable, a site plan identifying fire hydrant location shall be provided to meet permitting requirements.

8. Hazardous Materials The Contractor shall include all costs associated with the identification and abatement of asbestos-containing materials. All such work must be performed by properly licensed personnel in accordance with applicable regulations.

9. Permits and Compliance The Contractor shall obtain, at their own expense, all necessary permits, licenses, bonds, insurance, inspections, engineering, and approvals required to complete the work. All work shall comply with applicable local, state, and federal laws, codes, and regulations.

10. Schedule All work shall be completed within thirty (30) calendar days from issuance of the Notice to Proceed, unless otherwise approved in writing. The Contractor shall coordinate required inspections with the City at both project commencement and completion.

11. Assignment The Contractor shall not assign, transfer, or subcontract any portion of this Agreement without prior written consent from the City, except for properly licensed asbestos abatement services.

1) 104 FLEISHMAN ST, PIN: 0419-20-9979-This project is for City of Fayetteville Code Enforcement and is the result of a

Council approved demolition ordinance. Residential structure. Upon inspection and testing, asbestos containing building materials needing abatement WAS found. Detailed report is included. ACRES: 0.14

2) 419 HALL ST, PIN: 0437-61-2196- This project is for City of Fayetteville Code Enforcement and is the result of a Council approved demolition ordinance. Residential structure. Upon inspection and testing, asbestos containing building materials needing abatement WAS found. Detailed report is included. ACRES: 0.23

3) 429 CHATHAM ST, PIN: 0437-56-3989- This project is for City of Fayetteville Code Enforcement and is the result of a Council approved demolition ordinance. Residential structure. Upon inspection and testing, asbestos containing building materials needing abatement WAS NOT found. Detailed report is included. ACRES: 0.19

4) 1299 BINGHAM DR, PIN: 0406-47-5257- This project is for City of Fayetteville Code Enforcement and is the result of a Council approved demolition ordinance. Residential structure. Upon inspection and testing, asbestos containing building materials needing abatement WAS found. Detailed report is included. ACRES: 0.19

5) 5329 MURCHISON RD, PIN: 0429-15-5344- This project is for City of Fayetteville Code Enforcement and is the result of a Council approved demolition ordinance. Commercial structure. Upon inspection and testing, asbestos containing building materials needing abatement WAS NOT found. Detailed report is included. ACRES: 0.83

6) END OF LIST/////

Bidders shall submit all quotes on Bid Proposal Package Form

Submit by Mail:

Submit in Person:

City Hall Offices

Purchasing Division

2nd Floor Purchasing Division

433 Hay Street, Fayetteville, NC 28301-5337

433 Hay Street, Fayetteville, NC 28301-5337

Attn: Kimberly Toon, Purchasing Manager

Attn: Kimberly Toon, Purchasing Manager

Submittal Deadline: 2:00 PM EST, August 25, 2026

If you have questions, please contact:

Kimberly Toon, CLGPO Purchasing Manager at COFBiddingQuestions@FayettevilleNC.gov mailto:COFBiddingQuestions@FayettevilleNC.gov

CITY OF FAYETTEVILLE

Demolition, Asbestos Abatement & Lot Cleaning

(104 Fleishman St., 419 Hall St., 429 Chatham St., 1299 Bingham Dr., and 5329 Murchison Rd. Fayetteville, NC)

BID PROPOSAL PACKAGE FORM

The undersigned hereby proposes to furnish materials and perform the work for this project per the items listed herein in strict accordance with the Standard Specifications, contained in the documents for the consideration of prices quoted for the enclosed contract items.

THE CITY RESERVES THE RIGHT TO ELIMINATE OR ADD TO THIS CONTRACT.

ALL PRICES ARE TO INCLUDE NC SALES AND USE TAXES

This Bid Package is executed by:

Name: _______________________________________ Title: ______________________________

Company Name: _________________________________________________________________

Address: _____________________________ Email: ____________________________________

Signature: __________________________________________________ Phone Number: _________________

License Number: _______________________________________

Address Bid Amount 104 FLEISHMAN ST, Fayetteville NC $ 419 HALL ST, Fayetteville NC $ 429 CHATHAM ST, Fayetteville NC $ 1299 BINGHAM DR, Fayetteville NC $ 5329 MURCHISON RD, Fayetteville NC $

ACKNOWLEDGMENT OF ADDENDA

The vendor has received, acknowledged, and used the following addenda in completing the Proposal.

(Initial and Date as appropriate)

Addendum No. 1 _______________________________ Dated: _______________________________ Addendum No. 2 _______________________________ Dated: _______________________________ Addendum No. 3 _______________________________ Dated: _______________________________

BIDDER'S CHECKLIST

This checklist shall be included as the first page of the submitted bidding documents. As outlined in the Bid Proposal, the following items shall be included with the fully executed Bid Proposal.

• If any of these documents are not included with the Bid Proposal, then the Proposal will automatically be deemed non-responsive, and excluded from consideration:

A Registration with the North Carolina Secretary of State

B Certificate of Insurance – Valid or Issued within the 30 days

C Three References

D Safety protocols and incident prevention measures

E Copy of General Contracting License (required only if the proposal exceeds $40,000)

F Documented demolition projects in the past 3 years

G Listing of heavy equipment and description needed to complete the project along with ownership status

H Physical location of the property

Filed Ordinance – 429 Chatham

Filed Ordinance – 104 Fleishman Street

Filed Ordinance – 419 Hall Street

Filed Ordinance – 5329 Murchison Road

Filed Ordinance – 5329 Bingham Drive

Aerial Map - 1299 Bingham Drive

Aerial Map – 5329 Murchison Road

Aerial Map – 429 Chatham Street

Aerial Map – 104 Fleishman Street

Aerial Map – 419 Hall Street

Signed Lis Pendes – 419 Hall Street

Signed Lis Pendes – 429 Chatham Street

Signed Lis Pendes – 1299 Bingham Drive

Signed Lis Pendes – 5329 Murchison Rd

Signed Lis Pendes – 104 Fleishman St

REPORT OF THE ASBESTOS SURVEY’s and

Bulk Asbestos Analysis for the following Addresses

• 104 Fleishman Street, Fayetteville NC

• 419 Hall Street, Fayetteville NC

• 429 Chatham Street, Fayetteville NC

• 1299 BINGHAM Drive, Fayetteville NC

0406-47-5257 UNIT-A

0406-47-5257 UNIT-B

0406-47-5257 UNIT-C

0406-47-5257 UNIT-D

• 5329 MURCHISON Road, Fayetteville NC

REPORT OF THE ASBESTOS SURVEY

COF - 104 Fleishman Street, Fayetteville NC 0419-20-9979

PURPOSE AND SCOPE

An asbestos survey was conducted on June 17, 2026. The purpose of the asbestos inspection of this structure was to locate the asbestos containing building materials (ACBM) to protect human health and the environment. Information in this report should be made available to persons that may come in contact with the asbestos containing materials (ACM) as a result of demolition, repairs, or a change in ownership.

PROJECT DESCRIPTION

A limited survey was performed on the interior and exterior space. No below grade inspection preformed. Not responsible for any ACBM found during demolition.

PROCEDURE

No building plans were available. I was given unlimited access to the Structure.

During the walk-through, areas of suspect materials were identified. Representative samples of these materials were collected and analyzed via Polarized Light Microscopy by an NVLAP accredited laboratory.

RESULTS

As you review the data, you will find the following materials were determined to have

ASBESTOS:

ACBM – Left rear bedroom Ceiling ACBM – Transite Siding

If this material is not rendered friable (reduced to powder by hand pressure, also interpreted as chipping, sanding, or grinding), the material does not have to be removed.

If, however, this material is made friable, i.e. during demolition, replacement, or renovations, a North Carolina accredited asbestos abatement contractor should perform the removal. Any questions concerning the removal should be directed to the number listed below.

The NESHAP regulation dated Tuesday, November 20, 1990, Part III Environmental Protection Agency, 40CFR Part 61, requires that any building being renovated or demolished be inspected for asbestos containing building materials.

NOTE: If this structure is going to be demolished, or moved an asbestos permit application and notification for demolition/renovation is required by law to be mailed to the address below 10 working days prior to demolition or asbestos abatement activities.

Health Hazards Control Branch Occupational and Environmental Epidemiology

Section NC Department of Environment Raleigh, NC, 27626-0820 Telephone: (919) 733-0820

An asbestos inspection is a judgement call based on the experience of the inspector. The survey is conducted by sampling substances known to contain asbestos or by sampling materials suspected of containing asbestos.

I the inspector assume no liability for asbestos materials that are not included in an asbestos inspection due to the material being inaccessible, concealed, or not considered suspect ACM. I the inspector assume no liability for the condition of the building materials before or after the inspection.

Sincerely, JTL 6-19-2026

John T. Leonard Asbestos Inspector NC Accreditation # 12254

COF - 419 Hall Street, Fayetteville NC 0437-61-2196

PURPOSE AND SCOPE

An asbestos survey was conducted on June 17, 2026. The purpose of the asbestos inspection of this structure was to locate the asbestos containing building materials (ACBM) to protect human health and the environment. Information in this report should be

PROCEDURE

No building plans were available. I was given unlimited access to the Structure.

During the walk-through, areas of suspect materials were identified. Representative

ACBM – Kitchen Ceiling ACBM – Felt Paper under Transite Siding ACBM – Transite Siding

If, however, this material is made friable, i.e. during demolition, replacement, or renovations, a North Carolina accredited asbestos abatement contractor should perform the removal. Any questions concerning the removal should be directed to the number listed below.

The NESHAP regulation dated Tuesday, November 20, 1990, Part III Environmental below 10 working days prior to demolition or asbestos abatement activities.

Health Hazards Control Branch

Occupational and Environmental Epidemiology Section NC Department of Environment Raleigh, NC, 27626-0820 Telephone: (919) 733-0820

An asbestos inspection is a judgement call based on the experience of the inspector. The survey is conducted by sampling substances known to contain asbestos or by sampling materials suspected of containing asbestos.

I the inspector assume no liability for asbestos materials that are not included in an asbestos inspection due to the material being inaccessible, concealed, or not

John T. Leonard

COF - 429 Chatham Street, Fayetteville NC 0437-56-3989

PURPOSE AND SCOPE

An asbestos survey was conducted on June 17, 2026. The purpose of the asbestos inspection of this structure was to locate the asbestos containing building materials (ACBM) to protect human health and the environment. Information in this report should be

PROCEDURE

No building plans were available. I was given unlimited access to the Structure.

During the walk-through, areas of suspect materials were identified. Representative

NO ACBM detected during survey…

If, however, this material is made friable, i.e. during demolition, replacement, or renovations, a North Carolina accredited asbestos abatement contractor should perform the removal. Any questions concerning the removal should be directed to the number listed below.

The NESHAP regulation dated Tuesday, November 20, 1990, Part III Environmental below 10 working days prior to demolition or asbestos abatement activities.

Health Hazards Control Branch Occupational and Environmental Epidemiology Section NC Department of Environment Raleigh, NC, 27626-0820

Telephone: (919) 733-0820

An asbestos inspection is a judgement call based on the experience of the inspector. The survey is conducted by sampling substances known to contain asbestos or by sampling materials suspected of containing asbestos.

I the inspector assume no liability for asbestos materials that are not included in an asbestos inspection due to the material being inaccessible, concealed, or not

John T. Leonard

COF - 1299 BINGHAM Drive, Fayetteville NC

0406-47-5257 UNIT-A

PURPOSE AND SCOPE

An asbestos survey was conducted on June 30, 2026. The purpose of the asbestos inspection of this structure was to locate the asbestos containing building materials (ACBM) to protect human health and the environment. Information in this report should be

PROCEDURE

No building plans were available. I was given unlimited access to the Structure.

During the walk-through, areas of suspect materials were identified. Representative

ACBM – Coating on kitchen sink

If, however, this material is made friable, i.e. during demolition, replacement, or renovations, a North Carolina accredited asbestos abatement contractor should perform the removal. Any questions concerning the removal should be directed to the number listed below.

The NESHAP regulation dated Tuesday, November 20, 1990, Part III Environmental below 10 working days prior to demolition or asbestos abatement activities.

Health Hazards Control Branch Occupational and Environmental Epidemiology

Telephone: (919) 733-0820

An asbestos inspection is a judgement call based on the experience of the inspector. The survey is conducted by sampling substances known to contain asbestos or by sampling materials suspected of containing asbestos.

I the inspector assume no liability for asbestos materials that are not included in an asbestos inspection due to the material being inaccessible, concealed, or not

JTL 7-2-2026

John T. Leonard

0406-47-5257 UNIT-B

PURPOSE AND SCOPE

An asbestos survey was conducted on June 30, 2026. The purpose of the asbestos inspection of this structure was to locate the asbestos containing building materials (ACBM) to protect human health and the environment. Information in this report should be

PROCEDURE

No building plans were available. I was given unlimited access to the Structure.

During the walk-through, areas of suspect materials were identified. Representative

ACBM – No Asbestos detected during this survey

If, however, this material is made friable, i.e. during demolition, replacement, or renovations, a North Carolina accredited asbestos abatement contractor should perform the removal. Any questions concerning the removal should be directed to the number listed below.

The NESHAP regulation dated Tuesday, November 20, 1990, Part III Environmental below 10 working days prior to demolition or asbestos abatement activities.

Health Hazards Control Branch Occupational and Environmental Epidemiology

Telephone: (919) 733-0820

An asbestos inspection is a judgement call based on the experience of the inspector. The survey is conducted by sampling substances known to contain asbestos or by sampling materials suspected of containing asbestos.

I the inspector assume no liability for asbestos materials that are not included in an asbestos inspection due to the material being inaccessible, concealed, or not

John T. Leonard

0406-47-5257 UNIT-C

PURPOSE AND SCOPE

An asbestos survey was conducted on June 30, 2026. The purpose of the asbestos inspection of this structure was to locate the asbestos containing building materials (ACBM) to protect human health and the environment. Information in this report should be

PROCEDURE

No building plans were available. I was given unlimited access to the Structure.

During the walk-through, areas of suspect materials were identified. Representative

If, however, this material is made friable, i.e. during demolition, replacement, or renovations, a North Carolina accredited asbestos abatement contractor should perform the removal. Any questions concerning the removal should be directed to the number listed below.

The NESHAP regulation dated Tuesday, November 20, 1990, Part III Environmental below 10 working days prior to demolition or asbestos abatement activities.

Health Hazards Control Branch Occupational and Environmental Epidemiology

Telephone: (919) 733-0820

An asbestos inspection is a judgement call based on the experience of the inspector. The survey is conducted by sampling substances known to contain asbestos or by sampling materials suspected of containing asbestos.

I the inspector assume no liability for asbestos materials that are not included in an asbestos inspection due to the material being inaccessible, concealed, or not

John T. Leonard

0406-47-5257 UNIT-D

PURPOSE AND SCOPE

An asbestos survey was conducted on June 30, 2026. The purpose of the asbestos inspection of this structure was to locate the asbestos containing building materials (ACBM) to protect human health and the environment. Information in this report should be

PROCEDURE

No building plans were available. I was given unlimited access to the Structure.

During the walk-through, areas of suspect materials were identified. Representative

If, however, this material is made friable, i.e. during demolition, replacement, or renovations, a North Carolina accredited asbestos abatement contractor should perform the removal. Any questions concerning the removal should be directed to the number listed below.

The NESHAP regulation dated Tuesday, November 20, 1990, Part III Environmental below 10 working days prior to demolition or asbestos abatement activities.

Health Hazards Control Branch Occupational and Environmental Epidemiology

Telephone: (919) 733-0820

An asbestos inspection is a judgement call based on the experience of the inspector. The survey is conducted by sampling substances known to contain asbestos or by sampling materials suspected of containing asbestos.

