This document is the Project Manual for the Liberty Park Community Center Improvements project for the City of Grovetown, Georgia. The project involves improvements to the Liberty Park Community Center and the bid is due on December 6, 2023 no later than 2:00 PM. A mandatory pre-bid meeting will be held on November 8, 2023 at 10:00 AM at the Liberty Park Community Center. The project is being designed by Johnson, Laschober and Associates, P.C. and the project must be substantially complete within 120 days and ready for final payment within 150 days of the Notice to Proceed.
The bid must be a lump sum price and include a 5% bid bond. The contract will require 100% performance and payment bonds. The City of Grovetown reserves the right to reject any or all bids. There is a $50,000 project allowance included in the base bid. An add alternate is included for the toilet fixtures. The successful bidder must be a licensed general contractor in the State of Georgia and have experience completing similar community center projects.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Liberty Park Community Center Improvements_Dr.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
LIBERTY PARK COMMUNITY CENTER IMPROVEMENTS
FOR
CITY OF GROVETOWN
BID # 3048.2302
Sealed Bids are due December 6, 2023 no later than 2:00 PM. All questions are due November 28, 2023 no later than 3:00 PM. All questions must be submitted to JLA in writing. A mandatory pre-bid meeting will be held at Liberty Park Community Center, 1040 Newmantown Road, Grovetown, Georgia on November 8, 2023 at 10:00 AM.
OWNER
CITY OF GROVETOWN
103 OLD WRIGHTSBORO ROAD
GROVETOWN, GEORGIA 30813
PROJECT ARCHITECT AND ENGINEER
JOHNSON, LASCHOBER AND ASSOCIATES, P. C.
1296 BROAD STREET
AUGUSTA, GEORGIA 30901
PROJECT INTERIOR DESIGNER
JOHNSON, LASCHOBER AND ASSOCIATES, P. C.
1296 BROAD STREET
AUGUSTA, GEORGIA 30901
CONTACT INFORMATION:
RETT HARBESON
PROJECT MANAGER
JOHNSON, LASCHOBER AND ASSOCIATES, PC
1296 BROAD STREET
AUGUSTA, GA 30901
706-724-5756 rharbeson@theJLAgroup.com
OCTOBER, 2023
LIBERTY PARK COMMUNITY CENTER IMPROVEMENTS 10/2023
CITY OF GROVETOWN, GEORGIA 3048.2302
TOC-1
Liberty Park Community Center Improvements Grovetown, Georgia
TABLE OF CONTENTS
SECTION TITLE PAGES
SECTION A Advertisement A-1 SECTION TOCD Table Of Contents Drawings TOC-1 SECTION IB Instructions To Bidder’s IB-1 to IB-7 SECTION BF Bid Form BF-1 to BF-7 SECTION WCD Work Change Directive WCD-1 SECTION CO Change Order CO-1 to CO-2 SECTION GC Project General Conditions GC-1 to GC-67 SECTION SGC Supplementary General Conditions SGC-1 to SGC-9 SECTION AGC Amendment to Project General Conditions and AGC-1 Supplemental Conditions SECTION SA Standard Form of Agreement SA-1 to SA-8 SECTION NA Notice of Award NA-1 SECTION NP Notice to Proceed NP-1 to NP-2 SECTION SC Certificate of Substantial Completion CSC-1 TO CSC-3 SECTION AP Application for Payment AP-1 to AP-4
DIVISION 1 GENERAL REQUIREMENTS
011000 Summary 4 012100 Allowances 3 012500 Substitution Procedures 3 012600 Contract Modification Procedures 3 012900 Payment Procedures 5 013100 Project Management And Coordination 9 013200 Construction Progress 10 013300 Submittal Procedures 12 014000 Quality Requirements 10 014200 References 8 015000 Temporary Facilities and Controls 10 016000 Product Requirements 5 017300 Execution 11 017329 Cutting and Patching 2 017500 Project Warranties 1 017700 Closeout Procedures 7 017823 Operation And Maintenance Data 8
A-1
ADVERTISEMENT
BID NUMBER: 3048.2302
BID ITEM: Liberty Park Community Center Improvements
Specifications/Contract Documents may be obtained from and inquiries directed to JOHNSON, LASCHOBER AND ASSOCIATES, P.C., 1296 BROAD STREET, AUGUSTA, GA 30901, 706-724-
Sealed Bids will be received by the:
City of Grovetown, Georgia Grovetown City Hall
Attn: Bradley Smith, CPA 103 Old Wrightsboro Road
Grovetown, GA 30813 Phone 706-396-1590
Bids will be accepted until December 6, 2023 at 2:00 p.m. The bids will be publicly opened and read at 2:30 p.m. at Grovetown City Hall. Bid number and item should be noted on the outside of your envelope.
A mandatory pre-bid conference will be held on November 8, 2023 at 10:00 a.m. at Liberty Park Community Center located at 1040 Newmantown Road.
Copies of the Contract Documents may be obtained during regular business hours at the office of
JOHNSON, LASCHOBER AND ASSOCIATES, P.C., 1296 BROAD STREET, AUGUSTA, GA 30901.
For all non-planholders, a refundable deposit for the bidding instruments will be required in the amount of $200.00 per set. Bidder must be a verified plan holder and must have purchased bidding documents in order to submit a bid. Plan deposit will be refunded to plan holder upon return of complete bidding documents and if the bidding documents are in good condition.
Checks should be made payable to JOHNSON, LASCHOBER AND ASSOCIATES, P.C..
All bids shall be accompanied by a copy of the State of Georgia General Contractor’s license, a Bid Bond or Bid Security (Cashier’s Check is acceptable in lieu of bond) drawn in favor of City of Grovetown, Georgia in the amount of at least FIVE percent (5%) of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish a Performance Bond and Payment Bond as provided by law and approved by the Attorney for City of Grovetown, Georgia. Each bond shall be equal to ONE
HUNDRED percent (100%) of the contract amount. The Bid Bond shall be forfeited to City of Grovetown, Georgia as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within ten (10) days after being notified that he has been awarded the contract. Letters of credit will not be accepted. A Surety authorized to do business in the State of Georgia and showing a minimum “A+” rating, as set forth by Best Insurance Rating Service, must issue all bonds.
The City Council reserves the right to reject any or all bids. Any objections to the Specifications/Contract Documents as set forth should be filed in writing prior to bid openings.
Deadline for questions will be November 28, 2023 at 3:00 p.m. All questions must be written and sent via fax or email to the attention of Rett Harbeson at 706-724-5756 or rharbeson@theJLAgroup.com.
No faxed or emailed bids will be accepted.
**CONTRACTOR IS RESPONSIBLE FOR VERIFYING ISSUANCE OF
ADDENDUMS OR CONTRACT ADDITIONS/DELETIONS PRIOR TO BID
OPENING**
TABLE OF CONTENTS - DRAWINGS 1
TABLE OF CONTENTS – DRAWINGS
G-001 Project Cover Sheet Architectural AD001 Demolition Plan A-101 Proposed Floor Plan A-201 Reflected Ceiling Plan A-301 Roof Plan A-401 Exterior Elevations A-801 Door Schedule Types & Details A-901 Interior Finish Schedule, Plan, Specifications & Notes A-902 Enlarged Plans, 3D Views, Interior Elevations A-903 Enlarged Plans, Interior Elevations, Casework Details A-904 Enlarged Plan, Interior Elevations, Casework Details A-905 Enlarged Toilet Room Plans, Elevations, & Accessories Plumbing P-101 Plumbing Plan and Schedule Mechanical M-101 HVAC Plan, Schedule, And General Notes Electrical E-101 Electrical Plan E-201 Power Plan
C-200 Instructions to Bidders for Construction Contracts
00200 – 1
SECTION 200 - INSTRUCTIONS TO BIDDERS for Construction Contracts
ARTICLE 1 - DEFINED TERMS
ARTICLE 2 - COPIES OF BIDDING DOCUMENTS
ARTICLE 3 - QUALIFICATIONS OF BIDDERS
ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE
ARTICLE 5 - PRE-BID CONFERENCE
ARTICLE 6 - SITE AND OTHER AREAS
ARTICLE 7 - INTERPRETATIONS AND ADDENDA
ARTICLE 8 - BID SECURITY
ARTICLE 9 - CONTRACT TIMES
ARTICLE 10 - LIQUIDATED DAMAGES
ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS
ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS
ARTICLE 13 - PREPARATION OF BID
ARTICLE 14 - BASIS OF BID; COMPARISON OF BIDS
ARTICLE 15 - SUBMITTAL OF BID
ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID
ARTICLE 17 - OPENING OF BIDS
ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
ARTICLE 20 - CONTRACT SECURITY AND INSURANCE
ARTICLE 21 - SIGNING OF AGREEMENT
ARTICLE 22 - SALES AND USE TAXES
ARTICLE 23 - RETAINAGE
ARTICLE 24 - CONTRACTS TO BE ASSIGNED
ARTICLE 25 - PARTNERING
00200 – 2
ARTICLE 1 - DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and
Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office--The office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered.
ARTICLE 2 - COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents in the number and for the deposit sum, if any, stated in the
Advertisement or Invitation to Bid may be obtained from the Issuing Office. The deposit is refundable.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Architect assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Architect, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.
ARTICLE 3 - QUALIFICATIONS OF BIDDERS
3.01 The contractor must have a current business license and have a current General Contractors
License in the State of Georgia and must have completed at least three (3) similar projects in Georgia or South Carolina within the last five (5) years and preference will be given to those bidders who have successfully completed the construction of similar renovations and new construction of public facilities. Verification information including project name, date of completion, project description, project value and owner contact information shall accompany bid. This information must be typed.
ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE
4.01 Subsurface and Physical Conditions
A. The Supplementary Conditions identify:
1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that Architect has used in preparing the Bidding Documents.
2. Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site (except Underground Facilities) that Architect has used in preparing the Bidding
Documents.
B. Copies of reports and drawings referenced in Paragraph 4.01.A will be made available by Owner to any
Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.02 of the General Conditions has been identified and established in Paragraph 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions or information contained in such reports or shown or indicated in such drawings.
4.02 Underground Facilities
00200 – 3
A. Information and data shown or indicated in the Bidding Documents with respect to existing Underground
Facilities at or contiguous to the Site is based upon information and data furnished to Owner and Architect by owners of such Underground Facilities, including Owner, or others.
4.03 Hazardous Environmental Condition
A. The Supplementary Conditions identify those reports and drawings relating to a Hazardous Environmental
Condition identified at the Site, if any, that Architect has used in preparing the Bidding Documents.
B. Copies of reports and drawings referenced in Paragraph 4.03.A will be made available by Owner to any
Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.06 of the General Conditions has been identified and established in Paragraph 4.06 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Bidding
Documents due to differing or unanticipated conditions appear in Paragraphs 4.02, 4.03, and 4.04 of the General
Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in
Paragraph 4.06 of the General Conditions.
4.05 On request, Owner will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
Bidder shall comply with all applicable Laws and Regulations relative to excavation and utility locates.
4.06 Reference is made to Article 7 of the Supplementary Conditions for the identification of the general nature of other work that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) that relates to the Work contemplated by these Bidding Documents. On request, Owner will provide to each Bidder for examination access to or copies of Contract Documents (other than portions thereof related to price) for such other work.
4.07 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, the other related data identified in the Bidding
Documents, and any Addenda;
B. visit the Site and become familiar with and satisfy Bidder as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work;
D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the
Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in
Paragraph 4.02 of the General Conditions, and (2) reports and drawings of Hazardous Environmental Conditions at the
Site which have been identified in the Supplementary Conditions as provided in Paragraph 4.06 of the General
Conditions;
00200 – 4
E. obtain and carefully study (or accept consequences of not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and
Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto;
F. agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
H. correlate the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents;
I. promptly give Architect written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Architect is acceptable to
Bidder; and
J. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.
4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the
Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that
Bidder has given Architect written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Architect are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 5 - PRE-BID CONFERENCE
5.01 A mandatory pre-Bid conference will be held at Liberty Park Community Center, 1040 Newmantown Road, Grovetown GA on November 8, 2023 at 10:00 a.m. Representatives of Owner and Architect will be present to discuss the Project. Bidders are encouraged to have major subcontractors attend and participate in the conference. Architect will transmit to all prospective Bidders of record such Addenda as Architect considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
ARTICLE 6 - SITE AND OTHER AREAS
6.01 The Site is identified in the Bidding Documents. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by Owner unless otherwise provided in the Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor.
ARTICLE 7 - INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Architect in writing. Interpretations or clarifications considered necessary by Architect in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Architect as having received the Bidding Documents.
00200 – 5
Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by Owner or Architect.
ARTICLE 8 - BID SECURITY
Bids must be accompanied by a bid bond or bid security in the form of a cashier’s check and in an amount not less than
5% of the base bid.
ARTICLE 9 - CONTRACT TIMES
9.01 The number of days within which, or the dates by which, Milestones are to be achieved and, the Work is to be substantially completed and ready for final payment are set forth in the Agreement.
ARTICLE 10 - LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, are set forth in the Agreement.
ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the
Bidding Documents without consideration of possible substitute or “or-equal” items. Whenever it is specified or described in the Bidding Documents that a substitute or “or-equal” item of material or equipment may be furnished or used by Contractor if acceptable to Architect, application for such acceptance will not be considered by Architect until after the Effective Date of the Agreement.
ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, individuals, or entities to be submitted to Owner in advance of a specified date prior to the Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to
Owner a list of all such Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual, or entity if requested by Owner. If Owner or Architect, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit a substitute,
12.02 Contractor shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom
Contractor has reasonable objection.
ARTICLE 13 - PREPARATION OF BID
13.01 The Bid Form is included with the Bidding Documents.
00200 – 6
13.02 All blanks on the Bid Form shall be completed by typewriter and the Bid signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each listed therein, or the words “No Bid,” “No Change,” or “Not Applicable” entered.
13.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature.
13.04 All names shall be typed in ink below the signatures.
13.05 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
13.06 The address and telephone number for communications regarding the Bid shall be shown.
13.11 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the
Project is located or covenant to obtain such qualification prior to award of the Contract. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
ARTICLE 14 - BASIS OF BID; COMPARISON OF BIDS
14.01 Lump Sum
A. Bidders shall submit a Bid on a Lump Sum basis as set forth in the Bid Form. Preference will be given to the bidder who demonstrates the best overall project value and experience. Preference will be given to bidders who have successfully completed construction and renovations of community centers, schools or other similar facilities.
ARTICLE 15 - SUBMITTAL OF BID
15.01 With each copy of the Bidding Documents, a Bidder is furnished one separate unbound copy of the Bid Form.
15.02 A Bid shall be submitted no later than the date and time prescribed and at the place indicated in the Advertisement or Invitation to Bid and shall be enclosed in an opaque sealed envelope plainly marked with the Project title (and, if applicable, the designated portion of the
Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied other required documents.
ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of
Bids.
ARTICLE 17 - OPENING OF BIDS
17.01 Bids will be opened publicly and read out loud. An abstract of the Bids will be made available to Bidders after the opening of Bids.
00200 – 7
ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner may also reject the Bid if Owner believes that it would not be in the best interest of the Project to make an award. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder.
19.02 If the Contract is to be awarded, Owner will award the Contract to the Bidder whose Bid is in the best interests of the Project.
ARTICLE 20 - CONTRACT SECURITY AND INSURANCE
20.01 Article 5 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the executed
Agreement to Owner, it shall be accompanied by such bonds.
ARTICLE 21 - SIGNING OF AGREEMENT
21.01 When Owner gives a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the
Agreement as attached thereto. The Notice of Award will be issued within 60 days after the day of the Bid opening.
Within 15 days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the
Agreement and attached documents to Owner. Within ten days thereafter, Owner shall deliver one fully signed counterpart to Successful Bidder with a complete set of the Drawings with appropriate identification.
ARTICLE 22 - SALES AND USE TAXES
22.01 Owner is not exempt from GA state sales and use taxes on materials and equipment to be incorporated in the Work.
ARTICLE 23 - RETAINAGE
23.01 Provisions concerning Contractor’s rights to deposit securities in lieu of retainage are set forth in the
Agreement.
ARTICLE 24 - CONTRACTS TO BE ASSIGNED
OMITTED
ARTICLE 25 - PARTNERING
OMITTED
C-410 Bid Form
Page i
BID FORM – REVISED 10/25/2023
LIBERTY PARK COMMUNITY CENTER IMPROVEMENTS
FOR:
City of Grovetown, Georgia
1040 Newmantown Road
Grovetown, Georgia 30813
JLA Project Number 3048.2302
ALL BLANKS SHALL BE TYPED OF CLEARLY PRINTED
BID DATE DECEMBER 6, 2023 @ 2:00pm
Page ii
Page
Article 1 – Bid Recipient
Article 2 – Bidder’s Acknowledgements
Article 3 – Bidder’s Representations
Article 4 – Bidder’s Certification
Article 5 – Basis of Bid
Article 6 – Time of Completion
Article 7 – Attachments to This Bid
Article 8 – Defined Terms
Article 9 – Bid Submittal
ARTICLE 1 – BID RECIPIENT
1.01 This Bid is submitted to:
City of Grovetown, Georgia
Grovetown City Council
Attn: Bradley Smith, CPA
103 Old Wrightsboro Road
Grovetown, GA 30813
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
ARTICLE 3 – BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, other related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged:
Addendum No. Addendum Date
B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and is satisfied as to all Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) that have been identified in
SC-4.02 as containing reliable "technical data," and (2) reports and drawings of Hazardous
Environmental Conditions, if any, at the Site that have been identified in SC-4.06 as containing reliable "technical data."
E. Bidder has considered the information known to Bidder; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by
Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents; and (3) Bidder’s safety precautions and programs.
F. Based on the information and observations referred to in Paragraph 3.01.E above, Bidder does not consider that further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times required, and in accordance with the other terms and conditions of the Bidding
Documents.
G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has given Architect written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by
Architect is acceptable to Bidder.
1. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.
ARTICLE 4 – BIDDER’S CERTIFICATION
4.01 Bidder certifies that:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
ARTICLE 5 – BASIS OF BID
5.01 The undersigned Bidder, having carefully examined the Requirements, Conditions of the Contract, Drawings, Specifications, and all subsequent Addenda, having visited the site, and being familiar with all conditions and requirements of the Work, hereby agrees to furnish all material, labor, equipment and services, necessary to complete the construction of the above named project, for the stipulated sum of:
LUMP SUM BASE BID:
_______________________________________________________________________Dollars
Project Allowances sum is $50,000 for this project. See Schedule Of Allowances in Specification Section
012100. This total must be included in the Base Bid Lump Sum above.
Add Alternate No.1 – Lump Sump Cost for toilet fixtures - $_____________________________.
All specified cash allowances are included in the price(s) set forth above, and have been computed in accordance with Paragraph 11.02 of the General Conditions.
Retainage is specified in the Form of Agreement
ARTICLE 6 – TIME OF COMPLETION
6.01 Bidder agrees that Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
6.01 Bidder agrees that the Work will be substantially completed in 120 Days from the date of
Notice- To-Proceed and will be completed and ready for final payment in accordance with
Paragraph 14.07 of the General Conditions within 150 Days from the date of Notice-To-
Proceed.
ARTICLE 7 – ATTACHMENTS TO THIS BID
7.01 The following documents are submitted with and made a condition of this Bid:
A. List of Proposed Subcontractors/Suppliers.
1. Electrical Contractor:_________________________________________________
2. Plumbing Contractor:_________________________________________________
3. Mechanical Contractor:_______________________________________________
4. Roofing Contractor:_______________________________________________________
B. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such license within the time for acceptance of Bids;
C. Contractor’s Local and State License No’s.: _______________________________________
D. Bid Breakdown per Instructions To Bidders Article 18.
ARTICLE 8 – DEFINED TERMS
8.01 The terms used in this Bid with initial capital letters have the meanings stated in the
Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
Bid Submittal
9.01 This Bid is submitted by:
If Bidder is:
A Corporation
Corporation Name: (SEAL)
State of Incorporation:
Type (General Business, Professional, Service, Limited Liability):_______
By:
(Signature -- attach evidence of authority to sign)
Name (typed or printed):
Title:
(CORPORATE SEAL)
Attest
Date of Qualification to do business in South Carolina is ____/____/____.
Bidder's Business Address
Phone No. _____________________________________ Fax No.
E-mail ______________________________ _______
SUBMITTED on , 20____.
State Contractor License No. .
EJCDC C-940 Work Change Directive
Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute.
Work Change Directive
No.
Date of Issuance: Effective Date:
Project:
Owner:
Owner's Contract No.:
Contract:
Date of Contract:
Contractor:
Engineer's Project No.:
Contractor is directed to proceed promptly with the following change(s):
Item No. Description
Attachments (list documents supporting change):
Purpose for Work Change Directive:
Authorization for Work described herein to proceed on the basis of Cost of the Work due to:
Nonagreement on pricing of proposed change.
Necessity to expedite Work described herein prior to agreeing to changes on Contract
Price and Contract Time.
Estimated change in Contract Price and Contract Times:
Contract Price $ (increase/decrease) Contract Time (increase/decrease) days
Recommended for Approval by Engineer: Date
Authorized for Owner by: Date
Received for Contractor by: Date
Received by Funding Agency (if applicable): Date:
EJCDC C-941 Change Order
Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute.
Change Order
No.
Date of Issuance: Effective Date:
Project:
Owner:
Owner's Contract No.:
Contract:
Date of Contract:
Contractor:
Engineer's Project No.:
The Contract Documents are modified as follows upon execution of this Change Order:
Description:
Attachments (list documents supporting change):
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: Working days
Calendar days
Substantial completion (days or date):
$ Ready for final payment (days or date):
[Increase] [Decrease] from previously approved Change Orders No. to No.
[Increase] [Decrease] from previously approved Change Orders
No. to No. :
Substantial completion (days):
$ Ready for final payment (days):
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion (days or date):
$ Ready for final payment (days or date):
[Increase] [Decrease] of this Change Order: [Increase] [Decrease] of this Change Order:
Substantial completion (days or date):
$ Ready for final payment (days or date):
Contract Price incorporating this Change Order:
Contract Times with all approved Change Orders:
Substantial completion (days or date):
$ Ready for final payment (days or date):
RECOMMENDED: ACCEPTED: ACCEPTED:
By: By: By:
Engineer (Authorized Signature) Owner (Authorized Signature) Contractor (Authorized Signature)
Date: Date: Date:
Approved by Funding Agency (if applicable):
Date:
EJCDC C-941 Change Order
Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute.
Change Order
Instructions
A. GENERAL INFORMATION
This document was developed to provide a uniform format for handling contract changes that affect
Contract Price or Contract Times. Changes that have been initiated by a Work Change Directive must be incorporated into a subsequent Change Order if they affect Price or Times.
Changes that affect Contract Price or Contract Times should be promptly covered by a Change Order. The practice of accumulating Change Orders to reduce the administrative burden may lead to unnecessary disputes.
If Milestones have been listed in the Agreement, any effect of a Change Order thereon should be addressed.
For supplemental instructions and minor changes not involving a change in the Contract Price or Contract
Times, a Field Order should be used.
B. COMPLETING THE CHANGE ORDER FORM
Engineer normally initiates the form, including a description of the changes involved and attachments based upon documents and proposals submitted by Contractor, or requests from Owner, or both.
Once Engineer has completed and signed the form, all copies should be sent to Owner or Contractor for approval, depending on whether the Change Order is a true order to the Contractor or the formalization of a negotiated agreement for a previously performed change. After approval by one contracting party, all copies should be sent to the other party for approval. Engineer should make distribution of executed copies after approval by both parties.
If a change only applies to price or to times, cross out the part of the tabulation that does not apply.
C-700 Standard General Conditions of the Construction Contract
Page i
STANDARD GENERAL CONDITIONS OF THE
CONSTRUCTION CONTRACT
Page
Article 1 – Definitions and Terminology
1.01 Defined Terms
1.02 Terminology
Article 2 – Preliminary Matters
2.01 Delivery of Bonds and Evidence of Insurance
2.02 Copies of Documents
2.03 Commencement of Contract Times; Notice to Proceed
2.04 Starting the Work
2.05 Before Starting Construction
2.06 Preconstruction Conference; Designation of Authorized Representatives
2.07 Initial Acceptance of Schedules
Article 3 – Contract Documents: Intent, Amending, Reuse
3.01 Intent
3.02 Reference Standards
3.03 Reporting and Resolving Discrepancies
3.04 Amending and Supplementing Contract Documents
3.05 Reuse of Documents
3.06 Electronic Data
Article 4 – Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental
Conditions; Reference Points
4.01 Availability of Lands
4.02 Subsurface and Physical Conditions
4.03 Differing Subsurface or Physical Conditions
4.04 Underground Facilities
4.05 Reference Points
4.06 Hazardous Environmental Condition at Site
Article 5 – Bonds and Insurance
5.01 Performance, Payment, and Other Bonds
5.02 Licensed Sureties and Insurers
5.03 Certificates of Insurance
5.04 Contractor’s Insurance
5.05 Owner’s Liability Insurance
5.06 Property Insurance
5.07 Waiver of Rights
Page ii
5.08 Receipt and Application of Insurance Proceeds
5.09 Acceptance of Bonds and Insurance; Option to Replace
5.10 Partial Utilization, Acknowledgment of Property Insurer
Article 6 – Contractor’s Responsibilities
6.01 Supervision and Superintendence
6.02 Labor; Working Hours
6.03 Services, Materials, and Equipment
6.04 Progress Schedule
6.05 Substitutes and “Or-Equals”
6.06 Concerning Subcontractors, Suppliers, and Others
6.07 Patent Fees and Royalties
6.08 Permits
6.09 Laws and Regulations
6.10 Taxes
6.11 Use of Site and Other Areas
6.12 Record Documents
6.13 Safety and Protection
6.14 Safety Representative
6.15 Hazard Communication Programs
6.16 Emergencies
6.17 Shop Drawings and Samples
6.18 Continuing the Work
6.19 Contractor’s General Warranty and Guarantee
6.20 Indemnification
6.21 Delegation of Professional Design Services
Article 7 – Other Work at the Site
7.01 Related Work at Site
7.02 Coordination
7.03 Legal Relationships
Article 8 – Owner’s Responsibilities
8.01 Communications to Contractor
8.02 Replacement of Engineer
8.03 Furnish Data
8.04 Pay When Due
8.05 Lands and Easements; Reports and Tests
8.06 Insurance
8.07 Change Orders
8.08 Inspections, Tests, and Approvals
8.09 Limitations on Owner’s Responsibilities
8.10 Undisclosed Hazardous Environmental Condition
8.11 Evidence of Financial Arrangements
8.12 Compliance with Safety Program
Page iii
Article 9 – Engineer’s Status During Construction
9.01 Owner’s Representative
9.02 Visits to Site
9.03 Project Representative
9.04 Authorized Variations in Work
9.05 Rejecting Defective Work
9.06 Shop Drawings, Change Orders and Payments
9.07 Determinations for Unit Price Work
9.08 Decisions on Requirements of Contract Documents and Acceptability of Work
9.09 Limitations on Engineer’s Authority and Responsibilities
9.10 Compliance with Safety Program
Article 10 – Changes in the Work; Claims
10.01 Authorized Changes in the Work
10.02 Unauthorized Changes in the Work
10.03 Execution of Change Orders
10.04 Notification to Surety
10.05 Claims
Article 11 – Cost of the Work; Allowances; Unit Price Work
11.01 Cost of the Work
11.02 Allowances
11.03 Unit Price Work
Article 12 – Change of Contract Price; Change of Contract Times
12.01 Change of Contract Price
12.02 Change of Contract Times
12.03 Delays
Article 13 – Tests and Inspections; Correction, Removal or Acceptance of Defective Work
13.01 Notice of Defects
13.02 Access to Work
13.03 Tests and Inspections
13.04 Uncovering Work
13.05 Owner May Stop the Work
13.06 Correction or Removal of Defective Work
13.07 Correction Period
13.08 Acceptance of Defective Work
13.09 Owner May Correct Defective Work
Article 14 – Payments to Contractor and Completion
14.01 Schedule of Values
14.02 Progress Payments
14.03 Contractor’s Warranty of Title
14.04 Substantial Completion
14.05 Partial Utilization
Page iv
14.06 Final Inspection
14.07 Final Payment
14.08 Final Completion Delayed
14.09 Waiver of Claims
Article 15 – Suspension of Work and Termination
15.01 Owner May Suspend Work
15.02 Owner May Terminate for Cause
15.03 Owner May Terminate For Convenience
15.04 Contractor May Stop Work or Terminate
Article 16 – Dispute Resolution
16.01 Methods and Procedures
Article 17 – Miscellaneous
17.01 Giving Notice
17.02 Computation of Times
17.03 Cumulative Remedies
17.04 Survival of Obligations
17.05 Controlling Law
17.06 Headings
ARTICLE 1 – DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
A. Wherever used in the Bidding Requirements or Contract Documents and printed with initial capital letters, the terms listed below will have the meanings indicated which are applicable to both the singular and plural thereof. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms.
1. Addenda—Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents.
2. Agreement—The written instrument which is evidence of the agreement between Owner and
Contractor covering the Work.
3. Application for Payment—The form acceptable to Engineer which is to be used by
Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract
Documents.
4. Asbestos—Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United
States Occupational Safety and Health Administration.
5. Bid—The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed.
6. Bidder—The individual or entity who submits a Bid directly to Owner.
7. Bidding Documents—The Bidding Requirements and the proposed Contract Documents
(including all Addenda).
8. Bidding Requirements—The advertisement or invitation to bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any supplements.
9. Change Order—A document recommended by Engineer which is signed by Contractor and
Owner and authorizes an addition, deletion, or revision in the Work or an adjustment in the
Contract Price or the Contract Times, issued on or after the Effective Date of the Agreement.
10. Claim—A demand or assertion by Owner or Contractor seeking an adjustment of Contract
Price or Contract Times, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Claim.
11. Contract—The entire and integrated written agreement between the Owner and Contractor concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral.
12. Contract Documents—Those items so designated in the Agreement. Only printed or hard copies of the items listed in the Agreement are Contract Documents. Approved Shop
Drawings, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents.
13. Contract Price—The moneys payable by Owner to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work).
14. Contract Times—The number of days or the dates stated in the Agreement to: (i) achieve
Milestones, if any; (ii) achieve Substantial Completion; and (iii) complete the Work so that it is ready for final payment as evidenced by Engineer’s written recommendation of final payment.
15. Contractor—The individual or entity with whom Owner has entered into the Agreement.
16. Cost of the Work—See Paragraph 11.01 for definition.
17. Drawings—That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by
Contractor. Shop Drawings and other Contractor submittals are not Drawings as so defined.
18. Effective Date of the Agreement—The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver.
19. Engineer—The individual or entity named as such in the Agreement.
20. Field Order—A written order issued by Engineer which requires minor changes in the Work but which does not involve a change in the Contract Price or the Contract Times.
21. General Requirements—Sections of Division 1 of the Specifications.
22. Hazardous Environmental Condition—The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, or Radioactive Material in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto.
23. Hazardous Waste—The term Hazardous Waste shall have the meaning provided in Section
1004 of the Solid Waste Disposal Act (42 USC Section 6903) as amended from time to time.
24. Laws and Regulations; Laws or Regulations—Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction.
25. Liens—Charges, security interests, or encumbrances upon Project funds, real property, or personal property.
26. Milestone—A principal event specified in the Contract Documents relating to an intermediate completion date or time prior to Substantial Completion of all the Work.
27. Notice of Award—The written notice by Owner to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, Owner will sign and deliver the Agreement.
28. Notice to Proceed—A written notice given by Owner to Contractor fixing the date on which the Contract Times will commence to run and on which Contractor shall start to perform the
Work under the Contract Documents.
29. Owner—The individual or entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed.
30. PCBs—Polychlorinated biphenyls.
31. Petroleum—Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non-Hazardous Waste and crude oils.
32. Progress Schedule—A schedule, prepared and maintained by Contractor, describing the sequence and duration of the activities comprising the Contractor’s plan to accomplish the
Work within the Contract Times.
33. Project—The total construction of which the Work to be performed under the Contract
Documents may be the whole, or a part.
34. Project Manual—The bound documentary information prepared for bidding and constructing the Work. A listing of the contents of the Project Manual, which may be bound in one or more volumes, is contained in the table(s) of contents.
35. Radioactive Material—Source, special nuclear, or byproduct material as defined by the
Atomic Energy Act of 1954 (42 USC…