Livingston WLS Jan 2025.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- RoW Mow and Trim Smithland Section
- Solicitation number
- RFB-605-2500000440-1
- Issued by
- Cumberland County, Kentucky
About this file
This is a work location sheet for Livingston County, Kentucky detailing Right of Way (RoW) mowing requirements across multiple highway routes. The project covers 196.535 total miles of roadway with 779 acres requiring mowing across various state and federal highways, including US 60, US 62, and multiple Kentucky state routes (KY). Each location requires three mowing cycles, with a maximum of 20 working days allowed to complete each cycle. The work is divided between MP (Main Project) routes totaling 47.508 miles and 196 acres, and RS (Rural Secondary) routes covering 149.027 miles and 583 acres.
The project is organized by route segments with specific mile markers defining the start and end points for each section. Notable segments include US 60 (29.059 miles, 127 acres), KY 137 (24.398 miles, 100 acres), and KY 133 (18.716 miles, 63 acres). Each route segment is assigned a unique project number with the prefix FE01 070, indicating this is a Livingston County project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Crittenden WLS Jan 2025.xlsx | XLSX spreadsheet | |
| How to Submit an Online Response - March 2023.pdf | ||
| 2025 Drawings - Delineator Posts.pdf | ||
| 2025 Drawings Mowing with Trimming.pdf | ||
| Final_RFB_605_2500000440_1_SO_FORM.PDF | ||
| Lyon WLS Jan 2025.xlsx | XLSX spreadsheet | |
| 2025 Drawing - Trimming of Bridge Embankments.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Livingston County | ||||||||
| Mowing Work Location Sheet | Sheet 1 of 3 | |||||||
| Limits of Project | Project | Type 3 | Number | |||||
| Route | Project | Length | Mowing | of | ||||
| Number | System | County | Number | Begin | End | (Miles) | Acres | Cycles |
| US 60 | MP | Livingston | FE01 070 0060 | McCracken Co. Line | Crittenden Co. Line | 29.059 | 127 | 3 |
| 000-030 | (MP 0.000) | (MP29.059) | ||||||
| US 62 | MP | Livingston | FE01 070 0062 | Marshall Co. Line | Cumberland River Brd. | 2.808 | 6 | 3 |
| 000-003 | (MP 0.000) | (MP 2.808) | ||||||
| KY 453 | MP | Livingston | FE01 070 0453 | Lyon Co. Line | US 60 | 15.641 | 63 | 3 |
| 000-016 | (MP 0.000) | (MP 15.641) | ||||||
| Subtotal MP | 47.508 | 196 | ||||||
| KY 70 | RS | Livingston | FE01 070 070 | US 60 | KY 866 | 11.386 | 46 | 3 |
| 000-012 | (MP 0.000) | (MP 11.386) | ||||||
| KY 93 | RS | Livingston | FE01 070 0093 | Short Drive | KY 453 | 4.516 | 16 | 3 |
| 000-005 | (MP 0.000) | (MP 4.516) | ||||||
| KY 133 | RS | Livingston | FE01 070 0133 | Shelby Road | KY 137 | 18.716 | 63 | 3 |
| 000-019 | (MP 0.000) | (MP 18.716) | ||||||
| KY 135 | RS | Livingston | FE01 070 0135 | US 60 | Crittenden Co. Line | 13.367 | 48 | 3 |
| 000-014 | (MP 0.000) | (MP 13.367) | ||||||
| KY 137 | RS | Livingston | FE01 070 0137 | US 60 | KY 133 | 24.398 | 100 | 3 |
| 000-025 | (MP 0.000) | (MP 24.398) | ||||||
| KY 723 | RS | Livingston | FE01 070 0723 | Haynes Park Road | Crittenden Co. Line | 7.368 | 35 | 3 |
| 000-008 | (MP 0.000) | (MP7.368) | ||||||
| Livingston County | ||||||||
| Mowing Work Location Sheet | Sheet 2 of 3 | |||||||
| Limits of Project | Project | Type 3 | Number | |||||
| Route | Project | Length | Mowing | of | ||||
| Number | System | County | Number | Begin | End | (Miles) | Acres | Cycles |
| KY 763 | RS | Livingston | FE01 070 0763 | KY 137 | US 60 | 6.452 | 19 | 3 |
| 000-007 | (MP 0.000) | (MP 6.452) | ||||||
| KY 838 | RS | Livingston | FE01 070 0838 | KY 135 | Crittenden Co. Line | 6.748 | 27 | 3 |
| 000-007 | (MP 0.000) | (MP 6.748) | ||||||
| KY 866 | RS | Livingston | FE01 070 866 | KY 93 | KY 70 | 8.741 | 32 | 3 |
| 000-009 | (MP 0.000) | (MP 8.741) | ||||||
| KY 917 | RS | Livingston | FE01 070 0917 | US 62 | KY 866 | 8.297 | 28 | 3 |
| 000-009 | (MP 0.000) | (MP 8.297) | ||||||
| KY 937 | RS | Livingston | FE01 070 0937 | US 60 | KY 453 | 2.949 | 15 | 3 |
| 000-003 | (MP 0.000) | (MP 2.949) | ||||||
| KY 952 | RS | Livingston | FE01 070 0952 | IC Railroad Bridge | US 62 | 1.157 | 11 | 3 |
| 000-002 | (MP 0.000) | (MP 1.157) | ||||||
| KY 967 | RS | Livingston | FE01 070 0967 | US 60 | US 60 | 0.474 | 1 | 3 |
| 000-001 | (MP 0.000) | (MP 0.474) | ||||||
| KY 1433 | RS | Livingston | FE01 070 1433 | US 60 | KY 723 | 10 | 26 | 3 |
| 000-010 | (MP 0.000) | (MP 10.000) | ||||||
| KY 1436 | RS | Livingston | FE01 070 1436 | KY 137 | KY 133 | 5.531 | 35 | 3 |
| 000-006 | (MP 0.000) | (MP 5.531) | ||||||
| KY 1608 | RS | Livingston | FE01 070 1608 | KY 763 | KY 135 | 6.495 | 35 | 3 |
| 000-007 | (MP 0.000) | (MP 6.495) | ||||||
| Livingston County | ||||||||
| Mowing Work Location Sheet | Sheet 3 of 3 | |||||||
| Limits of Project | Project | Type 3 | Number | |||||
| Route | Project | Length | Mowing | of | ||||
| Number | System | County | Number | Begin | End | (Miles) | Acres | Cycles |
| KY 1889 | RS | Livingston | FE01 070 1889 | KY 453 | Heater Store Road | 2.665 | 17 | 3 |
| 000-003 | (MP 0.000) | (MP 2.665) | ||||||
| KY 2225 | RS | Livingston | FE01 070 2225 | KY 453 | KY 93 | 3.661 | 9 | 3 |
| 000-004 | (MP 0.000) | (MP 3.661) | ||||||
| KY 2232 | RS | Livingston | FE01 070 2232 | KY 866 | KY 70 | 3.146 | 8 | 3 |
| 000-004 | (MP 0.000) | (MP 3.146) | ||||||
| KY 3489 | RS | Livingston | FE01 070 3489 | US 60 | US 60 | 1.508 | 4 | 3 |
| 000-002 | (MP 0.000) | (MP 1.508) | ||||||
| KY 6005 | RS | Livingston | FE01 070 6005 | Begin State Maint. | KY 917 | 0.176 | 1 | 3 |
| 000-001 | (MP 0.000) | (MP 0.176) | ||||||
| KY 6006 | RS | Livingston | FE01 070 6006 | KY 917 | End State Maint. | 0.762 | 2 | 3 |
| 000-001 | (MP 0.000) | (MP 0.762) | ||||||
| KY 6074 | RS | Livingston | FE01 070 6074 | End State Maint. | Lakeview Drive | 0.514 | 5 | 3 |
| 000-001 | (MP 0.000) | (MP 0.514) | ||||||
| Subtotal RS | 149.027 | 583 |
| Grand Total | 196.535 | 779 | |
| Maximum number of days to complete a cycle: 20 working days. |
File details come from the government source that posted it. Updated .