This is a Request for Quote specification document issued by the Maine Department of Transportation (MDOT) for the purchase of live bottom 5th wheel trailers. MDOT Fleet Services is soliciting bids for four live bottom trailers to be delivered over a 24-month purchase cycle, with two trailers requested in the first 12-month period and two trailers in the second 12-month period. The trailers will be used for transporting hot asphalt pavement, recycled asphalt pavement, aggregates, salt, and mulch products. The first 12-month purchase order will be awarded following bid evaluation, with a second purchase order to be issued no later than 90 days before the start of the second cycle, contingent upon the State's needs. The contract period runs from February 1, 2008, to February 1, 2010. Delivery of the first two units is preferred on or before May 1, 2008, with the second two units preferred by May 1, 2009.
The live bottom trailers must meet detailed specifications including a minimum capacity of 26 cubic yards and maximum of 30 cubic yards, a full-length C-channel reinforced frame not exceeding 39 feet in overall length, tri-axle suspension with air ride capabilities, dual air brake systems with ABS, LED lighting, and insulation to maintain adequate heat for asphalt. The trailers must be equipped with direct hydrostatic drive live floors and air-operated locking tailgates. Pricing is expected to remain firm for the entire 24-month contract period. The successful bidder must maintain a 95 percent parts availability within 48 hours and 24-hour availability for expendable items, with parts inventory located within Maine. MDOT reserves the right to perform warranty work in-house and recover costs from the manufacturer, except for major engine, transmission, and axle work. A one-year warranty from the in-service date is required, along with two days of operator training—one day at delivery and one additional day within eight weeks. Bidders must provide detailed information regarding component specifications, advertising literature, proposed exceptions to specifications, and acknowledgment of compliance with all stated requirements.
Text of this file
Maine Department of Transportation file_0.bin thumbnail_0.png thumbnail_1.wmf
Request for Quote
Maine Department of Transportation Live Bottom Trailer Purchase
SPECIFICATION PURPOSE & INTENT - GENERAL
The attached Specifications require providing all things necessary, or proper for, or incidental to the furnishing and delivery of the bid item (or items) and associated equipment to Fleet Service/M.D.O.T., Augusta, Maine. The aforementioned bid item shall be of heavy-duty design and construction for extreme service or application. All things not expressly mentioned in these Specifications, but involved in carrying out their intent, are required by these Specifications and the vendor shall perform the same as though they were specifically mentioned, described and delineated.
The bid item (or items) and all associated equipment shall be furnished complete and in readiness for use as required by the terms of these Specifications and in strict accordance therewith. The bid item (or items) and all equipment furnished shall be the manufacturer's current or 2006 listed and published stock model, or models which meet or exceed all the applicable requirements of these Specifications. All design, materials and workmanship shall in every respect be in accordance with the best current practices in the industry and all materials used shall be new.
The bid item or items shall be in full compliance with any and all Federal and State of Maine, rules, regulations or codes. Any and all bid or accessory items furnished by the vendor, distributor and/or manufacturer shall be installed in accordance with the highest standards of the industry, full compliance of all applicable Federal and State of Maine rules, regulations or codes and must be completely inspected and serviced prior to delivery.
Fleet Service/M.D.O.T. reserves the right to expect replacement of any item, component or associated equipment from the vendor, distributor or manufacturer, at no cost to Fleet Service for failure to perform. Fleet Service also reserves the right to require training for operation or maintenance and repair where necessary at no additional cost.
All Warranties and Guarantees are to become effective the date the State of Maine places the bid item (or items) into service.
Since the continuous operation of the bid item (or items) as specified is of the utmost importance and sometimes of an emergency nature, it is necessary that the successful bidder be in a position to render prompt parts and if necessary, service. The successful bidder and subcontractor (if any) must maintain and/or have access to parts inventory within the State of Maine. The parts inventory shall be applicable to the bid item (or items) supplied to the State of Maine and must be of sufficient quantity and variety to offer a level of parts availability of 95% within 48 hours from time of order by MDOT. Availability of normally expendable items such as filters, belts, hydraulic lines and hoses shall not exceed 24 hours. Bidder shall attach a proposal program for parts and service availability for evaluation. Review of the bidder's ability to provide prompt parts and service may be a determining factor in the award of bid. Upon award of bid and before delivery of bid item (or items) MDOT must receive a complete list of parts containing part description, manufacturer's part number etc. for the entire item or items including any or all accessories which are supplied as part of the bid. This does not relieve the bidder from supplying parts manuals or repair manuals as required in the individual specification. The manufacturer’s manual must be supplied at time of bid.
During the term of the manufacturer's warranty Fleet Service reserves the right to perform any and all warranty work "in house" to meet operational needs or demands with the exception of major engine, transmission and axle rebuild or repair. Fleet Service will recover all parts and labor cost (labor time as allowed by manufacturer's rate manual Fleet Service standard labor rate at the time of repair) by billing the manufacturer and/or dealer. O.E.M. parts may be supplied at no cost by the manufacturer or dealer and will not be billed by Fleet Service, or may be purchased by Fleet Service on the open market to meet operational demands. Any and all defective parts will be returned to the manufacturer or dealer upon request. Additionally Fleet Service will perform no other paper work other than what is necessary for Fleet Service to track the cost of warranty repair through its own billing system. Manufacturers, dealers or vendors who are selected to any equipment, vehicles or accessories to Fleet Service, must place Fleet Service on a mailing list to provide warranty recalls and/or technical updates or service bulletins to the Fleet Manager’s Office of Fleet Service, 105 Capitol St., Station #26, Augusta, Maine 04333.
A paint code and/or name of brand, color and part number of paint must be supplied in order to match paint color.
Either before or after final acceptance any vehicle or equipment which does not meet these requirements may be rejected in whole or returned for correction at no cost.
Division of Purchases reserves the right to consider alternates and determine equivalency. Specifications differences will be reviewed. Division of Purchases also reserves the right to make multiple awards based on prior history or experience with the bidder or subcontractor and/or prior history or experience with equipment offered. Furthermore, Division of Purchases reserves the right to request information for clarification.
Award of bid will be based on:
Specifications & quality of equipment proposed
Prior history or experience with the bidder and/or subcontractor, and prior history or experience with equipment offered.
Price
Delivery timeliness.
REQUIRED INFORMATION FOR BID PROPOSALS
As evaluation of returned bid proposals can be a long and difficult process, it’s necessary to obtain as much information as possible for the vehicles, equipment and/or accessories which are offered to facilitate the review and decision making process. To this end, unless requested elsewhere in these documents by the Division of Purchases or Fleet Services there is certain information which is essential and must be provided with the bid proposal. This information includes but is not limited to:
A separate sheet noting any and all exceptions which are being taken to the specifications.
A copy of the specification must be retuned noting these same exceptions and also identifying the make, model, brand, type, size, etc. Of the components which are being supplied.
The most recent advertising literature pertaining to the vehicle, equipment and / or accessories which are being offered to also include any technical specifications or information.
| Scope: |
| MaineDOT Fleet Services is requesting bids on four Live Bottom 5th Wheel Trailers over a 24 month purchase cycle. MaineDOT requires a staggered delivery schedule, anticipating two trailers in the first 12 month cycle and two trailers in the second 12 month cycle. A purchase order for the first 12 months of the 24 month cycle will be awarded to the successful bidder after bid evaluation. The State reserves the right to cancel or amend the quantity of the second 12 month cycle due to unforeseen circumstances. If the State decides to purchase a second 12 month purchase. A Purchase Order will be awarded to the same successful bidder no later than 90 days before the start of the second 12 month purchase. |
| Contract Period: | |
| 2/1/08 to 2/1/10 |
| Prices: |
| Prices are expected to remain firm for the 24 month contract period. |
Department of Transportation Fleet Services
Technical Specification Live Bottom Trailer
It is the purpose and intent of these specifications to describe a live bottom over highway trailer of 5th wheel design. Used in the delivery of hot asphalt pavement, recycled asphalt pavement, aggregate such as crushed stone, mineral filler, salt, and mulch product.
