Linwood Ave - Addendum No 2 UPDATED.pdf
PDF 10 MB Posted
- Attached to
- Notice of Sole Source- Latino Network
- Solicitation number
- S-C01010-00005072
- Issued by
- Clackamas County, Oregon
About this file
This is an Addendum No. 2 issued January 12, 2023, to the Linwood Avenue Improvements project in Clackamas County, Oregon. The addendum provides clarifications, updated plan sheets, modified special provisions, and revised bid schedules in response to bidder questions regarding the street improvement project along SE Linwood Avenue. The project encompasses comprehensive roadway improvements including a pedestrian bridge crossing Johnson Creek, stormwater management systems, sanitary force main installation, traffic signal modifications, landscaping, irrigation systems at Mill Park, and various utility relocations for both Clackamas River Water and City of Milwaukie water services. Key clarifications address Good Faith Effort requirements, bridge railing and fencing details, traffic signal detection sensors, erosion and sediment control plan requirements, and irrigation system specifications. Updated plan sheets include revisions to concrete inlet details, minor adjustment notes, pedestrian bridge rail/fence conditions, and a modified shared-use path exhibit from SE Queen to SE La Jolla. Quantity adjustments reflect the modified path work, and new bid items have been added for City of Milwaukie water service relocations and fire hydrant work pending finalization of an Intergovernmental Agreement between Clackamas County and the City of Milwaukie.
The addendum substantially revises Special Provisions Section 00280 (Erosion and Sediment Control) to align with new 1200-CA permit guidance, establishing requirements for erosion and sediment control managers with ODOT certification or acceptable training, monthly ESCP updates, specific monitoring protocols including inspections every 14 days and within 24 hours of rainfall events, and emergency material stockpiles including 300 linear feet of straw wattles and 50 biofilter bags. Modified provisions address concrete washout facilities, stormwater planter buffers of 50 feet from Waters of the State, plant establishment watering methods, and payment procedures. Section 01160 and 01170 provisions are modified to reference the Clackamas River Water Technical Specifications for fire hydrants and potable water service connections. The bid schedule, dated January 10, 2023 (identified as Addendum No. 1), reflects quantity changes for items 58, 62-63, and 69-70 related to the modified path exhibit, modified descriptions for fire hydrant and water service bid items, and added line items 136.1 and 138.1 for City of Milwaukie water work contingent upon IGA execution. Properties 9, 35, 69, and 70 are noted as pending final County payment processing, which may delay work on those properties until payment is completed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Latino Network- Sole Source Notice.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Linwood Avenue Improvements Addendum No. 2 January 12, 2023
Questions/Answers and Clarifications:
1) Referring to the Good Faith Effort (GFE) form in the Instructions to Bidder, can you provide the Divisions of Work that GFE (unless self-performed) is required for?
Answer: Please complete the GFE forms as stated in the Bid Package. Clackamas does not provide NIGP or NAICS codes.
2) Would the PM consider adding a bid item for Flagging (paid by the hour)?
Answer: Flagging costs will be kept as incidental to BI 4 “Temporary Work Zone Traffic Control, Complete”
3) Please clarify the layout/details of fencing/railing beyond each corner of the pedestrian bridge.
Answer: Bridge railing will terminate at limits of the bridge. Chain link fencing will be added at all four corners as shown on revised drawing 5.7C
4) Sheet 12.5 of the traffic signal plans indicates 2 FLIR TrafiSense2 detection sensors.
Can you confirm quantity? Is the intent to detect bikes as they approach the signal or only at the signal, stopping / waiting area?
Answer: Yes, we need 2 FLIR detection sensors there, and they are for the bikes on the Springwater trail.
5) On the Traffic Signal Plan, it calls for a blank out sign. I don’t see specification or detail about this sign other than what is listed on Sheet 12.8. Are there more details?
Answer: The PTR sign are in the blue sheets. The pre-approved manufacturers are McCain and Wells Manufacturing.
6) In the Special Provisions (01120.0) it states “this work consists of the design-build irrigation system at Mill Park.” Does this refer to only areas affected by construction or a complete park system?
Answer: This statement refers to only areas affected by construction or where new mitigation plants are installed in middle area of the park. Sheet 9.2 indicates (by hatch) the area for inclusion of the temporary irrigation system. 01044.90 indicates that 2nd and 3rd year plant establishment at Mill Park includes all plants identified as “Mitigation Plantings” (BI’s 93-96).
7) The Special Provisions (01120.40) refer to schematic park irrigation drawings. Please provide as-builts of the existing system.
Answer: At this time, we do not have as-builts of the existing irrigation system at Mill Park. For bidding purposes, bidders can assume there is an existing irrigation system within the park and that they can connect to that existing system without making an independent connection to a public main. During construction, the Contractor will need to coordinate with Park staff to locate the existing irrigation system as part of their irrigation system design submittal.
8) Special Provision 01075.0 (Miscellaneous Private Property Adjustments” clearly identifies all fencing but makes no mention of existing irrigation systems on private property. If the fencing installation damages existing private irrigation, is that the responsibility of the fencing contractor to repair or not?
Answer: The prime contractor is ultimately responsible for all work on the project.
The County does not determine how individual tasks on the project are allocated to subcontractors. Section 01120.10 includes language to “repair to existing private irrigation systems damaged by construction improvements”. Fence installations required under 01075 are part of the construction improvements, and therefore the County would consider repair of private irrigation damage resulting from new fence construction to be covered under BI 134.
9) Special Provision 01044.21 states “water all newly installed plant materials…using the installed automatic irrigation system unless otherwise directed by the Engineer” Are meters and water connections designated for use on this project? Is temporary establishment irrigation the architect’s intention?
Answer: This project does not have an installed automatic irrigation system for the street trees and road landscaping. Therefore, watering for plant establishment under this section and BI 105 would be a continuation of the hand watering method required under 1040. BI 106 (Plant Establishment at Mill Park) would utilize the project-installed irrigation system for those plants. The automatic irrigation system for Mill Park will be connected to the Park’s existing irrigation system, therefore there will not be a need for separate contractor-provided water meters.
10) On drawings 5.0 through 5.7, Notes 53 and 54 identify meters, however it is unclear if those are private or public meters. Please advise if those meters are able to be used for right of way irrigation.
Answer: Notes 53 and 54 reference private property water meters that are being relocated for the project. They are not available for public irrigation.
Project Plans:
The following Plan Sheets have been updated:
Sheet Number(s) Description of Change
3.7 Updated Concrete Inlet Detail to reflect 18” min. sump
5.2 Revision to “Minor Adjustment” notes
5.4 Revision to “Minor Adjustment” notes
5.5 Revision to “Minor Adjustment” notes
5.6 Revision to “Minor Adjustment” notes
5.7 Revision to “Minor Adjustment” notes
5.7C Clarified Rail/Fence conditions at Pedestrian Bridge
5.8 Revision to “Minor Adjustment” notes
15.3 Added Lateral Extension
Add Modified Path Exhibit (SE Queen to SE La Jolla)
Note 1 - Detailed sheet revisions for the “Modified Path Exhibit (SE Queen to SE La Jolla)” will be provided with the IFC set. Approximate quantity adjustments for unit-based bid items have been captured in this Addendum or will be adjusted as required per field measure. It is assumed all bidders will make appropriate adjustments in their bid for LS items such as Mobilization, Traffic Control, Earthwork, etc. as required to incorporate this modified work.
Note 2 – The Project Drawings refer to some water meter/hydrant relocations or adjustments as work to be done “by others”, referencing City of Milwaukie. Clackamas County is working on an IGA with City of Milwaukie that would result in the inclusion of these tasks as Contractor work. This Addendum has added Bid Items associated with this City of Milwaukie water work, but if the IGA is not finalized, they could be removed from the project. If implemented, appropriate references in the plans of “by others”, and “For Informational Purposes” on Sheet 3.11, would not apply.
Special Provisions:
The following changes have been made to the Special Provisions:
00180.65 Right-of-Way and Access Delays – Modify the Subsection as follows:
There are possible Right-of-Way delays on this project. Although negotiations for Properties 9, 35, 69, and 70 are complete, they are still in the County payment process. We anticipate that this will be complete prior to NTP, however if it is not, work on these properties would need to wait until payment has been made.
00280 EROSION AND SEDIMENT CONTROL – Replace 00280 Special Provision subsections as follows to meet new 1200CA guidance:
SECTION 00280 - EROSION AND SEDIMENT CONTROL
Comply with Section 00280 of the Standard Specifications modified as follows:
00280.00 Scope - Replace the paragraph that begins "This Work also consists of providing temporary …" with the following paragraph:
This Work also consists of providing temporary erosion and sediment control (ESC) measures and furnishing, installing, moving, operating, maintaining, inspecting, and removing ESC throughout the Project area according to the Standard Drawings, the erosion and sediment control plan (ESCP) with an environmental management plan (EMP), when required for the Project, the Specifications, or as directed, until the site is permanently stabilized. Included also is the monitoring of weather, of stormwater and receiving waters, the reporting of monitoring observations, the reporting of corrective actions (when necessary) and the updates and revisions of the ESCP, including ESCP cover sheet, necessary to keep it representative of current site conditions and compliant with the 1200-CA Permit.
Add the following paragraph to the end of this subsection:
The Agency's NPDES 1200-CA Permit is applicable to the Project.
00280.02 Definitions -
Replace the sentence that begins “Temporary Stabilization” with the following sentence:
Temporary Stabilization - Measures or methods necessary to prevent erosion until permanent stabilization measures are in place and established.
00280.04 Erosion and Sediment Control Plan on Agency Controlled Lands - Replace the bullets with the following bullets:
• When using the Agency’s ESCP with only modifications required to keep the ESCP current during construction, submit a written notification indicating the Agency’s ESCP is used without modifications prior to construction.
• Prior to beginning construction, edit the ESCP to provide a list of all contractors working on the site.
• Prior to beginning construction edit the ESCP cover sheet to list all personnel by name and position who are responsible for the installation and maintenance of stormwater control measures including their individual responsibilities and certifications. Keep list current for the duration of the project.
• When using a Contractor modified version of the Agency’s ESCP, include the following:
• Proposed ESCP showing all ESC Work, and quantities of Work.
• An EMP that addresses pollution prevention and control of potentially contaminated sites or Materials.
• Implementation schedules for the ESCP
• Plans for each phase of Contractor’s Work
• Names and positions of all personnel engaged in construction activities.
• Names and positions of all personnel responsible for the installation and maintenance of stormwater control measures.
• Information required under 1200-CA permit.
• When using a Contractor developed ESCP, develop and stamp the ESCP by a professional with one of the following credentials. Include their name and credentials in the ESCP. The ESCP preparer shall be one of the following:
• Oregon Registered Professional Engineer,
• Oregon Registered Landscape Architect; or
• Oregon Certified Engineering Geologist
• When using a Contractor developed ESCP where engineered facilities such as sedimentation basins or diversion structures for erosion and sediment control are required, prepare and stamp the ESCP by one of the following:
• Oregon Registered Professional Engineer; or
• Oregon Registered Landscape Architect.
• When using a Contractor developed ESCP, provide plans for each phase of Contractor’s work implementation schedule and information required under the 1200-CA permit and as directed in ODOT’s Erosion Control Manual.
00280.16(i) Concrete Washout – Replace this subsection, except subsection number and title, with the following:
Furnish impermeable, spill resistant, leak proof concrete washout basin of sufficient size and quantity to retain all concrete wash water and concrete waste developed during construction, meeting the following requirements:
(1) Field fabricated washout basin as shown and consisting of the following:
• Straw Bales - Standard rectangular straw bales, with straw Material according to 01030.15, except no certification is required.
• Plastic Sheeting - Minimum 10-mil thick polyethylene plastic sheeting.
• Staples - 1/8-inch diameter steel wire staples. 2-inch "U" width with a length of 6 inches minimum
(2) Manufactured basins sufficiently durable to be removed intact, or cleaned of content without releasing concrete material or concrete washout water.
00280.30 Erosion and Sediment Control Manager - Replace this subsection, except for the subsection number and title, with the following:
If the Agency's NPDES 1200-CA Permit is applicable to the Project, designate and provide an ESCM who possesses a valid ODOT ESCM certificate or who has successfully completed an erosion control training that is acceptable to the Engineer.
The ESCM duties include:
• Manage and ensure proper implementation of the ESCP.
• Accompany the Engineer during field review of the ESCP prior to construction activities.
• Monitor rainfall, snow melt and runoff on and in the vicinity of the Project Site.
• Monitor water quality in receiving streams in the vicinity of the Project Site.
• Monitor water in sediment traps receiving runoff from soils amended with cementitious material for acidity or alkalinity.
• Monitor locations identified in Section 00294 for compliance.
• Inspect ESC and monitor receiving waters on active construction site on initial date and every 14 Days for effective functioning.
• Inspect ESC on inactive sites every 14 Days for effective functioning.
• Inspect ESC for effective functioning and monitor receiving waters, on all active and inactive sites at least within 24 hours of rainfall events sufficient to result in runoff from the Project Site.
• Ensure that ESC are regularly cleaned and maintained.
• Mobilize crews to make immediate repairs to ESC or install additional ESC during working and non-working hours when ESC is not effectively functioning.
• Record actions taken to clean up discharged sediment.
• Report potential permit violations to the Agency immediately upon discovery.
• Repair conditions that caused permit violations and prepare submittals for corrective actions that document repairs for Agency review and submittal to regulatory agencies.
• Update the ESCP monthly and within 7 Days after changes or major ESC modifications are implemented in the field.
• Submit ESCP revisions in electronic format, to Engineer within 30 Days after making revisions.
• Prepare a contingency plan in preparation for emergencies and for the periods between October 1 and May 31.
• Accompany the Engineer on inspections and, if required, on inspections by representatives of regulating agencies. If any of the following occur, revise the ESCP to reflect the change(s) within 7 Days.
• Changes to the construction plans that impact erosion and sediment control measures;
• Changes to the stormwater control BMPs, their location, maintenance required, and any other revisions necessary to prevent erosion and control sediment runoff;
• An increase in the area impacted by construction activities;
• Other activities at the site that are no longer accurately reflected in the ESCP. This includes changes made in response to corrective actions triggered;
• To reflect areas on the site map where operational control has been transferred (and the date of transfer) since initiating permit coverage;
• If inspections by DEQ determine that ESCP revisions are necessary for compliance with the 1200-CA permit;
• Where DEQ determines it is necessary to install or implement additional controls at the site in order to meet the requirements of the 1200-CA permit. Include the following in the
ESCP:
• A copy of any correspondence describing such measures and requirements; and
• A description of the controls to be used to meet such requirements.
• Change of Subcontractors that engage in construction activities on site, and the areas of the site where the Subcontractor(s) engage in construction activities;
• Change of any personnel (by name and position) that are responsible for the design, installation and maintenance of stormwater control measures;
• Change of the certified erosion and sediment control inspector, or of their contact information and any applicable certification and training experience;
• To reflect any revisions to applicable federal, state, tribal, or local requirements that affect the stormwater controls implemented at the site; and
• If a change in chemical treatment systems or chemically enhanced stormwater control is made, including use of a different treatment chemical, different dosage rate, or different area of application as applicable. Furnish temporary sediment trap as shown on drawings, stamped and signed by licensed engineer.
Submit revised ESCP to Engineer for signature by licensed professional (see 00280.04) and submission to DEQ when changes are made for the following reasons:
• Part of a corrective action requirement;
• An increase or decrease in project size;
• An increase or decrease in size or location of disturbed areas;
• Changes to BMPs, such as type, design or location;
• Change of the ESCM.
Add the following subsection
00280.41(e) Buffers - Retain and preserve buffer zones of natural, undisturbed vegetation, 50 feet in width between Work and Waters of the State. Where 50 foot buffers are not attainable, provide erosion, runoff and sediment control BMPs with effectiveness equivalent to a 50 foot buffer. Identify and mark buffer zones with flagging, construction fencing or other readily identifiable means.
00280.46(a) Construction Entrances - Add the following to the end of this subsection:
Construct the construction entrances as shown or directed.
00280.46(h) Temporary Sediment Trap - Add the following paragraph to the end of this subsection:
Where location of Temporary Sediment Trap is used post-construction for water quality treatment, storage or infiltration, remove sediment and soil to a depth of 18” and replace to finish grade with material approved by engineer.
00280.46(i) Concrete Washout - Add the following paragraph to the end of this subsection:
Locate concrete wash basins and concrete waste disposal to prevent stormwater that has been in contact with concrete wash or waste concrete from contaminating Waters of the State or stormwater inlets or conveyances. Handle wash water as waste. Do not dispose of concrete wash water or wash out concrete trucks or tools onto the ground, or into storm drains, open ditches, streets, or streams.
00280.48 Emergency Materials - Add the following paragraphs after the paragraph that begins "Provide, stockpile, and protect...":
Provide and stockpile the following emergency materials on the Project site:
Item Quantity
Straw Wattles ......................................................... 300 LF Biofilter Bags ............................................................ 50 EA
00280.62(a) Inspection and Monitoring - Replace this subsection, except for the subsection number and title, with the following:
Perform site inspection, complete all applicable parts of the ODOT Erosion Control Monitoring Form, and submit the form to the Agency as follows:
• On initial day of construction activity
• Every 14 days
• 24 hours after any rainfall event or snow melt event that results in runoff, including weekends and holidays
• When directed by the Engineer.
00280.91 Payment – Modify item (h) Concrete Washout Facility to be paid LS. Add the following:
Item (h) includes payment for all concrete washout facilities used on the project. The contractor may choose whether to use large steel boxes as shown in the standard detail or provide smaller disposable concrete washout facilities on an as-needed basis.
For item (j) “Inlet Protection, _____”, the “Type” of inlet protection is as shown in the construction drawings. See sheet 4.6 for reference.
01044.21 Watering – Replace the first sentence of this subsection with the following:
Water all newly installed plant materials at required intervals using either the project-installed automatic irrigation system or continuing with the hand-watering method established under the initial first-year plant establishment period, unless otherwise directed by the Engineer.
01160.90 Payment – Add the pay item as follows:
Pay Item Unit of Measurement
(f) Remove Existing, Replace and Relocate Fire Hydrant Each
Add the following:
Item (f) includes all work as shown in the Fire Hydrant Assembly Detail (110A) on Sheet 3.10 including new fire hydrant and retaining the existing gate valve at locations shown on the plans.
01150.00 Scope – Modify as follows:
In the paragraph added to the end of this section, replace the sentence beginning “The 4’ black vinyl coated fence…” with the following:
The 4’ The 4’ black vinyl coated fence required at the Johnson Creek Bridge (both on top of the cast-in-place concrete wall at the northeast corner and the short segments at the other 3 corners as shown on the plans) is included under the LS bid item “Johnson Creek Crossing Structure” (Section 00500).
01160 – Replace SP Subsection 001160 with the following:
SECTION 01160 - HYDRANTS AND APPURTENANCES
Comply with Section 01160 of the Standard Specifications modified as follows:
Except for Measurement & Payment, Contractor is to comply with the materials, installation, and testing requirements as provided in the latest version of the Clackamas River Water Technical Specifications.
01160.90 Payment – Add the pay items as follows:
(f) Remove Existing, Replace and Relocate Fire Hydrant Each
(g) Remove Existing, Replace and Relocate Fire Hydrant (City of Milwaukie) Each
Item (f) includes all work as shown in the Fire Hydrant Assembly Detail (110A) on Sheet 3.10 including new fire hydrant and retaining the existing gate valve at locations shown on the plans.
Item (g) includes all work as shown in the Fire Hydrant Installation Detail on Sheet 3.11
01170 – Replace SP Subsection 001170 with the following:
SECTION 01170 - POTABLE WATER SERVICE CONNECTIONS,
2 INCH AND SMALLER
Except for Measurement & Payment, Contractor is to comply with the materials, installation, and testing requirements as provided in the latest version of the Clackamas River Water Technical Specifications.
01170.90 Payment – Replace item (f) with the following:
(f) Install _______ Water Service Each
Add the following pay items:
(g) Pressure Reducing Valve Assembly Each
(h) Install ________ Water Service (City of Milwaukie) Each
Item (f) includes all work as shown in the Typical CRW Service Assembly detail on Sheet
3.10. Depending on side of the street compared to the water main, “Long Side” or “Short Side” will be inserted in the blank.
Item (g) includes installation of the Pressure Reducing Valve Assembly as shown in the Typical CRW Service Assembly detail on Sheet 3.10, as required.
Item (h) includes all work as shown in the City of Milwaukie Water Service details (dwg 401 or
402) on Sheet 3.11. Depending on side of the street compared to the water main, “Long Side” or “Short Side” will be inserted in the blank.
Items (f), (g), and (h) include excavation, connection to existing corporation stop, other pipe connections as required, laying and jointing the pipe and fittings and appurtenances, backfilling, testing, flushing and disinfection of the service connection. They also include obtaining any necessary plumbing permits to make connections to the existing service lines.
Bid Schedule:
A new bid schedule has been issued. The new bid schedule is dated January 10, 2023 and is identified with “Addendum No. 1”. Revisions include the following:
Item Number Description of Change
58, 62-63, 69-70 Changed Quantities per Modified Path Exhibit (Queen to La Jolla)
Modify Description to “Remove, Replace and Relocate Fire Hydrant”
136.1 Added Bid Item for City of Milwaukie Fire Hydrants
137 Modify Description to “Install Long Side Water Service” 138 Modify Description to “Install ‘Short Side Water Service”
136.1 Added Bid Item for City of Milwaukie Water Services
FTP Site:
The following changes/updates have been made to the supporting documents provided on the FTP site:
Sheet revisions associated with this addendum have been uploaded to the FTP site and placed in the folder “Addendum 1”.
www.tinyurl.com/LinwoodAve-SupportDocs http://www.tinyurl.com/LinwoodAve-SupportDocs
Bid Schedule - Addendum No. 1
ITEM SPEC DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL
1 00180 Work Place Harassment Prevention Plan LS 1
2 00196 Extra Work as Authorized FA 1 $ 250,000.00 $ 250,000.00
3 00210 Mobilization LS 1
4 00221 Temporary Work Zone Traffic Control, Complete LS 1
5 00225 Stripe Removal Ft 2,300
6 00225 Legend Removal SF 290
7 00270 Temporary Fence, 6 Ft Chain Link Fence with
Concrete Blocks Ft 1,500
8 00280 Erosion Control LS 1
9 00280 Construction Entrance Ea 1
10 00280 Inlet Protection, Type 4 (Bio Bag Inlet Protection) Ea 17
11 00280 Inlet Protection, Type 5 (Catch Basin Insert) Ea 40
12 00280 Sediment Barrier, Type 3 (Straw Wattles Fiber Rolls) Ft 1,000
13 00280 Concrete Washout Facility LS 1
14 00290 Pollution Control Plan LS 1
15 00310 Removal of Structures and Obstructions LS 1
16 00310 Removal of Waterline and Steel Girder at Johnson
Creek Crossing
LS 1
17 00320 Clearing and Grubbing LS 1
18 00330 Earthwork, Excavation and Embankment LS 1
19 00330 General Rock Excavation CY 200
20 00331 12 Inch Subgrade Stabilization SY 600
21 00350 Subgrade Geotextile SY 5,000
22 00390 Loose Riprap, Class 50 CY 20
23 00430 6 Inch Perforated Storm Pipe with Geotextile Sock, Class "B" Backfill Ft 765
24 00445 6 Inch Storm Sewer Pipe, Class "B" Backfill Ft 174
25 00445 12 Inch Storm Sewer Pipe, Class "B" Backfill Ft 281
January 10, 2023
General Conditions
Part 00200 - Temporary Features and Appurtenances
Part 00300 - Roadwork
Part 00400 - Drainage and Sewers
ITEM SPEC DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL
January 10, 2023
26 00445 12 Inch Ductile Iron Storm Sewer Pipe, Class "B"
Backfill Ft 355
27 00445 15 Inch Storm Sewer Pipe, Class "B" Backfill Ft 824
28 00445 12 Inch Restrained Sanitary Force Main Ductile Iron
Pipe, Class "B" Backfill Ft 1,708
29 00445 4 Inch Santiary Sewer Force Main Gravity Overflow
Pipe, Class "B" Backfill Ft 119
30 00445 4 Inch Sanitary Lateral Extension, Class "B" Backfill Ea 19
31 00470 Concrete Manholes, 48" Flat Top Manhole with Air
Release/Air Vacuum Assembly Ea 1
32 00470 Concrete Manholes, 48" Storm Sewer Standard
Manhole Ea 10
33 00470 Concrete Manholes, Combination Curb Inlet
Manhole Ea 1
34 00470 Catch Basin, Type CG-3 Ea 10
35 00470 Catch Basin, Type GB-2 Ea 9
36 00470 Catch Basin, Type Area Drain Ea 5
37 00470 Beehive Inlet Stormwater Planter Overflow Ea 16
38 00470 Storm Cleanout Ea 24
39 00470 Concrete Inlets, Type Steel Grate Channel Opening at Existing Bridge Ea 3
40 00490 Minor Adjustments of Manholes Ea 26
41 00490 Major Adjustments of Manholes Ea 6
42 00490 Adjusting Inlets Ea 2
43 00490 Controlled Low Strength Material CY 60
44 00490 Filling Abandoned Structures CY 150
45 00495 Trench Resurfacing SY 550
46 00500 Johnson Creek Crossing Structure LS 1
47 00500 Johnson Creek Crossing Structure Foundations LS 1
48 00596B Retaining Wall, Segmental Block (Height 2-4 Foot) SF 1,050
49 00596C Retaining Wall, Cast in Place Concrete with Fence LS 1
50 00596E Retaining Wall, Rockery SF 200
51 00620 Cold Plain Pavement Removal, 0-4" Deep SY 12,300
52 00641 Aggregate Base CY 2,000
Part 00600 - Bases
Part 00500 - Bridges and Walls
ITEM SPEC DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL
January 10, 2023
53 00641 Open Graded Aggregate Base for Pervious
Pavement
CY 1,200
54 00641 Chocker Aggregate Base for Pervious Pavement CY 350
55 00743 1/2" PAC Mixture Ton 1,100
56 00744 Level 3, 1/2" Dense ACP Mixture Ton 4,200
57 00759 Concrete Curbs, Standard Curb Ft 4,015
58 00759 Concrete Curbs, Curb and Gutter Ft 7,061
59 00759 Concrete Curbs, Modified Thickened Curb and
Gutter for Stormwater Planters Ft 873
60 00759 Concrete Curbs, Vertical Curb Wall Ft 140
61 00759 Concrete Curbs, Perimeter Curb Wall for
Stormwater Planters Ft 1,019
62 00759 Concrete Walks SF 12,600
63 00759 Concrete Driveways SF 18,735
64 00759 Concrete Driveways, Reinforced SF 2,006
65 00759 Concrete Driveways, Reinforced with Rapid Set SF 929
66 00759 Concrete Driveway Connection SF 8,015
67 00759 Concrete Driveway Connection, Exposed Aggregate SF 690
68 00759 Concrete Stairs CY 10
69 00759 Truncated Domes on New Surfaces SF 570
70 00759 Extra For New Curb Ramps Ea 31
71 00810 Guardrail, Modifications at Existing Johnson Creek
Bridge
LS 1
72 00865 Thermoplastic, Extruded, Surface, Non-Profiled Ft 15,000
73 00867 Pavement Legend, Type B-HS: Arrows Ea 16
74 00867 Pavement Legend, Type B-HS: Bicycle Lane Stencil Ea 18
75 00867 Pavement Legend, Type B-HS: Yield Line Triangle Ea 11
76 00867 Pavement Legend, Type B-HS: Shared Use Path
Markings Ea 80
77 00867 Pavement Bar, Type B-HS SF 3,100
78 00868 Green Bicycle Lane, Preformed Thermoplastic Film SF 1,200
Part 00900 - Permanent Traffic Control and Illumination Systems
Part 00700 - Wearing Surfaces
Part 00800 - Permanent Traffic Safety and Guidance Devices
ITEM SPEC DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL
January 10, 2023
79 00902 Crosswalk Closure Supports Ea 8
80 00905 Remove Existing Signs LS 1
81 00920 Sign Support Footings LS 1
82 00930 Perforated Steel Square Tube Anchor Sign Supports LS 1
83 00940 Signs, Standard Sheeting, Sheet Aluminum SF 560
84 00987 Telecommunications, Material LS 1
85 00987 Telecommunications, Installation LS 1
86 00987 Telecommunications, Splicing and Testing LS 1
87 00990 Traffic Signal Modifications, SE Linwood Ave and SE
King Rd
LS 1
88 00990 Traffic Signal Modifications, SE Linwood Ave and SE
Johnson Creek
LS 1
89 01015 Open Graded Aggregate Base for Stormwater
Planters Ton 80
90 01015 Washed Drain Rock for Stormwater Planters Ton 320
91 01015 Concrete Check Dams Ea 10
92 01030 Permanent Seeding Acre 1.0
93 01040 Deciduous Trees, 1/2 Inch Caliper (Mitigation
Plantings) Ea 16
94 01040 Evergreen Trees, 1/2 Inch Caliper (Mitigation
Plantings) Ea 7
95 01040 Shrubs, #1 Container (Mitigation Plantings) Ea 255
96 01040 Shrubs, #5 Container (Mitigation Plantings) Ea 91
97 01040 Water Quality Mixture CY 180
98 01040 Topsoil CY 675
99 01040 Bark Mulch, 3 Inch Depth SY 500
100 01040 Deciduous Trees, 2 Inch Caliper Ea 106
101 01040 Groundcover, #1 Container Ea 1,805
102 01040 Groundcover, #SP4 Container Ea 2,514
103 01040 Wetland, #SP4 Container Ea 3,560
104 01040 Root Barrier Ft 2,120
105 01044 2nd and 3rd Year Plant Establishment LS 1
106 01044 2nd and 3rd Year Plant Establishment at Mill Park LS 1
Part 01000 - Right of Way Development and Control
ITEM SPEC DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL
January 10, 2023
107 01050 Split Rail Wood Fence at Mill Park Ft 262
108 01065 Monument Boxes Ea 10
109 01070 Single Mailbox Supports Ea 46
110 01075 Private Property Improvements - Property 4 LS 1
111 01075 Private Property Improvements - Property 17 LS 1
112 01075 Private Property Improvements - Property 20 LS 1
113 01075 Private Property Improvements - Property 24 LS 1
114 01075 Private Property Improvements - Property 28 LS 1
115 01075 Private Property Improvements - Property 29 LS 1
116 01075 Private Property Improvements - Property 30 LS 1
117 01075 Private Property Improvements - Property 37 LS 1
118 01075 Private Property Improvements - Property 45 LS 1
119 01075 Private Property Improvements - Property 47 LS 1
120 01075 Private Property Improvements - Property 48 LS 1
121 01075 Private Property Improvements - Property 49 LS 1
122 01075 Private Property Improvements - Property 50 LS 1
123 01075 Private Property Improvements - Property 51 LS 1
124 01075 Private Property Improvements - Property 54 LS 1
125 01075 Private Property Improvements - Property 56 LS 1
126 01075 Private Property Improvements - Property 58 LS 1
127 01075 Private Property Improvements - Property 59 LS 1
128 01075 Private Property Improvements - Property 61 LS 1
129 01075 Private Property Improvements - Property 64 LS 1
130 01075 Private Property Improvements - Property 65 LS 1
131 01075 Private Property Improvements - Property 66 LS 1
132 01075 Private Property Improvements - Property 72 LS 1
133 01120 Irrigation System at Mill Park LS 1
134 01120 Repair Private Irrigation Systems LS 1
Part 01100 - Water Supply Systems
ITEM SPEC DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL
January 10, 2023
135 01150 Valve Box Replacement Ea 10
136 01160 Remove, Replace and Relocate Fire Hydrant Ea 3
136.1 01160 Remove, Replace and Relocate Fire Hydrant (City of
Milwaukie) Ea 3
137 01170 Install Long Side Water Service Ea 15
138 01170 Install Short Side Water Service Ea 21
138.1 01170 Install Short Side Water Service (City of Milwaukie) Ea 17
139 01170 Pressure Reducing Valve Assembly Ea 1
Total Bid (Number)Contractor Name
Total Bid (In Words)
ASPHALT ASPHALT
CONCRETE ASPHALT
GRAVEL CONCRETE CONCRETE CONCRETEGRAVEL
CONCRETE
ASPHALT
W W W W W W
10507 SE LINWOOD AVE
TAX LOT
12E31AA00500
6100 SE KING RD
TAX LOT
12E31AA02100
6140 SE KING RD
TAX LOT
12E31AA00100
6135 SE KING RD
TAX LOT
12E30DD01600
10123 SE LINWOOD AVE
TAX LOT
12E30DD01500
10291 SE LINWOOD AVE
TAX LOT
12E30DD01400
10263 SE LINWOOD AVE
TAX LOT
12E30DD01300
NO SITE ADDRESS
TAX LOT
12E29CC04600
6217 SE KING RD
TAX LOT
12E29CC04700
6200 SE KING RD
TAX LOT
12E29CC10000
6211 SE QUEEN RD
TAX LOT
12E29CC10100
10507 SE LINWOOD AVE
TAX LOT
12E31AA00500
X X X
X
XXXXXXX
X X
64+00 65+00 66+00 67+00 68+00 69+00 70+00 71+00
W
S E
Q
U E
N
R
D
K
I N
G
R
D
L
A
J O
L L
A
S
T
SE LINWOOD AVE
PLAN VIEW
SCALE: 1" = 20'
SCALE: 1" = '
10 20 40
Harper Houf Peterson Righellis Inc.
E N G I N E E R S P L A N N E R S
LANDSCAPE ARCHITECTS SURVEYORS
SE LINWOOD AVE
CLACKAMAS COUNTY, OREGON
JANUARY 2023
ADDENDUM #1
LINWOOD AVE - MODIFIED SHARED-USE PATH EXHIBIT
P:
\C
LA
(C lac ka ma s C ou nty
)\C
LA
-9 3 (
Lin wo od A ve )\C
LA
-D W
GS
\S
HE
ET
S\ C
LA
-3 .0
DE
TA
ILS
.dw g
R E V I S I O N S
DATE NO. DESCRIPTION
DATE:
DESIGNED:
CHECKED:
DRAWN:
SHEET NO.
JOB NO.
E N G I N E E R S P L A N N E R S
LANDSCAPE ARCHITECTS SURVEYORS
205 SE Spokane Street, Suite 200, Portland, OR 97202 phone: 503.221.1131 www.hhpr.com fax: 503.221.1171
Harper Houf Peterson Righellis Inc. LINWOOD AVENUE IMPROVEMENTS
CLACKAMAS COUNTY, OREGON CLA-93
HHPR TEAM
HHPR TEAM
DSH/JSH
11-11-2022
12/9/22 1 ADDENDUM #1
150 BEAVERCREEK ROAD
DEVELOPMENT AGENCY
CLACKAMAS COUNTY
P R E P A R E D F O R
OREGON CITY, OR 97045
DEVELOPMENT SERVICES BLDG.
3.7DETAILS
NOTE: UTILIZE SHALLOW CONE OR FLAT-TOP IN LOCATIONS WITH SHALLOW INCOMING PIPE
66+00 66+50 67+00 67+50 68+00 68+50 69+00 69+50 70+00 70+50 71+00
GB
S
TA
6+
.9
EL
EV
.1
GB
S
TA
7+
.0
EL
EV
.3
GB
S
TA
7+
.0
EL
EV
.6
GB
S
TA
8+
.4
EL
EV
.1
GB
S
TA
8+
.5
EL
EV
.1
GB
S
TA
9+
.0
EL
EV
.5
GB
S
TA
9+
.0
EL
EV
.7
GB
S
TA
0+
.2
EL
EV
.7 3-2.50%
0.06% -2.85%
-2.00%
-1.65%
-1.10% -1.70%
OFFSET CROWN
CONSTRUCT WITH LEFT AND RIGHT GUTTER DESIGN PROFILES
SEE SHEET 5.2A FOR PROFILES
FG/EG @ CENTERLINE
EX MH-16
EX MH
STA: 68+19.73, 7.32' R
RIM ELEV = 169.22
15" IE IN (S) = 160.52
18" IE IN (SE) = 161.00
12" IE IN (W) = 161.88
18" IE OUT (N) = 160.47
EX MH-8
BURIED EX MH
STA: 68+68.47, 7.12' R
RIM ELEV = 168.31
12" IE IN (W) = 159.56
18" IE IN (S) = 159.56
24" IE OUT (N) = 159.36
MH-8
48" STANDARD MANHOLE
STA: 66+11.76, 18.33' R
RIM ELEV = 172.01
15" IE IN (S) = 163.92
12" IE IN (W) = 168.32
15" IE OUT (N) = 163.92
W W
XX
SD
6140 SE KING RD
6135 SE KING RD
10123 SE LINWOOD AVE
10291 SE LINWOOD AVE
NO SITE ADDRESS
6217 SE KING RD
6200 SE KING RD
6100 SE KING RD
6211 SE QUEEN RD
TAX LOT
12E31AA00100
TAX LOT
12E30DD01600
TAX LOT
12E30DD01500
TAX LOT
12E30DD01400
TAX LOT
12E29CC04600
TAX LOT
12E29CC04700
TAX LOT
12E29CC10000
TAX LOT
12E31AA02100
TAX LOT
12E29CC10100
EX 5.00' WIDE SLOPE
AND EMBANKMENT
EASEMENT
EX 5.00' WIDE
SLOPE EASEMENT
EX 6.00' WIDE
TRAFFIC CONTROL,
ILLUMINATION, AND
UTILITY EASEMENT
EX 25.00' INGRESS/
EGRESS EASEMENT
EX 10.00' WATER LINE AND
ROOF DRAIN EASEMENT
2+
3+
66+00 67+00 68+00 69+00 70+00 71+00
TYP.
TYP.
5 5
6 6
7 7
7 8
R
R
P
R
R
R
R
11 R
R
P
P
P
R
R
R
R
REL
11 R
R
MIN; EX MH-16
32 R
36 CB-10
CB-11
32R
32A
A
34MAJ 40 EX MH-8
A
52A
A
REL;MWK
51REL;MWK
52 A
A;CRW
A;CRW
A
52A
REL
REL
REL
34A, MIN
34A, MIN
66 A
TYP.18P4
13 REL
R
TYP.
R
10 10
TYP.
P
TYP.
66A
AD-1
10 77 4
1 TYP. 1TYP.
TYP.
SE LINWOOD AVE
I N
G
R
D
MH-8
OF-4
TYP.
P
EX ROW EX TRAFFIC CONTROL,
ILLUMINATION, AND
PUBLIC UTILITY EASEMENT
EX ROW
EX PERMANENT SIGN,
SCOPE, PUBLIC UTILITY,
AND SIDEWALK EASEMENT
PROPOSED CROWN
PR TCE
PR TCE
DAYLIGHT
DAYLIGHT
PR ROW
PR ROW
EX ROW
54 TYP.
LIMITS OF GRIND & INLAY
P
LIMITS OF GRIND & INLAY
1 TYP.26
P
7.4
7.4
7.6
7.652 A
CO-60
EG=169.23
FG=169.24
EG=168.96
FG=168.97
EG=164.73
FG=164.73
LINWOOD AVE PLAN VIEW
SCALE: 1"=20'
LINWOOD AVE - CENTERLINE PROFILE
SCALE: 1"=20' (HORIZ.)
1"=5' (VERT.)
M A
T C
H L
I N
E
S
T A
H E
T
M A
T C
H L
I N
E
S
T A
E
P:
\C
LA
(C lac ka ma s C ou nty
)\C
LA
-9 3 (
Lin wo od A ve )\C
LA
-D W
GS
\S
HE
ET
S\ C
LA
-5 .0
RO
AD
W
AY
P
LA
N
AN
D
PR
OF
ILE
.dw g
R E V I S I O N S
DATE NO. DESCRIPTION
DATE:
DESIGNED:
CHECKED:
DRAWN:
SHEET NO.
JOB NO.
E N G I N E E R S P L A N N E R S
LANDSCAPE ARCHITECTS SURVEYORS
205 SE Spokane Street, Suite 200, Portland, OR 97202 phone: 503.221.1131 www.hhpr.com fax: 503.221.1171
Harper Houf Peterson Righellis Inc. LINWOOD AVENUE IMPROVEMENTS
CLACKAMAS COUNTY, OREGON CLA-93
HHPR TEAM
HHPR TEAM
DSH/JSH
11-11-2022
12/9/22 1 ADDENDUM #1
150 BEAVERCREEK ROAD
DEVELOPMENT AGENCY
CLACKAMAS COUNTY
P R E P A R E D F O R
OREGON CITY, OR 97045
DEVELOPMENT SERVICES BLDG.
5.2LINWOOD PLAN AND PROFILE
(EX)
(EX)
(EX)
(EX)
(EX)
(EX)
(EX)
NOTE: SEE EROSION CONTROL PLANS ON SHEET SERIES 4.0 FOR TREE REMOVAL PLAN.
SEE SHEET SERIES 12.0 FOR SIGNAL
MODIFICATIONS AT SE KING RD
INTERSECTION
(EX)
(EX)
SCALE: 1" = '
10 20 40
CONSTRUCTION NOTES:
SEE SHEET 5.2A FOR DRAINAGE DATA
AND STORM INLET PROFILES
NOTE: SEE SHEET SERIES 15.0 FOR SANITARY PLAN AND PROFILE. # SEE SHEET SERIES 7.0 FOR CURB RETURN AND RAMP INFORMATION
1 CONSTRUCT CURB AND GUTTER PER DETAIL S150 ON SHEET 3.0.
2 CONSTRUCT STANDARD CURB PER DETAIL S100 ON SHEET 3.0.
3 CONSTRUCT PERVIOUS SHARED-USE PATH. SEE SECTION DETAIL ON SHEET 6.0.
4 CONSTRUCT CONCRETE SIDEWALK PER DETAIL S960 ON SHEET 3.0. SEE SECTION DETAIL ON
SHEET 6.0.
5 CONSTRUCT SIDEWALK RAMP WITH TACTILE WARNING PER ODOT STANDARD DRAWINGS
RD902, RD904, RD905, RD910 ON SHEETS 3.3 AND 3.4. SEE SPOT ELEVATIONS ON SHEET
SERIES 7.0.
6 CONSTRUCT CONCRETE BICYCLE RAMP PER DETAIL ON SHEET 3.5. SEE SPOT GRADE
ELEVATIONS ON SHEET SERIES 7.0.
7 CONSTRUCT CONCRETE DRIVEWAY APPROACH PER ODOT STANDARD DWG RD740 AND
RD750 ON SHEET 3.1. MATCH EXISTING WIDTH AND MATERIAL BEHIND APPROACH
UNLESS NOTED OTHERWISE. SAWCUT AND REMOVE EXISTING SURFACE AS REQUIRED.
MINIMUM STRUCTURAL SECTION BEHIND APPROACH: 3" AC PAVEMENT OVER 8"
AGGREGATE BASE OR 6" P.C.C. OVER 8" AGGREGATE BASE, OR MATCH EXISTING SECTION,
WHICHEVER IS GREATER. SEE DRIVEWAY TABLE FOR DIMENSIONS AND MATERIAL TYPE ON
SHEET 8.0.
8 CONSTRUCT FULL DEPTH ROADWAY SECTION. SAWCUT TO LIMITS SHOWN AND AS
REQUIRED. SEE SECTION DETAIL ON SHEET 6.0.
9 CONSTRUCT VARIABLE GRIND (0-4") OF EXISTING AC AND REPLACE WITH 4" INLAY.
PRE-LEVEL AS REQUIRED. SEE CENTERLINE PROFILES, TYPICAL SECTIONS, AND CROSS
SECTIONS.
10 MATCH NEW CURB TO EXISTING CURB AND/OR MATCH NEW SIDEWALK TO EXISTING
SIDEWALK. SAWCUT AS REQUIRED AND DIRECTED.
11 REMOVE (R) OR PROTECT (P) EXISTING CONCRETE CURB AND/OR SIDEWALK. SAWCUT
NEAT LINE AT LIMIT OF REMOVAL.
12 REMOVE (R), PROTECT (P), OR RELOCATE (REL) EXISTING FENCE & GATES. FOR REMOVALS, REMOVE EXISTING FENCE WITHIN ROW LIMITS. INSTALL NEW FENCE AND/OR GATE ON
PROPERTY LINE AT LOCATIONS IDENTIFIED IN THE SPECIFICATIONS.
13 RELOCATE (REL), PROTECT (P), OR DEMOLISH (D) EXISTING MAILBOX(ES). FOR ANY
RELOCATION OR ADJUSTMENT, SEE ODOT STANDARD DRAWING RD100 AND RD101 ON
SHEET 3.12. COORDINATE LOCATION WITH ENGINEER.
18 CONSTRUCT PRIVATE CONCRETE WALK CONNECTION. SEE DETAIL S960 ON SHEET 3.0 AND
SECTION DETAIL ON SHEET 6.0.
19 CONSTRUCT VERTICAL CURB WALL WITH 12" EXPOSURE PER DETAIL ON SHEET 3.2.
22 CONSTRUCT STANDARD TYPE C CURB WITH 0.4' EXPOSURE ON SHARED-USE PATH SIDE PER
DETAIL S100 ON SHEET 3.0.
26 REMOVE (R) OR PROTECT (P) EXISTING COMMERCIAL SIGN.
32 PROTECT (P), REMOVE (R), ADJUST (A), OR PLUG AND ABANDON (AB) EXISTING STORM
STRUCTURE. UPON REMOVAL, FILL ANY VOID WITH CONTROLLED DENSITY FILL (CDF).
33 CONNECT TO EXISTING PIPE OR STRUCTURE PER DETAIL ON SHEET 3.6.
34 ADJUST STRUCTURE RIM, COVER, OR FRAME TO FINISH GRADE PER ODOT STANDARD DWG
RD360 AND STANDARD DWG SWM MH-2.0 ON SHEET 3.8. MAJ = MAJOR ADJUSTMENT,
MIN = MINOR ADJUSTMENT.
36 CONSTRUCT STANDARD CATCH BASIN GB-2 AND LATERALS PER STANDARD DWG SWM
CB-5.0 ON SHEET 3.6. SEE PROFILE AND DRAINAGE DATA FOR INVERTS AND LOCATION.
37 CONSTRUCT STORMWATER TREATMENT PLANTER PER DETAIL ON SHEET 3.9. SEE DETAILED
PLANTER GRADING ON SHEET SERIES 8.0 FOR CURB CUT STATIONING AND PLANTER
GRADING.
38 CONSTRUCT AREA DRAIN PER DETAIL ON SHEET 3.6. SEE PLAN FOR INVERTS AND DATA.
39 REMOVE EXISTING STORM STRUCTURE AND CONSTRUCT 48" STANDARD STORM SEWER
MANHOLE PER STANDARD DWG SWM MH-9.0 ON SHEET 3.7. CONNECT TO EXISTING PIPE
PER DETAIL ON SHEET 3.6. SEE PROFILE AND DRAINAGE DATA FOR INVERTS AND
LOCATION.
40 EXISTING MANHOLE BURIED UNDER ASPHALT. LOCATE EXISTING MANHOLE AND ADJUST
RIM TO FINISH GRADE PER ODOT STANDARD DWG RD360 AND STANDARD DWG SWM
MH-2.0 ON SHEET 3.8.
42 CONSTRUCT OVERFLOW BEEHIVE INLET PER STANDARD DETAIL ON SHEET 3.8 AND 3.9.
SEE DETAILED PLANTER GRADING IN SERIES 8.0 FOR INVERTS, ORIFICE SIZE AND LOCATION.
48 CONSTRUCT STORM SEWER CLEANOUT PER STANDARD DETAIL SWM ST-4.0 ON SHEET 3.8.
51 RELOCATE (REL), ADJUST (A), OR PROTECT (P) EXISTING FIRE HYDRANT. CLACKAMAS RIVER
WATER (CRW) RELOCATIONS AND ADJUSTMENTS BY CONTRACTOR. CITY OF MILWAUKIE
(MWK) RELOCATIONS AND ADJUSTMENTS BY OTHERS. APPROXIMATE LOCATION OF NEW
HYDRANT SHOWN ON PLANS. CONTRACTOR TO COORDINATE.
52 RELOCATE (REL), ADJUST (A), PROTECT (P), OR REPLACE (REP) EXISTING WATER VALVE BOX.
CLACKAMAS RIVER WATER (CRW) RELOCATIONS, ADJUSTMENTS, AND REPLACEMENTS BY
CONTRACTOR. CITY OF MILWAUKIE (MWK) RELOCATIONS AND ADJUSTMENTS BY OTHERS.
CONTRACTOR TO COORDINATE.
53 RELOCATE (REL), ADJUST (A). OR PROTECT (P) EXISTING WATER METER, BOX, AND SERVICE.
CLACKAMAS RIVER WATER (CRW) RELOCATIONS AND ADJUSTMENTS BY CONTRACTOR.
CITY OF MILWAUKIE (MWK) RELOCATIONS AND ADJUSTMENTS BY OTHERS. APPROXIMATE
LOCATION OF NEW METER LOCATIONS SHOWN ON PLANS. CONTRACTOR TO
COORDINATE.
54 RELOCATE (REL), ADJUST (A). OR PROTECT (P) EXISTING IRRIGATION. RELOCATIONS AND
ADJUSTMENTS BY OTHERS. CONTRACTOR TO COORDINATE.
61 RELOCATE (REL), REMOVE (R), OR PROTECT (P) EXISTING UTILITY POLE. REMOVAL OR
RELOCATION BY UTILITY. CONTRACTOR TO COORDINATE POLE AND WIRE RELOCATIONS
WITH APPROPRIATE UTILITIES.
66 RELOCATE (REL), ADJUST (A), OR PROTECT (P) EXISTING GAS VALVE. RELOCATION OR
ADJUSTMENT BY UTILITY. CONTRACTOR TO COORDINATE.
68 REMOVE (R) OR PROTECT (P) EXISTING PRIVATE LIGHT POLE.
76+00 76+50 77+00 77+50 78+00 78+50 79+00 79+50 80+00 80+50 81+00
GB
S
TA
7+
.2
EL
EV
.2
GB
S
TA
7+
.0
EL
EV
.8
GB
S
TA
0+
.0
EL
EV
.4
1.50% 0.50%
2.15%
2.00%
PVI STA: 81+32.10
PVI ELEV: 168.06
K: 37.04
LVC: 100.00
BV
CS
: 8 0+
.1
BV
CE
: 1
.0
EV
CS
: 8 1+
.1
EV
CE
: 1
.7
52.5 LF 12" STM S=0.005017.7 LF 12" STM S=0.0100
CONSTRUCT SECTION WITH CENTERLINE DESIGN PROFILE
SEE PROFILE BELOW
FG @ CENTERLINE
EG @ CENTERLINE
EX MH-33
EX MH
STA: 76+64.14, 3.48' R
RIM ELEV = 158.96
48" IE IN (S) = 149.49
12" IE IN (NE) = 154.49
12" IE IN (NW) = 152.64
48" IE OUT (N) = 149.45
EX MH-39
EX MH
STA: 79+91.64, 4.02' R
RIM ELEV = 165.13
48" IE IN (S) = 148.83
12" IE IN (SE) = 159.99
48" IE OUT (N) = 148.81
CB-14
INLET TYPE (CG-3)
GUT STA: 79+81.01, 18.15' R
GUT ELEV = 164.62
12" IE IN (N) = 160.27
12" IE OUT (NW) = 160.17
SUMP ELEV = 158.67
CB-15
INLET TYPE (GB-2)
GUT STA: 80+33.45, 20.02' R
GUT ELEV = 165.45
12" IE IN (N) = 162.07
12" IE OUT (S) = 160.53
SUMP ELEV = 159.03
W W W W W
W W
X X X X
XXX
X X X X
XXXXXXX
X X
FM FM FM FM FM FM FM FM FM FM FM FM
W
9957 SE LINWOOD AVE
9949 SE LINWOOD AVE
9943 SE LINWOOD AVE
9939 SE LINWOOD AVE
9929 SE LINWOOD AVE
9925 SE LINWOOD AVE
25 9911 SE
LINWOOD
AVE
6305 SE NEEDHAM ST
9900 SE LINWOOD AVE
9916 SE LINWOOD AVE
9922 SE LINWOOD AVE
9940 SE LINWOOD AVE
TAX LOT
12E30DD00700
TAX LOT
12E30DD00600
TAX LOT
12E30DD00400
TAX LOT
12E30DD00300
TAX LOT
12E30DD00100
TAX LOT
12E30DA13200 TAX LOT
12E30DA13100
TAX LOT
12E29CB06700
TAX LOT
12E29CC02200
TAX LOT
12E29CC02300
TAX LOT
12E29CC02400
TAX LOT
12E29CC03600
1+
2+
1+
2+
76+00 77+00 78+00 79+00 80+00 81+00
1+
2 TYP.
5 5 56 6
7 7 7 7 7 7
57 7 7 7 7
8 9
R
R
R
R
P
R
12R 12 R
R
R
R
P
R
REL
REL 13
REL
REL
REL
REL
REL
REL
REL
REL
31R
32R
31 AB
31 R
P
34MIN; EX MH-33
36 CB-15
52 A
P;CRW
REP
51REL;CRW
REL;CRW
REL;CRW
52A
REL;CRW
REL;CRW
A
REL;CRW
A
REL;CRW 53
REL;CRW
51P;CRW
52P
42OF-9
REL
REL
34A, MIN
34A, MIN
34 A, MIN
A
34MIN; EX MH-39
CB-14
5 5 32 R
2 10
TYP.
TYP.
TYP.
H=2'-3' (C)
13REL
A, MIN
P
P
A
A
A
A
32 R
31 AB
32 R
32 R
E
C
E
D H
M
SE LINWOOD AVE
O
R
OF-10
37 P10
REL
P9
TYP.
TYP.
TYP.
CO-10
CO-9
P;CRW
EX ROW
EX ROW
PR TCE
DAYLIGHT
DAYLIGHT
P11
OF-11
CO-11
P
7.8 7.8
7.8
NOTE:
CONFIRM PROPERTY OWNER 64 HAS SIGNED
PERMIT OF ENTRY PRIOR TO FENCE RELOCATION.
COORDINATE WITH ENGINEER FOR UPDATED
DRIVEWAY CONNECTION.
EG=158.38
FG=158.74
EG=158.69
FG=158.96 EG=165.10
FG=165.13
EG=165.37
FG=165.46
LINWOOD AVE PLAN VIEW
SCALE: 1"=20'
LINWOOD AVE - CENTERLINE PROFILE
SCALE: 1"=20' (HORIZ.)
1"=5' (VERT.)
M A
T C
H L
I N
E
S
T A
E
M A
T C
H L
I N
E
S
T A
E
P:
\C
LA
(C lac ka ma s C ou nty
)\C
LA
-9 3 (
Lin wo od A ve )\C
LA
-D W
GS
\S
HE
ET
S\ C
LA
-5 .0
RO
AD
W
AY
P
LA
N
AN
D
PR
OF
ILE
.dw g
R E V I S I O N S
DATE NO. DESCRIPTION
DATE:
DESIGNED:
CHECKED:
DRAWN:
SHEET NO.
JOB NO.
E N G I N E E R S P L A N N E R S
LANDSCAPE ARCHITECTS SURVEYORS
205 SE Spokane Street, Suite 200, Portland, OR 97202 phone: 503.221.1131 www.hhpr.com fax: 503.221.1171
Harper Houf Peterson Righellis Inc. LINWOOD AVENUE IMPROVEMENTS
CLACKAMAS COUNTY, OREGON CLA-93
HHPR TEAM
HHPR TEAM
DSH/JSH
11-11-2022
12/9/22 1 ADDENDUM #1
150 BEAVERCREEK ROAD
DEVELOPMENT AGENCY
CLACKAMAS COUNTY
P R E P A R E D F O R
OREGON CITY, OR 97045
DEVELOPMENT SERVICES BLDG.
5.4LINWOOD PLAN AND PROFILE
(EX)
(EX)
(EX)
(EX)
(EX)
(EX)
EX IE SHOWN WAS INTERPOLATED
USING EX SLOPE UPSTREAM AND
DOWNSTREAM. CONTRACTOR TO
CONFIRM IE.
NOTE: SEE EROSION CONTROL PLANS ON SHEET SERIES 4.0 FOR TREE REMOVAL PLAN.
SCALE: 1" = '
10 20 40
CONSTRUCTION NOTES:
SEE SHEET 5.4A FOR STORM INLET PROFILES
NOTE: SEE SHEET SERIES 15.0 FOR SANITARY PLAN AND PROFILE.
# SEE SHEET SERIES 7.0 FOR CURB RETURN AND RAMP INFORMATION
1 CONSTRUCT CURB AND GUTTER PER DETAIL S150 ON SHEET 3.0.
2 CONSTRUCT STANDARD CURB PER DETAIL S100 ON SHEET 3.0.
3 CONSTRUCT PERVIOUS SHARED-USE PATH. SEE SECTION DETAIL ON SHEET 6.0.
4 CONSTRUCT CONCRETE SIDEWALK PER DETAIL S960 ON SHEET 3.0. SEE SECTION DETAIL ON
SHEET 6.0.
5 CONSTRUCT SIDEWALK RAMP WITH TACTILE WARNING PER ODOT STANDARD DRAWINGS
RD902, RD904, RD905, RD910 ON SHEETS 3.3 AND 3.4. SEE SPOT ELEVATIONS ON SHEET
SERIES 7.0.
6 CONSTRUCT CONCRETE BICYCLE RAMP PER DETAIL ON SHEET 3.5. SEE SPOT GRADE
ELEVATIONS ON SHEET SERIES 7.0.
7 CONSTRUCT CONCRETE DRIVEWAY APPROACH PER ODOT STANDARD DWG RD740 AND
RD750 ON SHEET 3.1. MATCH EXISTING WIDTH AND MATERIAL BEHIND APPROACH
UNLESS NOTED OTHERWISE. SAWCUT AND REMOVE EXISTING SURFACE AS REQUIRED.
MINIMUM STRUCTURAL SECTION BEHIND APPROACH: 3" AC PAVEMENT OVER 8"
AGGREGATE BASE OR 6" P.C.C. OVER 8" AGGREGATE BASE, OR MATCH EXISTING SECTION,
WHICHEVER IS GREATER. SEE DRIVEWAY TABLE FOR DIMENSIONS AND MATERIAL TYPE ON
SHEET 8.0.
8 CONSTRUCT FULL DEPTH ROADWAY SECTION. SAWCUT TO LIMITS SHOWN AND AS
REQUIRED. SEE SECTION DETAIL ON SHEET 6.0.
9 CONSTRUCT VARIABLE GRIND (0-4") OF EXISTING AC AND REPLACE WITH 4" INLAY.
PRE-LEVEL AS REQUIRED. SEE CENTERLINE PROFILES, TYPICAL SECTIONS, AND CROSS
SECTIONS.
10 MATCH NEW CURB TO EXISTING CURB AND/OR MATCH NEW SIDEWALK TO EXISTING
SIDEWALK. SAWCUT AS REQUIRED AND DIRECTED.
11 REMOVE (R) OR PROTECT (P) EXISTING CONCRETE CURB AND/OR SIDEWALK. SAWCUT
NEAT LINE AT LIMIT OF REMOVAL.
12 REMOVE (R), PROTECT (P), OR RELOCATE (REL) EXISTING FENCE & GATES. FOR REMOVALS, REMOVE EXISTING FENCE WITHIN ROW LIMITS. INSTALL NEW FENCE AND/OR GATE ON
PROPERTY LINE AT LOCATIONS IDENTIFIED IN THE SPECIFICATIONS.
13 RELOCATE (REL), PROTECT (P), OR DEMOLISH (D) EXISTING MAILBOX(ES). FOR ANY
RELOCATION OR ADJUSTMENT, SEE ODOT STANDARD DRAWING RD100 AND RD101 ON
SHEET 3.12. COORDINATE LOCATION WITH ENGINEER.
15 CONSTRUCT SEGMENTAL BLOCK RETAINING WALL PER DETAIL ON SHEET 3.2. HEIGHT (H)
NOTED ON PLANS. WALL TYPE CUT (C) OR FILL (F) NOTED ON PLANS.
18 CONSTRUCT PRIVATE CONCRETE WALK CONNECTION. SEE DETAIL S960 ON SHEET 3.0 AND
SECTION DETAIL ON SHEET 6.0.
22 CONSTRUCT STANDARD TYPE C CURB WITH 0.4' EXPOSURE ON SHARED-USE PATH SIDE PER
DETAIL S100 ON SHEET 3.0.
24 REMOVE (R) OR PROTECT (P) EXISTING WALL.
25 CONSTRUCT ASPHALT DRAINAGE CURB PER DETAIL ON SHEET 3.0. MATCH SIZE AND TYPE
TO EXISTING.
27 CONSTRUCT LOW MAINTENANCE AGGREGATE GRAVEL BEHIND WALL.
31 PROTECT (P), REMOVE (R), OR PLUG AND ABANDON IN-PLACE (AB) EXISTING STORM PIPE
IN-PLACE AS REQUIRED AND DIRECTED. UPON ABANDON IN-PLACE, FILL PIPE WITH
CONTROLLED DENSITY FILL (CDF).
32 PROTECT (P), REMOVE (R), ADJUST (A), OR PLUG AND ABANDON (AB) EXISTING STORM
STRUCTURE. UPON REMOVAL, FILL ANY VOID WITH CONTROLLED DENSITY FILL (CDF).
33 CONNECT TO EXISTING PIPE OR STRUCTURE PER DETAIL ON SHEET 3.6.
34 ADJUST STRUCTURE RIM, COVER, OR FRAME TO FINISH GRADE PER ODOT STANDARD DWG
RD360 AND STANDARD DWG SWM MH-2.0 ON SHEET 3.8. MAJ = MAJOR ADJUSTMENT,
MIN = MINOR ADJUSTMENT.
35 CONSTRUCT STANDARD CURB INLET CATCH BASIN CG-3 AND LATERALS PER ODOT
STANDARD DWG RD371 AS MODIFIED ON SHEET 3.7. SEE PROFILE AND DRAINAGE DATA
FOR INVERTS AND LOCATION.
36 CONSTRUCT STANDARD CATCH BASIN GB-2 AND LATERALS PER STANDARD DWG SWM
CB-5.0 ON SHEET 3.6. SEE PROFILE AND DRAINAGE DATA FOR INVERTS AND LOCATION.
37 CONSTRUCT STORMWATER TREATMENT PLANTER PER DETAIL ON SHEET 3.9. SEE DETAILED
PLANTER GRADING ON SHEET SERIES 8.0 FOR CURB CUT STATIONING AND PLANTER
GRADING.
41 CONSTRUCT STORM SEWER CLEANOUT PER STANDARD DETAIL SWM ST-4.0 ON SHEET 3.8.
SEE DETAILED PLANTER GRADING IN SERIES 8.0 FOR INVERTS, ORIFICE SIZE AND LOCATION.
42 CONSTRUCT OVERFLOW BEEHIVE INLET PER STANDARD DETAIL ON SHEET 3.8 AND 3.9.
SEE DETAILED PLANTER GRADING IN SERIES 8.0 FOR INVERTS, ORIFICE SIZE AND LOCATION.
44 COORDINATE MANHOLE GRADE ADJUSTMENT WITH ENGINEER. INSTALL WATER TIGHT
TIGHT MANHOLE LID.
51 RELOCATE (REL), ADJUST (A), OR PROTECT (P) EXISTING FIRE HYDRANT. CLACKAMAS RIVER
WATER (CRW) RELOCATIONS AND ADJUSTMENTS BY CONTRACTOR. CITY OF MILWAUKIE
(MWK) RELOCATIONS AND ADJUSTMENTS BY OTHERS. APPROXIMATE LOCATION OF NEW
HYDRANT SHOWN ON PLANS. CONTRACTOR TO COORDINATE.
52 RELOCATE (REL), ADJUST (A), PROTECT (P), OR REPLACE (REP) EXISTING WATER VALVE BOX.
CLACKAMAS RIVER WATER (CRW) RELOCATIONS, ADJUSTMENTS, AND REPLACEMENTS BY
CONTRACTOR. CITY OF MILWAUKIE (MWK) RELOCATIONS AND ADJUSTMENTS BY OTHERS.
CONTRACTOR TO COORDINATE.
53 RELOCATE (REL), ADJUST (A). OR PROTECT (P) EXISTING WATER METER, BOX, AND SERVICE.
CLACKAMAS RIVER WATER (CRW) RELOCATIONS AND ADJUSTMENTS BY CONTRACTOR.
CITY OF MILWAUKIE (MWK) RELOCATIONS AND ADJUSTMENTS BY OTHERS. APPROXIMATE
LOCATION OF NEW METER LOCATIONS SHOWN ON PLANS. CONTRACTOR TO
COORDINATE.
61 RELOCATE (REL), REMOVE (R), OR PROTECT (P) EXISTING UTILITY POLE. REMOVAL OR
RELOCATION BY UTILITY. CONTRACTOR TO COORDINATE POLE AND WIRE RELOCATIONS
WITH APPROPRIATE UTILITIES.
66 RELOCATE (REL), ADJUST (A), OR PROTECT (P) EXISTING GAS VALVE. RELOCATION OR
ADJUSTMENT BY UTILITY. CONTRACTOR TO COORDINATE.
1 1
81+00 81+50 82+00 82+50 83+00 83+50 84+00 84+50 85+00 85+50 86+00
-1.40% -2.20%
-3.20%
-0.70% GB
S
TA
4+
.0
EL
EV
.1
GB
S
TA
4+
.0
EL
EV
.4
GB
S
TA
5+
.0
EL
EV
.3
PVI STA: 81+32.10
PVI ELEV: 168.06
K: 37.04
LVC: 100.00
BV
CS
: 8 0+
.1
BV
CE
: 1
.0
EV
CS
: 8 1+
.1
EV
CE
: 1
.7
1HIGH PT. STA: 81+56.18
HIGH PT ELEV: 167.80
CONSTRUCT SECTION WITH CENTERLINE DESIGN PROFILE
SEE PROFILE BELOW
FG @ CENTERLINE
EG @ CENTERLINE
EX MH-15
EX MH
STA: 85+59.37, -4.05' L
RIM ELEV = 162.38
48" IE IN (S) = 147.51
12" IE IN (SE) = 154.84
12" IE IN (S) = 155.97
48" IE OUT (N) = 147.49
MH-10
48" FLAT TOP MH
STA: 83+25.45, 19.53' R
RIM ELEV = 167.01
12"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .