Lincoln Center Gym Floor Removal and Installation.pdf
PDF 254 KB Posted
- Solicitation number
- ITB 27-006
- Issued by
- Brazos County, Texas
About this file
This is a scope of work document for a gym floor removal and installation project issued by the City of College Station Parks and Recreation Department in Texas. The project involves removing the existing rubber flooring at the Lincoln Recreation Center Gold Gym, preparing the substrate, and installing replacement flooring using Tarkett Sports Polyturf Plus or an equal product. The installation scope includes creating game lines and courts for basketball, volleyball, four pickleball courts, and a walking track with one lane around the perimeter. The project requires complete demolition, disposal, and haul-away of existing materials as part of the removal phase, with the contractor responsible for protecting the newly installed floor upon completion.
The document does not specify pricing terms, contract duration, renewal options, response deadlines, site visit requirements, bidders' meetings, or award dates. No set-asides, incumbent information, funding sources, or budget amounts are identified in the file. The primary requirement is that the contractor provide or match the Tarkett Sports Polyturf Plus product specification with corresponding game line layouts as detailed in attached exhibit materials.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .