2nd Revised Service Lot-1 TOC Floor Operations Pricing Schedule.xlsx
XLSX spreadsheet 37 KB Posted
- Attached to
- RFP#: 160904 TOC Floor Operations & SSP Services
- Solicitation number
- RFP-125593
- Issued by
- Virginia
About this file
This is a pricing schedule template for the Virginia Department of Transportation's RFP #160904, specifically for Lot 1 TOC Floor Operations Services across five regional Traffic Operations Centers. The RFP requires proposals for continuous 24/7/365 operations supporting traffic monitoring, incident management, arterial management, system monitoring, and weather operations. The contract encompasses five geographic regions designated by Cost-of-Living Adjustment (COLA) classifications: Northern Virginia (Region 1), Hampton Roads (Region 2), Richmond (Region 3), and two Southwest/Northwest regional areas (Regions 4). Proposals were due October 2, 2026, at 10:00 a.m. EST, with an optional pre-proposal conference held on August 24, 2026, and optional site visits scheduled for August 25-26 and August 31, 2026. The contract carries an initial four-year term with two optional two-year renewal periods.
Pricing must utilize fully burdened, loaded hourly rates for nine defined staffing roles including Control Room Supervisors, Control Room Lead Operators, Control Room Operators at three levels, Signal Engineers, Data Analysts, and Lane Closure System Technicians, with separate rates for full-time and part-time positions across each COLA region. Contractors must also provide fixed monthly management costs broken down by functional role and a single annual lump-sum cost for Operator Training & Certification, Administrative Support, and Traffic Control Support. Annual price escalation is capped at 5 percent per year, tied to the Bureau of Labor Statistics Employment Cost Index for total compensation in private industry, with agency discretion to decrease rates if indices decline. Contractors must provide BLS or authoritative source documentation to support escalation claims. The pricing schedule requires offerors to demonstrate cost component breakdowns showing fringe benefits and overhead and general administrative costs as percentages of total cost, with profit calculated as a fixed percentage applied to fully burdened labor rates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 160904 Addendum 5.pdf | ||
| 160904 Addendum 1.pdf | ||
| 160904 Addendum 2.pdf | ||
| RFP160904_TOC_SSP.pdf | ||
| Lot-1 TOC Floor Operations Pricing Schedule.xlsx | XLSX spreadsheet | |
| Lot-2 SSP Services Pricing Schedule.xlsx | XLSX spreadsheet | |
| 160904 Addendum 3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COLA Region-1
| Each loaded rate cost component shall be shown as a % of total cost with the exception of Base Wage |
| • Provide this for each Floor Role proposed |
| Full-Time Loaded Hourly Rate Calculated by adding Fringe and Overhead & General Administrative (G&A) costs to the Base Wage to determine the fully burdened labor cost. A Fixed profit % is then applied to that burdened cost. |
| The Part‑Time Loaded Hourly Rate excludes Fringe costs but includes Overhead & General Administrative (G&A) costs. A fixed Profit percentage is applied to the resulting burdened labor cost |
| Price Item | Floor Operations Role | Base Wage $ | Fringe % | Overhead & G&A % | Profit % (fixed) | Loaded Hourly Rate- Full-Time | Loaded Hourly Rate-Part-Time "non-benefit" | |
| CRS | Control Room Supervisors | $ - 0 | $ - 0 | $ - 0 | ||||
| CLO | Control Room Lead Operators | $ - 0 | $ - 0 | $ - 0 | ||||
| OP1 | Control Room Operators Level 1 | $ - 0 | $ - 0 | $ - 0 | ||||
| OP2 | Control Room Operators Level 2 | $ - 0 | $ - 0 | $ - 0 | ||||
| OP3 | Control Room Operators Level 3 | $ - 0 | $ - 0 | $ - 0 | ||||
| SE | Signal Engineers | $ - 0 | $ - 0 | $ - 0 | ||||
| DA | Data Analyst | $ - 0 | $ - 0 | $ - 0 | ||||
| LCS | Lane Closure System Technician | $ - 0 | $ - 0 | $ - 0 | ||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | |||||||
| Price Item | LUMP SUM | COST | Offerors shall provide a single annual, lump‑sum cost for Operator Training & Certification, Administrative Support for Operator Functions, and Traffic Control Support (Non‑Patrolling). This combined annual cost must be submitted as one fully inclusive fee covering all required activities and associated expenses. | |||||
| OTC | Operator Training & Certification (Annual) | |||||||
| $ - 0 | ||||||||
| Operational Management Cost by Role | ||||||||
| Role | Portion of Monthly Cost | Description | ||||||
| Position Title | $ | Management Functions | ||||||
| Statewide Contract Program Director | ||||||||
| Regional TOC Contract Manager | VDOT requires Offerors to submit functional role breakdown of management cost total |
| $ - 0 | ||
| Annual Price Escalation | ||
| Basis: : Annual labor adjustments apply using an appropriate economic index. | ||
| Labor: Escalated using BLS ECI (Total Compensation, Private Industry). | ||
| Formulas: | ||
| Labor: | Loaded Labor Rate_YearX = Loaded Labor Rate_Prior Year × (1 + Labor ECI %) | |
| Profit Dollars = Loaded Labor Rate_YearX × Profit % (fixed) | ||
| Subtotal Labor = Loaded Labor Rate_YearX + Profit Dollars |
| Final Hourly Rate: |
| Final Rate_YearX = Subtotal Labor |
| • | Cap: Maximum 5% per year (12) month cycle. |
| • | Agency Discretion: Rates may decrease if indices decline. |
| • | Documentation: Contractor must provide BLS or authoritative source data |
COLA Region-2
| Each loaded rate cost component shall be shown as a % of total cost with the exception of Base Wage |
| • Provide this for each Floor Role proposed |
| Full-Time Loaded Hourly Rate Calculated by adding Fringe and Overhead & General Administrative (G&A) costs to the Base Wage to determine the fully burdened labor cost. A Fixed profit % is then applied to that burdened cost. |
| The Part‑Time Loaded Hourly Rate excludes Fringe costs but includes Overhead & General Administrative (G&A) costs. A fixed Profit percentage is applied to the resulting burdened labor cost |
| Price Item | Floor Operations Role | Base Wage $ | Fringe % | Overhead & G&A % | Profit % (fixed) | Loaded Hourly Rate- Full-Time | Loaded Hourly Rate-Part-Time "non-benefit" | |
| CRS | Control Room Supervisors | $ - 0 | $ - 0 | $ - 0 | ||||
| CLO | Control Room Lead Operators | $ - 0 | $ - 0 | $ - 0 | ||||
| OP1 | Control Room Operators Level 1 | $ - 0 | $ - 0 | $ - 0 | ||||
| OP2 | Control Room Operators Level 2 | $ - 0 | $ - 0 | $ - 0 | ||||
| OP3 | Control Room Operators Level 3 | $ - 0 | $ - 0 | $ - 0 | ||||
| SE | Signal Engineers | $ - 0 | $ - 0 | $ - 0 | ||||
| DA | Data Analyst | $ - 0 | $ - 0 | $ - 0 | ||||
| LCS | Lane Closure System Technician | $ - 0 | $ - 0 | $ - 0 | ||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | |||||||
| Price Item | LUMP SUM | COST | Offerors shall provide a single annual, lump‑sum cost for Operator Training & Certification, Administrative Support for Operator Functions, and Traffic Control Support (Non‑Patrolling). This combined annual cost must be submitted as one fully inclusive fee covering all required activities and associated expenses. | |||||
| OTC | Operator Training & Certification (Annual) | |||||||
| $ - 0 | ||||||||
| Operational Management Cost by Role | ||||||||
| Role | Portion of Monthly Cost | Description | ||||||
| Position Title | $ | Management Functions | ||||||
| Statewide Contract Program Director | ||||||||
| Regional TOC Contract Manager | VDOT requires Offerors to submit functional role breakdown of management cost total |
| $ - 0 | ||
| Annual Price Escalation | ||
| Basis: : Annual labor adjustments apply using an appropriate economic index. | ||
| Labor: Escalated using BLS ECI (Total Compensation, Private Industry). | ||
| Formulas: | ||
| Labor: | Loaded Labor Rate_YearX = Loaded Labor Rate_Prior Year × (1 + Labor ECI %) | |
| Profit Dollars = Loaded Labor Rate_YearX × Profit % (fixed) | ||
| Subtotal Labor = Loaded Labor Rate_YearX + Profit Dollars |
| Final Hourly Rate: |
| Final Rate_YearX = Subtotal Labor |
| • | Cap: Maximum 5% per year (12) month cycle. |
| • | Agency Discretion: Rates may decrease if indices decline. |
| • | Documentation: Contractor must provide BLS or authoritative source data |
COLA Region-3
| Each loaded rate cost component shall be shown as a % of total cost with the exception of Base Wage |
| • Provide this for each Floor Role proposed |
| Full-Time Loaded Hourly Rate Calculated by adding Fringe and Overhead & General Administrative (G&A) costs to the Base Wage to determine the fully burdened labor cost. A Fixed profit % is then applied to that burdened cost. |
| The Part‑Time Loaded Hourly Rate excludes Fringe costs but includes Overhead & General Administrative (G&A) costs. A fixed Profit percentage is applied to the resulting burdened labor cost |
| Price Item | Floor Operations Role | Base Wage $ | Fringe % | Overhead & G&A % | Profit % (fixed) | Loaded Hourly Rate- Full-Time | Loaded Hourly Rate-Part-Time "non-benefit" | |
| CRS | Control Room Supervisors | $ - 0 | $ - 0 | $ - 0 | ||||
| CLO | Control Room Lead Operators | $ - 0 | $ - 0 | $ - 0 | ||||
| OP1 | Control Room Operators Level 1 | $ - 0 | $ - 0 | $ - 0 | ||||
| OP2 | Control Room Operators Level 2 | $ - 0 | $ - 0 | $ - 0 | ||||
| OP3 | Control Room Operators Level 3 | $ - 0 | $ - 0 | $ - 0 | ||||
| SE | Signal Engineers | $ - 0 | $ - 0 | $ - 0 | ||||
| DA | Data Analyst | $ - 0 | $ - 0 | $ - 0 | ||||
| LCS | Lane Closure System Technician | $ - 0 | $ - 0 | $ - 0 | ||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | |||||||
| Price Item | LUMP SUM | COST | Offerors shall provide a single annual, lump‑sum cost for Operator Training & Certification, Administrative Support for Operator Functions, and Traffic Control Support (Non‑Patrolling). This combined annual cost must be submitted as one fully inclusive fee covering all required activities and associated expenses. | |||||
| OTC | Operator Training & Certification (Annual) | |||||||
| $ - 0 | ||||||||
| Operational Management Cost by Role | ||||||||
| Role | Portion of Monthly Cost | Description | ||||||
| Position Title | $ | Management Functions | ||||||
| Statewide Contract Program Director | ||||||||
| Regional TOC Contract Manager | VDOT requires Offerors to submit functional role breakdown of management cost total |
| $ - 0 | ||
| Annual Price Escalation | ||
| Basis: : Annual labor adjustments apply using an appropriate economic index. | ||
| Labor: Escalated using BLS ECI (Total Compensation, Private Industry). | ||
| Formulas: | ||
| Labor: | Loaded Labor Rate_YearX = Loaded Labor Rate_Prior Year × (1 + Labor ECI %) | |
| Profit Dollars = Loaded Labor Rate_YearX × Profit % (fixed) | ||
| Subtotal Labor = Loaded Labor Rate_YearX + Profit Dollars |
| Final Hourly Rate: |
| Final Rate_YearX = Subtotal Labor |
| • | Cap: Maximum 5% per year (12) month cycle. |
| • | Agency Discretion: Rates may decrease if indices decline. |
| • | Documentation: Contractor must provide BLS or authoritative source data |
COLA Region-4
| Each loaded rate cost component shall be shown as a % of total cost with the exception of Base Wage |
| • Provide this for each Floor Role proposed |
| Full-Time Loaded Hourly Rate Calculated by adding Fringe and Overhead & General Administrative (G&A) costs to the Base Wage to determine the fully burdened labor cost. A Fixed profit % is then applied to that burdened cost. |
| The Part‑Time Loaded Hourly Rate excludes Fringe costs but includes Overhead & General Administrative (G&A) costs. A fixed Profit percentage is applied to the resulting burdened labor cost |
| Price Item | Floor Operations Role | Base Wage $ | Fringe % | Overhead & G&A % | Profit % (fixed) | Loaded Hourly Rate- Full-Time | Loaded Hourly Rate-Part-Time "non-benefit" | |
| CRS | Control Room Supervisors | $ - 0 | $ - 0 | $ - 0 | ||||
| CLO | Control Room Lead Operators | $ - 0 | $ - 0 | $ - 0 | ||||
| OP1 | Control Room Operators Level 1 | $ - 0 | $ - 0 | $ - 0 | ||||
| OP2 | Control Room Operators Level 2 | $ - 0 | $ - 0 | $ - 0 | ||||
| OP3 | Control Room Operators Level 3 | $ - 0 | $ - 0 | $ - 0 | ||||
| SE | Signal Engineers | $ - 0 | $ - 0 | $ - 0 | ||||
| DA | Data Analyst | $ - 0 | $ - 0 | $ - 0 | ||||
| LCS | Lane Closure System Technician | $ - 0 | $ - 0 | $ - 0 | ||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| Contractor Proposed ROLE" | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | |||||||
| Price Item | LUMP SUM | COST | Offerors shall provide a single annual, lump‑sum cost for Operator Training & Certification, Administrative Support for Operator Functions, and Traffic Control Support (Non‑Patrolling). This combined annual cost must be submitted as one fully inclusive fee covering all required activities and associated expenses. | |||||
| OTC | Operator Training & Certification (Annual) | |||||||
| $ - 0 | ||||||||
| Operational Management Cost by Role | ||||||||
| Role | Portion of Monthly Cost | Description | ||||||
| Position Title | $ | Management Functions | ||||||
| Statewide Contract Program Director | ||||||||
| Regional TOC Contract Manager | VDOT requires Offerors to submit functional role breakdown of management cost total |
| $ - 0 | ||
| Annual Price Escalation | ||
| Basis: : Annual labor adjustments apply using an appropriate economic index. | ||
| Labor: Escalated using BLS ECI (Total Compensation, Private Industry). | ||
| Formulas: | ||
| Labor: | Loaded Labor Rate_YearX = Loaded Labor Rate_Prior Year × (1 + Labor ECI %) | |
| Profit Dollars = Loaded Labor Rate_YearX × Profit % (fixed) | ||
| Subtotal Labor = Loaded Labor Rate_YearX + Profit Dollars |
| Final Hourly Rate: |
| Final Rate_YearX = Subtotal Labor |
| • | Cap: Maximum 5% per year (12) month cycle. |
| • | Agency Discretion: Rates may decrease if indices decline. |
| • | Documentation: Contractor must provide BLS or authoritative source data |
Contract Year 1-SUMMARY TAB
| Initial Term-Year 1 | Pricing Schedule-LOT-1 TOC Floor Operations | ||||||||||||||||
| Operational Management Costs | |||||||||||||||||
| Actual Hours will be determined in AWP. Assumption is for Evaluated Total Price | Unit | NRO TOC-COLA Region 1 | ERO TOC-COLA Region 2 | CRO TOC-COLA Region 3 | SWRO TOC-COLA Region 4 | NWRO TOC-COLA Region 4 | |||||||||||
| Fixed | Quantity | Monthly Fixed Cost | Evaluated Total Price | Quantity | Monthly Fixed Cost | Evaluated Total Price | Quantity | Monthly Fixed Cost | Evaluated Total Price | Quantity | Monthly Fixed Cost | Evaluated Total Price | Quantity | Monthly Fixed Cost | Evaluated Total Price | ||
| Monthly | 12 | $ - 0 | 12 | $ - 0 | 12 | $ - 0 | 12 | $ - 0 | 12 | $ - 0 | |||||||
| Sub Total - Operational Management Cost | $ - 0 | Sub Total | $ - 0 | Sub Total | $ - 0 | Sub Total | $ - 0 | Sub Total | $ - 0 | ||||||||
| Floor Staffing Hourly Rate Costs | |||||||||||||||||
| Description | Unit | Floor Ops | NOVA-COLA Region 1 | ERO-COLA Region 2 | CRO-COLA Region 3 | SWRO-COLA Region 4 | NWRO-COLA Region 4 | ||||||||||
| Position Title | Billed by | Staffing | Annual Hours Assumption | Role Loaded Rate | Evaluated Total Price | Annual Hours Assumption | Role Loaded Rate | Evaluated Total Price | Annual Hours Assumption | Role Loaded Rate | Evaluated Total Price | Annual Hours Assumption | Role Loaded Rate | Evaluated Total Price | Annual Hours Assumption | Role Loaded Rate | Evaluated Total Price |
| Control Room Supervisors | Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Control Room Lead Operators | Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Control Room Operators Level 1 | Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Control Room Operators Level 2 | Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Control Room Operators Level 3 | Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Signal Engineers | Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Data Analyst | Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Lane Closure System Technician | Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Hourly | Full-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Part-Time | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Sub Total Floor Staffing Expense | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Operator Non-Floor Operations Required | Evaluated Total Price | Evaluated Total Price | Evaluated Total Price | Evaluated Total Price | Evaluated Total Price | ||||||||||||
| Operator Training & Certification (Annual) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| SubTotal Lump Sum Expense | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| TOTAL -Contract Cost | Total Regional TOC Evaluated Cost Year 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
$ - 0 Offeror's Year 1 Contract Cost used in Evaluation Scoring
File details come from the government source that posted it. Updated .