1. Capacity:
1.1 Unit must be able to handle a capacity of a minimum of 26 cu.Yds. and a maximum capacity of 30 cu. Yds. not exceed the height of the bed rail when fully loaded.
2. Frame:
| 2.1 | Full length “C” Channel reinforcement mandatory. |
| 2.2 | Heavy duty 100,000 P.S.I. yield minimum side rail. |
| Fish plates not acceptable. |
Heavy duty gusseted cross members shall be provided.
Local installation of frame reinforcement not acceptable.
Overall length not to exceed 39 feet.
King pin to center of last axle no more than 34 ft.
King pin will not have set back of more than 17 in.
Landing gear will be of a two (2) speed crank down design
3. Suspension:
| 3.1 | (2) 25,000 LBS axles with steel piloted hubs of a ten bolt | |
| design. |
3.2 Tri-axle 3 leaf suspension / air ride.
3.3 (12) 22.5 x 8.5 One piece heavy duty tubeless hub piloted disc rims, of a 10 hole design.
3.4 (12) 12R x 22.5 radial tubeless tire with 16 ply rating Goodyear G124 or approved equal
| 3.5 | Front axle shall be 23,000 LBS of an air lift axle design. | |
| 3.6 | Spare tire and wheel to match design on equipment. |
4. Brakes :
4.1 Air Brakes.
4.2 Dual air brake system with A.B.S.
4.3 Brakes will be 16.5 x 7” S cam type, two (2) 30/30
moisture resistance chambers.
4.4 Rear parking chambers must be positioned to prevent
parking brake canisters from extending past rear tires and to prevent interference when backing into pavers, shoulder boxes, etc.
4.5 Parking brake must be spring actuated “piggy-back” type, on the two most rear axles.
Air reservoirs shall have ample road clearance and be of sufficient reserve capacity to support all vehicle air accessories.
4.7 Pull drains on each reservoir with loose end of cable
attached professionally in location that is easily accessible to the operator.
| Brakes must have backing plates. |
| Brake drums shall be of a cast design, with piloted hub, and ten whole pattern, to match with the aforesaid brake type and size. |
5. Body:
| 5.1 Overall height will not exceed 10 feet | |
| Overall width not to exceed 102 in. | |
| Live Floor – chain with oil and heat resistant rubber belt no less than 38” in width. | |
| Adjustable chain lubricator. | |
| Front shaft chain tightener | |
| Direct hydrostatic drive. | |
| Steel hydraulic lines with standard quick couplings. | |
| A dual cylinder air operated Locking tailgate w/over center locks. |
Access ladder.
| All lighting must be of LED design and D.O.T. approved. |
| Must have D.O.T. tape applied to regulation. |
| All axles must have fenders of either aluminum or stainless steel design. |
Load cover must be air or electrically operated and may not extend above the height of the body more then 12 in.
Truck to trailer Elec. connection will be a seven pin round trailer connector wired to a standard ICC wiring pattern.
Fifth wheel plate, and king pin suited for truck transport.
Body must be insulated to maintain adequate heat for premixed asphalt.
7 Training:
| 7.1 | Training shall include one day at the time of delivery, and one additional day to be determined by Fleet Service no later than eight weeks after initial training has been completed. |
| 7.2 | Tow service and parts manuals will accompany each trailer upon delivery. If available, CD’s or electronic copies will be provided in addition to the printed copies. |
8 Warranty:
8.1 Warranty will cover equipment for one year from the time of in service date. A copy of warranty terms and conditions to include parts and labor covered will be provided with the bid, and upon delivery.
9 Delivery:
9.1 Delivery of the first two unites, in the first 12 month cycle is preferred to be on or before May 1, 2008.
9.2 Delivery of the second two unites in the second 12 month cycle is preferred to be on or before May 1, 2009. Please state in your bid response if this is acceptable, and/or state your earliest possible delivery date.
9.3 A written statement acknowledging compliance with these specifications must accompany the bid proposal.
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation_terms.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .