limited_sources_J_and_A LAMS IDS Redacted_Redacted.pdf

PDF 337 KB Posted

Attached to
Ebbing IDS installed in LAMS facilities
Solicitation number
Not on record
Issued by

About this file

This Limited Sources Justification and Approval (J&A) document is for Intrusion Detection Systems and Access Control Systems for a flightline armory (Building 115) by the 97 Contracting Squadron. The procurement is specifically for a full turnkey installation and service from Advantor Systems, which is justified as a sole-source contract due to the proprietary nature of their system. The system is considered unique because no other contractor can perform service or preventative maintenance within the closed stand-alone system, and the proprietary software and equipment limits other contractors from upgrading it.

The contract will be executed through the Multiple Award Schedule Program using GSA pricing, with Advantor being a GSA Contractor. The document emphasizes that the majority of Advantor's proposed costs are GSA-priced, which supports the determination that the proposed cost is fair and reasonable. The justification notes that while the system is proprietary, replacing the current system would likely result in another proprietary ownership situation from a different vendor. The purchase request number is F1T0AM5176A001, and the contract is associated with the Electronic Security Systems Program.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Limited Sources Justification and Approval (J&A)

CONTROLLED UNCLASSIFIED INFORMATION

April 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 7April 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 7

Date SAF/AQ

[ Name ] [ Office Symbol / Phone Number ]

Signature

Date [ Title ] [ Name ] [ Office Symbol / Phone Number ]

Signature

Date [ Title ] [ Name ] [ Office Symbol / Phone Number ]

Signature

APPROVAL (DAFFARS 5306.304(a))

Date Chief of the Contracting Office (COCO)

[ Name ] [ Office Symbol / Phone Number ]

Signature

Date Contracting Officer

[ Name ] [ Office Symbol / Phone Number ]

Signature

Date Competition Advocate

[ Name ] [ Office Symbol / Phone Number ]

Signature

Date PEO

[ Name ] [ Office Symbol / Phone Number ]

Signature

Date Senior Procurement Executive

[ Name ] [ Office Symbol / Phone Number ]

Signature

Date [ Title ] [ Name ] [ Office Symbol / Phone Number ]

Signature

April 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 7April 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 7

( See guidance at the end of this document for completing the following sections. )

I. Contracting Activity.

97 Contracting Squadron

II. Nature and/or description of the action being processed.

Intrusion Detection Systems and Access Control Systems for LAMS Facilities. Full Turnkey Installation and service.

III. Description of supplies/services required to meet agency needs.

Intrusion Detection Systems and Access Control Systems for BLDG 115, flightline armory. Full Turnkey Installation and service.

IV. Identification of the justification/rationale for limiting sources and demonstration of the contractor's unique qualifications to provide the required supply/service.

Advantor Systems is proprietary and therefore no other contractor can do service or Preventative Maintenance within the closed stand-alone system. The proprietary nature of this software/ equipment limits any other contractor from upgrading this system.

V. Determination by the ordering activity Contracting Officer that the order represents the best value consistent with

FAR 8.404(d).

Advantor Systems is proprietary and therefore no other contractor can do service or Preventative Maintenance within the closed stand-alone system. The proprietary nature of this software/ equipment limits any other contractor from upgrading this system.

VI. Description of the market research conducted and the results, or explain why market research was not conducted.

Proprietary restraints prevent another contractor from upgrading this system software and equipment.

VII. Other facts supporting the justification.

Advantor is a GSA Contractor and the majority of their proposed costs are GSA priced. Based on these findings, the Advantor proposed cost is considered fair and reasonable and therefore is in the best interest of the Government.

VIII. Actions the agency may take to remove or overcome any barriers that led to the restricted consideration before any subsequent acquisition for the supplies or services.

The Advantor quote consists of mostly GSA priced items. These systems are proprietary in nature and replacing this current system will most likely lead to another proprietary ownership situation from another vendor.

IX. Certification by the Contracting Officer.

As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my

April 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 4 of 7April 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 4 of 7 knowledge and belief.

X. Certification by the technical/requirements personnel.

As evidenced by my (our) signature(s) above, I (we) certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete.

April 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 5 of 7April 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 5 of 7

GUIDANCE

I. Contracting Activity.

Fully identify the contracting activity responsible for the proposed contracting action. Include the name/phone number of the Contracting Officer. Specifically identify as a “Limited Sources” Justification. Identify purchase request number, if applicable.

II. Nature and/or description of the action being processed.

State whether the action is a new order or by modification to an existing order. Identify the GSA schedule number, the Blanket Purchase Agreement (BPA) number, the order number for the current action, and the Contactor(s). Indicate the Period of Performance (PoP). Also identify the type of the order/line items on the order (e.g. Firm Fixed Price, Labor Hour, etc).

III. Description of the supplies/services required to meet agency needs.

Specifically describe the supplies and/or services to be acquired including the price and quantity of each item in the order and state the total estimated value of the order. For services, state whether the services are performance-based and, if not, provide rationale for not being performance based. Also state the delivery/performance schedule/period for the items under the order.

IV. Identification of the justification/rationale for limiting sources and demonstration of the contractor's unique qualifications to provide the required supply/service.

This section is normally the most detailed part of the justification. To assist you in preparing this justification, an introductory sentence and the four circumstances of FAR 8.405-6 that justify restricting the number of schedule holders are provided below. Select the appropriate cite, then provide, in narrative form, a detailed explanation supporting the specific circumstance cited for limiting the number of schedule holders.

(Introductory sentence) FAR 8.405-6 requires an ordering activity to justify its actions when restricting consideration of schedule contractors to fewer than required in FAR 8.405-1 or FAR 8.405-2.

After selecting the appropriate cite, next select one of the four sentences below and provide a detailed explanation supporting the specific circumstance cited.

FAR 8.405-6(a)(1)(i)(B), “Only one source is capable of responding due to the unique or specialized nature of the work”. (Provide a detailed justification with supporting documentation, as evidence of the “unique or highly specialized” nature of the procurement.

The user/customer typically provides this supporting information. Recommend attaching supporting documentation to the back of the document. General statements are not acceptable.)

FAR 8.405-6(a)(1)(i)(C), “The new work is a logical follow-on to an original Federal Supply Schedule order provided that the original order was placed in accordance with the applicable Federal Supply Schedule ordering procedures.” The original order was not issued under sole source or limited source procedures. (Provide details on the previously competed order and explain how this order is a logical follow-on to that order. Explain fully the connection between the previous work/order and the current one.

The user/customer typically provides this supporting information. General statements are not acceptable.)

FAR 8.405-6(a)(1)(i)(A), “An urgent and compelling need exists, and following the ordering procedures would result in unacceptable delays.” (Provide a detailed justification with supporting documentation that explains the exact urgency of the requirement and the schedule impact if time were to be taken to follow FSS ordering procedures. The user/customer typically provides this supporting information. Recommend attaching supporting documentation to the back of the document. General statements of urgency are not acceptable.)

FAR 8.405-6(b)(1), “The item is peculiar to one manufacturer. A brand name item, whether available on one or more schedule contracts, is an item peculiar to one manufacturer.” (Brand name specifications should not be used unless the particular brand name, product or feature is essential to the Government's requirements. Therefore, explain why the particular brand item is essential to the Government's requirements, and why other companies' similar items, or products lacking the particular feature, do not meet, or

April 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 6 of 7April 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 6 of 7 cannot meet, or cannot be modified to meet, the agency's need. The user/customer typically provides this supporting information.

General statements are not acceptable.)

V. Determination by the ordering activity Contracting Officer that the order represents the best value consistent with

FAR 8.404(d).

This section needs to be tailored based upon whether the order is for supplies/services not requiring a statement of work (FAR 8.405-1) or if the order is for services requiring a statement of work (FAR 8.405-2).

For FAR 8.405-1 orders the best value determination needs to be based upon the supply or service offered under MAS contracts by surveying at least three schedule contractors through the GSA Advantage! on-line shopping service, or by reviewing the catalogs or price lists of at least three schedule contractors. The ordering Contracting Officer's review of the Contractor's price list(s) and any price reductions sought is also required. (Contracting Officer should seek additional price discounts/concessions based on the specific order requirements on all orders over the micro-purchase threshold.) In addition to price, when determining best value, the ordering activity may consider, among other factors, past performance, special features of the supply or service required for effective program performance, trade-in considerations, probable life of the item selected as compared with that of a comparable item, warranty considerations, maintenance availability, environmental and energy efficiency considerations, and delivery terms.

When an order contains brand name specifications, the Contracting Officer shall post the Request for Quote (RFQ) along with the basis of the justification as required by FAR 8.405-6(b)(3).

For FAR 8.405-2 orders for services requiring a statement of work, FAR 8.405-2(d) requires that an evaluation be performed based on the criteria provided to the schedule contractors. Therefore, the justification must address how the FAR 8.404(d) requirement for an evaluation of the proposed level of effort and mix of labor will be conducted and include a statement that the Contracting Officer will perform a price reasonableness determination as part of the best value determination.

VI. Description of the market research conducted and the results, or explain why market research was not conducted.

Discuss market research that was conducted among schedule holders and the market research results that led to the conclusion to go sole source or to limit the number of schedule holders to be solicited. The narrative in this section should provide a high level of confidence that the requirements of FAR 8.405-1 and FAR 8.405-2 could not be met. If no market research was conducted, state so and provide the rationale.

VII. Other facts supporting the justification.

When FAR 8.405-6(a)(1)(i)(C) is cited for an follow-on acquisition as the basis for the justification, include an estimate of the cost that would be duplicated and the basis and derivation of the estimate, or provide details on why a delay to solicit additional schedule holders would be unacceptable.

Provide any other facts supporting the Limited Sources Justification.

VIII. Actions the agency may take to remove or overcome any barriers that led to the restricted consideration before any subsequent acquisition for the supplies or services.

Describe all efforts to be taken to remove or overcome any barriers that preclude the agency from meeting the requirements of FAR 8.405-1and FAR 8.405-2 before any subsequent acquisition for the supplies or services is made. If no actions are planned, so state and provide reasons.

IX. Certification by the Contracting Officer.

The contracting officer's signature on the signature page evidences that he/she has determined this document to be both accurate and complete to the best of his/her knowledge and belief.

X. Certification by the technical/requirements personnel

April 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 7 of 7April 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 7 of 7

As evidenced by their signatures on the signature page, the technical/requirements personnel have certified that any supporting data contained herein which is their responsibility is both accurate and complete.

File details come from the government source that posted it. Updated .