This is a pricing schedule template for Lot 1 TOC Floor Operations services associated with Virginia's Transportation Operations Center (TOC) contract opportunity. The document establishes the pricing framework for five regional TOC operations across Virginia, organized by Cost of Living Adjustment (COLA) regions: Northern Regional Operations (NRO) in COLA Region 1, Eastern Regional Operations (ERO) in COLA Region 2, Central Regional Operations (CRO) in COLA Region 3, and Southwest Regional Operations (SWRO) and Northwest Regional Operations (NWRO) in COLA Region 4. Offerors must submit hourly rates for floor operations positions including Control Room Supervisors, Control Room Lead Operators, Control Room Operators (Levels 1-3), Signal Engineers, Data Analysts, and Lane Closure System Technicians, with the option to propose additional roles. Pricing must differentiate between full-time and part-time loaded hourly rates, with full-time rates including fringe benefits and part-time rates excluding fringe. The template requires offerors to calculate loaded rates using specified formulas that incorporate base wage, fringe percentage, overhead and general administrative percentage, and profit percentage.
In addition to hourly staffing costs, offerors must provide a single annual lump sum cost covering Operator Training & Certification, Administrative Support for Operator Functions, and Traffic Control Support on a non-patrolling basis. The pricing schedule requires submission of operational management costs broken down by role, specifically identifying positions for Statewide Contract Program Director and Regional TOC Contract Manager. Annual price escalation is capped at a maximum of 5% per year and must be based on the BLS Employment Cost Index (ECI) for Total Compensation in Private Industry, with documentation required from BLS or authoritative sources. The agency retains discretion to decrease rates if indices decline. All pricing is evaluated on a total annual basis per region, with actual hours determined in the Annual Work Plan (AWP).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2nd Revised Service Lot-1 TOC Floor Operations Pricing Schedule.xlsx | XLSX spreadsheet | |
| 160904 Addendum 5.pdf | ||
| Lot-2 SSP Services Pricing Schedule.xlsx | XLSX spreadsheet | |
| 160904 Addendum 2.pdf | ||
| RFP160904_TOC_SSP.pdf | ||
| 160904 Addendum 1.pdf | ||
| 160904 Addendum 3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COLA Region-1
| Each loaded rate cost component shall be shown as a % of total cost with the exception of Base Wage |
| • Provide this for each Floor Role proposed |
| Full-Time Loaded Hourly Rate = Base Wage * (1 + Fringe Percentage + Overhead Percentage + General and Administrative Percentage + Profit Percentage) |
| Part‑Time Loaded Hourly Rate = Base Wage * (1 + Overhead Percentage + General and Administrative Percentage + Profit Percentage |
| Price Item | Floor Operations Role | Base Wage $ | Fringe % | Overhead & G&A % | Profit % (fixed) | Loaded Hourly Rate- Full-Time | Loaded Hourly Rate-Part-Time "non-benefit" | |
| CRS | Control Room Supervisors | $ - 0 | $ - 0 | $ - 0 | ||||
| CLO | Control Room Lead Operators | $ - 0 | $ - 0 | $ - 0 | ||||
| OP1 | Control Room Operators Level 1 | $ - 0 | $ - 0 | $ - 0 | ||||
| OP2 | Control Room Operators Level 2 | $ - 0 | $ - 0 | $ - 0 | ||||
| OP3 | Control Room Operators Level 3 | $ - 0 | $ - 0 | $ - 0 | ||||
| SE | Signal Engineers | $ - 0 | $ - 0 | $ - 0 | ||||
| DA | Data Analyst | $ - 0 | $ - 0 | $ - 0 | ||||
| LCS | Lane Closure System Technician | $ - 0 | $ - 0 | $ - 0 | ||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | |||||||
| Price Item | LUMP SUM | COST | Offerors shall provide a single annual, lump‑sum cost for Operator Training & Certification, Administrative Support for Operator Functions, and Traffic Control Support (Non‑Patrolling). This combined annual cost must be submitted as one fully inclusive fee covering all required activities and associated expenses. | |||||
| OTC | Operator Training & Certification (Annual) | |||||||
| $ - 0 | ||||||||
| Operational Management Cost by Role | ||||||||
| Role | Portion of Monthly Cost | Description | ||||||
| Position Title | $ | Management Functions | ||||||
| Statewide Contract Program Director | ||||||||
| Regional TOC Contract Manager | VDOT requires Offerors to submit functional role breakdown of management cost total |
| $ - 0 | ||
| Annual Price Escalation | ||
| Basis: : Annual labor adjustments apply using an appropriate economic index. | ||
| Labor: Escalated using BLS ECI (Total Compensation, Private Industry). | ||
| Formulas: | ||
| Labor: | Loaded Labor Rate_YearX = Loaded Labor Rate_Prior Year × (1 + Labor ECI %) | |
| Profit Dollars = Loaded Labor Rate_YearX × Profit % (fixed) | ||
| Subtotal Labor = Loaded Labor Rate_YearX + Profit Dollars |
| Final Hourly Rate: |
| Final Rate_YearX = Subtotal Labor |
| • | Cap: Maximum 5% per year (12) month cycle. |
| • | Agency Discretion: Rates may decrease if indices decline. |
| • | Documentation: Contractor must provide BLS or authoritative source data |
COLA Region-2
| Each loaded rate cost component shall be shown as a % of total cost with the exception of Base Wage |
| • Provide this for each Floor Role proposed |
| Full-Time Loaded Hourly Rate = Base Wage * (1 + Fringe Percentage + Overhead Percentage + General and Administrative Percentage + Profit Percentage) |
| Part‑Time Loaded Hourly Rate = Base Wage * (1 + Overhead Percentage + General and Administrative Percentage + Profit Percentage |
| Price Item | Floor Operations Role | Base Wage $ | Fringe % | Overhead & G&A % | Profit % (fixed) | Loaded Hourly Rate- Full-Time | Loaded Hourly Rate-Part-Time "non-benefit" | |
| CRS | Control Room Supervisors | $ - 0 | $ - 0 | $ - 0 | ||||
| CLO | Control Room Lead Operators | $ - 0 | $ - 0 | $ - 0 | ||||
| OP1 | Control Room Operators Level 1 | $ - 0 | $ - 0 | $ - 0 | ||||
| OP2 | Control Room Operators Level 2 | $ - 0 | $ - 0 | $ - 0 | ||||
| OP3 | Control Room Operators Level 3 | $ - 0 | $ - 0 | $ - 0 | ||||
| SE | Signal Engineers | $ - 0 | $ - 0 | $ - 0 | ||||
| DA | Data Analyst | $ - 0 | $ - 0 | $ - 0 | ||||
| LCS | Lane Closure System Technician | $ - 0 | $ - 0 | $ - 0 | ||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | |||||||
| Price Item | LUMP SUM | COST | Offerors shall provide a single annual, lump‑sum cost for Operator Training & Certification, Administrative Support for Operator Functions, and Traffic Control Support (Non‑Patrolling). This combined annual cost must be submitted as one fully inclusive fee covering all required activities and associated expenses. | |||||
| OTC | Operator Training & Certification (Annual) | |||||||
| $ - 0 | ||||||||
| Operational Management Cost by Role | ||||||||
| Role | Portion of Monthly Cost | Description | ||||||
| Position Title | $ | Management Functions | ||||||
| Statewide Contract Program Director | ||||||||
| Regional TOC Contract Manager | VDOT requires Offerors to submit functional role breakdown of management cost total |
| $ - 0 | ||
| Annual Price Escalation | ||
| Basis: : Annual labor adjustments apply using an appropriate economic index. | ||
| Labor: Escalated using BLS ECI (Total Compensation, Private Industry). | ||
| Formulas: | ||
| Labor: | Loaded Labor Rate_YearX = Loaded Labor Rate_Prior Year × (1 + Labor ECI %) | |
| Profit Dollars = Loaded Labor Rate_YearX × Profit % (fixed) | ||
| Subtotal Labor = Loaded Labor Rate_YearX + Profit Dollars |
| Final Hourly Rate: |
| Final Rate_YearX = Subtotal Labor |
| • | Cap: Maximum 5% per year (12) month cycle. |
| • | Agency Discretion: Rates may decrease if indices decline. |
| • | Documentation: Contractor must provide BLS or authoritative source data |
COLA Region-3
| Each loaded rate cost component shall be shown as a % of total cost with the exception of Base Wage |
| • Provide this for each Floor Role proposed |
