LISC Follow-on Industry Day Brief.pdf
PDF 5 MB Posted
- Attached to
- LISC FO Post Industry Day Information
- Solicitation number
- 45CONS
- Issued by
-
Department of Defense
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LISC FO INDUSTRY DAY ATTENDEES.pdf | ||
| LISC FO Industry Day Questions and Answers - Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Launch and Test Range System (LTRS) Integrated Support Contract (LISC) Follow-on
Industry Day
Ms. Charlene Thomas, Contracting Officer Maj Joe Silvio, Multi-funcitional Team Lead
SLD 45/PMD
13 Dec 2021
Highest Overall Classification:
UNCLASSIFIED - PRE-DECISIONAL
UNCLASSIFIED - PRE-DECISIONAL
AGENDA
• LTRS Program Description
• SLD 30 Mission Brief
• SLD 45 Mission Brief
• ROTF Overview
• Range Architecture and Transition
• LISC FO Acquisition Strategy Development
• Schedule & Industry Engagements
• LISC FO Scope
• LISC FO Program Objectives
• LISC FO Desired Outcomes
• LISC FO Framing Assumptions
• LISC FO Strategy Considerations
• LISC FO & Small Business
UNCLASSIFIED – Pre-Decisional
• The following is preliminary, pre-decisional information only
• All information provided is subject to change
• Government is not currently soliciting proposals
• Submit today’s questions in writing
• Questions (non-attribution) and responses will be posted on SAM.gov
• Some Questions may be addressed today
• Both verbal and written answers are not binding: the circumstances of the proposed acquisition may change over time.
DISCLAIMER
UNCLASSIFIED – Pre-Decisional
LTRS Program Description
Highest Overall Classification:
UNCLASSIFIED - PRE-DECISIONAL
• The LTRS consists of the Eastern Range (ER) and Western Range (WR), and comprises a network of 11 subsystems, that must work in concert:
• Command Destruct
• Communications
• Data Handling
• Range Safety
• Optics
• Planning & Scheduling
• Radar
• Surveillance
• Timing & Sequencing
• Telemetry
• Weather
• Public Safety, mission success, and assured access to space are of prime importance
LTRS PROGRAM DESCRIPTION
Semper Supra
HQ United States Space Force (USSF) Eastern and Western Ranges, collectively referred to as the Launch and Test Range System (LTRS), is a system of sub-systems employed to directly support launch and test activities as a critical enabler to Assured Access to Space and supports DoD test activities / Major Range and Test Facility Base (MRTFB)
Western Range Operations Control Center (WROCC)
Eastern Range Morrell Operations Center (MOC) 6
MISSION
• Direct support to National Security Space (NSS)
• Conducts civil and commercial space launch activities in accordance with National Space Transportation Policy
• Conducts Department of Defense (DoD) Test and Evaluation
(T&E) activities pursuant to DoD Directive 3200.11, Major Range and Test Facility Base (MRTFB)
24/7 Assured Access To Space (AATS)
Pre-Launch, Launch, Flyback, Re-entry, Recovery
Support for DoD, Civil, and Commercial operations
Foundation for Space Warfighting Construct and critical enabler for global combat operations: warning, navigation, ISR, comm, weather
LAUNCH AND TEST RANGE SYSTEM-LTRS
7CONTROLLED UNCLASS
SLD 30 Mission Brief
