Limerock_Technical_Specification.pdf
PDF 151 KB Posted
- Attached to
- Supply and Delivery of Limerock
- Solicitation number
- Invitation to Bid 2026-004
- Issued by
- Alachua County, Graceville City, Florida
About this file
This document is a Technical Specifications / Statement of Work for Limerock supply and delivery, issued by Gainesville Regional Utilities (GRU). The specification establishes requirements for furnishing and delivering Limerock that meets Florida Department of Transportation (FDOT) Standard Specifications, specifically Section 911 for Limerock Base Material. The estimated annual quantity requested is 9,000 tons, with quantities provided for bid evaluation purposes and no guaranteed minimum or maximum purchase commitment. Deliveries will be made to the GRU Eastside Operations Center in Gainesville, FL, with normal delivery expected within two business days of order placement and emergency deliveries possible within two hours.
Billing will be conducted on a per-ton (dry weight) basis, allowing a maximum moisture content of 15% by weight. Deductions will be calculated for moisture content exceeding 15%, with a detailed formula provided for determining the price adjustment. GRU reserves the right to sample and test delivered Limerock to verify conformance with specifications, with options to reject non-conforming material, require immediate removal at the contractor's expense, or accept the material at a reduced price. Repeated failure to meet specifications may result in contract termination. Each delivery must include a comprehensive ticket with details such as delivery date, source of material, quantity, and truck information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Supply_and_Delivery_of_Limerock.pdf | ||
| Contract_Sample_Document.pdf | ||
| Limerock_Pricing_Response_Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Specifications Page | 1
ATTACHMENT 1
TECHNICAL SPECIFICATIONS / STATEMENT OF WORK
LIMEROCK
1.1 SCOPE.
1.1 The purpose of this specification is to establish minimum requirements for the supply and delivery of Limerock for Gainesville Regional Utilities (GRU), to be used in various construction and maintenance projects.
1.2 The provisions contained in this section are intended to supplement or modify the
Supplemental Conditions and General Conditions. In case of any conflict, the intent of the
Technical specifications shall govern.
2.0 DESCRIPTION OF WORK.
2.1 The Contractor shall furnish and delivery Limerock meeting the requirements of Florida
Department of Transportation (FDOT) Standard Specifications for Road and Bridge
Construction, Section 911 – Limerock Base Material (latest edition). Material shall meet all gradation, quality , and bearing value requirements as specified herein.
2.2 Quantities shown in this solicitation are esimates only and are provide for bid evaluation purposes. GRU does not guarantee minimum or maximum quantity of purchase. The estimated annual quantity requested is 9,000 tons.
3.0 BILLING.
3.1 Limerock shall be billed on a per-ton (dry weight) basis, allowing for a maximum moisture content of 15% by weight.
3.2 A deduction will be made for material delivered with moisture content in excess of 15% for that portion which exceeds 15%. A representative sample will be taken at the GRU’s option and the measured moisture content will be used to establish the actual tonnage delivered and will be used for all deliveries that day on which the sample is taken.
3.3 The calculation to be used to determine moisture content shall be based on the delivered
Limerock’s moisture content percentage exceeding the 15% allowable moisture content.
[For example, if the moisture content of Limerock delivered is tested and results indicate that the moisture content is 25%, the product is essentially 75% product instead of the required 85% product, dividing the actual percentage of product by the required product yields the percentage of the deduction. (Ex: 75% divided by 85% = .88) This rate would then be multiplied by the per ton cost to determine the deduction.]
Technical Specifications Page | 2
3.4 Invoices must include:
• Requesting GRU Department,
• Delivery date,
• Delivery ticket number,
• Net delivered weight (after any moisture adjustment),
• Signed delivery ticket(s),
• Purchase Order (PO) number
4.0 DELIVERY.
4.1 The Limerock shall be delivered to GRU Eastside Operations Center, 4747 North Main
Street, Gainesville FL 32609, or other GRU-designated location within Gainesville, FL as specified at the time of the order.
4.2 Delivery shall be made by truck and dumped at the GRU-designated location by
Contractor.
4.3 Normal delivery shall occur within two (2) business days of order placement. In emergency situations, GRU may request delivery within two (2) hours. Failure to meet required delivery times may result in GRU procuring materials from alternate sources without penalty or obligation to the Contractor.
4.4 Each delivery ticket shall indicate the net weight of each load delivered. The Contractor’s delivery personnel shall have the GRU’s authorized personnel sign the delivery ticket and provide a copy to GRU staff.
4.5 All trucks delivering Limerock must comply with all applicable State of Florida and local vehicle weight, safety, and environmental regulations. Loads that arrive overweight or contaminated with foreign material may be rejected at no cost to GRU.
4.6 Delivery tickets shall be furnished with every delivery to a GRU representative at the time of delivery. Copies of these tickets shall also be provided with each invoice. Failure to provide a delivery ticket to a GRU representative may result in rejection of payment for the associated delivery.
All deliveries of limerock shall include a delivery ticket with the following information:
• Ticket Number
• Delivery Date and Time
• Delivery Faclity Name or Address (location where material is delivered to)
• Source of Material (Pit Name)
• Delivered Quantity (tons, net weight after moisture allowance)
• Truck Driver Name
• Vehicle/Truck Number
5.0 PRODUCT TESTING.
5.1 GRU reserves the right to sample and test any Limerock delivered to verify conformance with FDOT Section 911 requirements.
Technical Specifications Page | 3
5.2 In the event the material does not conform to specifications, GRU may:
• Reject the material and require immediate removal at the Contractor’s expense, or
• Accept the material at a reduced price, as determined by GRU
5.3 Repeated failure to meet specifications shall be cause for contract termination for default.
END OF SECTION