| Full-Time Loaded Hourly Rate = Base Wage * (1 + Fringe Percentage + Overhead Percentage + General and Administrative Percentage + Profit Percentage) |
| Part‑Time Loaded Hourly Rate = Base Wage * (1 + Overhead Percentage + General and Administrative Percentage + Profit Percentage |
| Price Item | Floor Operations Role | Base Wage $ | Fringe % | Overhead & G&A % | Profit % (fixed) | Loaded Hourly Rate- Full-Time | Loaded Hourly Rate-Part-Time "non-benefit" | |
| CRS | Control Room Supervisors | $ - 0 | $ - 0 | $ - 0 | ||||
| CLO | Control Room Lead Operators | $ - 0 | $ - 0 | $ - 0 | ||||
| OP1 | Control Room Operators Level 1 | $ - 0 | $ - 0 | $ - 0 | ||||
| OP2 | Control Room Operators Level 2 | $ - 0 | $ - 0 | $ - 0 | ||||
| OP3 | Control Room Operators Level 3 | $ - 0 | $ - 0 | $ - 0 | ||||
| SE | Signal Engineers | $ - 0 | $ - 0 | $ - 0 | ||||
| DA | Data Analyst | $ - 0 | $ - 0 | $ - 0 | ||||
| LCS | Lane Closure System Technician | $ - 0 | $ - 0 | $ - 0 | ||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | |||||||
| Price Item | LUMP SUM | COST | Offerors shall provide a single annual, lump‑sum cost for Operator Training & Certification, Administrative Support for Operator Functions, and Traffic Control Support (Non‑Patrolling). This combined annual cost must be submitted as one fully inclusive fee covering all required activities and associated expenses. | |||||
| OTC | Operator Training & Certification (Annual) | |||||||
| $ - 0 | ||||||||
| Operational Management Cost by Role | ||||||||
| Role | Portion of Monthly Cost | Description | ||||||
| Position Title | $ | Management Functions | ||||||
| Statewide Contract Program Director | ||||||||
| Regional TOC Contract Manager | VDOT requires Offerors to submit functional role breakdown of management cost total |
| $ - 0 | ||
| Annual Price Escalation | ||
| Basis: : Annual labor adjustments apply using an appropriate economic index. | ||
| Labor: Escalated using BLS ECI (Total Compensation, Private Industry). | ||
| Formulas: | ||
| Labor: | Loaded Labor Rate_YearX = Loaded Labor Rate_Prior Year × (1 + Labor ECI %) | |
| Profit Dollars = Loaded Labor Rate_YearX × Profit % (fixed) | ||
| Subtotal Labor = Loaded Labor Rate_YearX + Profit Dollars |
| Final Hourly Rate: |
| Final Rate_YearX = Subtotal Labor |
| • | Cap: Maximum 5% per year (12) month cycle. |
| • | Agency Discretion: Rates may decrease if indices decline. |
| • | Documentation: Contractor must provide BLS or authoritative source data |
COLA Region-4
| Each loaded rate cost component shall be shown as a % of total cost with the exception of Base Wage |
| • Provide this for each Floor Role proposed |
| Full-Time Loaded Hourly Rate = Base Wage * (1 + Fringe Percentage + Overhead Percentage + General and Administrative Percentage + Profit Percentage) |
| Part‑Time Loaded Hourly Rate = Base Wage * (1 + Overhead Percentage + General and Administrative Percentage + Profit Percentage |
| Price Item | Floor Operations Role | Base Wage $ | Fringe % | Overhead & G&A % | Profit % (fixed) | Loaded Hourly Rate- Full-Time | Loaded Hourly Rate-Part-Time "non-benefit" | |
| CRS | Control Room Supervisors | $ - 0 | $ - 0 | $ - 0 | ||||
| CLO | Control Room Lead Operators | $ - 0 | $ - 0 | $ - 0 | ||||
| OP1 | Control Room Operators Level 1 | $ - 0 | $ - 0 | $ - 0 | ||||
| OP2 | Control Room Operators Level 2 | $ - 0 | $ - 0 | $ - 0 | ||||
| OP3 | Control Room Operators Level 3 | $ - 0 | $ - 0 | $ - 0 | ||||
| SE | Signal Engineers | $ - 0 | $ - 0 | $ - 0 | ||||
| DA | Data Analyst | $ - 0 | $ - 0 | $ - 0 | ||||
| LCS | Lane Closure System Technician | $ - 0 | $ - 0 | $ - 0 | ||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | |||||||
| Price Item | LUMP SUM | COST | Offerors shall provide a single annual, lump‑sum cost for Operator Training & Certification, Administrative Support for Operator Functions, and Traffic Control Support (Non‑Patrolling). This combined annual cost must be submitted as one fully inclusive fee covering all required activities and associated expenses. | |||||
| OTC | Operator Training & Certification (Annual) | |||||||
| $ - 0 | ||||||||
| Operational Management Cost by Role | ||||||||
| Role | Portion of Monthly Cost | Description | ||||||
| Position Title | $ | Management Functions | ||||||
| Statewide Contract Program Director | ||||||||
| Regional TOC Contract Manager | VDOT requires Offerors to submit functional role breakdown of management cost total |
| $ - 0 | ||
| Annual Price Escalation | ||
| Basis: : Annual labor adjustments apply using an appropriate economic index. | ||
| Labor: Escalated using BLS ECI (Total Compensation, Private Industry). | ||
| Formulas: | ||
| Labor: | Loaded Labor Rate_YearX = Loaded Labor Rate_Prior Year × (1 + Labor ECI %) | |
| Profit Dollars = Loaded Labor Rate_YearX × Profit % (fixed) | ||
| Subtotal Labor = Loaded Labor Rate_YearX + Profit Dollars |
| Final Hourly Rate: |
| Final Rate_YearX = Subtotal Labor |
| • | Cap: Maximum 5% per year (12) month cycle. |
| • | Agency Discretion: Rates may decrease if indices decline. |
| • | Documentation: Contractor must provide BLS or authoritative source data |
Contract Year 1-SUMMARY TAB
| Initial Term-Year 1 | Pricing Schedule-LOT-1 TOC Floor Operations | ||||||||||||||||
| Operational Management Costs | |||||||||||||||||
| Actual Hours will be determined in AWP. Assumption is for Evaluated Total Price | Unit | NRO TOC-COLA Region 1 | ERO TOC-COLA Region 2 | CRO TOC-COLA Region 3 | SWRO TOC-COLA Region 4 | NWRO TOC-COLA Region 4 | |||||||||||
| Fixed | Quantity | Monthly Fixed Cost | Evaluated Total Price | Quantity | Monthly Fixed Cost | Evaluated Total Price | Quantity | Monthly Fixed Cost | Evaluated Total Price | Quantity | Monthly Fixed Cost | Evaluated Total Price | Quantity | Monthly Fixed Cost | Evaluated Total Price | ||
| Monthly | 12 | $ - 0 | 12 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | 12 | $ - 0 | $ - 0 | ||||
| Sub Total - Operational Management Cost | $ - 0 | Sub Total | $ - 0 | Sub Total | $ - 0 | Sub Total | $ - 0 | Sub Total | $ - 0 | ||||||||
| Floor Staffing Hourly Rate Costs | |||||||||||||||||
| Description | Unit | Floor Ops | NOVA-COLA Region 1 | ERO-COLA Region 2 | CRO-COLA Region 3 | SWRO-COLA Region 4 | NWRO-COLA Region 4 | ||||||||||
| Position Title | Billed by | Staffing | Annual Hours Assumption | Role Loaded Rate | Evaluated Total Price | Annual Hours Assumption | Role Loaded Rate | Evaluated Total Price | Annual Hours Assumption | Role Loaded Rate | Evaluated Total Price | Annual Hours Assumption | Role Loaded Rate | Evaluated Total Price | Annual Hours Assumption | Role Loaded Rate | Evaluated Total Price |
| Control Room Supervisors | Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Control Room Lead Operators | Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Control Room Operators Level 1 | Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Control Room Operators Level 2 | Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Control Room Operators Level 3 | Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Signal Engineers | Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Data Analyst | Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Lane Closure System Technician | Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Sub Total Floor Staffing Expense | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Operator Non-Floor Operations Required | Evaluated Total Price | Evaluated Total Price | Evaluated Total Price | Evaluated Total Price | Evaluated Total Price | ||||||||||||
| Operator Training & Certification (Annual) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| SubTotal Lump Sum Expense | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| TOTAL -Contract Cost | Total Regional TOC Evaluated Cost Year 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
$ - 0 Offeror's Year 1 Contract Cost used in Evaluation Scoring