UNCLASSIFIED - PRE-DECISIONAL
Aeronauticals
SLD 30 OVERVIEW
VSFB: A Power Projection Platform
Range Services Installation Services
Real Property Security
Environmental
Fire Commodities
Telemetry
Radar Optics
Command Destruct
Area Clearance
Weather
Communications
Largest Base in USSF 118K Acres
46 mi coastline 16 launch sites 2K+ buildings 15K ft runway
621 miles roads 10K personnel
Assured Access to Space Major Range and Test Facility Base Host Base Responsibilities
CMD
CT-6
Point Mugu
Frequency Monitoring
MOBILE
TLM
CMD
CT-3
CMD
CT-1
CMD
CT-5
SODAR
RADAR
FPS-16
Area Surveillance
5-OSS
Wx Towers & Airfield Sensors
Optics
ROTI
Optics Mobile
WROCC
Range Safety Processing
TLM VTRS
35 Ft
TLM VTRS
44’ A
TLM VTRS
44’ B
RADAR
HAIR
RADAR
TPQ-18
Optics
DOAMS
Transponder Measurement
Van
Area Surveillance
1-ARSR
915 MHz
DRWP
AMPS LLPS
Radio Frequency
Measurement Van
Range Safety Measurement Van
Command Receiver
Measurement Van
GPS
Measurement Van
Vandenberg SFB & Vicinity
TGRS
RR/
QM
RR/
QM
RADAR
FPQ-6
TLM
44 ft
TLM
40 ft
CMD
CT-4
Pillar Point
TGRS
RR/
QM
RR/
QM
WR INSTRUMENTATION 2020 (BASELINE)
UNCLASSIFIED - PRE-DECISIONAL
http://www.cisco.com/c/dam/en/us/td/docs/unified_computing/ucs/UCS_CVDs/CPA_for_BigData_with_Cloudera.fm/_jcr_content/renditions/CPA_for_BigData_with_Cloudera-002.jpg
B a l l i s t i c
LF-23
LF-08
LF-24
LF-21
LF-10
LF-05
LF-04
LF-09
LF-07
LF-25
LF-26
LF-06
LF-02
LF-03
Minuteman
/GBSD
Ground-Based Interceptor
SPACE
LAUNCH
DELTA 30
SLD 30/XPR: Chart Updated Nov 2021
Current
New (in work)
Deactivated
Text
Text
Launch Vehicle Legend
SLC-11
SLC-5
LZ-4
SLC-4
GERTS
SLC-6
Vina Terrace
Boathouse Flats
Sudden Ranch
SLC-3
576E Runway
SLC-9
SLC-2
Boat Dock
SLC-8
Talon-A
RS1
Daytona, Laguna
Delta IV
Terran 1
X-37B
S p a c e L i f t
Pegasus
Minotaur I/IV
Atlas V Vulcan
Falcon 9, Falcon Heavy
SLD 30/XPR: Chart Updated Nov 2021
Alpha
Current
New (in work)
Multi-User Pad
Text
Text
Launch Vehicle Legend
SPACE
LAUNCH
DELTA 30
SLC-11
TP-01
SLC-5
GERTS
SLC-6
Vina Terrace
Boathouse Flats
Sudden Ranch
SLC-9
Boat Dock
SLC-8
S p a c e L i f t
Terran R
SLD 30/XPR: Chart Updated Nov 2021
Beta
Potential
Future Launch Sites
Multi-User Pad
Text
Launch Vehicle Legend
SPACE
LAUNCH
DELTA 30
New Glenn
Rocket 3
Electron
Launcher Light
TP-01
SLD 45 Mission Brief
UNCLASSIFIED - PRE-DECISIONAL
Space Launch Delta 45: One Team…delivering assured access space launch, range and combat capabilities for the nation
Atlas V Launch Vehicle
Lunar Lander
Delta IV Launch Vehicle
SLBM
FlybackFalcon-9 Launch Vehicle
EASTERN RANGE
Delta structure eliminates Groups Squadrons report directly to the Delta CC
TLM
TAA 50-1
TGRS
RR/
QM
RR/
QM
CMD
JDMTA A
CMD
JDMTA B
TLM
TAA 50-2
TLM
TAA 50-3
TLM
TAA 50-5
Jonathan Dickinson Missile Tracking Annex (JDMTA)
TLM
TAA-3C-2
TLM
TAA-3C-1
Ascension
Fixed Optics
2 DOAMS
MIDDS915 MHz
DRWP
AMPS WX Towers & Airfiels Sensors
MOTR
19.39
RADAR
1.16
(Standby)
RADAR
19.14
WX
Surveillance
Radar
Mobile Optics
2 ATOTS
Frequency Control
Analysis Vans
ROCC
(MOC)
RADAR
0.134
TLM
Tel-IV
TAA-3C
TLM
Tel-IV
TAA-24A
CMD
Cape 1B
Range Safety Processing
Area Surveillance
2 – SSR
LPLWS
Mobile Optics
4 CINE
CMD
Cape 1A
Cape Canaveral SFS & Patrick SFB
EASTERN RANGE
UNCLASSIFIED - PRE-DECISIONAL
http://www.cisco.com/c/dam/en/us/td/docs/unified_computing/ucs/UCS_CVDs/CPA_for_BigData_with_Cloudera.fm/_jcr_content/renditions/CPA_for_BigData_with_Cloudera-002.jpg
Black text – current programs; Blue text – in work; * – sub-orbital
SLF: X-37; SNC Dream Chaser Landings
Complex 39B: NASA SLS; NGIS OmegA
Complex 39A: SpaceX Falcon 9; Falcon Heavy (Dragon 2)
Complex 41: ULA Atlas V (CST-100; Dream Chaser)
Complex 41: ULA Vulcan (CST-100; Dream Chaser)
Complex 40: SpaceX Falcon 9
Complex 37: ULA Delta IV; Delta IV Heavy
Complex 20: Firefly Alpha
Complex 16: Relativity Terran
Landing Zone 1/2: SpaceX landing
Complex 36/11: Blue Origin New Glenn
Atlantic: SpaceX / Blue Origin Landings, Navy Trident II
Complex 46: Minotaur IV; Navy*
Skid Strip: MDA MRBM Test*
Complex 17/18: Moon Express*
Skid Strip: NGIS Pegasus
ER SPACE LAUNCH COMPLEXES
COMBINED PROJECTIONS FOR ER & WR
Actuals through 2020; Aerospace Assured Space Access Model (ASAM) simulation projections through 2030
Potential for significant growth in launch activity. Considerable and increasing uncertainty for future years.
File: ASAM_Output_2021_05_13.xlsx ER WR Combined
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
An nu al L au nc he s
Fiscal Years
Eastern and Western Combined Launch Projections
90th Percentile Value Optimistic Scenario
Median Value Optimistic Scenario
Median Value Modest Scenario
Median Value Pessimistic Scenario
10th Percentile Value Pessimistic Scenario
Actuals
Range of the Future (ROTF) Overview
Highest Overall Classification:
UNCLASSIFIED - PRE-DECISIONAL
SPACE SYSTEMS COMMAND
ROTF DRIVERS
• Revolution in Spacelift mission areas (launch, range, and acquisition)
• Significant growth of Commercial Space Launch providers / launch rates
• Expansion of space missions (tourism, on-orbit maintenance, moon base, etc.)
• Automated Flight Safety System (AFSS): “the game changer”
• Enables fundamental transformation of range services and capacity
• Complementary changes in range acquisition
• Range technology/infrastructure/processes outdated and difficult to OM&S
ER LAUNCH DEMAND POTENTIAL
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Commercial 8 6 10 5 14 23 45 72 74 112 136 133 164 153 157 Civil 5 7 6 5 8 5 14 11 22 14 13 12 12 11 11
NSS 6 6 4 6 3 6 6 10 8 14 7 9 13 15 9
DoD T&E 2 0 4 1 0 2 0 3 3 3 3 3 3 3 3 Assume 3 per year average
Totals 21 19 24 17 25 36 65 96 107 143 159 157 192 182 180
LISN 29 30 36 26 48 49 65 45 32 17 LISN 9/27/2021
ASAM 90th Percentile
23 22 33 23 32 38 41 50 60 79 103 119 128 132 132
ASAM 50th Percentile 19 19 25 22 29 34 36 41 51 66 87 101 109 112 113
File: Launch_Schedule_2021_10_07.xlsx Sheet: ER_SandChart_4MissionCat_Op1r
ASAM 9/30/2021
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
N um be r o f A nn ua l L au nc he s
U.S. Government Fiscal Year
Eastern Range Launch Activity 5-Year Look Back / 9-Year Look Ahead
Commercial
Civil
NSS
DoD T&E
LISN
90th Percentile
50th Percentile
1-Year Projections (lines) versus
Actuals (Sand Chart)
The Sand Chart and Table represents the forecast of planned launches.
The dashed lines represent the number of launches from the simulation.
Optimistic Scenario Forecast
WR LAUNCH DEMAND POTENTIAL
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Commercial 0 4 7 4 0 2 8 31 35 39 37 45 48 59 55 Civil 1 0 3 0 0 2 2 1 1 1 1 1 1 1 2
NSS 2 2 1 1 0 2 4 4 4 11 6 11 4 8 3
DoD T&E 5 5 3 5 5 15 9 14 24 26 26 24 15 15 15
Totals 8 11 14 10 5 21 23 50 64 77 70 81 68 83 75
LISN 13 19 21 13 29 25 23 22 17 11 LISN 9/27/2021
ASAM 90th Percentile
21 12 28 15 19 35 55 65 67 73 70 71 73
ASAM 50th Percentile 19 11 25 12 17 31 49 58 58 63 58 61 61
File: Launch_Schedule_2021_10_07.xlsx 18 NAWCs shown at start of FY20 Sheet: WR_SandChart_4MissionCat_Op1r
ASAM 9/30/2021
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
N um be r o f A nn ua l L au nc he s
U.S. Government Fiscal Year
Western Range Launch Activity 5-Year Look Back / 9-Year Look Ahead
Commercial
Civil
NSS
DoD T&E
LISN
90th Percentile
50th Percentile
The Sand Chart and Table represents the forecast of planned launches.
The dashed lines represent the number of launches from the simulation.
Optimistic Scenario Forecast
1-Year Projections (lines) versus
Actuals (Sand Chart)
CSO ROTF 2028 STRATEGIC INTENT
• General Raymond’s vision for the Launch & Test Ranges has 4 priorities
1. Evolve ER/WR architecture to support all phases of launch and test operations for multiple users simultaneously . . . fully enable commercial activity, while protecting the warfighter’s assured access to space.
2. Deliver streamlined, equitable access to Range resources while creating and improving upon public services and infrastructure at ER/WR
3. Establish a new Range operations business model emphasizing public-private partnerships as a steppingstone to our fourth priority . . .
4. Transform the Ranges into National Spaceports
KEY PROJECTS / FOCUS AREAS
– Implement comm upgrades
– Provision PaaS & IaaS via RSHP
– Plug-and-play based on use cases
– Transition to DevSecOps delivery
Architecture
– Installation Planning and Roadmaps
– Vehicle and Spacecraft Processing
– Multi-user launch complex
Infrastructure
– LISC Follow-on
– Consistent Processes
– Consistent Functions Across Ranges
Operations / Business Model
– AFSS Transition
– Legislative Proposal
– Policy changes (FMR, DoDI, etc.)
Policy / MRTFB
– Interagency Planning Group
– Management Structures
Spaceports
Operate as an Innovative Enterprise & Address Unique Customer Needs
LTRS R&PC
SLD 30/45
SLD 30/45
SSC/S3
SSC/S3
Preserve and advance National Security interests by building globally competitive
Ranges with capacity to support launch and test operations on demand
ROTF
Policy/MRTFB
ROTF STRATEGIC INTENT IN EXECUTION…
Infrastructure
Range Infrastructure Studies / Projects
GN2 GHe LNG Roads Power Deluge Water
Wastewater
Architecture IRCC /
RAD
Mission Voice Architecture
Commercial Internet over VULCAN
Dense Wave Division Multiplexing
Ops Center Modernization
7.3m Dish
Mobile TM Mobile Optics Winds/Lightning
Investments Multi-Use Pads
SLC-8 / TP-01 /
SLC-46 / SLC-20
Accelerate IP Network Acceptance
Transformation Enablers
Mission Defense Team
Zero Trust Implementation
Remote Spectrum Ops
CLEER – 3D Wx
SV Processing Facilities
Operations/ Business Model
Ops at Relevant Speed Onboarding new users at speed -- Buzzard in <9 months -- Astra on pace for 6 months -- 34 Hrs turn time demonstrated at WR/ER -- “Yes” to Mulitple 2-in-24 requests
Laying Spaceport Foundation Robust technical support for AFSS cert
FAA/Navy Engagement
Lightning Safety Radius Reduction
POLICY & SPACEPORT EVALUTION
Airport-Style Operation Commodities for simultaneous and high-flow ops
Autonomous Flight Safety/Monitoring
CLSRB
Modifications
Visiting airports / seaports with more visits planned
Rapid commercial customer on-boarding
Engaging w/ USN and FAA to increase launch opportunities
Range Safety
T-X work
General aviation contour reductions
Accept 10x risk increase;
Launch opportunities increased by 80%;
Saves SLD 45 ~1,100 hrs/yr;
Returns ~400 USN operating hrs/yr
LC-46, LC-47, LC-48, SLC-8, TP-01
(7 vehicles interested)
Partnering w/local & state agencies
Identifying areas where SLD 30 / 45 can possibly charge based on Commercial Space
Launch Act definition
Quicker transition between missions and/or simultaneous ops (driven by AFSS)
Implementing common/streamlined FAA and DoD rules (e.g., Critical
Asset Protection, neighboring operations)
Expanded weekly Ops Status w/
LSPs & partners
Lightning range rings reduction
5nm to 4nm;
Reduced work stoppage time by 20%
Next step: Develop Spaceport Cost Model to operate and sustain the Ranges
Policy/Law: Change required to move to a Spaceport Model:
Change Commercial
Space Act Title 51
LC-37 / SLC-6 –
Future multi-use pads Available in 2023/24
(3 med vehicles interested)
Dedicated Pad vs.
Multi-Use Pad
Concept
COA 1 – Source Select 7 potential vehicles;
1 selected per vacant pad
COA 2 – Multi-Use Pad Concept 7 potential vehicles;
Up to 7 selected
Launch Complex allocation process for property distribution
Maximize access to launch complexes by multiple launch providers
LC-20 – Future multi-use pad;
Available in 2022
Po lic y Sp ac ep or t
AATS FOR THE WARFIGHTER
Range of the Future 2028
Transform Spaceports
Range Vision 2028
Evolve Capabilities
Streamline Access
Evolve Business Model
KEY TAKEAWAYS
• Major instrumentation modernization complete by 2027
• Fragile infrastructure requires shared investment
• Innovation driven by industry — business-like solutions
• Prime for Spaceport transformation
Range Architecture and Transition
Highest Overall Classification:
UNCLASSIFIED - PRE-DECISIONAL
LTRS TO-BE OV-1
• ROTF acquisition focusing on rapid capability development:
• Leverage SpRCO principles for ROTF implementation – ROTF projects in months not years
• Investigate OTA efforts across DoD w/respect to planning, acquisition and ops (e.g., leverage SpRCO, Ogden, OSD and others’ expanding consortiums)
• Implement 804-like prototyping – leverage wing innovation initiatives
• Focus on use of COTS, push the bounds of performance for capability delivery
• Build out true DevOps environments for delivering low-cost, rapid reaction ROTF capabilities to ops
• Balance “top-down” requirement-driven acquisitions w/”bottom-up” tech-driven solutions
ROTF ARCHITECTURE ACQUISITION
Today’s Baseline Construct ROTF Baseline Construct
LTRS Ops BaselineLTRS Sustainment System (LSS) ROTF Ops BaselineROTF Dev Baseline
• Mirror-image dev & ops environments
• No operational re-testing
• Fast/routine solution drops
• Environments are close, but not identical
• Significant operational re-testing
• Slow/one-off solution drops
Combat Development Division (CDD)
• “Bottom-up” innovation aligned w/ROTF
• No easy ops onboard mechanism
• Teaming still developing
Combat Development Division (CDD)
• “Bottom-up” innovation aligned w/ROTF
• Seamless ops onboard mechanism through dev baseline
• Heavy teaming between SSC, Ops
Deltas and OM&S Contractor
ROTF ARCHITECTURE ACQUISITION
Data Center/Cloud
• House central data handling processor to receive, process, route, distribute, and archive sensor data, generate range acq. data & data products
• House sensor processing where appropriate
• Virtual environments are a goal
• Expandable beyond initial occupancy
• Can be on-premises, off-premises, or hybrid
• Telemetry
• Launch Head - Multiple small non-steerable antennas augmented by high-gain steerables.
RF shipped over fiber to central processing sys.
• Downrange – Retain existing antennas and replace legacy processing with system same as in data center
Optics
• Multi-Functional – Optical Imaging, Debris
Track, RTF, MRTFB
• Two sensors each range Radar
• Multi-Functional – Radar Imaging, Debris Track
(TBD), RTF, MRTFB
• One imaging radar (ROSA)/range plus WR FPQ-6 Area & RF Surveillance/Weather
• Retain today’s inventory/functionality
• Transition to data center/virtual environment when/where feasible Communications
• IP network
• MEN & WMN
Timing
• Network Timing Protocol (NTP)
• Range Count provided as today
ROTF ARCHITECTURE AT A GLANCE
LISC FO Acquisition Strategy Development
Highest Overall Classification:
UNCLASSIFIED - PRE-DECISIONAL
Schedule & Industry Engagements Event Baseline Date
Acquisition Strategy Panel May 22
Draft RFP Release January 23
Industry Day #2 January 23
Pre-proposal RFI January 23
Final RFP Release May 23
Proposals Due June 23
Contract Award March 24
Contract Transition June 24 – September 24
Contract Start October 24
LISC FO Scope
•Range Operations •Range Organizational Level Maintenance •Range Hardware Depot Level Maintenance •Range Software Depot Level Maintenance •Range Logistics Management •Range Sustainment Engineering •Range Modifications •Range Integration Management and Testing •Downrange Base Operating Support •Mission Support Communication Services
Task Areas
• Operations
• Range Operations - Mission planning, mission scheduling, mission and range preparation, operator training, operator instructions, range operations, reporting, modification support (impact analysis, testing, acceptance, etc.)
• Maintenance
• Organizational Maintenance – equipment and facilities support, mx scheduling, reporting, analysis/trending, Level 1
Mx activities
• Depot Maintenance – Mx plan development, depot operations and support, Level 2 Mx activities, TMDE PMEL certifications
• Sustainment
• Logistics Management – inventory and procurement management, supply support
• Sustainment Engineering – deficiency tracking and resolution, obsolescence/vanishing vendor analysis, performance-based logistics analysis, DMSMS, RMA trending and analysis
• Integration
• Systems Engineering – change management, requirements management, requirements assessments/evaluations/recommendations, configuration management, interface management, risk management, system safety, test and evaluation, modification transition, information assurance accreditations, engineering studies
• Modification
• Projects - planning, execution, and closeout
Program Objectives UNCLASSIFIED – Pre-Decisional
1. Align with Range of the Future priorities & CSO direction toward Spaceports
2. Maintain operational mission assurance and meet customer demand through responsive, flexible, and efficient OM&S services
3. Employ an acquisition structure that accelerates decisions; maximizes budget execution, increases program capability; and speeds contracting actions
LISC FO Desired Outcomes
• Maintain mission readiness and support while enabling transition to the Range of the Future
• Leveraging industrial base to maximum potential to get best value solutions for LTRS
• Ensuring Assured Access to Space for National Security Space, Civil, and Commercial missions
Framing Assumptions
# Framing Assumption Implication Expectations Metrics
1 Spaceport concept will not be implemented by 2024 but will by
LISC FO will need to setup contract that allows for transition to a model appropriate for the Spaceport concept adopted by the service
Current model of Government range involvement will be implemented at contract award; however, transition to new business model will likely occur during LISC FO
• ROTF Policy element
• CSO Directives
2 ROTF Architecture and Plans defined and stable prior to solicitation release
LISC FO will be able to award initial OM&S base support with possible transition to future model
Solicitation updates will not be needed between RFP release and Contract Start
• ROTF Plans
• LISC FO RFP(s)
UNCLASSIFIED – Pre-Decisional
Evolving Range Operations Tempo and CONOPS Drives LISC Follow-on Strategy
Initial Strategy Considerations
• Evolving Range Operations Tempo and CONOPS Drives LISC Follow-on
Strategy
• MFT considering Multi-award IDIQ for LISC FO effort to enable flexibility to adapt to changing operations (10 year ordering period)
• Base award(s) for ops, mx, sust, and int (initial PoP of base awards still TBD)
• Allows award to companies that can perform one or all of task areas
• Will assess need to on ramp new companies during PoP due to lengthy ordering period
• Competitive awards of modification projects to get best value solution each time for govt
• Currently assessing which Task Areas should be pursued as separate or combined task orders (ops, mx, sust, int)
• Assessing advantages and disadvantages of separating or combining task areas as well as separating or combining task orders b/t ER and WR (efficiencies, risks, opportunities, etc.)
• Looking at relationships between task areas and amount of info sharing/teamwork needed between each of the interfaces
• Once task orders defined, will identify contract type for each (Fixed price vs cost plus)
• Goal for Incentive Strategy is to be aligned to program objectives
• Evaluating use of positive incentives versus negative incentives
Initial Strategy Considerations
• Soliciting industry thoughts during one-on-ones or post-event follow-up questions/comments to support acq strategy development during 1Q CY22
• Use of multi-award IDIQ
• Possible combinations/separations of task areas
• Contract types of task areas
• Incentives aligned to program objectives
• Integration approach and risks
• Intend to have proposed task orders for base awards included in draft RFP release so that additional feedback and questions can be submitted
LISC FO & SMALL BUSINESS
• Assessing small business goals for LISC FO
• Not anticipating set aside in any of the task areas or any locations for LTRS services
| Launch and Test Range System (LTRS) Integrated Support Contract (LISC) Follow-on Industry Day |
| AGENDA |
| DISCLAIMER |
| LTRS Program Description |
| LTRS PROGRAM DESCRIPTION |
| MISSION |
| Slide Number 7 |
| SLD 30 Mission Brief |
| Slide Number 9 |
| SLD 30 OVERVIEW |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| SLD 45 Mission Brief |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| COMBINED PROJECTIONS FOR ER & WR |
| Range of the Future (ROTF) Overview |
| SPACE SYSTEMS COMMAND |
| ROTF DRIVERS |
| ER LAUNCH DEMAND POTENTIAL |
| WR LAUNCH DEMAND POTENTIAL |
| CSO ROTF 2028 STRATEGIC INTENT |
| KEY PROJECTS / FOCUS AREAS |
| ROTF STRATEGIC INTENT IN EXECUTION… |
| POLICY & SPACEPORT EVALUTION |
| AATS FOR THE WARFIGHTER |
| KEY TAKEAWAYS |
| Range Architecture and Transition |
| LTRS TO-BE OV-1 |
| Slide Number 33 |
| Slide Number 34 |
| Slide Number 35 |
| LISC FO Acquisition Strategy Development |
| Schedule & Industry Engagements |
| LISC FO Scope |
| Task Areas |
| Program Objectives |
| LISC FO Desired Outcomes |
| Framing Assumptions |
| Initial Strategy Considerations |
| Initial Strategy Considerations |
| LISC FO & SMALL BUSINESS |