EXTERIOR NATURAL GAS LINE REPAIR
Solicitation number
30471PR260000001
Issued by

About this file

This is a Statement of Work (SOW) for the replacement of a corroded/degraded 2-inch gauge liquid natural gas (LNG) line at U.S. Coast Guard Station Morro Bay, California. The contractor shall remove approximately fifty linear feet of existing LNG piping extending from the city meter to the emergency generator and install replacement piping of equivalent specifications. The work must be completed within 14 calendar days from acceptance of submittals, with all labor performed during normal base hours of 7:00 a.m. to 4:00 p.m., Monday through Friday. The contractor is responsible for all supervision, labor, equipment, parts, and materials necessary to complete the project, including air testing of newly installed equipment, perp and paint application with corrosion-resistant coating, and delivery of installation, operation, and maintenance manuals to the Contracting Officer's Representative upon completion. The Davis-Bacon Act applies to this procurement.

Key contractual requirements include submittal of a basic construction plan with material declarations and work delivery schedule within five calendar days of award, with Coast Guard review and approval occurring within an additional five calendar days. The contractor must arrange a pre-work site visit with MK1 Jack Fielden to verify existing conditions and dimensions before ordering materials. The contractor is wholly responsible for work site safety, site restoration, and cleanup to a standard equal to or exceeding the pre-work condition, with no final acceptance until the on-site representative approves the job site appearance. The contractor shall notify the COR one day before performance and inspection testing, which will be conducted in the presence of the on-site representative. Any damage to government property caused by the contractor must be repaired or replaced at no cost to the government. Government-furnished utilities include on-site electrical power, though telephone services and building restroom facilities are not available; the contractor must provide portable restroom facilities for employees.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work and Specifications for

Coast Guard Station Morro Bay Liquid Natural Gas Line Repair

Located at U.S. Coast Guard Station Morro Bay, CA

December 2025

PSN: 31321064

Commanding Officer United States Coast Guard Sector Los Angeles – Long Beach Sector Engineering Division San Pedro, CA 90731

1) SCOPE: The Contractor shall provide all supervision, labor, equipment, parts and materials to replace-in-kind approximately fifty (50) linear feet of corroded/degraded 2” gauge liquid natural gas (LNG) line extending from the city meter to the emergency generator. This work is located at the USCG Station Morro Bay, CA 93442. The facility is located at 1279 Embarcadero, Morro Bay, CA 93442.

Government Furnished Equipment:

N/A

2) GOVERNMENT FACILITIES AND UTILITIES:

a. Electrical power is available on the site. The Contractor will be permitted to utilize these utilities in performing the work, provided that the existing systems are not overloaded.

b. Telephone services will not be available for use by the contractor.

c. Building restroom facilities are not available for use. The Contractor shall provide portable restroom facilities for use by their employees.

3) MATERIALS AND LOCATIONS:

a. Materials shall be delivered to the jobsite in their original unopened packages, clearly marked with the manufacturer’s name, brand name, and description of contents. Storage shall be in accordance with manufacturers’ recommendations in a clean, dry, well-ventilated area. Stored materials shall be protected from sunlight and kept away from excessive heat. Insulation board shall not be exposed to flame or other ignition sources. The contractor shall not store any highly flammable materials in the work area. Sufficient area for staging is available on site; storage areas will be pre-approved by the on-site representative. Special precautions shall be taken to ensure construction materials and debris does not enter the airfield, runways, or taxiways.

b. The Contractor is required to comply with local VOC laws and regulations. All applicable Material Safety Data Sheets shall be available upon request.

4) SCHEDULE OF WORK: Completion of work shall be accomplished within 14 calendar days from acceptance of submittals. The Contractor shall perform all work during normal base work hours. The facility normal working hours are 7:00 am to 4:00 pm, Monday through Friday.

5) EXISTING CONDITIONS: The contractor is expected to satisfy themselves as to the existing conditions and the work to be performed. The contractor shall verify all dimensions and equipment data prior to ordering materials and commencement of work. A site visit should be arranged with MK1 Jack Fielden, and can be contacted via email at Jack.A.Feilden@uscg.mil.

6) LIABILITY OF CONTRACTOR: Any damage to government property caused by the contractor shall be repaired or replaced by the contractor at no cost to the government. The contractor shall not disconnect any service without approval from the COR.

7) INSPECTION AND ACCEPTANCE: The COR or an on-site representative will accomplish inspection and acceptance of work.

8) LABOR LAWS: The Davis-Bacon Act applies to the procurement.

9) SAFETY: The Contractor is wholly responsible for work site safety. The Contractor shall implement a safety program that protects the lives and health of personnel in the construction area, prevents damage to property, and avoids work interruptions. To accomplish this end, the Contractor shall provide appropriate safety barricades, signs, signal lights, etc. as well as complying with the requirements of all Federal, State and Local safety laws, rules and regulations.

10) SITE RESTORATION & CLEAN UP: The work site shall be cleaned up at the completion of each workday. Contractor shall take special care to contain dust while working. Upon completion of the job, the Contractor shall clean up the job site, returning it to a state of cleanliness equal to or exceeding that in which it was found. The Contractor shall properly dispose of any trash, extra materials, dirt, debris, or other litter that remains. There will be no final acceptance of the contract until the on-site representative approves the appearance of the job site.

11) GOVERNMENT FACILITIES AND REGULATIONS: The Contractor, their employees, and any sub-contractors shall become familiar with and obey all Base/ Unit regulations. All personnel employed on the project shall keep within the limits of the work area and shall not enter any other area outside of the work site unless to do so in the performance of their duties. There shall be No Smoking in any Coast Guard Building. All smoking must be done in the designated smoking area.

12) CONTRACT TIMELINE: The Contractor shall provide all required information and complete this contract within this time schedule, unless approved by the Contracting Officer.

a. Provide all required submittals to the Contracting Officer within 5 calendar days after contract award.

b. The U.S. Coast Guard will have 5 calendar days to review the submittals and respond to Contractor.

c. Contractor shall provide projected delivery schedule during proposal and provide a firm delivery date within 5 calendar days after the contract has been awarded.

d. The Contractor, upon receiving notification that the U.S. Coast Guard has approved the submittals and having received the Contractors firm delivery date schedule, will have 5 Calendar days to begin work on the project and have the project completed within 14 calendar days. The Contractor shall notify the Contracting Officer of any long lead time delivery of equipment, so that the Contracting Officer can modify the delivery date of the contract.

13) SUBMITTALS:

a. Once awarded, the following list of submittals required for approval defines the specific minimum requirements for this contract. The submittal shall contain sufficient information that can be used to determine compliance of the material with these specifications and referenced specifications.

i) Basic proposed construction plan including declaration of replacement materials

ii) Work delivery schedule

14) REFERENCES:

a. Photos of location of existing LNG line

15) TECHNICAL REQUIREMENTS: Provide all supervision, labor, equipment, parts and materials necessary to remove the existing LNG line and replace-in-kind.

a. The Contractor is to provide and install any and all parts necessary to fully install this prescribed equipment.

b. The Contractor shall remove the existing run of LNG piping.

c. The Contractor shall install the new 2” gauge gas line.

d. The Contractor shall utilize the same pathway and use existing supports/galvanized piping.

e. The Contractor shall match the gas piping exactly to the existing system.

f. The Contractor shall not replace the existing seismic cutoff valve.

g. The Contractor shall air test the newly installed equipment

h. The Contractor shall perp and paint the new exposed piping with a corrosion resistant coating.

i. Installation, operation, maintenance manuals and warranty information for the equipment and system components shall be turned over to the COR upon project completion.

16) TESTING AND INSPECTION:

a. The Contractor shall notify the Contracting Officer’s Representative (COR) 1 days before the performance, inspection and acceptance tests are to be conducted. The tests shall be performed in the presence of the onsite representative, MK1 Jack A. Fielden.

b. Installation, workmanship, fabrication, assembly, erection, examination, inspection and testing shall be in accordance with appropriate sections of 29 CFR 1910, 1

REFERENCE (a): Existing site conditions with corroded LNG line.