I the inspector assume no liability for asbestos materials that are not included in an asbestos inspection due to the material being inaccessible, concealed, or not

John T. Leonard

COF - 5329 MURCHISON Road, Fayetteville NC 0429-15-5344

PURPOSE AND SCOPE

An asbestos survey was conducted on June 17, 2026. The purpose of the asbestos inspection of this structure was to locate the asbestos containing building materials (ACBM) to protect human health and the environment. Information in this report should be

PROCEDURE

No building plans were available. I was given unlimited access to the Structure.

During the walk-through, areas of suspect materials were identified. Representative

NO ACBM detected during survey…

If, however, this material is made friable, i.e. during demolition, replacement, or renovations, a North Carolina accredited asbestos abatement contractor should perform the removal. Any questions concerning the removal should be directed to the number listed below.

The NESHAP regulation dated Tuesday, November 20, 1990, Part III Environmental below 10 working days prior to demolition or asbestos abatement activities.

Health Hazards Control Branch Occupational and Environmental Epidemiology Section

Telephone: (919) 733-0820

An asbestos inspection is a judgement call based on the experience of the inspector. The survey is conducted by sampling substances known to contain asbestos or by sampling materials suspected of containing asbestos.

I the inspector assume no liability for asbestos materials that are not included in an asbestos inspection due to the material being inaccessible, concealed, or not

John T. Leonard

Bulk Asbestos Analysis By Polarized Light Microscopy EPA Method: 600/R-93/116 and

40 CFR, Part 763, Subpart E, App.E

Lab Order ID:Attn: 10110789Customer: JTL Services 3999 Sanderosa Rd.

Fayetteville, NC 28312

Analysis:

Date Received:

Jay Leonard

PLM

06/18/2026

Project: COF 0419-20-9979 104 Fleishman Street Fayetteville NC

Date Reported: 06/18/2026

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos

Fibrous Components

Non-Fibrous Components Treatment

Attributes

10110789_0001

Ceiling Surfacing

2% Chrysotile 98% Other

Non-Fibrous

Crushed

Off-white

Homogeneous

10110789_0002

Ceiling Surfacing

None Detected 100% Other

Non-Fibrous

Crushed

Off-white

Homogeneous

10110789_0003

Ceiling Surfacing

None Detected 100% Other

Non-Fibrous

Crushed

Off-white

Homogeneous

10110789_0004

Joint Compound

None Detected 100% Other

Non-Fibrous

Crushed

White

Homogeneous

10110789_0005

Sheetrock

None Detected 100% Other

Non-Fibrous

Crushed

Gray

Homogeneous

10110789_0006

Roofing felt

None Detected 90% Cellulose 10% Other

Fibrous

Ashed

Black

Homogeneous

10110789_0007

Roofing Shingle

None Detected 10% Fiber Glass 90% Other

Non-Fibrous

Dissolved

Black

Homogeneous

10110789_0008

Felt

None Detected 90% Cellulose 10% Other

Fibrous

Ashed

Black

Homogeneous

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogenous soil samples be conducted by TEM for confirmation of "None Detected" by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program.

Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Leo Shaffer (9)

Analyst Approved Signatory

Page 1 of 2P-F-002 r15 1/15/2028 Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

EPA Method: 600/R-93/116 and

40 CFR, Part 763, Subpart E, App.E

Lab Order ID:Attn: 10110789Customer: JTL Services 3999 Sanderosa Rd.

Fayetteville, NC 28312

Analysis:

Date Received:

Jay Leonard

PLM

06/18/2026

Project: COF 0419-20-9979 104 Fleishman Street Fayetteville NC

Date Reported: 06/18/2026

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos

Fibrous Components

Non-Fibrous Components Treatment

Attributes

10110789_0009

Transite

10% Chrysotile 90% Other

Non-Fibrous

Crushed

Gray

Homogeneous

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogenous soil samples be conducted by TEM for confirmation of "None Detected" by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program.

Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Leo Shaffer (9)

Page 2 of 2P-F-002 r15 1/15/2028 Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

J:,. ~

Relinquished By

JTL services LLC Jotin Le~>nard 3999 Sariderosa~oad Fayetteville NC 28312 910-237-3519 moldservicesjtl@aol.com

COF 0419-20-9979

104 Fleishman Street Fayetteville NC

JQ<,a

1 Room ceiling surfacing 2 Room ceiling surfacing 3 Bathroom Ceiling Surfacing 4 Living room wall 5 Walls Sheetrock 6 Roofing Felt 7 Roofing Shingle 8 Outside wrap felt 9 Transite Siding

Ceiling Surfacing Ceiling Surfacing Ceiling Surfacing Joint Compound Sheetrock Roofing felt Roofing Shingle Felt Transite

Iv ll o7<B9 left rear right rear

Under siding l.\~C

Re~t•d - 0 ee I !(fl

Received By

L crJ a

0 Scientific Analytical Institute 4604 Dundas Dr. Greensboro, NC 27 407

Phone: 336.292.3888 Fax: 336.292.3313 www.sailab.com lab@sailab.com

Company Contact Information Company: J" 1 L Sexv\ c.a..~ LLC.. Contact: ::ro...\.j Le,on 0-v d-- Address: 3 q q q .s OJI\ Qe, V v '5 CL i<, oo.cl Phone 0: 9 I 0- a') 't -),c:, \ 9

~OJ../ e \ \~ : \ \..-e. N~ ato3\J,. Fax0:

