List of Bid Items 657A4-22-309 Rev 081925.docx
DOCX document 15 KB Posted
- Attached to
- Z1NE--657A4-22-309, Fire Main and Water Storage Federal contract opportunity
- Solicitation number
- Not on record
About this file
This document is a List of Bid Items for a Department of Veterans Affairs project at the Poplar Bluff VAMC (Veterans Affairs Medical Center) to replace fire mains and water storage infrastructure. The solicitation includes three Contract Line Item Numbers (CLINs) with varying scopes and performance periods: CLIN 0001 is the base bid for full project scope with a 520-calendar day performance period, while CLIN 0002 and CLIN 0003 are deductive alternates that progressively reduce project scope and performance time to 430 and 340 calendar days, respectively.
The government reserves the right to award on any of the CLINs and requires offerors to provide pricing for each line item, including a detailed breakdown of material and labor costs by specification division. Overhead, profit, and bond costs must be added after calculating material and labor subtotals. The intended award will be on CLIN 0001, but if bids exceed available funding, the government may award CLIN 0002 or CLIN 0003. The project involves construction work including site preparation, demolition, equipment installation, and infrastructure replacement at the Poplar Bluff VAMC facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25525R0099 0005.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID ITEMS
Poplar Bluff VAMC 657A4-22-309 Replace Fire Mains and Water Storage
PROPOSAL SCHEDULE
Poplar Bluff VAMC 657A4-22-309 Replace Fire Mains and Water Storage
CLIN 0001, GENERAL CONSTRUCTION: BASE BID: VA Poplar Bluff VAMC, requires a Construction Contractor to completely prepare site for building operations, including demolition and removal of existing structures, and furnish equipment, testing, labor and materials and perform work for the “Replace Fire Main and Water Storage” project in accordance with the attached specifications and drawings. Work includes general construction, alterations, roads, walks, grading, drainage, and as necessary removal of existing structures and construction and certain other items. (Period of Performance 520 calendar days)
CLIN 0002, DEDUCTIVE ALTERNATE NO. 1: All work in CLIN 0001 except delete the following scope of work: “demolition and removal of all existing water and fire mains, associated excavation, asphalt paving and concrete repair” and replace with, “abandon all existing water and fire mains in place, as detailed in the project plans and specification”. (Period of Performance reduced to 430 calendar days)
CLIN 0003, DEDUCTIVE ALTERNATE NO.2: All work in CLIN 0002 with the exception of Remove domestic water storage tank and fire water storage tank, associated foundations concrete, pipe bollards, storm water inlet and piping, subgrade prep, final grading and domestic water and fire water piping from the tanks to the pumphouse as well as piping from the mains to the tanks (Period of Performance reduced to 340 calendar days)
THE GOVERNMENT RESERVES THE RIGHT TO AWARD ON ANY OF THE RESPECTIVE CLINS 0001-0003. Offerors must provide a price for each line item. In addition, offerors shall include a breakdown of material and labor costs, by specification division for each bid item. Overhead, profit, and bond costs shall be added after a subtotal of materials and labor costs has been calculated. It is intended that award will be made on CLIN 0001, however, should bids exceed the funds available, award will be made on CLINs 0002 or and CLIN 0003; if pricing is within the Government’s available funding.