About this file
This document is a Notice to Bidders for the 2024 Transportation Facility Renovations Project issued by the Lenawee Intermediate School District (LISD). The project requires qualified General Contractors to provide all labor, materials, and permits for the renovations. A mandatory pre-bid walk-through is scheduled for February 15, 2024, and all proposals must be submitted by February 27, 2024. The project is expected to commence on May 6, 2024, and be completed by November 1, 2024. LISD reserves the right to reject any or all proposals and to accept a bid other than the low bid.
The bid documents require a 5% Bid Security, a sworn and notarized statement disclosing any familial relationship between the bidder's employees and the LISD Board of Education or Superintendent, and a sworn and notarized Affidavit of Compliance with the Iran Economic Sanctions Act. A Michigan-based business preference of the lesser value of 5% or $10,000 will apply in determining awards.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2024 TRANSPORTATION FACILITY RENOVATIONS PROJECT
Notice to Bidders
The Lenawee Intermediate School District will receive sealed bid proposals from qualified General Contractors for the LISD 2024 Transportation Facility Renovations Project. All proposals shall include all labor, materials, and permits.
A mandatory pre-bid walk through for interested parties is scheduled for Thursday, February 15, 2024, starting at 3:00 p.m in the Transportation Building, 2946 Sutton Road, Adrian, MI.
All proposals shall be mailed or delivered to the front desk at theWilliam J. Ross Building, 4107 N Adrian Hwy, Adrian, MI. Proposals must be received prior to 2:00 pm on Thursday, February 27, 2024, and will be opened and read aloud in the Conference room at a meeting open to the public. All bids will be evaluated after the bid opening. All bids received after the bid receipt deadline will be returned unopened. Facsimile bids will not be accepted.
The bidders shall read and review the Bidding specifications carefully, and familiarize themselves thoroughly with all requirements.
Questions and comments by Contractors for inclusion as Bidders shall be addressed to Todd Dailey, Dailey Engineering, Inc. by email at todddailey@me.com. Bid drawings and specifications will be available on February 09, 2024 and can be obtained electronically by making a request to Dailey Engineering, Inc:
e-mail: todddailey@me.com or phone: (517)467-9000.
A Bid Security in the amount of five percent (5%) is required and must be submitted with the bid prior to the bid due date. The Bid Security may be in the form of a Bid Bond, Cashier’s Check, or Money Order. Bids may not be withdrawn for a period of thirty (30) days after the bid date.
Additional bond requirements are listed in the bid specifications.
All bidders shall provide familial disclosure in compliance with MCL 380.1267. All bids shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the Owner or any employee of the bidder and any member of the Board of Education of the Lenawee Intermediate School District (“LISD”), or the superintendent of the LISD. A form will be enclosed in the specification’s booklet that shall be used for this purpose.
A sworn and notarized Affidavit of compliance for the Iran Economic Sanctions Act certifying the contractor does and will comply with Public Act 517 of 2012 shall accompany all proposals. The Owner will not accept a proposal that does not include a sworn and notarized Affidavit of Compliance for the Iran Economic Sanctions Act. A form will be enclosed in the specification’s booklet that shall be used for this purpose.
A Michigan based business preference of the lesser value of 5% or $10,000 will apply in determining awards.
Field construction may begin as early as May 6, 2024 The Project Completion Date is November 01, 2024.
The Owner reserves the right to reject any or all proposals, accept a bid other than the low bid, and to waive informalities, irregularities and/or errors in the bid proposals which they feel to be in their own best interest.
End of Notice mailto:todddailey@me.com