\ I

Email B:m-o\O..SQ..t\J\Ut ·,+-I@..

owl·-c.1

Billing/Invoice Information Turn Around Times Company: L,Y e.cli-\- to.x o.., \'N\ ~ \ \ e., 90 Min. □ 48Hours D Contact: CJJ F 0 l{1q 2..,() qq7q 3 Hours □ 72Hours 0

Address: / Dl/ f- /-e1sh n,O..N ~~e'\ 6Hours □ 96Hours 0 ~~~i(-< ,-re_ 12 Hours S 120Hours D

24Hours D 144+Hours D

PO Number:

Project Name/Number:

Lab Use Only (') J /0 C, Lab Order ID: ___ .... _____ .... ll.__-J.-+ Client Code: ------

Asbestos Test Types PLM EPA 600/R-93/116 (PLM) i:l

Positive stop □ PLM Point Count 400 (PT4) □ PLM Point Count 1000 (PTM) □

(Y) PCM NlOSH 7400-A Rules (PCM) □ B Rules (PCB) 0 TWA(PTA)0

TEM AHERA (AHE) □

TEM Level II (Lil) □

TEM NIOSH 7402 (TNI) □

TEM Bulk Qualitative (TBL) □ TEM Bulk Chatfield (TBS) □ TEM Bulk Quantitative (TBQ) □ TEM Wipe ASTM D6480-05 □ TEM Microvac ASTM D5755-02 □ TEM Water EPA 100.2 (TWl) □ Other: □

Sample ID# Volume/ Area Comments

I ~ ~~ 2 (l,_ - ~ CJ

10-e-~~ ~5

Total # of Samples

Relinquished by Date/Time Received by Date/Time

Page __ of __

A-F-017 EXP: 12·1-13

EPA Method: 600/R-93/116 and

40 CFR, Part 763, Subpart E, App.E

Lab Order ID:Attn: 10111935Customer: JTL Services 3999 Sanderosa Rd.

Fayetteville, NC 28312

Analysis:

Date Received:

Jay Leonard

PLM

07/01/2026

Project: COF 0406-47-5257 1299 Bingham Drive Fayetteville NC 28304 Unit A

Date Reported: 07/01/2026

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos

Fibrous Components

Non-Fibrous Components Treatment

Attributes

10111935_0001

Joint Compound

None Detected 100% Other

Non-Fibrous

Dissolved

Off-white

Homogeneous

10111935_0002

Joint Compound

None Detected 100% Other

Non-Fibrous

Dissolved

Off-white

Homogeneous

10111935_0003

Surfacing

None Detected 100% Other

Non-Fibrous

Dissolved

Off-white

Homogeneous

10111935_0004

Joint Compound

None Detected 100% Other

Non-Fibrous

Dissolved

Off-white

Homogeneous

10111935_0005

Sheetrock

None Detected 5% Cellulose 95% Other

Non-Fibrous

Dissolved

Gray

Homogeneous

10111935_0006

Coating

3% Chrysotile 97% Other

Non-Fibrous

Dissolved

Brown, Off-white

Homogeneous

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogenous soil samples be conducted by TEM for confirmation of "None Detected" by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program.

Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Kiersten Smith (6)

Page 1 of 1P-F-002 r15 1/15/2028 Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

JTL services LLC John [eonard 3999 Sanderosa Road Fayetteville NC 28312 910-237-3519

Id

1299 Bingham Drive Fayetteville NC 28304 Unit A

7/1/2026 0:00

.-- 1 Kitchen wall Joint Compound

Relinquished By

2 Kitchen Ceilinjg Joint Compound 3 Kitchen Ceiling Surfacing 4 Bathroom wall Joint Compound 5 Sheetrock wall 6 Kitchen sink coating

I

Joint-Compound Joint Compound Surfacing Joint Compound Sheetrock Coating

Accepted ~

Rejected D cg

\O\\\~'b~ bottom of sink

71\ Received By ~, \ ()" ,::t> f--Yhl)

,a~ Scientific Analytical Institute

Phone: 336.292.3888 Fax: 336.292.3313 www.sailab.com Jab@sailab.com anv Contact Information Company: .T I L Su V \ CL~ LL C... Contact: :f"o..\J L<2.,on o.,v cJ.-- Address: 3q °i q SO--V\clt.vo_sa.... tZoo.d-. Phone B : 9 1 o- a '/t-:,cs t 9

~0-\J ~~ \ \.-e . ~ c.., a <o 3 , a Fax0:

Email 0: m. t> \ llSQ..t \J\ u. ~.·,+-I @., Lab Use Only I /J~ Lab Order ID: _..___ .... J.,_~.-.......__ __ Client Code: ______ _

Asbestos Test Types

PLM EPA 600/R-93/116 (PLM) .21 ------------------------------ --

Positive slop □ PLM Point Count 400 (PT4) □ PLM Point Count IOOO (PTM) □

Ol..ol ··C4M PCM NIOSH 7400-A Rules (PCM) □

Billin!!llnvoice Information Company: '' -• • · ' •• ....- .

Contact:

Address:

PO Number: l./l'l i f ~ Project Name/Number:

Sample ID#

_3

Turn Around Times B Rules (PCB) 0 TWA(PTA) 0

90 Min. D I 48 Hours D TEM AHERA (AHE) □ 3 Hours □ 72 Hours □ TEM Level II (LII) □ 6Hours □ 96Hours □ TEM NIOSH 7402 (TNI) □

12 Hours.2 120Hours D TEM Bulk Qualitative (TBL) □ 24Hours D 144+Hours D TEM Bulk Chatfield (TBS) □

TEM Bulk Quantitative (TBQ) □ TEM Wipe ASTM D6480-05 □ TEM Microvac ASTM D5755-02 □ TEM Water EPA I 00.2 (TW I) □ Other: □

Volume/ Area Comments

"t-<1" ~

Total # of Samples

Relinquished by Date/Time Received by Date/Time

Page_of_

A-F-017 EXP: 12-1-13

EPA Method: 600/R-93/116 and

40 CFR, Part 763, Subpart E, App.E

Lab Order ID:Attn: 10111938Customer: JTL Services 3999 Sanderosa Rd.

Fayetteville, NC 28312

Analysis:

Date Received:

Jay Leonard

PLM

07/01/2026

Project: COF 0406-47-5257 1299 Bingham Drive Fayetteville NC 28304 Unit B

Date Reported: 07/01/2026

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos

Fibrous Components

Non-Fibrous Components Treatment

Attributes

10111938_0001

Joint Compound

None Detected 100% Other

Non-Fibrous

Dissolved

White

Homogeneous

10111938_0002

Surfacing

None Detected 100% Other

Non-Fibrous

Dissolved

Off-white

Homogeneous

10111938_0003

Surfacing

None Detected 100% Other

Non-Fibrous

Dissolved

Off-white

Homogeneous

10111938_0004

Joint Compound

None Detected 100% Other

Non-Fibrous

Dissolved

Off-white

Homogeneous

10111938_0005

Window Glaze

None Detected 100% Other

Non-Fibrous

Ashed

Tan

Homogeneous

10111938_0006

Sheetrock

None Detected 5% Cellulose 95% Other

Non-Fibrous

Dissolved

Gray

Homogeneous

10111938_0007

Joint Compound

None Detected 100% Other

Non-Fibrous

Dissolved

Off-white

Homogeneous

10111938_0008

Duct wrap

None Detected 20% 20%

Cellulose Fiber Glass

60% Other

Fibrous

Ashed

Yellow, Silver

Homogeneous

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogenous soil samples be conducted by TEM for confirmation of "None Detected" by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program.

Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Kiersten Smith (8)

Page 1 of 1P-F-002 r15 1/15/2028 Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

Relinquished By

JTL services LLC John Leonard 3999 Sanclerosa Road Fayetteville NC 28312 910-237-3519 moldsendcesitl<alaol.com

COF 04~7-5257

1299 Bingham Drive Fayetteville NC 28304 UnitB

1 Kitchen wall Joint Compound 2 Living Room ceiling surfacing 3 Bedroom Ceiling Surfacing 4 Bathroom ceiling Joint Compound 5 Window Glaze 6 Sheetrock Wall 7 Bedroom wall joint compound 8 HVAC duct wrap

Joint Compound Surfacing Surfacing Joint Compound Window Glaze Sheetrock Joint Compound Duct wrap

\ C) \ \,\

Accepted

Rejected 0

3~

71 \ \ O-,2') !trv} Received By

Scientific Analytical I nst_itute

Phone: 336.292.3888 Fax: 336.292.3313 www.sailab.com lab@sailab.com

Company: .JI L SUV\ CR..~ LLL..- Contact: ::ro . .: LQ..on ().JI cl.

Address: 3 q q q S 0-.-V\ cl~v asa_ (i_ oo.cl

Fax0:

Billin nvoice Information Turn Around Times Company: C.,'( e,<l_i -\- 90 Min. □ 48 Hours □

Contact: co f: 3 Hours □ 72 Hours □

Address: 6Hours □ 96Hours □ 12 Hours ~ 120Hours D 24 Hours □ 144+Hours D

I PO Number:

Project Name/Number:

Lab Use Only / C4 ~ 8 Lab Order ID: --'--/ __ _ Client Code: _____ _

Asbestos Test Types

PLM EPA 600/R-93/116 (PLM) ~

Positive stop □ PLM Point Count 400 (PT4) □ PLM Point Count 1000 (PTM) □ PCM NI0SH 7400-A Rules (PCM) □

B Rules (PCB) 0 TWA(PTA)O

TEM AHERA (AHE) □

TEM Level Il (LIT) □

TEMNIOSH 7402 (TN!) □

TEM Bulk Qualitative (TBL) □ TEM Bulk Chatfield (TBS) □ TEM Bulk Quantitative (TBQ) □ TEM Wipe ASTM D6480-05 □ TEM Microvac ASTM 05755-02 □ TEM Water EPA I 00.2 (TWI) □ Other: □

Sample ID# Volume/ Area Comments

L

Total # of Samples

Relinquished by Dateffime Received by Dateffime

Page of

A-F--017 IDC~

EPA Method: 600/R-93/116 and

40 CFR, Part 763, Subpart E, App.E

Lab Order ID:Attn: 10111940Customer: JTL Services 3999 Sanderosa Rd.

Fayetteville, NC 28312

Analysis:

Date Received:

Jay Leonard

PLM

07/01/2026

Project: COF 0406-47-5257 1299 Bingham Drive Fayetteville NC 28304 Unit C

Date Reported: 07/01/2026

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos

Fibrous Components

Non-Fibrous Components Treatment

Attributes

10111940_0001

Joint Compound

None Detected 100% Other

Non-Fibrous

Crushed

White

Homogeneous

10111940_0002

Surfacing

None Detected 100% Other

Non-Fibrous

Crushed

White, Beige

Homogeneous

10111940_0003

Sheetrock

None Detected 100% Other

Non-Fibrous

Crushed

Gray

Homogeneous

10111940_0004

Joint Compound

None Detected 100% Other

Non-Fibrous

Crushed

White

Homogeneous

10111940_0005

Surfacing

None Detected 100% Other

Non-Fibrous

Crushed

Off-white

Homogeneous

10111940_0006

Window Glaze

None Detected 100% Other

Non-Fibrous

Crushed, Dissolved

Gray, Beige

Homogeneous

10111940_0007

Joint Compound

None Detected 100% Other

Non-Fibrous

Crushed

White

Homogeneous

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogenous soil samples be conducted by TEM for confirmation of "None Detected" by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program.

Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Lachlan Krenz (7)

Page 1 of 1P-F-002 r15 1/15/2028 Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

Relinquished By

JTL services LLC John Leonard 3999 Sanderosa Road Fayetteville NC 28312 910-237-3519 moldservicesjtl@aol.com

COF 0406-47-5257

1299 Bingham Drive Fayetteville NC 28304 UnitC

7/1/2026 0:00

PLM

·1 • Bedroom wall joint compound 2 Bedroom ceiling Surfacing 3 Sheetrock wall 4 Kitchen cemng joint compound 5 Kitchen ceiling surfacing 6 Window Glaze 7 Living room wall joint compound

Joint co·mpouna Surfacing Sheetrock Joint Compound Surfacing Window Galze Joint Compound

\0\ \\ q4\J

Accepted

,.....-..1.:Ku.tejected d

Received By c» 1\ \ (0·2otYv]

,,O~ Scientific Analytical Institute

Phone: 336.292.3888 Fax: 336.292.3313 www.sailab.com lab@sailab.com

Comoanv Contact Information Company: .T ,- L Suv( a.~ LLC.. Contact: To..~ LQ..on O...V d..-- Address: 3q qq SCU'\cle-vosa__ ~oa.cl Phone B: 9 I O - a 'J q -~ 5 I 9

~C)..\J~_,,A\~.e . ~~ a <o3 \~ Fax0:

Email 13: M -o\ £lsq_,t \I\C.H. ·,+-I~

Lab Use Only / q 4 Q Lab Order ID: _....__ ___ _ Client Code: _____ _

Asbestos Test Types

PLM EPA 600/R-93/116 (PLM) ~

Positive stop □ PLM Point Count 400 (PT4) □ PLM Point Count 1000 (PTM) □

OLO I·· C4fY'l PCM NIOSH 7400-A Rules (PCM) □

Billin21Invoice Information Turn Around Times B Rules (PCB) 0 TWA(PTA) □

Company: ex tcli "t C.,(U' £l_ l"N\ ~ 0\ \ t, 90Min. □ 48Hours D TEM AHERA (AHE) □ Contact: rJ\ r::-- {~L/f\[A - J'1~ ,it:;--z 3 Hours □ 72Hours D TEM Level II (Lil) □

6 Hours □ 96Hours D TEM NIOSH 7402 (TN!) □ 12 Hours lfl 120Hours D TEM Bulk Qualitative (TBL) □ 24Hours D 144+Hours D TEM Bulk Chatfield (TBS) □

PO Number: LAN IT G TEM Bulle Quantitative (TBQ) □ TEM Wipe ASTM D6480-05 □

Project Name/Number: TEM Microvac ASTM D5755-02 □ TEM Water EPA 100.2 (TWI) □ Other: □

Sample ID# Volume/ Area Comments

'L

Total # of Samples __

Relinquished by Date/Time Received by Date/Time

Page_of_

A-F--017 EXP: 12-1-13

EPA Method: 600/R-93/116 and

40 CFR, Part 763, Subpart E, App.E

Lab Order ID:Attn: 10111941Customer: JTL Services 3999 Sanderosa Rd.

Fayetteville, NC 28312

Analysis:

Date Received:

Jay Leonard

PLM

07/01/2026

Project: COF 0406-47-5257 1299 Bingham Drive Fayetteville NC 28304 Unit D

Date Reported: 07/01/2026

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos

Fibrous Components

Non-Fibrous Components Treatment

Attributes

10111941_0001

Sheetrock

None Detected 20% Cellulose 80% Other

Fibrous

Crushed

Brown, Off-white

Homogeneous

10111941_0002

Surfacing

None Detected 100% Other

Non-Fibrous

Crushed

White

Homogeneous

10111941_0003

Joint compound

None Detected 100% Other

Non-Fibrous

Crushed

White

Homogeneous

10111941_0004

Joint Compound

None Detected 100% Other

Non-Fibrous

Crushed

White

Homogeneous

10111941_0005

Joint compound

None Detected 100% Other

Non-Fibrous

Crushed

White

Homogeneous

10111941_0006

Joint compound

None Detected 100% Other

Non-Fibrous

Crushed

White

Homogeneous

10111941_0007

Joint Compound

None Detected 100% Other

Non-Fibrous

Crushed

White

Homogeneous

10111941_0008

Felt Paper

None Detected 60% Cellulose 40% Other

Fibrous

Teased

Black

Homogeneous

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogenous soil samples be conducted by TEM for confirmation of "None Detected" by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program.

Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Katelyn Stewart (11)

Page 1 of 2P-F-002 r15 1/15/2028 Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

EPA Method: 600/R-93/116 and

40 CFR, Part 763, Subpart E, App.E

Lab Order ID:Attn: 10111941Customer: JTL Services 3999 Sanderosa Rd.

Fayetteville, NC 28312

Analysis:

Date Received:

Jay Leonard

PLM

07/01/2026

Project: COF 0406-47-5257 1299 Bingham Drive Fayetteville NC 28304 Unit D

Date Reported: 07/01/2026

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos

Fibrous Components

Non-Fibrous Components Treatment

Attributes

10111941_0009

Shingles

None Detected 20% Fiber Glass 80% Other

Non-Fibrous

Dissolved

Gray, Black

Homogeneous

10111941_0010

Insulation

None Detected 98% Fiber Glass 2% Other

Fibrous

Teased

Pink

Homogeneous

10111941_0011

Insulation

None Detected 98% Fiber Glass 2% Other

Fibrous

Teased

White

Homogeneous

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogenous soil samples be conducted by TEM for confirmation of "None Detected" by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program.

Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Katelyn Stewart (11)

Page 2 of 2P-F-002 r15 1/15/2028 Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

I

Relinquished By

JTL services LLC John Leonard 3999 Sanderosa Road Fayetteville NC 28312 910-237-3519 moldservicesjtl@aol.com

COF 0406-47-5257

1299 Bingham Drive Fayetteville NC 28304 UnitD

PLM

7/1'2026 0:00

1 Garage wall sheetrock 2 Ceiling surfacing 3 Wall joint compound 4 Bathroom_ wall joint compound 5 Bedroom joint compound 6 Living room wall joint compound 7 Kitchen ceiling joint compound 8 Roofing felt paper 9 Roofing shingles

1 0 Wall insulation 11 Ceiling Insulation

J

Sheetrock Surfacing Joint compound Joint Compound Joint compound Joint compound Joint Compound Felt Paper Shingles Insulation Insulation

\ 0 \ \ \ qL\ \

Upstairs Upstairs

Pink White

Accepted W Rejected 0

(1) _7lu0-

Ml

Scientific Analytical Institute 4604 Dundas Dr. Greensboro, NC 27407

Phone: 336.292.3888 Fax: 336.292.3313 www.sailab.com lab@sailab.com

Company: .TI L Suvi eR..~ LLC...

Address: 3q q SO-V\.cle..vasa__ i<.oo.d..

Fax0:

Billin nvoice Information Turn Around Times 90 Min. D 48 Hours D

Contact: 3 Hours D 72 Hours D Address: 6 Hours O 96 Hours D

12Hours G 120Hours 0 24Hours D

PO Number: UN l-r D Project Name/Number:

Lab Use Only l t'At I I Lab Order ID: _.,__7-L---k'1....,__ Client Code: _____ _

Asbestos Test Types

PLM EPA 600/R-93/116 (PLM) ~

Positive stop □ PLM Point Count 400 (PT4) □ PLM Point Count I 000 (PTM) □ PCM NIOSH 7400-A Rules (PCM) □ B Rules (PCB) 0 TWA(PTA) 0

TEM AHERA (ARE) □

TEM Level II (LII) □

TEM NIOSH 7402 (TNI) □

TEM Bulk Qualitative (TBL) □ TEM Bulk Chatfield (TBS) □ TEM Bulk Quantitative (TBQ) □ TEM Wipe ASTM D6480-05 □ TEM Microvac ASTM D5755-02 □ TEM Water EPA 100.2 (TWI) □ Other: □

Sample ID# Volume/ Area Comments

Total # of Samples

Relinquished by Date/Time Received by Date/Time

EPA Method: 600/R-93/116 and

40 CFR, Part 763, Subpart E, App.E

Lab Order ID:Attn: 10110805Customer: JTL Services 3999 Sanderosa Rd.

Fayetteville, NC 28312

Analysis:

Date Received:

Jay Leonard

PLM

06/18/2026

Project: COF 0429-15-5344 5329 Murchison Road Fayetteville NC

Date Reported: 06/18/2026

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos

Fibrous Components

Non-Fibrous Components Treatment

Attributes

10110805_0001

Ceiling Surfacing

None Detected 100% Other

Non-Fibrous

Crushed

White

Homogeneous

10110805_0002

Ceiling Surfacing

None Detected 100% Other

Non-Fibrous

Dissolved

White, Beige

Homogeneous paint only; no surfacing

10110805_0003 sheetrock

None Detected 100% Other

Non-Fibrous

Crushed

Off-white

Homogeneous

10110805_0004 joint compound

None Detected 100% Other

Non-Fibrous

Crushed

White

Homogeneous

10110805_0005

Attic insulation

None Detected 99% Fiber Glass 1% Other

Fibrous

Teased

Yellow

Homogeneous

10110805_0006 wall surfacing

None Detected 100% Other

Non-Fibrous

Dissolved

Beige, White

Homogeneous paint only; no surfacing

10110805_0007

Ceiling tile

None Detected 60% 30%

Mineral Wool Cellulose

10% Other

Fibrous

Teased

Tan

Homogeneous

8 - A

10110805_0008 tile flooring

None Detected 100% Other

Non-Fibrous

Crushed

Gray

Homogeneous tile

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogenous soil samples be conducted by TEM for confirmation of "None Detected" by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .