About this file

This document contains an abstract of bids received for repairs to W.D. Mayo Lock and Dam 14 and Newt Graham Lock and Dam 18 in Oklahoma. Highpoint Partners submitted the lowest bid of $4,891,221 for the base work, which included repairs to dikes and slopes. Central Bridge, Mobley, and Dredgit also submitted bids ranging from approximately $5.9 million to $8.6 million. The solicitation was issued on March 7, 2022 and amendments were acknowledged. Highpoint Partners was awarded contract W912BV-22-C-0010 for $4,891,221 on May 10, 2022 to complete the repairs to the locks and dams by the US Army Corps of Engineers Tulsa District. The abstract of bids provides unit pricing and estimated amounts for various work items such as riprap, dredging, grading, and other activities required to repair the structures.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT SPECIALIST

MAJ Daniel K. Jernigan

$7,976,062.16TOTAL: $8,580,902.50 $5,920,054.00 $6,109,306.04 $4,891,221.00

$18,000.00

$236,618.55

$323,544.00

$55,169.10

$433,166.00$79.48

$222,040.00

$60,048.00

$626,750.00

$8,200.00

$164,088.00

$60,903.00

$40,050.00

$17,000.00

$236,838.00

$59,320.00

$11,580.00

$19,536.00

$17,000.00

$8,200.00

$160,965.00

$50,752.00

$37,530.00

$795,700.00

$8,200.00

$210,442.00

$69,432.00

$51,345.00

$17,000.00

$45.00

$8.00

$45.00

$146.00

$2,371,770.00

$130,000.00

$14,650.00

$330,720.00

$43.00

$8.00

$45.00

XXX

XXX

$43.00

$9.00

$45.00

XXX

XXX

$40.00

$30.00

$48.00

XXX

XXX

$146.00

XXX

$5,000.00

$52.00

$21.00

$8,744.31

$66.15

$51.00

$66.15

XXX

XXX

$18,000.00

$323,738.10

$442,629.00

$75,477.15

$7,198.29

$18,000.00

$252,428.40

$345,117.00

$58,873.50

$7,198.29

$66.15

$51.00

$66.15

$66.15

$51.00

$66.15

XXX

XXX

$16,984.00

$25,234.00

$10,000.00

$110,000.00

$286,200.00

XXX

XXX

$35,160.00

$420,714.00

$66.15

$71.51

$57.32

$110.19

XXX

$575,178.00

$98,100.45

$27,602.86

$23,329.24

$10,000.00

$110,000.00

$268,275.00

$236,845.00

$64,080.00

$10,000.00

$110,000.00

$367,050.00

$115.00

$1,868,175.00

$110,000.00

$43,950.00

$477,000.00

$394,730.00

$106,776.00

$72.00

XXX

XXX

$75.00

$35.00

$72.00

XXX

XXX

$75.00

$35.00

$62.00

$303,765.00

$82,152.00

XXX

XXX

$75.00

$35.00

$885,625.00

$115.00

XXX

$15,000.00

$75.00

$35.00

$72.00

$44.00

$660,690.00

$154,035.00

$200,205.00

$11,580.00

$20,350.00

$35,000.00

$72.00

XXX $650,965.91 $162.50

$50.00 $433,950.00

BASE BID

NEWT GRAHAM LOCK AND DAM 18

30” Type 1 ODOT Riprap – In-channel Dike 5,450 Ton

0017 Compacted Fill - Embankment 8,679 CY XXX XXX

XXX

XXX

$135.00

$35,000.00

$30,000.00

$482,895.00

$317,200.00

$112,590.00

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

Job

Job

Ton

CY

Ton

Surveying

Haul Road Maintenance

24" Type 1 ODOT Riprap

Compacted Fill - Embankment

Riprap Bedding Stone

3,577

$30,000.00

$515,160.00

$338,350.00

$120,150.00

$35,000.00

$30,000.00

6,344

$135.00

$50.00

XXX

$135.00

$50.00

$135.00

XXX

XXX

$135.00

$135.00

XXX

XXX

XXX

XXX

$1,125,391.10

XXX

XXX

XXX

XXX

$908,844.08

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

Job

Ton

CY

Ton

Job

Job

Ton

Ton

3,816

6,767

4,894

1,141

Haul Road Maintenance

24" Type 1 ODOT Riprap

Compacted Fill - Embankment

Riprap Bedding Stone

OPTION THREE

Slope Repair STA. 1009+00 to STA 1024+39

Surveying

Haul Road Mainenace

24" Type 1 ODOT Riprap

Riprap Bedding Stone

OPTION FOUR

Slope Repair STA. 965+75 to STA 977+00

XXX

$969,471.58

XXX

$162.50

XXX

7,000

$135.00

$50.00

$135.00

$30.00

$50.00

XXX0009

$2,518,828.64

$1,802,560.85

XXX

XXX

XXX

XXX

XXX

XXX

XXX

Clearing and Grubbing

24" Type 1 ODOT Riprap

Compacted Fill - Embankment

Riprap Bedding Stone

Compacted Fill - Access Road

Traffic Bound Surface Course – Access Road

OPTION TWO

Slope Repair STA. 997+00 to STA 1009+00

Surveying Job

XXX

Job

Acre

Ton

CY

Ton

CY

CY

2.93

6,360

11,278

1,483

XXX

XXX

XXX

$2,639,812.50

$50,000.00

$20,510.00

$858,900.00

$563,900.00

$12,000.00

$66.15

$51.00

$1,790,036.55

$515,283.25

BASE BID

W.D. MAYO LOCK AND DAM 14

30” Type 1 ODOT Riprap – In-channel Dike 16,245 Ton XXX

OPTION ONE

Slope Repair STA. 977+00 to STA 997+00

Haul Road 1

XXX

XXX

XXX

DATE OPENED

15-Apr-22

UNIT

PRICE

ESTIMATED

AMOUNT

DATE ISSUED

7-Mar-22

NO. 2

AMENDMENTS ACKNOWLEDGED

CONTRACTING OFFICER

DARIO M. RISSONE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

ABSTRACT OF OFFERS - CONSTRUCTION SOLICITATION NUMBER:

W912BV-22-B-0001

ISSUING OFFICE:

CONTRACTING DIV (W912BV)

US ARMY CORPS OF ENGINEERS, TULSA DISTRICT

2488 E. 81ST STREET

TULSA OK 74137-4290

Project Title:

W.D. MAYO LOCK AND DAM 14, AND NEWT GRAHAM LOCK AND DAM 18 DIKE

REPAIRS, ARKANSAS RIVER, OKLAHOMA

NUMBER OF AMENDMENTS ISSUED:

A0001-11MAR22; A0002-25MAR22; A0003-1APR22; A0004-6APR22

OFFEROR:

Highpoint Parnters

BID SECURITY (AMOUNT)

Yes

AMENDMENTS ACKNOWLEDGED

Yes

UNIT

PRICE

ESTIMATED

AMOUNT

NO. 3

OFFEROR:

Mobley

BID SECURITY (AMOUNT)

Yes

AMENDMENTS ACKNOWLEDGED

Yes

UNIT

PRICE

ITEM NO. DESCRIPTION OF OFFERED ITEM EST.

QUANTITY

UNIT UNIT

PRICE

ESTIMATED

AMOUNT

GOVERNMENT ESTIMATE

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit

107.99% 74.50% 76.88% 61.55%

+ 7.99 % - 25.50 % - 23.12 % - 38.45 %

NO. 1

UNIT

PRICE

ESTIMATED

AMOUNT

AMENDMENTS ACKNOWLEDGED

BID SECURITY (AMOUNT)

Yes

Yes

OFFEROR:

Central Bridge

BID SECURITY (AMOUNT)

Yes

Yes

Dredgit

OFFEROR:

ESTIMATED

AMOUNT

NO. 4

Slide Number 1

2022-05-06T14:16:02-0500
RISSONE.DARIO.MICHAEL.1158965441

File details come from the government source that posted it. Updated .