A 1 ? „ KF1 ~
r4 U.S. International Trade Commission
500 E Street, SW Washington, DC 20436 United States 202-205-3098 wvw.usitc.gov
Print Fo rm
Justification & Approval Limited Sources/Brand Name for Federal Supply Schedule
USITC - 053 (Rev. 6 /2016)
REQUISITION NUMBER: 6100-OCIO-16-0196
1. CONTRACTING OFFICE
U.S. International Trade Commission Office of Procurement 500 E Street, SW Washington, DC 20436
REQUIRING OFFICE
U.S. International Trade Commission
Office of Chief Information Officer
500 E Street, SW Washington, DC 20436
2. NATURE/DESCRIPTION OF ACTION(S)
Sole Source
In accordance wi th FAR Subpart 8.405-6, this l imited sources justification for other than full and open competit ion wil l result in award of a
Federal Supply Schedule order to CenturyLink .
3. DESCRIPTION OF SUPPLIES/SERVICES (Check box below:)
This requirement is t o purchase:
Telecom and hosting services
O S u p p o r t services (non-R&D)
O S u p p l i e s / e q u i p m e n t
® In fo rma t ion t e c h n o l o g y (IT)
O O the r (specify):
4. ESTIMATED CONTRACT VALUE
5. ANTICIPATED PERIOD OF PERFORMANCE/ DELIVERY DATE
Period of Performance
October 1,2016 to September 30,2017
Options Through: September 30,2019
Page 1 of4
I Pr int Fo rm j
Justification 8c Approval Limited Sources/Brand Name for Federal Supply Schedule
USITC-053 (Rev. 6 /2016)
6. AUTHORITY AND RATIONALE
This acquisition is being conducted under the authority of the Multiple-Award Schedule Program. The proposed action may be awarded on a limited sources basis under the fol lowing authority: Check box below and provide supporting rationale.
FAR Subpart 8.405-6(a)(1)(i)(A) An urgent and compell ing need exists, and fol lowing the procedures would result in unacceptable delays;
FAR Subpart 8.405-6(a)(1)(i)(B) Only one source is capable of providing the supplies or services required at the level of quality required because the supplies or services are unique or highly specialized; or
FAR Subpart 8.405-6(a)(1)(i)(C) In the interest of economy and efficiency, the new work is a logical fol low-on to an original
Federal Supply Schedule order provided that the original order was placed in accordance wi th the applicable Federal Supply
Schedule ordering procedures. The original order or BPA must not have been previously issued under sole-source or l imited-sources procedures.
FAR Subpart 8.405-6(b) An item peculiar to one manufacturer (Example: particular brand name, product, or a feature of a product, peculiar to one manufacturer.)
This procurement is a continuation of existing services awarded on the GSA Networx Universal contract (reference ITC-TO-11-0005). GSA has extended this expiring contract until March 28,2020 and is currently competing the successor contract, Enterprise Infrastructure Solutions (EIS), wi th awards anticipated early in calendar year 2017. GSA desires agencies to re-compete their services on EIS as soon as feasible t o realize anticipated savings on the new contract. Re-competing the services under the expiring Networx Universal contract wil l incur substantial avoidable costs and disruption to the agency. There wil l be duplication of effort for procurement and IT staffs since it is likely that EIS procurement activities wil l be conducted in parallel w i th a Networx Universal re-compete. This wil l result in identical services being competed on two different contracts at the same t ime. Due to the 6-12 month t imeframe required for installation after award, it is likely that services transitioned to a new Networx contractor will be shut down and transitioned again to an EIS contractor soon after activation. Each service carries installation costs, which wil l be doubled by having two transitions. There wil l also be disruption to agency IT operations during the transition. Agency equipment at the Centurylink Sterling data center wil l have to be relocated to the new contractor's facility. New Internet circuits wil l replace the existing ones. As a result the agency's public IP addresses wil l change, causing Internet connectivity to business partners to fail until appropriate configuration changes are made by the business partners. Experience has shown that these outages are diff icult to avoid even w i th careful planning. It is highly desirable to incur these disruptions only once during the transition to EIS, and not twice due to a re-compete on the Networx contract.
In sum, a re-compete of services on the expiring Networx Universal contract wil l result in unnecessary costs, effort and disruption, and hinder the required transition to the new EIS contract.
7. DETERMINATION OF BEST VALUE
In accordance wi th FAR Subpart 8.404(d), services offered on Federal Supply Schedules are priced either at hourly rates, or at a fixed price for performance of a specific task. The awarding agency has already determined the prices of supplies and fixed-price services, and rates for services offered at hourly rates, under schedule contracts to be fair and reasonable.
U.S. International Trade Commission 500 E Street, SW Washington, DC 20436 United States 202-205-3098 www.usitc.gov
Page 2 of4
U.S. International Trade Commission 500 E Street, SW Washington, DC 20436 United States 202-205-3098 wnv.usitc.gov
Pr in t Fo rm
Justification & Approval Limited Sources/Brand Name for Federal Supply Schedule
USITC-053 (Rev. 6 /2016)
8. MARKET RESEARCH
In accordance w i th FAR Part 10, market research was conducted and it was determined that the product and/or services are available to Government agencies through the Federal Supply Schedules.
9. ANY OTHER FACTS SUPPORTING THE JUSTIFICATION
N/A
10. FUTURE PLANS TO PROMOTE COMPETITION
OCIO wil l re-compete all Networx Universal services on the EIS contract once awarded, in accordance wi th GSA's timeframes. Each service on Networx Universal can be canceled and charges stopped wi th 30 day notice once the EIS services are in place.
U.S. International Trade Commission
" / M^M™ 8 Washington, DC 20436 S rwlHivy/ 9
United States >ff) \ J ^ J / ^ 202-205-3098
(x_^vj ul jjy> wvw.usitc.gov
Print Fo rm
Justification & Approval Limited Sources/Brand Name for Federal Supply Schedule
USITC - 053 (Rev. 6 /2016)
11. TECHINICAL PERSONNEL/REQUIRING OFFICE CERTIFICATION
I certify that the facts and representations in this justif ication, included herein, meet the Government's need and that the support ing data which forms the basis for this justification is complete and accurate
Prepared By: Print Name: Ke
Signature: , K FOIA Exemption (b)(6)
Requestor/COR
Date: Sep tember 2 ,2016
Approved By: Print Name: J F O | A E x e m p t i o n (b)(6
Signature:
Office Director/Cost Center Manager
Date: <j / £ / & / (/
12. CONTRACTING OFFICER CERTIFICATION
I have received this justif ication and f ind it to be accurate and complete to the best of my knowledge and belief.
Approved By: Print Name:
FOIA Exemption (b)(6) Signature:
Contracting Officer
Date: S / Z ^ / X O / b