LINCOLN PARK PUBLIC SCHOOLS BID ADVERTISEMENT.pdf
PDF 411 KB Posted
- Attached to
- Lincoln Park High School Abatement
- Solicitation number
- RFP LPP 260000001337 1
- Issued by
- Michigan
About this file
This is a bid advertisement issued by Lincoln Park Public Schools for asbestos abatement and selective interior demolition work at the high school during summer 2026. The project involves removal of asbestos-containing ceiling and flooring materials in classrooms, corridors, cafeteria, main office, science wing, and athletic wing pool office areas, along with removal of thermal system pipe insulation and selective demolition of millwork and countertops. Work is divided into two separate bid groups to potentially accommodate multiple contractors, though contractors may bid on both groups with a combined cost proposal. A mandatory pre-bid walkthrough is scheduled for March 18, 2026, at 3:00 p.m. at Lincoln Park High School (1701 Champaign Road, Lincoln Park, Michigan 48146), and only attendees will be permitted to submit bids. Written pre-bid questions must be submitted by March 23, 2026, at 1:00 p.m. Sealed bid proposals are due on March 31, 2026, at 1:00 p.m. at the Board of Education office (1650 Champaign, Lincoln Park, Michigan 48146). Bid evaluation will occur March 31 through April 3, 2026, with contractor recommendation on April 8, 2026, and final board approval on April 21, 2026.
Bid security in the form of a 5% bid bond or certified check is required, with successful bidders required to provide 100% performance bonds and 100% labor and material payment bonds through Treasury-approved sureties. Prevailing wage requirements and certified payroll statements are mandatory for all invoicing related to the 2024 Bond-funded classroom ceiling and flooring removal work. Bidders must submit proposals in triplicate on provided forms and include a sworn, notarized familial relationship disclosure statement and certification of compliance with Michigan's Iran Economic Sanctions Act. Contractors must hold a valid State of Michigan Asbestos Abatement License and provide proof of asbestos-specific insurance. The project is subject to state sales tax and use tax on all materials and supplies. Successful contractor(s) must allocate all necessary equipment and workers with accreditation numbers and guarantee completion by the specified deadline to enable district reconstruction activities.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LINCOLN PARK PUBLIC SCHOOLS BID ADVERTISEMENT
BASE BID FOR ASBESTOS ABATEMENT/SELECTIVE INTERIOR DEMOLITION
HIGH SCHOOL RENOVATIONS
SUMMER 2026
BID ADVERTISEMENT
Lincoln Park Public Asbestos Abatement and Selective Demolition Work. Asbestos Abatement Removal
/Demolition Projects have been detailed into Three Separate Pricing Bids for the 2026 Summer work.
This work has been broken into 2 Groups to accommodate up to 2 separate contractors to achieve the project completion deadline. However, if the contractors so choose to Bid Both Groups of work #1 & #2, then please provide a combined cost ion Bid 3 with any possible discounted costs. Please remember the work and labor force must accommodate meeting the deadline target completion date.
Removal of the 1st Level Ceiling/Flooring System to include Ceiling system and Flooring Removal Demolition in Corridors, Classrooms, Cafeteria rooms, Main Office, Science Wing Classrooms, and any Thermal System
Pipe Insulation Removal where discovered above ceilings and in Walls.
The Contractors will only receive the Bidding Documents at the Mandatory Pre-Bid Walk Through.
The Contractors Can Print Building Plans and Prints on E1 size paper 30”x42” Size for Actual Scale.
Project Summary: Lincoln Park Public Schools is requesting Bid Submittals for the removal of Asbestos
Containing Ceiling and Flooring Materials in Classrooms and Corridors, Selective Interior Demolition of Millwork /
Countertops and Asbestos Thermal System Pipe Insulation. All abatement projects (Asbestos) shall be performed within full negative pressure HEPA filtered containment/ Regulated work areas equipped with Decontamination
Units attached to each work area.
• Renovation/Demolition for Summer Work 2026. Asbestos Abatement will involve removal of Non
Asbestos Containing Ceiling Tiles with Asbestos Containing Glue-pods on plasterboard/drywall ceiling systems to include all steel and metal ceiling supporting materials, hangers and all Asbestos floor tile and/or Asbestos mastic by grinding method for new flooring installation prep work in the corridors, classrooms, including any remaining Asbestos Thermal System Insulation.
• Additional Athletic Wing Pool office Asbestos Abatement of ceilings and flooring in that area.
• Some Millwork may be required to remain and contractors shall verify the cabinets and millwork to be removed prior to demolition and damage. The contractors will be held responsible for any damage to millwork not slated for removal or scheduled for demolition. Reference all demolition plans prior to work commencing.
BIDDING OPTION:
LPPS will entertain the option to retain multiple contractors to split the work between Bid 1 & Bid 2 separately.
However, If the contractor has the manpower and would entertain a Bid qualifier discount to be considered to perform all Phases, would be considered. If a single sourced contractor is contracted to perform Both
Bids, then the Contractor MUST Reassure LPPS together with TEK Environmental that ALL work will be completed per the scheduled completion deadline as stated herein.
The Contractor MUST provide a complete list of allocated Equipment and Workers with names and accreditation numbers that will be scheduled for the duration of the work to be performed until completed, pursuant to the scheduled substantial completion deadline dates. These dates will be enforced to meet the requirements to return the building to the districts Construction Manager for reconstruction.
Questions may be addressed to:
TEK Environmental & Consulting Services, Inc. (734) 878-5588
Mr. Tyler S. Lenling, tyler@tekenvironmental.com
Senior Project Manager, Asbestos Project Designer
And
Lincoln Park Public Schools (313) 389-0251
Mr. Ron Revoir, Ronald.Revoir.Jr@lpps.info
Director of Operations
Mandatory Pre-Bid Walk Through
TEK will have all necessary Bid documents will be provided at the WEST Parking Lot at McCarthy & Smith
Job Trailer. It must be understood that only bidders who attend the Mandatory Pre-Bid walk through will only be permitted to Bid the project.
Contractors must Park in the WEST Parking Lot at McCarthy & Smith Job Trailer along I-75
DO NOT PARK in EAST Parking Lot area.
Mandatory Pre-Bid Walk thru: Lincoln Park Public Schools
Location: High School, 1701 Champaign Rd., Lincoln Park, MI 48146
Date: Wednesday, March 18, 2026, Time: 3:00p.m. (local time)
Pre-Bid Questions from Pre-Bid Walk Through. Questions must be sent by email in writing all Above listed:
Address Questions for each area shall be titled by Building Name-High School
Pre Bid Questions in Writing to Email Provided: March 23, 2026
Time: On or before 1:00 p.m. (local time)
*Answers will be Addressed and submitted in an emailed Addendum by TBD
BIDS DUE AND OPENING DATE:
***BIDS Must Meet Prevailing Wage Requirements along with all required Certified Payroll Sheets
Date: March 31, 2026
Time: 1:00 P.M. Local Time (No Late Bids will be Opened)
Location: Board of Education Receptionist Desk–1650 Champaign, Lincoln Park, MI. 48146
Opening: Board Room 1650 Champaign, Lincoln Park, MI. 48146
All bids must be addressed in signed (sealed) envelopes stated as:
ASBESTOS ABATEMENT BID / RENOVATION PROJECT SUMMER 2026
Attn: Mr. Ron Revoir
Lincoln Park Public Schools
1650 Champaign, Lincoln Park, MI 48146 mailto:tyler@tekenvironmental.com mailto:Ronald.Revoir.Jr@lpps.info
LPPS BID EVALUATION DATES:
Dates: March 31, 2026 through April 3, 2026
LPPS BUILDING AND GROUNDS CONTRACTOR RECOMMENDATION DATE:
Date: Wednesday April 8, 2026 after LPPS Board of Education Meeting
Approval
FINAL BID APPROVAL-RESOLUTION by LPPS BOARD OF EDUCATION FOR CONTRACTOR
AWARD
Date: Tuesday April 21, 2026
BONDING WILL BE REQUIRED AS FOLLOWS:
Bid Bond: 5%
Performance Bond 100%, Labor & Material Bond 100%
2024 BOND PREVAILING WAGES ARE REQUIRED WITH CERTIFIED PAYROLL STATEMENTS
WITH ALL INVOICING.
The Contractors shall be made aware that Prevailing Wage Requirements shall be in effect for the classroom ceiling and flooring removal within the Corridors and Classrooms and associated Closets and storage rooms.
These areas are part of the new 2024 Bond. Therefore, All Work associated with these areas shall be submitted as Certified Payroll to the Lincoln Park Schools Business Office with your Invoices.
The Bid Bond:
Bid security in the form of a Bid Bond by a Treasury approved surety licensed to do business in the State of
Michigan, Cashier's Check, or Certified Check in the amount of 5% of the bid price shall be submitted with the "Bid
Proposal Packet" and shall be submitted with the understanding that if his/her bid is accepted, he/she will enter into a formal contract with the Owner in accordance with the form of agreement and that the required Performance and
Payment Bonds will be given. Bid security obligee is Lincoln Park Public Schools. Bidders shall agree not to withdraw proposals for a period of forty-five (45) days after date for receipt of bids.
The Performance Bond & Labor and Material Payment
The accepted bidder(s) will be required to furnish in the amount of 100% of the Contract Price, satisfactory
Performance Bond and Labor and Material Payment Bond by a Treasury approved surety licensed to do business in the State of Michigan.
Familial Relationship Disclosure:
As required by the State of Michigan, P.A. 232 of 2004, a sworn and notarized statement, on the state required form, disclosing any familial relationship that exists between the Lincoln Park Public Schools or any employee of the bidder, and any member of the school board, or the superintendent of the school district must accompany all bids. The Lincoln Park Public Schools will not accept a bid that does not include this sworn and notarized disclosure statement.
Iran Economic Sanctions Disclosures:
The undersigned, the owner or authorized officer of the below-named Contractor (the “Contractor”), pursuant to the compliance certification requirement provided in the Lincoln Park Public Schools' (the “School District”)
Invitation For Proposal, hereby certifies, represents and warrants that the Contractor (including its officers, directors and employees) is not an “Iran linked business” within the meaning of the Iran Economic Sanctions
Act, Michigan Public Act No. 517 of 2012 (the “Act”), and that in the event Contractor is awarded a contract as a result of the aforementioned RFP, the Contractor will not become an “Iran linked business” at any time during the course of performing any services under the contract.
Additional Pertinent Information
All applicable insurance policies (including asbestos specific) will be required from the accepted bidder and submitted in the bid submittal packet.
If unavailable, at the time of the bid, the insurance certificates do not need to be included in the bid proposal.
Bidders must submit copies of the Contractor's State of Michigan Asbestos Abatement License. This project is not tax exempt from State Sales Tax and/or Use Tax. All materials and supplies incorporated and used in construction and becoming a permanent part of this project will not be exempt from State Sales Tax and/or Use Tax.
Bidding Submittal Requirements
The Bid Proposal Packet shall be submitted on the forms furnished in this specification. The Bid Proposal Packet must be submitted in Triplicate (3 COPIES ARE REQUIRED). Please provide 1 original and 2 copies with your submittal.
ATTACHMENT – Iran Economic Sanctions
CERTIFICATION OF COMPLIANCE - IRAN ECONOMIC SANCTIONS ACT
Michigan Public Act No. 517 of 2012
The undersigned, the owner or authorized officer of the below-named Contractor (the “Contractor”), pursuant to the compliance certification requirement provided in the Lincoln Park Public Schools' (the “School District”)
Invitation For Proposal, hereby certifies, represents and warrants that the Contractor (including its officers, directors and employees) is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 (the “Act”), and that in the event Contractor is awarded a contract as a result of the aforementioned RFP, the Contractor will not become an “Iran linked business” at any time during the course of performing any services under the contract.
The Contractor further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the School District’s investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to proposal on an Invitation For Proposal for three (3) years from the date it is determined that the person has submitted the false certification.
Name of Company
Signature of Authorized Representative
Name of Authorized Representative
Title of Authorized Representative
Date
FAMILIAL RELATIONSHIP DISCLOSURE (CONSTRUCTION, ADDITIONS AND
RENOVATIONS)
Contractors and/or vendors participating in competitive bids are required to sign a sworn and notarized statement disclosing any familial relationship(s) that exists between the owner(s) or any employee of the bidder and any member(s) of the Board of Education or the Superintendent. Failure to provide a notarized statement/signature will result in bid disqualification.
AFFIDAVIT OF BIDDER FAMILIAL RELATIONSHIP
The undersigned, the owner or authorized officer of, (vendor/bidder), pursuant to the familial disclosure requirement stated above and provided in the LINCOLN PARK PUBLIC SCHOOLS advertisement for construction bids, hereby represents and warrants, except as provided below, that no familial relationship(s) exist between the owner(s) or any employee of the bidder and any member(s) of the Board of Education or the Superintendent.
If a familial relationship exists, please list and explain:
Bidder/Vendor:
By (officer): (signature)
Name: (print)
Title: (print)
Date:
NOTARIZED STATEMENT:
Subscribed and sworn to before me, on this day of , 20
County, Michigan Notary
Public
My commission expires on:
File details come from the government source that posted it. Updated .