libi10-2_LittleBighorn_Pre-Ad- Plans_Final_20240604.pdf
PDF 13 MB Posted
- Solicitation number
- 69056723B000002
About this file
This document is a Pre-Advertisement for a federal construction contract opportunity, MT NP LIBI 10 (2), Little Bighorn Battlefield National Monument, issued by the Department of Transportation Federal Highway Administration.
The pre-advertisement notifies prospective offerors that the project will be advertised during a period when viewing the project site may not be possible due to snow. Offerors are encouraged to view the project site during the summer or fall as conditions permit. The contract will be for construction work at the Little Bighorn Battlefield National Monument. See the attachments for the full project requirements. The solicitation number is 69056723B000002, and the opportunity type is Pre-Solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Preliminary Letter_MT NP LIBI 10(2).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED FOR
on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for e (max)
V
SADT (2044)
SADT (2024)
6%
30 MPH
Concrete Pavement
Aggregate Base, Asphalt
Grading, Drainage, Recycled
N
Project Location
MONTANA KEY MAP
COLUMBIA
BRITISH
ALBERTA
SASKATCHEWAN
N O
R T
H D
A K
O T
A
S O
U T
H D
A K
O T
A
WYOMING
ID
A
H O
UNITED STATES
CANADA
PARK
NATIONAL
GLACIER
PARK
NATIONAL
YELLOWSTONE
WILDLIFE RANGE
NATIONAL
CHARLES M. RUSSELL
Lake
Flathead Elwell
Lake
M
Lake
Fort Peck
I SOS U IR
KALISPELL
MISSOULA
Anaconda
HELENA
BUTTE
BOZEMAN
Livingston
BILLINGS
City
Miles
Glendive
Point
Wolf Glasgow
HAVRE
Shelby
FALLS
GREAT
Lewistown
Dillon
RIV
ER
93 15
19189
MONTANA
National Monument
Custer Battlefield m ile s
To S h e rid a n , W
Y
END PROJECT
MT NP LIBI 10(2)
20+46.00
BEGIN PROJECT
MT NP LIBI 10(2)
8+08.28
Agency
Crow m ile s T o B illin g s
Little
B ig h o rn
R iv e r
Pit
Gravel
Pits
Gravel
SCALE IN MILES
01 1 2 3
R 35 ER 34 E
T
S
36 31
36 31
Pit
Gravel
Cemetery
National
Custer
National Monument
Custer Battlefield
NATIONAL MONUMENT
LITTLE BIGHORN BATTLEFIELD
NATIONAL PARK SERVICE
U. S. DEPARTMENT OF THE INTERIOR
PROJECT MANAGER
L. HIGA
PLANS FOR PROPOSED PROJECT
MONTANA
BIG HORN COUNTY
LENGTH 0.23 MILES
NATIONAL
PARK
SERVICE
Department of the Interior
NATIONAL MONUMENT
LITTLE BIGHORN BATTLEFIELD
NPS PMIS NO. 262851
MT NP LIBI 10(2)
APPROVED:
Western Federal Lands Highway Division
Director, Project Delivery, Little Bighorn Battlefield National Monument
Superintendent, DATE
DATE
PLANS PREPARED BY
ROBERT PECCIA AND ASSOCIATES
HELENA, MONTANA
N O
T
FO
R
CO
N
STRU
CTI
O
N
PRELI
M
IN
ARY
:0
P
A p r il li b i0 a a .d g n r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n P h a s e \D
G N
\G e n e r a l
I n f o r m a ti o n \M
T N
P L
I B
I p ln g e n ti tl e .d g n
PROJECT
NUMBER
SHEET
A.1
NPS Drwg No. xxxxxx NPS PMIS No. 262851
MT NP LIBI 10(2)
PRELIMINARY-NOT FOR CONSTRUCTION
:1
A
A p r il
IN
D E
X T
O S
H E
E T
S
R
P A
-H L
N -0
\S h a re d \h ig h w a y s \F
H W
A \2 m t-n p -l ib i-
(2
L it tl e B ig h o rn
P h a s e \D
G N
\G e n e ra l In fo rm a ti o n \M
T N
P L
IB
I_
(2 p ln g e n in d e x .d g n
INDEX TO SHEETS
PROJECT
A.2
BH TP
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
M.P.
M.L.
monument minimum thousand gallon maximum material mile post main line
W
RIP
DI
G W G WV
CP GPS
36 31
36 31
N
E
N 1000EL. 1234.56
TP
TP
SEC.
SEC.
NO SCALE
θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
between bearing bridge balance point bench mark back face back btwn brg.
br.
BP
BM
b.f.
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center
NOTE:
1.
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend
W west drwg(s).
dist.
diaph.
dia.
DHV
D exp. jt.
exc.
EW
EQ or eq.
EOP
emb.
elev.
El. 94.16 e.f.
e E expansion joint excavation edge of water equation edge of pavement embankment elevation elevation in feet each face superelevation rate east drawing(s) distance diaphragm diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge) jt.
IE
ID
joint invert elevation inside diameter ftg.
flg.
fin.
f.f.
footing flange finish front face
LW
lt. or LT Ls
LPSM
long.
LNFT
lat.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude length of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph V vertical point of intersection vehicles per hour design speed (velocity)
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sect.
SC
SADT
S point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
KSI
square inch thousand pounds per pvmt.
PT
PST
PSC
PSI
PSF
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve pounds per square inch pounds per square foot point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve
OHWM
OG
OD
o. to o.
o.c.
ordinary high water mark original ground outside diameter out to out on center
NC
N normal crown north
A A
DI
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Control Point (Terrestrial and GPS)
Gas & Water Meter; Gas & Water Valve
Flagpole; Fire Hydrant
Cooking Grate; Garbage Can; Picnic Table
Boulder; Well; Antenna; Grave
Above Ground Tank; Underground Tank
Spot Elevation; Coordinate Grid Tick
Material Source; Bore Hole; Test Pit
Treeline; Individual Trees
Spring or Seep
Section Line 4
Section Corner (Found, Projected) 4
Section Line 16
Section Corner (Found, Projected)16
Property Line
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Paved, Gravel)
Railroad
Trail
Fiber Roll
Silt Fence
Sandbag
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservior; Marshland
North Arrow
Slope Stake Limits Top of Cut
Toe of Fill
Construction Limits
Bottom of Ditch
Fence
Gate with Fence
Cattleguard
Guardrail
Concrete Barrier and Guard Wall
Retaining Wall wall face
Signs (single, double post; portable)
Delineators
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Pipe Culvert with Drop Inlet
Box Culvert
Underdrain
Overhead/Above Ground Utilities
Underground Utilities
Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
Building
Right-of-Way Line
Permanent Easement
Construction Easement
Riprap
- no symbol -
Section A-A
EXISTING PROPOSED
STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, TP = telephone pedestal, TV = CATV pedestal,
- no symbol -
11/2001 DETAIL APPROVED FOR USE
6/2022
10/2014 10/2009 1/2007 9/2005 REVISED: 101-1W
WFLHD DETAIL
ABBREVIATIONS
PLAN SYMBOLS AND
:1
A p ri l
D e t W
-1 rp a -h ln -0
\s h a re d \h ig h w a y s \F
H W
A \2 m t-n p -l ib i- (2
L it tl e B ig h o rn
P h a s e \D
G N
\G e n e ra l In fo rm a ti o n \M
T N
P L
IB
I_ (2 p ln g e n a b b re v .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
A.3
PARK BOUNDARY
PARK BOUNDARY
BNSF Railway
Ren o C ana l
Reno Canal
O n io n C r e e k
M e d ic in e T a il C re e k
F o rk C re e k
C r e e k
B e a r in M id d le
River
Little Bighorn
River
Little Bighorn
River
Little Bighorn
C u s te r C r e e k
INTERSTATE
INTERSTATE
N
END PROJECT
20+46.00
MT NP LIBI 10(2)
BEGIN PROJECT
8+08.28
MT NP LIBI 10(2)
66 miles
To Sheridan, WY
55 miles
To Billings
1 1
Scale in miles
Visitor center
Cemetery Road Stone House Parking
:1
A p r il
V ic in it y
M a p r p a h ln
\s h a r e d
\h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n
P h a s e
\D G
N \G e n e r a l
I n f o r m a ti o n
\M T
N
P
L I B
I p ln g e n v ic in it y
.d g n
VICINITY MAP
PROJECT
A.4
NOTE:
FOOTNOTE:
3. Mirror details as needed.
2. See Sheet C.4 for shoulder widening locations.
1. See Sheet C.2 for cut and fill slope rounding details.
and locations.
Increase width in roadside parking areas. See Sheet C.2 for details [5]
Place scrub seal over full width of typical section.
[4]
Place fog seal on recycled aggregate base immediately after construction.
[3]
Construct slopes as shown in the Staking Report.
[2]
Match existing cross slopes.
[1]
Var.
1:3
Traveled way
11'-0"
Profile grade
Traveled way
11'-0"
[5]
1' Shldr.
[5]
1' Shldr.
LC
"MAIN 01"
See Sheet C.2 for details
Safety Edge Detail
See Sheet C.2.
Safety Edge Detail
Edge of existing pavement
Existing ground
Shoulder widening
[3]
Fog seal
8" compacted depth
Roadway aggregate, method 2, Geogrid, stabilization
Place tack coat between lifts
4" compacted depth
Recycled aggregate base, geotextile, class 1, type C (nonwoven)
Separation-stabilization
3-inch compacted depth, place in two equal lifts
0.3 to < 3 million ESAL (type III roughness), or 3/4-inch nominal maximum size aggregate, Asphalt concrete pavement, gyratory mix, 1/2-inch
[4]
Scrub seal
Top of existing pavement
Place tack coat between lifts
3-inch compacted depth, place in two equal lifts
0.3 to < 3 million ESAL (type III roughness), 3/4-inch nominal maximum size aggregate, Asphalt concrete pavement, gyratory mix, 1/2-inch or
.72
.72
Existing ground on Sheet C.2
See Fill Slope Rounding
[2
Va ria ble topsoil, 4-inch depth Placing conserved
(hydraulic method) Turf establishment
C o n s tr u c ti o n l im it
2 1/2-inch depth
Asphalt pavement milling, 11+09.53 to 20+46.00
NO SCALE
:4
A p r il li b i0 c a .d r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n P h a s e \D
G N
\T y p ic a l
S e c ti o n s \M
T N
P L
I B
I p ln ty p ty p ic a l-
.d g n
TYPICAL SECTIONS
PROJECT
C.1
1. See Sheet C.1 for surfacing details.
Adjust width to match existing or proposed conditions.
[2]
Match existing cross slope.
[1]
LC
11'
LC
[1]Var.
[2]
Varies or concrete curb and gutter
Existing pavement, concrete slab, Traveled way
11'
Red top in staking notes
Point available
Second lift of asphalt
First lift of asphalt to cover safety edge
Pull recycled aggregate base
Recycled aggregate base, 4" depth
SAFETY EDGE DETAIL
Edge of existing pavement curb and gutter concrete slab, or concrete
Match existing pavement, LC concrete curb and gutter
Proposed pavement or
C le a r in g l im it s
ROUNDING DETAIL
FILL SLOPE
Va ria ble
D
5' 5'
ROUNDING DETAIL
CUT SLOPE
C o n s tr u c ti o n l im it
Existing ground
Existing ground
S lo p e s ta k e l im it s
0.25 D
5' 5'
D
10'
Slope stake limit
0.25 D
"MAIN 01" - ADDITIONAL WIDENING
11+86.00 to 19+09.00
"MAIN 01" LEFT
19+65.88 to 20+35.09
16+26.11 to 17+70.00
11+98.00 to 12+44.33
"MAIN 01" RIGHT
NEW PAVEMENT OR CONCRETE CURB AND GUTTER
"MAIN 01" - ADDITIONAL MILLING
MATCH TO EXISTING PAVEMENT/CONCRETE SLAB/CURB AND GUTTER
"MAIN 01" - ADDITIONAL MILLING
17+70.00 to 19+65.88
12+44.33 to 16+26.11
"MAIN 01" RIGHT
LC
[1]
Var.
Edge of existing pavement
NO CURB
"MAIN 01" - ADDITIONAL MILLING
20+35.09 to 20+38.00
11+66.55 to 11+98.00
"MAIN 01" RIGHT
19+09.00 TO 20+38.00
11+09.53 to 11+86.00
"MAIN 01" LEFT
NO SCALE
:5
A p r il li b i0 c f .d r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n P h a s e \D
G N
\T y p ic a l
S e c ti o n s \M
T N
P L
I B
I p ln ty p d e ta il s .d g n
DETAILS
TYPICAL SECTION
PROJECT
C.2
W
L
Top of proposed subgrade
Top of proposed subgrade
18-inch compacted depth
Select borrow, Geogrid, stabilization (subexcavation)
(nonwoven) (subexcavation) geotextile, class 1, type C
Separation-stabilization ground
Existing
Profile grade
Profile grade
[1]Typical section
SUBEXCAVATION DETAIL
SUBEXCAVATION PROFILE
1:2 1:
Select borrow, 18-inch compacted depth
[1]Typical section
E N
D S
U B
E X
C A
V A
T
IO
N
B E
G
IN
S U
B E
X C
A V
A T
IO
N
Geogrid, stabilization (subexcavation) class 1, type C (nonwoven) (subexcavation)
Separation-stabilization geotextile, FOOTNOTE:
NOTE:
1. See Sheets D.3 and E.1 for quantities.
Adjust locations to meet field conditions as approved.
[3]
Mirror detail as appropriate.
[2]
See Sheet C.1.[1]
NO SCALE
18-inch Subexcavation depth ground
Existing
:0
A p r il
S u b e x c a v a ti o n
D e ta il r p a h ln
\s h a r e d
\h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n
P h a s e
\D G
N \T y p ic a l
S e c ti o n s \M
T
N P
L
I B
I p ln ty p s u b e x
.d g n
SUBEXCAVATION DETAILS
PROJECT
C.3
SHOULDER WIDENING LEGEND*:
*See sheet A.3 for other features not listed in legend
Stone House shoulder widening
"MAIN 01" 20+46.00
END CONSTRUCTION
END PROJECT
Mainline additional shoulder widening
"MAIN 01" 11+09.53
BEGIN CONSTRUCTION
"MAIN 01" 8+08.28
BEGIN PROJECT
:2
A p r il
S h o u ld e r W id e n in g
P la
.5
T o
.0 r p a h ln
\s h a r e d
\h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n
P h a s e
\D G
N \T y p ic a l
S e c ti o n s \M
T
N P
L
I B
I p ln ty p w id e n in g
.d g n
SHOULDER WIDENING PLANS
PROJECT
C.4
:2
A p r il
S u r v e y
C o n tr o l r p a h ln
\s h a r e d
\h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n
P h a s e
\D G
N \P la n a n d P r o f il e \M
T
N P
L
I B
I p ln p p c o n tr o l.
d g n
SURVEY CONTROL
PROJECT
D.1
:3
A p r il
T
A B
U L
A T
IO
N
O F
P L
A N
A N
D P
R O
F
IL
E Q
U A
N T
IT
IE
-1
R
P A
-H L
N -0
\S h a re d \h ig h w a y s \F
H W
A \2 m t-n p -l ib i-
(2
L it tl e B ig h o rn
P h a s e \D
G N
\P la n a n d P ro fi le \M
T N
P L
IB
I_
(2 p ln p p q ta b .d g n
SHEET 1 OF 2
PROFILE QUANTITIES
TABULATION OF PLAN AND
PROJECT
D.2
See Sheets H.2-H.4 for details.
See Sheet H.1 for details.
[3]
Based on 1.97 TON/CUYD.
[2]
See Sheet C.4 for details.
[1]
FOOTNOTE:
:3
A p r il
T
A B
U L
A T
IO
N
O F
P L
A N
A N
D P
R O
F
IL
E Q
U A
N T
IT
IE
-2 r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n P h a s e \D
G N
\P la n a n d P r o f il e \M
T N
P L
I B
I p ln p p q ta b .d g n
SHEET 2 OF 2
PROFILE QUANTITIES
TABULATION OF PLAN AND
PROJECT
D.3
IR
A
R N I N
G
B
U R I E
D
U
T I L I T
Y
R
IP
R
IP
R
IP
R
IP
S P
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
D I
S P
U P
S P
S P
S P
S P
S P S
P
S P
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IPR
IP
R
IPR
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IPR
IP
W V
W V
U P
C P
T V
W V
W V
W V
W V
W V
PI 11+84.41
Δ = 12°18'55" (LT)
R = 500.00' T = 53.94' L = 107.47' e = Match Existing
PI 17+33.82
Δ = 18°03'19" (LT)
R = 940.00' T = 149.35' L = 296.22' e = Match Existing1
S44°02'35"E
S56°21 '30"E
P C
.4
P T
.9
P C
.4
PI 8+88.56
Δ = 02°10'52" (RT)
R = 1,000.00' T = 19.04' L = 38.07' e = Match Existing
S46°13'28"E
P C
.5
P T
.5
CP
N
See Sheets H.2-H.4 Install cattle guard, 22 feet
11+13, LT
See Sheets E.2 - E.3 and parking area Stone House approach
Adjust valve box
12+94, LT
Profile grade = Existing ground to be constructed "MAIN 01" Line
See Sheet E.7 for details concrete, 12-inch depth Curb and gutter, See Sheets H.2-H.4 Install cattle guard, 12 feet
11+13, RT
Slope stake limits
Do not disturb concrete curb and gutter Existing concrete slab and and gutter, concrete Removal of curb
Construction limits
Edge of pavement
Edge of pavement
UTILITY OWNER CONTACT(S)
dale.nafts@mdu.com
(406) 896-4206 Boise, Idaho 83706 PO Box 7608 Mark Vinger Montana Dakota Utilities mrussell@bhec.com
(406) 665-2830 Hardin, MT 59034 303 S. Mitchell Avenue Big Horn Electric Cooperative jim.tuell@nemont.coop
(406) 620-7011 Worden, MT 59088 2457 Main Street Jim Tuell Nemont Telephone Cooperative
10'
CONNECTION DETAIL
Little Bighorn Battlefield Road
.5
Existing roadway structure pavement Proposed
3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00
3,220 3,220
3,230 3,230
3,240 3,240
3,250 3,250
3,260 3,260
El.= 3238.47 E= 2497570.562 N= 488831.965
MAIN 01" 11+09.53"
BEGIN CONSTRUCTION
PLAN AND PROFILE LEGEND:
Subexcavation
Line to be constructed
Subex., RT
See Sheet C.3
T) g
LITTLE B
IGHORN BATTLEFI
ELD ROADEl.= 3220.85 E= 2497358.944 N= 489046.341
MAIN 01" 8+08.28"
BEGIN PROJECT
:4
A p ri l
P la n
S h e e t]
R
P A
-H L N
-0 \S h a re d \h ig h w a y s \F
H W
A \2 m t-n p -l ib i- (2
L it tl e B ig h o rn
P h a s e \D
G N
\P la n a n d P ro fi le
\M T
N
P L
IB
I_ (2 p ln p p p p s h e e ts
.d g n
PROJECT
D.4
DI
A R N I N G
B U R I E D
U T I L I T Y
DI WV
SP
DI
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
SP
SP
SP
WV
SP
WV
W A R N I N G
B U R I E D
U T I L I T Y
SP
CP
UP
RIP
RIP
RIP
WV
WV
CP
DI
G
WV
UP
WV
UP
WV
WV
WV
WV
EM
EM
WV
WV
BENCHBENCH
BENCHBENCH
RIP
RIP
RIP
e = Match Existing
PI 17+33.82
Δ = 18°03'19" (LT)
R = 940.00' T = 149.35' L = 296.22' e = Match Existing
PI 20+66.48
Δ = 22°49'59" (LT)
R = 920.00' T = 185.78' L = 366.63' e = Match Existing2
N70 °1
1'1 8"
E
P C
C
.7
P
C C
.7
P C
C
.3
P C
C
.3
P T
.6
.9
CP
CP
N to be constructed "MAIN 01" Line
Profile grade = Existing ground + 0.5"
See Sheet E.7 for details Curb and gutter, concrete, 12-inch depth Removal of curb and gutter, concrete
Slope stake limits
See Sheet H.1 Install gate Removal of gate 20+46
See Sheet E.7 for details Sidewalk, concrete, 4-inch depth and gutter, concrete Removal of curb
See Sheet E.7 for details concrete, 12-inch depth Curb and gutter, Construction limits
See Sheet E.5 Visitor Center parking area pavement Edge of
CONNECTION DETAIL
Little Bighorn Battlefield Road
.0 structure pavement Proposed
Existing roadway
See Sheet E.9 for details Install perpendicular curb ramp
10'
17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00
3,250 3,250
3,260 3,260
3,270 3,270
3,280 3,280
E x te n d p ip e c u lv e rt L
T
LITTLE BIGHORN BATTLEFIELD ROAD
See Sheet C.3
C le a n c u lv e rt i n p la c e
El.= 3256.15 E= 2498386.533 N= 488403.495
"MAIN 01" 20+46.00
END CONSTRUCTION
END PROJECT
Subex., RT
:4
A p ri l
P la n
S h e e t] rp a -h ln -0
\s h a re d \h ig h w a y s \F
H W
A \2 m t-n p -l ib i- (2
L it tl e B ig h o rn
P h a s e \D
G N
\P la n a n d P ro fi le
\M T
N
P L
IB
I_ (2 p ln p p p p s h e e ts
.d g n
PROJECT
D.5
Based on a conserved topsoil depth of 6 inches.
Unadjusted quantity. Includes conserved topsoil.
:5
A p r il
T a b u la ti o n o f P a r k in g a n d A p p r o a c h Q u a n ti ti h e e t o f r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n P h a s e \D
G N
\A p p r o a c h R o a d s \M
T N
P L
I B
I p ln a p p r q ta b .d g n
PARKING QUANTITIES
TABULATION OF APPROACH AND
PROJECT
E.1
3240 324
W A R N I N
G B
U R I E D U
T I L I T
Y
W A R N I N
G B
U R I E D U
T I L I T
Y
S P
S P
W V
W V
W V
W V
W V
W V
W V
W V
S P
D I
R
IP
R
IP
R
IP S
P
R
IP
D I
S P
U P
W V
W V
U P
W V
U P
T V
T V
W V
W V
C P
S P
S P
W V
E M
W V
W V
W V
W V
W V
W V
W V
S39°17'58"W S37°38'14"W
S0 3°
'07
"W e = Match Existing
'11.61L =
'5.80T =
'400.00R =
(LT)01°39'44"Δ =
1000+10.75PI
e = Match Existing '74.73L = '38.52T = '125.00R =
(LT)34°15'06"Δ =
1001+21.60PI
.9
.5
.0
.8
.9
P
S S
S S
N
El. 3,245.42
E= 2497563.775
N= 488581.680
"STONE HOUSE" 1001+82.40
END CONSTRUCTION
El. 3,242.89
E= 2497641.884
N= 488738.785
"STONE HOUSE" 1000+00.00
BEGIN CONSTRUCTION
Profile grade = Existing ground + 0.5"
See Sheet E.3 for details.
Stone House parking area approach sufacing details.
2. See Sheet E.6 for Stone House
1. See Sheet E.1 for quantities.
NOTE:
C le a n c u lv e rt i n p la c e
"Stone House" Line to be constructed
Slope stake limits
999+77.57
"STONE HOUSE"
"MAIN 01" 12+24.07
Construction limits
Edge of pavement
STONE HOUSE ROAD
"MAIN 01"
L
IT
T L E B
IG
H O
R N B
A T T L E F
IE
L D R
O A
D
999+50 1000+001000+00 1000+50 1001+00 1001+50
3,234 3,234
3,236 3,236
3,238 3,238
3,240 3,240
3,242 3,242
3,244 3,244
3,246 3,246
3,248 3,248
3,250 3,250
3,252 3,252
3,254 3,254
:5
A p ri l
S to n e
H
S h e
R
P A
-H L N
-0 \S h a re d \h ig h w a y s \F
H W
A \2 m t-n p -l ib i- (2
L it tl e B ig h o rn
P h a s e \D
G N
\A p p ro a c h R o a d s \M
T N
P L
IB
I_ (2 p ln a p p r_ p p .d g n
STONE HOUSE APPROACH
PROJECT
E.2
MT NP LIBI 10(2)
PLAN PROFILE
W A
R N I N
G
B
U R I E
D
U
T I L I T
Y
W A
R N I N
G
B
U R I E
D
U
T I L I T
Y
S P
S P
W V
W V
W V
W V
W V
W V
W V
W
VS
P
D
IR
IP
R
IP
R
IPR
IP
S P
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
D I
S P
U P
S P
S P
W V
W V
U P
W V
U P
T V
T V
W V
W V
C P
S P
S P
W V
T V
E M
W V
W V
W V
W V
W V
W V
W V
S S
S S
N
NOTE:
2. See Sheet E.6 for surfacing details.
1. See Sheet E.1 for quantities.
2001020
Scale in feet
See Sheet E.8 for details.
Install curb, concrete (Stone House)
Removal of curb and gutter, concrete
Do not disturb
Existing fire hydrant
Slope stake limits pavement
Edge of
See Sheet E.8 for details.
Install curb, concrete (Stone House)
Removal of curb and gutter, concrete
40'
See Sheet C.3 for details
Subexcavation
Sawcut pavement
Slope stake limits milling (full depth)
Asphalt pavement
Adjust valve box
Construction limits
Construction limits
"MAIN 01"
L I T
T L E B I G
H O
R N B
A T
T L E F I E
L D R
O A
D
STONE HOUSE ROAD
"STONE HOUSE"
compliance
Existing concrete for ADA
Surface diamond grinding
Sawcut pavement
See Sheet E.7 reinforced, 6-inch depth
Minor concrete pavement, 50'
70'
180' x 15'
See Sheet C.3 for details
Subexcavation
32'
105.7'
Wheelstop, concrete
:5
A p r il
S to n e H o u s e P a r k in g
A r e a L a y o u t r p a h ln
\s h a r e d
\h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n
P h a s e
\D G
N \A p p r o a c h
R o a d s \M
T
N P
L
I B
I p ln a p p r s to n e h o u s e .d g n
LAYOUT
STONE HOUSE PARKING AREA
PROJECT
E.3
S P
S P
W V
S P
S P
S P
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
S P
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
W V
W V
S49°24'3 3"E
S18°45'23"E
S49°27'0 1"E e = Match Existing
'90.95L =
'46.59T =
'170.00R =
(RT)30°39'10"Δ =
2000+64.42PI
e = Match Existing '80.36L = '41.17T = '150.00R =
(LT)30°41'38"Δ =
2001+93.42PI
.2
.6
.8
C 2
.7
.8
P
N
D o n o t d is tu rb d ia m e te r p ip e c u lv e rt
E x is ti n g
-i n c h e q u iv a le n t
See Sheet E.8 for details.
Cemetary curb outlet
See Sheet E.8 for details.
Concrete (Cemetery ramp)
See Sheet E.8 for details.
Install curb, concrete (Cemetery) Removal of curb and gutter, concrete
See Sheet E.8 for details.
Install curb, concrete (Cemetery) Removal of curb and gutter, concrete
El.= 3233.75 E= 2497619.454 N= 488178.384
"CEMETERY ROAD" 2000+55.47
BEGIN CONSTRUCTION
El.= 3228.28 E= 2497896.575 N= 487858.578
"CEMETERY ROAD" 2004+87.81
END CONSTRUCTION
NOTE:
2. See Sheet E.6 for surfacing details.
1. See Sheet E.1 for quantities.
Existing ground
Existing ground
Profile grade
Profile grade
Construction limits
Line to be constructed
"CEMETERY ROAD"
Slope stake limits
Removal of pavement, asphalt
Construction limits limits Slope stake pavement Edges of
CEMETERY ROAD
1999+50 2000+00 2000+50 2001+00 2001+50
3,220 3,220
3,222 3,222
3,224 3,224
3,226 3,226
3,228 3,228
3,230 3,230
3,232 3,232
3,234 3,234
3,236 3,236
3,238 3,238
3,240 3,240
-0.18%
-6.08%
.0
.0
.7
.0
' VC25
4K =
'195SSD =
' VC60
26K =
'493SSD =
,2
.0
2002+00 2002+50 2003+00 2003+50 2004+00 2004+50
3,212 3,212
3,214 3,214
3,216 3,216
3,218 3,218
3,220 3,220
3,222 3,222
3,224 3,224
3,226 3,226
3,228 3,228
3,230 3,230
3,232 3,232
+5.4 2%
-8.42%
+1.65%
.9
.0
.6
.0
' VC40
11K =
'306SSD =
' VC110
8K =
'72HLSD =
:0
A p ri l
C e m e ta ry S h e
R
P A
-H L N
-0 \S h a re d \h ig h w a y s \F
H W
A \2 m t-n p -l ib i- (2
L it tl e B ig h o rn
P h a s e \D
G N
\A p p ro a c h R o a d s \M
T N
P L
IB
I_ (2 p ln a p p r_ p p .d g n
CEMETERY ROAD
PROJECT
E.4
MT NP LIBI 10(2)
PLAN PROFILE
SP
SP
SP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
DI
WARNING BURIED UTILITY
DI
WV
SP
DI
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIPSP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
SP
SP
SP
SP
WV
SP
WARNING BURIED UTILITY
SP
DI
G
WV
WV
WV
WV
WV
WV
EMEM
WVWV
WV
WV
WV
RIP
RIP
RIP
2. See Sheet E.6 for surfacing details.
1. See Sheet E.1 for quantities.
NOTE:
2001020
Scale in feet
"MAIN 01"
See Sheet E.7 for details
New curb and gutter, concrete, 12-inch depth
Visitor's Center
N and gutter, concrete
Removal of curb
60'
35'
See Sheet E.7 for details
12-inch depth
Install curb and gutter, concrete, Removal of curb and gutter, concrete
See Sheet E.7 for details
Install sidewalk, concrete
Removal of sidewalk
See Sheet E.7 for details
Install sidewalk, concrete
Removal of sidewalk
See Sheet E.7 for details
Install curb and gutter, concrete, 12-inch depth
See Sheet C.3 for details
Subexcavation
10'
Removal of pavement, asphalt
See Sheet E.10 for details
Install parallel curb ramp and gutter, concrete
Removal of curb and gutter, concrete
Removal of curb
See Sheet E.7 for details.
Concrete ADA curb ramp retaining wall
See Sheet E.9 for details
Install perpendicular curb ramp
Installed by others
Concrete parking pad
See Sheet E.7 for details concrete, 12-inch depth
Install curb and gutter, LITTLE BIGHORN BATTLEFIELD ROAD
Comfort Station
4 5
27 28
:1
A p r il
V is it o r C e n te r P a r k in g A r e a L a y o u r p a h ln
\s h a r e d
\h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n
P h a s e
\D G
N \A p p r o a c h
R o a d s \M
T
N P
L
I B
I p ln a p p r v is it o r c e n te r .d g n
LAYOUT
VISITOR CENTER PARKING AREA
PROJECT
E.5 n s tr u c ti o n l im it topsoil, 4-inch depth Placing conserved
(hydraulic method) Turf establishment
Va ria bl e
1:3
Existing ground
WIDENING DETAILS
MILLING DETAILS
Tie to existing curb from 1000+00.00 to 1000+27.62 LT.
[5]
Place scrub seal over full width of typical section.
[4]
Place fog seal on recycled aggregate base immediately after construction.
[3]
Construct slopes as shown in the Staking Report.
[2]
Match existing cross slopes.
[1]
FOOTNOTE:
li m it C o n s tr u c ti o n
4-inch depth topsoil, Placing conserved
1:3 Max.
Va ria ble li m it C o n s tr u c ti o n topsoil, 4-inch depth Placing conserved
(hydraulic method) Turf establishment
1:3
Existing ground li m it C o n s tr u c ti topsoil, 4-inch depth Placing conserved
Va ria bl
V ariable
SHOULDER WIDENING SURFACING DETAIL
Fog seal
8" compacted depth
Roadway aggregate, method 2, Geogrid, stabilization
Place tack coat between lifts
4" compacted depth
Recycled aggregate base, geotextile, class 1, type C (nonwoven)
Separation-stabilization
3-inch compacted depth, place in two equal lifts
0.3 to < 3 million ESAL (type IV roughness), or 3/4-inch nominal maximum size aggregate, Asphalt concrete avement, gyratory mix, 1/2-inch
VISITOR CENTER PARKING AREA
CEMETERY ROAD
STONE HOUSE PARKING AREA
TYPICAL SURFACING SECTION
Place tack coat between lifts
4-inch compacted depth, place in two equal lifts
0.3 to < 3 million ESAL (type IV roughness), or 3/4-inch nominal maximum size aggregate, Asphalt concrete pavement, gyratory mix, 1/2-inch
Geogrid, stabilization class 1, type C (nonwoven)
Separation-stabilization geotextile, 3" compacted depth
Recycled aggregate base, 3" compacted depth
Roadway aggregate, method 2, CEMETERY ROAD
TYPICAL SECTION
C o n s tr u c ti li it
4.5'
Traveled way
4.5'
Traveled way
LC
See Sheet E.8 for details
See Sheet E.4 for locations
Curb, concrete, (Cemetery)
Profile grade
T u r f e s ta b li s h m e n t h y d r a u li c m e th o d
P la c in g c o n s e r v e d to p s o il in c h d e p th
C o n s tr u c ti o n li it
1000+00.00 to 1001+82.40
"STONE HOUSE"
1:3
11'
Traveled way
11'
Traveled way
Edge of existing pavement and gutter concrete curb
Match existing curb and gutter
Existing concrete
Profile grade
Details
See Widening
Sheet C.2
Rounding on
See Fill Slope
Rounding on Sheet C.2
See Fill Slope See Cut Slope Rounding on Sheet C.2
Rounding on Sheet C.2
See Cut Slope
Sheet C.2
Rounding on
See Fill Slope
See Milling Details
2 1/2-inch depth
Asphalt pavement milling, DETAIL
MILLING SURFACING
Top of existing pavement
Place tack coat between lifts place in two equal lifts
(type IV roughness), 3-inch compacted depth, size aggregate, 0.3 to < 3 million ESAL
1/2-inch or 3/4-inch nominal maximum
Asphalt concrete pavement, gyratory mix, NO SCALE
DITCH DETAIL
FILL SLOPE DETAIL
DITCH DETAIL
FILL SLOPE DETAIL
1.5' desired min. depth
6" desired min. depth
:5
A p r il
A p p r o a c h a n d P a r k in g A r e a S u r f a c in g D e ta h e e t o r p a h ln
\s h a r e d
\h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n
P h a s e
\D G
N \A p p r o a c h
R o a d s \M
T
N P
L
I B
I p ln a p p r s u r f d e ta il s .d g n
SURFACING DETAILS
APPROACH AND PARKING AREA
PROJECT
E.6
4-inch depth concrete, Sidewalk, 4-inch depth
Sidewalk, concrete, Expansion joint
Top of curb elevation existing ground elevation to match
Top of wall
6-inch compacted depth
Bedding material, 4-inch compacted depth
Bedding material, 1'-6"
6"
6"
1'-6"
6"
1" R
" R2
Sidewalk
Sidewalk
12-INCH DEPTH
CURB AND GUTTER, CONCRETE,
DETAIL
RETAINING WALL
ADA CURB RAMP
LAYDOWN CURB AND GUTTER DETAIL
class 1, type C (nonwoven)
Separation-stabilization geotextile, Geogrid, stabilization
7.5 %
Sidewalk
Expansion joint
Expansion joint
NO SCALE
3" (typ.)
Geogrid, stabilization
#4 @ 12" centers
#4 @ 12" centers class 1, type C (nonwoven)
Separation-stabilization geotextile, Bedding material, 4-inch compacted depth
Varies ty p
Sidewalk, concrete, 4-inch depth
6-inch compacted depth
Bedding material, TYPICAL CONCRETE SIDEWALK SECTION
TYPICAL CONCRETE PAVEMENT SECTION
6-inch depth
Minor concrete pavement, reinforced, NOTE:
1. All rebar is epoxy coated class 1, type C (nonwoven)
Separation-stabilization geotextile, Geogrid, stabilization
6-inch compacted depth
Bedding material, Bedding material, 4-inch compacted depth
Bedding material, 6-inch compacted depth surfacing
Top of proposed surfacing
Top of proposed
V a r ie s
Existing ground
Concrete
:5
A p r il
C u r b D e ta il s S h e e t
O
F r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n P h a s e \D
G N
\A p p r o a c h R o a d s \M
T N
P L
I B
I p ln a p p r c u r b .d g n
SHEET 1 OF 2
CURB DETAILS
PROJECT
E.7
Top of curb elevation
Top of curb elevation
Outlet flowline
4-inch compacted depth
Bedding material, 4-inch compacted depth
Bedding material, 4-inch compacted depth
Bedding material, "2 m a x
V a r ie s
6"
5"
3'-0"
34" outlet width
" R2
1" R
(STONE HOUSE)
CURB, CONCRETE
(CEMETERY)
CURB, CONCRETE
SIDE VIEW
CEMETERY CURB OUTLET
CEMETERY CURB OUTLET DETAILS
Geogrid, stabilization Geogrid, stabilization
Geogrid, stabilization class 1, type C (nonwoven)
Separation-stabilization geotextile, class 1, type C (nonwoven)
Separation-stabilization geotextile,
2.0 %
1:5 class 1, type C (nonwoven)
Separation-stabilization geotextile, 14"
Top of curb elevation
Top of curb elevation
Top of proposed surfacing
Top of proposed surfacing
Top of proposed surfacing
Existing sidewalk
Curb, concrete (Cemetery)
FRONT VIEW
CEMETERY CURB OUTLET
CEMETERY RAMP DETAIL
Curb, concrete, (Cemetery), typ.
class 1, type C (nonwoven)
Separation-stabilization geotextile, 4-inch compacted depth
Bedding material, Geogrid, stabilization surfacing proposed
Top of surfacing proposed
Top of
NO SCALE
TERMINAL END DETAIL
CURB AND GUTTER
CURB AND
2' (typ.)
1:4 Taper
PLAN VIEW*
ELEVATION VIEW
* Curb and gutter shown here.
top of proposed surfacing
Gutter line or
Begin or end station t y p
Ramp width is 5'.
[4]
Adjust curb height to match existing ground.
[3]
Taper curb height as shown where new curb doesn't terminate at existing curb.
[2]
Maintain a 1:4 taper ratio for curb reveal heights different than 6 inches.
Length will vary based on curb reveal height.
[1]
Concrete
Concrete
Concrete
:3
A p r il
C u r b
D e ta il s S h e e t o r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n P h a s e \D
G N
\A p p r o a c h R o a d s \M
T N
P L
I B
I p ln a p p r c u r b .d g n
SHEET 2 OF 2
CURB DETAILS
PROJECT
E.8
R a m p r u n
Width
Variable
Width
Variable warning field with detectable
Walking surface
R a m p
V a r ia b le
DIAGONAL CURB RAMP
PERPENDICULAR CURB RAMP
RAMP - TYPICAL SECTION
RAMP - ISOMETRIC
TRUNCATED DOME
SECTION
PLAN
S id e w a lk
Face of curb Si de w al k warning field with detectable
Walking surface
WITH TRUNCATED DOMES
DETECTABLE WARNING FIELD
or equal to 1:48
Surface to be flatter than material same as sidewalk.
Surface and bed course
Flared sides m ax.
1:12 m ax
1:
m ax .1:
Sidewalk
Ramp Length
Variable
Variable curb and gutter or
Concrete curb
12 max.
Finished sidewalk grade
Pavement surface
1:20 or flatter
Truncated dome
Face of curb warning field with detectable
Walking surface
2.35" c-c 0.4"
.2
0.9"
2.35" c-c
.3 c c
4'-0"
L a n d in g m in
Minimum
4'-0"
W id th m in
4'-0" m in.
T o p l a n d in g m in
Minimum
4'-0"
W id th m in
615-1
CURB CUT
WHEELCHAIR RAMP
of ramp walking surfaces or landings.
Locate drainage inlets and manholes outside inches.
of abrupt vertical changes not to exceed 2.5 gutters, or streets that are flush and free
Construct ramp transitions between walks, curb. Avoid skewing the ramp face.
Construct curb ramp perpendicular to the exclusive of the detectable warning fields.
resistant surface on concrete ramp surfaces, perpendicular to the slope to create a slip
Use a coarse broom finish running exceed 2% in any direction.
The maximum cross slopes of ramps must not
5.
4.
3.
2.
1.
STANDARD APPROVED FOR USE --/---- NO SCALE
DRAFT: 1/2004
REVISED:
:0
A p r il
E
.1 r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n P h a s e \D
G N
\A p p r o a c h R o a d s \M
T N
P L
I B
I p ln a p p r s td
.d g n
U.S. CUSTOMARY STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
E.9
TRUNCATED DOME
SECTION
PLAN
WITH TRUNCATED DOMES
DETECTABLE WARNING FIELD
Truncated dome
NOTE:
Varies truncated domes
Walking surface with or flatter
1:12 or fl at te r1:
Pavement surface
Concrete curb
PARALLEL CURB RAMP
4' -0 " m in
2' -0
4' -0 " m in
6"
2.35" c-c
.3 c c
4'-0"
2.35" c-c 0.4"
.2
0.9"
615-2
4'-0" m in.
CURB TAPER
WHEELCHAIR RAMP
ramp walking surfaces or landings.
Locate drainage inlets and manholes outside of vertical changes not to exceed 2.5 inches.
or streets that are flush and free of abrupt
Construct ramp transitions between walks, gutters, detectable warning fields.
concrete ramp surfaces, exclusive of the the slope to create a slip resistant surface on
Use a coarse broom finish running perpendicular to
2% in any direction.
The maximum cross slopes of ramps must not exceed
4.
3.
2.
STANDARD APPROVED FOR USE --/---- NO SCALE
DRAFT: 1/2004
REVISED:
:0
A p r il
E
.1 r p a h ln
\s h a r e d
\h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n
P h a s e
\D G
N \A p p r o a c h
R o a d s \M
T
N P
L
I B
I p ln a p p r
S td
.d g n
U.S. CUSTOMARY STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
E.10
Place fiber rolls around culverts according to Sheet F.4.
See Sheet F.5 for details.
[3] embankment slopes per Standard W157-21.
and protect temporary soil stabilization on
Use additional fiber rolls to minimize erosion [2]
See Sheets F.4 and F.6 for details.
[1]
NOTE:
FOOTNOTE:
1.
:5
A p r il
T
A B
U L
A T
IO
N
O F
E R
O S
IO
N
T R
O L
Q U
A N
T
IT
IE
S
S H
E r p a h ln
\s h a r e d
\h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n
P h a s e
\D G
N \E r o s io n C o n tr o l\ M
T
N P
L
I B
I p ln e c q ta b .d g n
CONTROL QUANTITIES
TABULATION OF EROSION
PROJECT
F.1
32453245
003300
W A
R N I N
G
B
U R I E
D
U
T I L I T
Y
R
IP
R
IP
R
IP
R
IP
S P
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
D I
S P
U P
S P
S P
S P
S P
S P S
P
S P
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IPR
IP
R
IPR
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IPR
IP
W V
W V
U P
C P
G A T E
T V
W V
W V
W V
W V
W V
N
DI
W A R N I N G
B U R I E D
U T I L I T Y
DI WV
SP
DI
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
RIP
SP
SP
SP
WV
SP
WV
W A R N I N G
B U R I E D
U T I L I T Y
SP
CP
UP
RIP
RIP
RIP
WV
WV
CP
DI
G
WV
UP
WV
UP
WV
WV
WV
EM
EM
WV
WV
BENCHBENCH
BENCHBENCH
RIP
RIP
RIP
"MAIN 01" 11+09.53
Install soil erosion control, fiber roll, typ.
Install soil erosion control, check dam, typ.
Install soil erosion control, fiber roll, typ.
EROSION CONTROL LEGEND*:
*See sheet A.3 for other features not listed in legend
Install soil erosion control, fiber roll, typ.
"MAIN 01" 8+08.28
BEGIN PROJECT
"MAIN 01" 20+46.00
END CONSTRUCTION
END PROJECT
:2
A p r il
E r o s io n C o n tr o l
P la
.5
T o r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n P h a s e \D
G N
\E r o s io n C o n tr o l\
M T
N
P L
I B
I p ln e c p p .d g n
11+09.53 TO 20+46
EROSION CONTROL PLANS
PROJECT
F.2
3240 324
W A R N I N
G B
U R I E D U
T I L I T
Y
W A R N I N
G B
U R I E D U
T I L I T
Y
S P
S P
W V
W V
W V
W V
W V
W V
W V
W V
S P
D I
R
IP
R
IP S
P
D I
S P
U P
W V
W V
U P
W V
U P
T V
T V
W V
W V
C P
1G
A T E
S P
S P
W V
E M
W V
W V
W V
W V
W V
W V
W V
N
S P
S P
W V
S P
S P
S P
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
S P
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
R
IP
W V
W V
N
Install soil erosion control, check dam, typ.
Install soil erosion control, fiber roll, typ.
"STONE HOUSE" 1000+00.00
"STONE HOUSE" 1001+82.40
END CONSTRUCTION
"CEMETERY ROAD" 2000+55.47
BEGIN CONSTRUCTION
"CEMETERY ROAD" 2004+87.81
END CONSTRUCTION
Install soil erosion control, fiber roll, typ.
:0
A p r il
E r o s io n C o n tr o l
P la to n e H o u s e a m e te r y R o a r p a h ln
\s h a r e d
\h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n
P h a s e
\D G
N \E r o s io n C o n tr o l\ M
T
N P
L
I B
I p ln e c p a r k in g
.d g n
CEMETERY ROAD
STONE HOUSE AND
EROSION CONTROL PLANS
PROJECT
F.3 flowing water.
Place fiber rolls adjacent to ditches with standing or[2] flowing water.
ditches intersecting the culverts with standing or or flowing water. Ensure rolls extend across any
Place fiber rolls around culverts with standing [1]
2. See Sheet F.6 for fiber roll details.
field.
approximate. Final locations are to be approved in the
1. The location of soil erosion control devices shown are
D it ch [2
D it ch [2
Minor culvert
AT MINOR CULVERTS
TYPICAL FIBER ROLL PLACEMENT
Install fiber rolls
Culvert
AT FLOWING DRAINAGES
TYPICAL FIBER ROLL PLACEMENT
Install fiber rolls [1]
F lo w in g D ra in a g e
D it ch [2
Install fiber rolls [1]
D it ch [2
NO SCALE
:0
A p r il
F ib e r R o ll
P la c e m e n t
D e ta r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n P h a s e \D
G N
\E r o s io n C o n tr o l\
M T
N
P L
I B
I p ln e c c u lv e r t.
d g n
FIBER ROLL PLACEMENT DETAIL
PROJECT
F.4
REVISED: 7/2016
DETAIL APPROVED FOR USE --/----
W157-15
MODERATE GRADES
CHECK DAM
Se e N ote
2%
3%
4%
5%
6%
NO SCALE
2%
3%
4%
5%
6%
2%
3%
4%
5%
1.
2.
3.
4.
5.
6.
7.
Construct check dams from fiber rolls, filter rock, or gravel bags as approved by the CO, to meet the functional requirements of the check dam device.
Repair all rills or gullies and properly compact prior to installation.
Install check dams in ditches perpendicular to the flowline.
stakes. Drive stakes at each end of the fiber roll and at
Drive stakes into undisturbed soil of trench bottom.
Provide sufficient length to prevent water from flowing around the ends of the fiber roll.
Adjust check dam spacing based on site-specific conditions.
(FT)
(FT)
(FT)
Trench 2" (min.)
m in
Fiber roll 9" Ø (min.)
Trench 2" (min.)
Stake fiber rolls in place with 1 8-inch x 1
8-inch wood
2-foot (max.) spacing.
Expose stakes 2-inches (min.) above top of fiber roll.
m in
"6 m in m in .6
9" Ø minimum fiber roll.
V-DITCH
CROSS SECTION
FLAT-BOTTOM DTICH
CROSS SECTION
CROSS SECTION
CROSS SECTION
FIBER ROLL
STAKING DETAIL
PLAN
are similar for flat-bottom ditches
Check dam installation details
V-ditch design shown.
Flow line
DITCH
GRADE
GRAVEL BAG
CHECK DAM SPACING*
(See Note 7)
Gravel bag the ends. See Note 6 to prevent flow around
Curve ends upstream
Filter rock
Filter rock
FIBER ROLL CHECK DAM
GRAVEL BAG CHECK DAM
CHECK DAM
SPACING (max.)
See Note 5
NOTE:
DITCH
GRADE
CHECK DAM
SPACING (max.)
FILTER ROCK
CHECK DAM SPACING
(See Note 7)
DITCH
GRADE
FIBER ROLL
CHECK DAM SPACING*
(See Note 7)
CHECK DAM
SPACING (max.)
FILTER ROCK CHECK DAM
uphill side of fiber roll trench material on
Place excavated
Flow
F lo w
* Spacing calculated based on
Do not use fiber roll check dams on ditch grades steeper than 5%.
* Do not use gravel bag check dams on ditch grades steeper than 6%.
U.S. CUSTOMARY DETAIL
:0
A p r il
W
C h e c k
D a m
M o d e r a te
G r a d r p a h ln
\s h a r e d
\h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n
P h a s e
\D G
N \E r o s io n C o n tr o l\ M
T
N P
L
I B
I p ln e c s td
W
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
F.5
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
FIBER ROLL
(FT)
(FT)
W157-21
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber
Overlap fiber rolls 12-inch minimum. Drive stakes at
6-inches from fiber roll end angles towards the adjacent fiber roll and space stakes at 4-foot max.
NO SCALE
Spacing Slope
STAKES REQUIRED
1:4 or flatter
1:3
1:2
1:1
Stakes required for each roll
FIBER ROLL SPACING
Fiber roll length
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
Runoff from disturbed areas
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll
D ire c tio n o f ru n o ff along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
ALTERNATE FIBER ROLL JOINT DETAIL
SLOPE PROTECTION INSTALLATION
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
1.
2.
roll is secure to slope. Live stakes may be used for permanent installations. Do not crush fiber roll while staking.
Step 1: Excavate trench and install fiber rolls
Step 2: Backfill soil against fiber rolls
NOTE:
U.S. CUSTOMARY DETAIL
:0
A p r il
W
F ib e r R ll r p a h ln
\s h a r e d
\h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n
P h a s e
\D G
N \E r o s io n C o n tr o l\ M
T
N P
L
I B
I p ln e c s td
W
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
F.6
:0
A p r il
D e s ig n I n tl r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n P h a s e \D
G N
\D r a in a g e \M
T N
P L
I B
I p ln h y d q ta b .d g n
PROJECT
G.1
2.
3.
4.
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVERSPAN x RISE
PIPE ARCH
SIZE
PIPE ARCH
SIZE
SPAN x RISE
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVER
MINIMUM
COVERDIAMETER
PIPE
SIZE
PIPE
SIZE
DIAMETER
MINIMUM
COVER
ALUMINUMSTEEL
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
special analysis by the CO.
The fill heights in the table are for helical lockseam and welded seam pipe only.
Fill heights for culvert pipe with annular corrugations are more restrictive than those of helical lockseam and welded seam pipe.
Obtain approval before furnishing annular corrugation pipe.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.
METAL PIPE CULVERT
Fill heights exceeding 100 feet require
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
INCHES
INCHES
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
INCHES
3.5
INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.109/120.138/10 0.168/8
INCHES INCHES INCHES
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
3.5
" CORRUGATIONS2
1" x 3
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
0.135/100.105/120.075/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.060/160.135/100.105/120.075/140.060/16
STANDARD APPROVED FOR USE 12/1993
6/2005 4/1994 REVISED:
602-1
:0
A p r il
S td r p a h ln
\s h a r e d
\h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n
P h a s e
\D G
N \D r a in a g e \M
T
N P
L
I B
I p ln h y d
S td
.d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
G.2
2.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Smoother sleeve with center stop.
Stab type joint
ROUND PIPE
DIAMETER
PIPE ARCH
SPAN × RISE
CORRUGATION
W
Band Band
Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge
Watertight pipe joints are not required unless specified in the Special Contract Requirements.
Other types of coupling bands or fastening devices that comply with the joint performance criteria of AASHTO Standard specifications for
Highway Bridges, Division II Section 26 may be used.
of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
[1] Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as
[2] For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the dimension of the end corrugation in the pipe.
COUPLING BANDS FOR METAL PIPE CULVERT [1]
[3] Use annular corrugated bands with pipes having annular corrugations or with helical pipe the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
ANNULAR
CORRUGATED
HELICALLY
CORRUGATED
BANDS [4]
SEMI-
CORRUGATEDSIZE [2]
BANDS [3] BANDS [5]
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
W
BoltsBand
WW
MINIMUM BAND WIDTH (INCHES)
1 × 2
1 × 3
3 × 1
5 × 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 × 64 to 142 × 91
60 × 46 to 81 × 59
87 × 64 to 142 × 91
60 × 46 to 81 × 59
49 × 33 to 83 × 57
17 × 13 to 42 × 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
rerolled with 3" × 1" pipe corrugations.
COUPLING BAND
METAL PIPE CULVERT
having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" × 3
2pipe ends rerolled with 2 steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
"2 1" × 3
2The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 corrugations on rerolled pipe ends.
diameter, required above 42" diameter
Second angle connection optional to 42" diameter, required above 42" diameter
Second angle connection optional to 42"
NOTE:
underdrain [6]
[4] Use helical corrugated bands with pipes having helically corrugated ends.
[5]
[6]
" for 18" round culvert (21" × 15" pipe arch) or less8
" for 21" round culvert (24" × 18" pipe arch) or more2
STANDARD APPROVED FOR USE 12/1993
6/2005 4/1994 REVISED:
602-2
:0
A p r il
S td r p a h ln
\s h a r e d
\h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n
P h a s e
\D G
N \D r a in a g e \M
T
N P
L
I B
I p ln h y d
S td
.d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
G.3
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
See Section 704 for bedding and backfill requirements.
1.
2.
3.
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
MULTIPLE PIPE INSTALLATION
PIPING PLUG
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ON UNSTABLE MATERIAL
ABOVE AND BELOW
NATURAL GROUND
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
LEGEND:
Bedding material (uncompacted)
Impermeable backfill material.
BEDDING DEPTH
MINIMUM SPACING
SPACING
DIAMETER
or SPAN
PIPE SIZE (H) DEPTH
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
H
Width
H H
H H
H H
H H
H
H
H
H
Finished subgrade Finished subgrade
Natural ground
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
depth table
See bedding excavation in trench
HH
compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding
H
Half diameter or whichever is less
(see table)
Minimum spacing or Span
Diameter or Span
Diameter section
Metal endMetal end section or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth; or lean concrete
> 54"
12" to 54"
6"
4"
18" (min.)
6" in uncompacted depth.
* Reduce to 18" for
UP to 48"
48" and UP
24" span or 36", PIPE CULVERT BEDDING
METAL AND PLASTIC
2'-0" ±
1'-0" ±
18" ±
18" ±18"±
(min.)
6"
(min.)
6"
12" (min.), 24" (max.)
"/foot of cover,2 minimum
1'-0"
NOTE:
2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.)
STANDARD APPROVED FOR USE 12/1993
10/2017 DRAFT:
6/2005 4/1994 REVISED:
602-3
:1
A p r il
S td r p a h ln
\s h a r e d
\h ig h w a y s \F
H W
A \2 m t-n p li b i-
L it tl e B ig h o r n
P h a s e
\D G
N \D r a in a g e \M
T
N P
L
I B
I p ln h y d
S td
.d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
G.4
S T O P
"2
16'-1
C RoadwayL
"2
16'-1
"2
B
B
Detail B
"16 5to pipe welds
Typ. all pipe
3"
2'-6" material
6" Bedding
Detail A
HSS5.0…
This is the start of the file's text. The full file is on GovTribe.