LIFT_STATION_66_AND_LIFT_STATION_77_WASTEWATER_INFRASTRUCTURE_MODIFICATIONS_-_CONSTRUCTION_ADMINISTRATION_AND_INSPECTION_SERVICES.pdf
PDF 201 KB Posted
- Solicitation number
- WS90501009
- Issued by
- Maricopa County, Phoenix City, Arizona
About this file
This is a Request for Qualifications (RFQ) issued by the City of Phoenix Office of the City Engineer for Construction Administration and Inspection Services related to Lift Station 66 and Lift Station 77 Wastewater Infrastructure Modifications. The project encompasses construction oversight for upgrades to two existing lift stations located at 30101 N. Black Canyon Highway and 31700 N. 51st Avenue, with an estimated construction cost of $15 million. Scope of work includes supervision of the installation of an additional pump within the existing wet well at Lift Station 77, construction administration for a new wet well installation at Lift Station 66 with new pumps and odor control improvements, and right-of-way work for installing a new gravity main from Lift Station 77 to Lift Station 66 and a new force main from Lift Station 66 to Cave Creek Road. A pre-submittal meeting is scheduled for 10:00 a.m. on Friday, March 20, 2026, at City Hall (with a virtual Teams option), and Statements of Qualifications are due by 12:00 p.m. Phoenix time on Friday, April 3, 2026. Selection notifications are expected in mid-April 2026, with a scope meeting scheduled for early May 2026.
The City intends to select up to two qualified consultant teams, awarding Items 1 and 2 of the scope to the highest-ranked firm and Item 3 to the second-highest-ranked firm. Evaluation criteria total 1,021 points, with weightings for construction administration and inspection experience of the prime firm (200 points), key personnel and subconsultant experience (300 points), project understanding and approach (300 points), staffing information and availability (200 points), and reference checks (21 points). Statements of Qualifications are limited to 11 pages maximum in PDF format with a minimum 10-point font size and must be submitted electronically through the City's Procurement Portal. All responding firms must be registered in the City's Vendor Management System prior to submission. The procurement documents do not specify set-asides or restrictions on eligible respondents, though the City tracks Small Business Enterprise subcontractors and suppliers. Consultants are required to maintain all project records electronically and may be required to use UNIFIER, a web-based project management database. No incumbent vendor is identified, and contract fees will be negotiated following selection and City Council approval.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF PHOENIX, ARIZONA
OFFICE OF THE CITY ENGINEER
DESIGN AND CONSTRUCTION PROCUREMENT
REQUEST FOR QUALIFICATIONS
LIFT STATION 66 AND LIFT STATION 77 WASTEWATER
INFRASTRUCTURE MODIFICATIONS - CONSTRUCTION
ADMINISTRATION AND INSPECTION SERVICES
OPENGOV ID NO. WS90501009
RFQ Rev. 1/25 Page | 2
The City of Phoenix is seeking up to two qualified consultant teams to provide construction administration and inspection services for upgrades to existing Lift Station 77 and Lift Station 66 including installation of new gravity and force mains. The project is located at 30101 N. Black
Canyon Highway and 31700 N. 51st Avenue. The estimated construction cost is $15 million.
Project Description
This project will include developer upgrades to existing Lift Stations 77 and 66 to increase capacity for future flows in the area. The upgrades will also include installation of a new gravity main from the Lift Station 77 discharge structure to Lift Station 66 and new force main from Lift Station 66 to
Cave Creek Road.
Scope of Work
1. Lift Station 77 Construction administration and inspection services for site-specific upgrades at
Lift Station 77. Services include oversight of installing an additional pump within the existing wet well.
2. Lift Station 66 Construction administration and inspection services for site-specific upgrades at
Lift Station 66. Increased capacity from the new wet well at Lift Station 77 will require installation of a new wet well at Lift Station 66, including new pumps, odor control improvements, and necessary electrical upgrades.
3. Additional Scope The scope also includes right-of-way work for installing a new gravity main from the Lift Station 77 discharge structure located at 29th Avenue and Sonoran Desert Drive to
Lift Station 66, as well as installation of a new force main from Lift Station 66 to Cave Creek Road north of Pinnacle Peak Road, and a section of gravity main from the discharge to the Cave Creek
Reclamation Plant. Services may include installation of gravity and force mains in both right-of-way and easements.
Use of UNIFIER, an Application Service Provider (ASP) web-based project management database, may be required. The following information provides a guideline for utilization. Any questions related to the requirements of UNIFIER should be directed to the Project Manager.
• The Consultant will be required to maintain all project records in electronic format.
• The City provides an ASP web-based project management database which the Consultant will be required to utilize in the fulfillment of the contract requirements.
• The Consultant shall provide a computerized networked office platform with broadband internet connectivity.
• UNIFIER training will be provided through the City of Phoenix to firms under contract.
Pre-Submittal Meeting
A pre-submittal meeting will be held at 10:00 am, Phoenix time on Friday, March 20, 2026, at City
Hall, 200 W. Washington St., 9th Floor, Water Services Department Training Room AND Teams.
Page | 3
At this meeting, City staff will discuss the scope of work, general project requirements, and respond to questions from the attendees. It is strongly recommended that interested firms attend the pre-submittal meeting. Inquiries regarding the project scope outside of this pre-submittal meeting must be directed to the Contracts Specialist.
Pre-Submittal Meeting Teams Information:
Join: https://teams.microsoft.com/meet/26758327713875?p=b5yLuWia0rq6dhE5pB
Meeting ID: 267 583 277 138 75
Passcode: tD9at7ug
Statement of Qualifications Evaluation Criteria
Firms will be selected through a qualifications-based selection process based on the criteria below. Subcriteria are listed in order of importance in relation to project services. City of Phoenix project experience is not required.
No. Evaluation Criteria Scoring Method Weight (Points)
1. Construction Administration and
Inspection Experience of the Prime Firm
Describe the experience and qualifications of the prime firm in providing construction administration and inspection (CA&I) services for similar projects within the last three years. Identify projects the submitting firm has completed. Include assigned CA&I personnel. For each project listed, provide:
A. Description of the project including scope and project owner
B. Role of the firm and explain how this relates to the services being solicited
C. Project’s original contract value, final contract value, and reason for variance
D. Project’s start date and completion date
Points Based 200 (19.6% of Total) https://teams.microsoft.com/meet/26758327713875?p=b5yLuWia0rq6dhE5pB
Page | 4
2. Construction Administration and
Inspection Experience of Key Personnel and Subconsultants
Describe the experience and qualifications of the project team expected to be assigned to this project in providing construction administration and inspection services for similar projects within the last three years. For each key person identified, list their length of time with the firm. List each key person’s role in the projects provided. If a project selected for a key person is the same as one selected for the firm, provide just the project name and the role of the key person. Include assigned
CA&I personnel. For each project listed, provide:
A. Description of the project including scope and project owner
B. Role of the team or team member and explain how this relates to the services being solicited
C. Project’s original contract value, final contract value, and reason for variance
D. Project’s start date and completion date
Points Based 300 (29.4% of Total)
3. Project Understanding and Approach
Describe your firm’s understanding of the
City’s need for this project, including important considerations such as project issues and challenges. Describe the team’s approach to the project, including important considerations such as scope, schedule, and budget.
Points Based 300 (29.4% of Total)
Page | 5
4. Staffing Information for Key Personnel
Provide the following:
A. Team’s availability and commitment to the project, including subconsultants
B. Team’s plan to maintain continuity of the proposed services
C. Organization chart showing key personnel, current professional licenses or certifications, and assigned roles for Construction
Administration and Inspection
Services for the project
D. Identify the location of the lead firm’s principal office and the home office location of key staff on this project.
Points Based 200 (19.6% of Total)
5. Reference Checks
Use the form provided in the Attachments section to obtain at least three references.
It is preferred no more than one be a City of Phoenix project. If your firm has not completed prior projects with other agencies, you will not be penalized. It is recommended there be references outside the City of Phoenix.
*These points are in addition to the 1,000 points for the SOQ.
Points Based 21 (2.1% of Total)
Submittal Requirements
Electronic Submittal Process: Firms interested in this project must submit a Statement of
Qualifications (SOQ) electronically through the City's Procurement Portal at https://procurement.opengov.com/portal/phoenix.
Submittal requirements are as follows:
Vendor Information: All firms must be registered in the City’s Vendor Management System prior to submitting a proposal. The vendor number should be included on the cover of the
SOQ. Information on how to register with the City is available at:
https://www.phoenix.gov/financesite/Pages/EProc-help.aspx
If your firm is already registered with the City of Phoenix’s Procurement system, please visit https://procurement.opengov.com/portal/phoenix to login and access the electronic solicitation.
https://procurement.opengov.com/portal/phoenix https://www.phoenix.gov/financesite/Pages/EProc-help.aspx https://procurement.opengov.com/portal/phoenix
Page | 6
Submittals:
• Submit only one SOQ electronically, in .PDF format only, addressing all evaluation criteria. No hard copies will be accepted.
• Clearly display the firm legal name, vendor number, project title, and project number on the cover of the SOQ.
• A maximum of 11 pages is permitted to address all content in the SOQ submittal.
(Maximum page limit includes evaluation criteria and all additional content. It does not include information sheet.)
• Submit electronically the Statement of Qualifications by 12:00 pm, Phoenix time, on
Friday, April 3, 2026.
• Page size must meet requirements of 8½” x 11”.
• Font size must not be less than 10 point.
• Content count:
o Each side of a page containing evaluation criteria and additional content will be counted toward the maximum page limit noted above.
o Pages that have project photos, charts and/or graphs will be counted towards the maximum page limit noted above.
o Front and back covers, information sheet, Table of Contents pages, and divider (tab) pages will NOT be counted toward the maximum page limit noted above, unless they include evaluation criteria and additional content that could be considered by the selection panel.
Information Sheet: Provide an information sheet that includes project title, OpenGov ID number, legal firm name (not a trade name), address, phone number, vendor number, and the name, title, email address and signature of your contact person for the project. Do not include any additional information.
Evaluation Criteria: Address the SOQ evaluation criteria.
Note: All pages exceeding the specified maximum page limit will be removed from the submittal and not considered in evaluating a submitted SOQ.
Grounds for Disqualification
Please be advised that the following will be grounds for disqualification, and will be strictly enforced:
• Submitting a Statement of Qualifications for a different project.
• Violating the “Contact with City Employees” policy contained in this RFQ.
Selection Process and Schedule
Page | 7
Interested teams will submit a Statement of Qualifications (SOQ). The teams will be selected through a qualifications-based selection process. A Selection Panel will evaluate each SOQ per the criteria set forth above.
The City will select a team based on the SOQ’s received; no formal interviews will be conducted. The City may conduct a due diligence review on the team(s) receiving the highest evaluation.
The City expects to create a final list of at least two, but not more than four teams for this project.
The City will enter into negotiations with the selected teams and execute a contract upon completion of negotiation of fees and contract terms for City Council approval. The City intends to award Item 1 and Item 2 of the Scope of Work to the highest ranked firm and Item 3 of the
Scope of Work to the second highest ranked firm.
The following tentative schedule has been prepared for this project.
Pre-submittal Meeting 10:00 am on Friday, March 20, SOQs Due 12:00 pm on Friday, April 3, 2026
Selection Notification Mid-April 2026
Scope Meeting Early May 2026
If the City is unsuccessful in negotiating a contract with the best-qualified teams, the City may then negotiate with the next most qualified team until a contract is executed, or the City may decide to terminate the selection process. Once a contract is executed with the successful firm, the procurement is complete.
The firms selected for this project will be notified directly by the City. Notification to all other firms on the status of a short list for this project will be posted on the City of Phoenix’s Procurement
Portal:
https://procurement.opengov.com/portal/phoenix
General Information
Citywide Capital Improvement Projects. Consulting and contractor services supporting the
City’s Capital Improvement Projects are procured under the authority of the City Engineer, currently located within the Street Transportation Department. Design and Construction
Procurement coordinates the citywide consulting and construction contracting procurement processes.
Changes to Request for Qualifications. Any changes to this Request for Qualifications
(RFQ) will be in the form of a Notification. The City of Phoenix shall not be held responsible for any oral instructions. Notifications are available on both the Current Opportunities and City's eProcurement Portal at https://procurement.opengov.com/portal/phoenix.
Page | 8
It shall be the responsibility of the registered RFQ holder to determine, prior to the submittal of the Statement of Qualifications, if a Notification has been issued. Registered
RFQ holders may refer to the web page or call the Contracts Specialist (listed below) to ascertain if a Notification has been issued for this project.
Alternate Format. For more information or a copy of this publication in an alternate format, contact Alissa Bahr at #602-256-4107 or TTY 711. Requests will only be honored if made within the first week of the advertising period.
Release of Project Information/Public Records Request. The City shall provide the release of all public information concerning the project, including selection announcements and contract awards. Those desiring to release information to the public must receive prior written approval from the City. To submit a Public Records Request, visit phoenix.gov/prr.
City Rights. The City of Phoenix reserves the right to reject any or all Statements of
Qualifications, to waive any informality or irregularity in any Statement of Qualifications received, and to be the sole judge of the merits of the respective Statements of Qualifications received.
Contact with City Employees. This policy is intended to create a level playing field for all
Proposers, assure that contracts are awarded in public, and protect the integrity of the selection process. OFFERORS THAT VIOLATE THIS POLICY WILL BE DISQUALIFIED.
Beginning on the date the RFQ is issued and until the date the contract is awarded or the RFQ withdrawn, all persons or entities that respond to the RFQ, including their authorized employees, agents, representatives, proposed partner(s), subcontractor(s), joint venture(s), member(s), or any of their lobbyists or attorneys (collectively the Proposer), will refrain from any direct or indirect contact with any person (other than the designated Contract Specialist) who may play a part in the selection process, including members of the evaluation panel, the City Manager, Assistant
City Manager, Deputy City Managers, Department heads, the Mayor and other members of the
Phoenix City Council. As long as the RFQ solicitation is not discussed, Proposers may continue to conduct business with the City and discuss business that is unrelated to this RFQ solicitation with City staff.
Commencing on the date and time a solicitation is published, potential or actual proposers
(including their representatives) will only discuss matters associated with the solicitation with the
Mayor, any members of City Council, the City Manager, any Deputy City Manager, or any department director directly associated with the solicitation (including in each case their assigned staff, except for the designated procurement officer) at a public meeting, posted under the Arizona
Revised Statutes, until the resulting contract(s) are awarded or all offers or responses are rejected and the solicitation is cancelled without any announcement by the procurement officer of the City’s intent to reissue the same or a similar solicitation.
Proposers may discuss their proposal or the RFQ solicitation with the Mayor or one or more members of the Phoenix City Council, provided such meetings are scheduled through the
Contract Specialist (listed below), conducted in person at 200 W. Washington, Phoenix, Arizona
85003, and are posted as open meetings with the City Clerk at least twenty-four (24) hours prior to the scheduled meetings. The City Clerk will be responsible for posting the meetings. The posted notice shall identify the participants and the subject matter, as well as invite the public to participate.
https://phoenix.gov/prr
Page | 9
Conflict of Interest. The City reserves the right to disqualify any Proposer on the basis of any real or apparent conflict of interest that is disclosed by the proposal submitted or any other data available to the City. This disqualification is at the sole discretion of the City. Any Proposer submitting a proposal herein waves any right to object now or at any future time, before any body or agency, including but not limited to, the City Council of the City of Phoenix or any court.
Protest Procedures. Firms responding to disqualification or a procurement outcome are referred to the Code of the City of Phoenix Chapter 2, Article XII, Section 2-187 to 2-190.4, which governs protest procedures utilized throughout the selection process. The procedures may be reviewed through the City of Phoenix website at:
http://www.codepublishing.com/az/phoenix/
A copy of the Protest Policy is also available online at:
https://www.phoenix.gov/administration/departments/streets/careers/business-opportunities.html
Questions - Questions pertaining to this selection process or contract issues should be submitted via the Procurement Portal.
Vendor Questionnaire
*Response required http://www.codepublishing.com/az/phoenix/ https://www.phoenix.gov/administration/departments/streets/careers/business-opportunities.html
File details come from the government source that posted it. Updated .