This is a Request for Qualifications (RFQ) issued by Liberation Academy, a Georgia public charter school, for Construction Management (CM) services for a campus renovation project located at 2600 Flat Shoals Road, College Park, Georgia. Liberation Academy seeks a qualified Construction Manager to oversee a comprehensive facility renovation totaling not to exceed $1,500,000 in hard costs, including CM fees, within a total project budget not to exceed $2,000,000. The scope of work includes modernizing the existing educational facility to achieve Group E occupancy code compliance, encompassing renovations to nine classrooms, administration areas, and kitchen/cafeteria facilities, along with new HVAC and fire sprinkler systems, flooring and ceiling work, wall repairs, lighting and electrical upgrades, and ADA-compliant restroom renovations. The RFQ was issued on November 10, 2026, with a mandatory site walk on November 30, 2026, at 12:00 PM ET. Written questions must be submitted by December 2, 2026, by 12:00 PM ET, with responses provided on December 4, 2026. Proposals are due by December 9, 2026, at 9:00 AM ET, with shortlist notifications on December 10, 2026, and interviews scheduled for December 14-15, 2026. The Notice of Intent to Award is anticipated for December 17, 2026, followed by contract negotiation from December 18-22, 2026. Construction is targeted to begin on February 18, 2027, with substantial completion scheduled for June 26, 2027, representing approximately a four-month construction period.

The CM fee structure requires submission of a detailed fee proposal breakdown including preconstruction fees (fixed fee for services estimated at two weeks or less) and construction fees (as a percentage of cost of work), along with maximum preconstruction and construction overhead costs. Proposals must include general conditions costs, CM markup percentages, insurance cost markups, labor rate tables, and project schedules accounting for material and labor escalation. The selected CM will be required to provide performance and material payment bonds at 100% of the Guaranteed Maximum Price (GMP), along with a bid bond, and must accept a Cost-Plus Fixed Fee with GMP contract structure whereby the CM bears risk for project delivery within the approved budget. All cost savings revert to Liberation Academy with no contingency cost-sharing incentives provided. Retainage of 10% applies to pay applications until final completion. Qualifications criteria emphasize experience with charter school projects delivered on fast-track schedules within budget, a minimum of five years continuous business operations, bonding capacity for 100% of estimated construction value, and demonstrated commitment to soliciting bids from Minority and Women Business Enterprises. Submissions require three copies sent via U.S. Mail, courier service, or hand delivery to Liberation Academy at the specified address, with attendance at the November 30 mandatory pre-bid conference required as a prerequisite to bid submission.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

November 10, 2026

Request for Qualifications Construction Management Services

Liberation Academy

2600 Flat Shoals Rd. College Park, GA 30349

Prepared by:

Facility Resource Center

Section 1 4

1.1 Introduction (Division 00 11 13 – Advertisement for Bids) 4

1.2 Request for Proposal/Request for Qualifications (Division 00 11 19 – Request for Proposal/00 11 53 – Request for Qualifications) 4

1.3 Project Information/Description (Division 00 30 00 – Available Information) 4

1.3.1 Project Description 4

1.3.2 Project Budget 00 31 16 – Project Budget Information 5

1.3.3 Project Team 5

1.3.4 Project Schedule (Division 00 31 13.13 – Preliminary Project Schedule, 00 31 13.16 – Preliminary Construction Schedule) 5

1.3.5 Project Phasing (00 31 13.23 – Preliminary Project Phases) 5

1.3.6 RFQ/RFQ Timeline/Critical Dates 6

Section 2 (Division 00 21 13 – Instructions to Bidders) 7

2.1 RFQ/RFQ Question/Response Process 7

2.2 Receipt of Proposals/RFQ/RFQ Submission Instructions 7

2.3 RFQ/RFQ Content of Proposals/Construction Manager Services Proposal Requirements 7

2.4 CM Selection Criteria 9

2.5 Confidentiality 10

2.6 Rights & Responsibilities 10

2.7 Offer Validity 11

2.8 Additional Information 11

Section 3 – Construction Manager Scope of Services 11

3.1 PROCUREMENT DEFINITIONS (Division 00 23 00 – Procurement Definitions) 11

3.2 SCOPE AND STYLE OF SERVICES TO BE PERFORMED (Division 00 24 13 – Scopes of Bids) 12

3.3 CM Expectations 12

3.3.1 Quality 12

3.3.2 Building Rules & Regulations 13

3.3.3 Site Coordination 13

3.3.4 Safety (Division 00 73 19 – Health and Safety Requirements) 13

3.3.5 Project Risk Management 14

3.3.6 Preconstruction Services 14

3.3.6.1 Design Document Review & Estimating 14

3.3.6.2 Site & Existing Conditions 14

3.3.6.3 Schedule Planning 14

3.3.6.4 Pre-Construction Coordination 14

3.3.6.5 Bid Package & Subcontractor Strategy 14

3.3.6.6 Permitting & Authority Coordination 14

facilityresourcecenter.com/gcsafrc | frcteam@gacharters.org

3.3.7 Construction Services 14

3.3.7.1 Mobilization & Contract Administration 15

3.3.7.2 Document Management 15

3.3.7.3 Onsite Management & Supervision 15

3.3.7.4 Meetings & Coordination 15

3.3.7.5 Quality Assurance 15

3.3.7.6 Safety & Site Conditions 16

3.3.7.7 Schedule & Progress Monitoring 16

3.3.7.8 Submittals & Procurement 16

3.3.7.9 Issue Resolution 16

3.3.8 Project Closeout & Post-Construction Support 16

3.3.8.1 Final Inspections & Punch List 16

3.3.8.2 Final Documentation 17

3.3.8.3 Owner Training & Handover 17

3.3.8.4 Post-Move Support 17

3.3.8.5 Security Compliance 17

3.3.9 Change Orders (Division 00 94 63 – Record Change Orders) 17

3.3.10 Payments 18

Section 4 - EXHIBITS 19

EXHIBIT A - CM FEE PROPOSAL BID FORM (Division 00 41 13 – Bid Form) 20

Exhibit B - Certification Form 23

Section 1

1.1 Introduction (Division 00 11 13 – Advertisement for Bids)

Liberation Academy (hereafter called ”School” or “Owner”) desires to retain the services of a professional Construction Management (CM)/Contracting firm and therefore requests proposals from suitably qualified vendors to undertake Construction Management (“CM”) services to manage a campus renovation totaling not to exceed $1,500,000 at 2600 Flat Shoals

Rd. College Park, GA 30349.

MISSION AND BACKGROUND

Liberation Academy is a State Charter Schools Commission of Georgia public charter school that is currently serving 5th through 8th grade scholars in College Park, Georgia. The school has a statewide attendance zone, meaning students from anywhere in the state of Georgia can attend the school.

Through rigorous, relevant instruction, community collaboration, and the development of innate skills, Liberation Academy will empower Solutionist that will become problem solvers equipped to impact their community and the world. Liberation Academy's vision is to cultivate a dynamic learning ecosystem where students continuously grow into resourceful, community-minded individuals and leaders poised to identify and solve complex challenges that contribute to a more equitable and prosperous world.

1.2 Request for Qualifications (Division 00 11 53 – Request for Qualifications)

Request for Qualifications (hereafter called “RFQ”) is intended for the purpose of appointing a suitably qualified and experienced CM to provide the necessary services for the Project. The CM is the organization which will contract with Liberation Academy and will undertake the Contracting Services

(collectively, the “Services”) in accordance with the functional and performance specifications and the contract terms and conditions set forth in this RFQ.

If the CM declines this RFQ then the CM must destroy all information it has received from the Owner and confirm in writing that this has been completed within two (2) business days.

Please note that this document is not a “Bid” or “Contract”, nor will any contract be implied as a result of any response to this document.

1.3 Project Information/Description (Division 00 30 00 – Available Information)

1.3.1 Project Description

Liberation Academy (LA), a Georgia Charter School, is pursuing a location for the school at the property located at 2600 Flat Shoals Rd., College Park, GA 30349. This project involves modernizing an existing educational facility to achieve full Group E occupancy code compliance.

The scope of work features comprehensive renovations to nine classrooms, the administration area, and the kitchen/cafeteria, including a new dedicated HVAC system and a new fire sprinkler system. Additional upgrades encompass flooring and ceiling demolition, wall repairs and painting, lighting and electrical modernizations, accessible restroom renovations, and ADA improvements.

The contractor shall be responsible for coordinating all work to minimize disruption to daily school operations and ensure the safety of students, staff, and visitors. This includes, but is not limited to, maintaining clear separation between construction and occupied areas, implementing appropriate safety barriers and signage, and coordinating work hours, deliveries, and site access in alignment with school requirements.

1.3.2 Project Budget 00 31 16 – Project Budget Information

The project budget is not to exceed $2,000,000.

The hard cost of the project should not exceed $1,500,000, including CM fees.

Prior to the start of construction, the CM will be required to submit a Guaranteed Maximum Price (GMP) for review and approval. The CM will be held accountable for delivering the project on schedule and within the approved budget.

1.3.3 Project Team

Liberation Academy

Facility Resource Center

Croft - Architect

1.3.4 Project Schedule (Division 00 31 13.13 – Preliminary Project Schedule, 00 31 13.16 – Preliminary Construction Schedule)

A preliminary design schedule for construction is listed below.

Mid-December: Provide design set for pricing Late-January: Any value engineering and reconciliation of drawings Mid-January: Construction Documents set January: Submit for permit January-February: Permit review February: Reconcile permit comments and issue IFC set

1.3.5 RFQ/RFQ Timeline/Critical Dates

The CM is expected to adhere to the dates in the following schedule. Dates are tentative, and

Liberation Academy reserves the right to change the schedule at any time. Changes in the schedule will be communicated to all RFQ respondents via electronic correspondence.

Current Work Being Performed

● Due Diligence

● Master plan

● Schematic Design and Construction Documents

Milestone Date

RFQ Issued Tuesday, November 10, 2026

Mandatory Site Walk Monday, November 30, 2026 12 pm ET

Deadline for Written Questions Wednesday, December 2, 2026 by 12 pm ET

Responses to Bidder Questions Friday, December 4, 2026

Proposal/Bid Submission Deadline Wednesday, December 9, 2026 by 9 am ET

Shortlist Notification (if applicable) Thursday, December 10, 2026

Interviews with Shortlisted Firms (if applicable) December 14-15, 2026

Notification of Intent to Award* Thursday December 17 , 2026

Contract Negotiation December 18-22, 2026 (may fluctuate based on holiday schedule)

Target Construction Start February 18, 2027

Target Substantial Completion June 26, 2027

(*): Selection is preliminary and contingent upon successful due diligence, negotiations, and execution of a definitive contract between Liberation Academy and the Construction Manager.

Section 2 (Division 00 21 13 – Instructions to Bidders)

2.1 RFQ/RFQ Question/Response Process

All matters pertaining to submission of the proposal should be directed to the FRC TEAM.

Bidders can submit written questions via email. All questions must be submitted in a single document or within the body of a single email. Each question must be numbered.

All questions must be received by no later than December 2, 2026 by 12 pm noon ET.

Questions concerning the RFQ shall be emailed to Jenny Tabor at frcteam@gacharters.org with a carbon copy to Brian King at brian.king@liberationacademy.org. The submission must display “Questions for Liberation Academy CMAR RFQ ” in the subject line.

CM’s are strictly forbidden from contacting any team members of Liberation Academy directly, any of its or their affiliates regarding this RFQ (this does not apply to existing initiatives that a

Vendor is working on with Liberation Academy or any of its divisions). Failure to comply with the foregoing restriction may result in possible disqualification from being selected to perform the Services.

Please note that responses to questions submitted to the project team will be shared with all bidders via email if the questions are general in nature. If the school, at its sole discretion, determines that a question is specifically related to an individual vendor, then the response will be provided exclusively to that particular vendor.

2.2 Receipt of Proposals/RFQ/RFQ Submission Instructions

Proposals will be received until Wednesday, December 9, 2026, at 9 am ET. To be accepted, all proposals are to be submitted, in sealed packages marked “Response to Liberation Academy CMAR RFQ 2026”. Proposals must be sent by U.S. Mail, courier services such as Federal Express or United Parcel Services or hand delivered. No proposals will be accepted via email or fax transmission regardless of time of delivery. Proposals delivered late due to fault by courier service will not be accepted. Three (3) copies of the proposal should be sent or delivered to:

CMAR RFQ Attention: Brian King Liberation Academy 1743 Hardin Ave College Park, GA 30337

All correspondence, questions, and communication will be with the Facility Resource Center.

Any other attempts at communication, other than with the parties outlined above is grounds for bid disqualification. Please present all questions for record in written form only. If a question is not submitted in writing it shall be deemed not for record or formal response.

mailto:frcteam@gacharters.org

The proposal package shall bear the legal entity name, and business (DBA) name and address of the CM. All submissions shall be sent electronically. Late or incomplete proposals received after the time and date specified above may be rejected.

2.3 RFQ/RFQ Content of Proposals/Construction Manager Services Proposal Requirements

To be considered for acceptance, the proposals shall contain the following minimum information to be presented as set out in the format and sequence shown.

● Firm History & Information

○ Briefly describe your firm, its officers, and executive management.

○ Provide an organizational chart for your firm, specifically indicating those who will be involved in this project, along with their resumes.

○ Project team member references and resumes (highlight media/broadcast facilities)

Please note:

■ Liberation Academy and Facility Resource Center must be informed of changes to key field personnel.

■ Liberation Academy reserves the right to interview and approve potential new team members.

● Related School Experience

○ Compile a list of all school projects (at least three) completed by your firm in the past five (5) years, particularly those completed on a fast-track schedule.

○ Specifically identify three (3) of the most recently completed CMAR projects.

○ Provide references from at least two (2) different schools for which you have performed similar work.

● Current/Recent Projects

○ List all projects your firm is currently involved with and/or has recently completed that are comparable to this project.

○ Identify your firm's role on each project (e.g., architect of record, associate architect, interior designer) and include the project budget and timeline for completion.

● Project Approach

○ Provide a brief outline and description of your firm’s approach to a project of this nature.

● Timeline

○ Provide an anticipated timeline for project completion.

● Bonding information

○ Provide the name, address, telephone number, and contact for your surety and bonding agent.

○ Provide your total bonding capacity and the total value of all projects currently under construction.

● Claims History

○ List all litigations, arbitrations, and mediations in which the firm has been involved in the past five (5) years. If these claims involved were over $50,000 made by an owner against the firm or by the firm against the owner, indicate the disposition of each such claim, the name of the owner, and the nature of the claim.

● Lawsuit Status

○ List all litigations, arbitrations, and mediations in which the firm has been involved in the past five (5) years.

● Historical Safety Violations

○ Provide any historical safety violations in which the firm has been involved.

● Saving Reversions

○ Provide the firm’s approach to savings reversions.

● CM proposal Fee

○ Complete the CM Fee Proposal Bid Form as provided in Exhibit A.

The purpose of this section is to provide a framework of key information that should be included in the respondent's proposal. Facility Resource Center, in collaboration with

Liberation Academy will conduct an impartial and comprehensive evaluation of all responses.

The RFQ submission must include the following information within the proposal for consideration.

2.4 CM Selection Criteria

The services being sought under the RFQ are considered professional in nature. Consequently, the evaluation of the proposals will be based upon consideration of the demonstrated qualifications and capabilities of the proposers, which result in an award that is in the best interest of Liberation Academy.

To qualify for this project, firms must demonstrate expertise, resources, and personnel experience in project planning, cost management, project controls, pre-construction and construction methods, value engineering, scheduling, and quality assurance.

The Construction Manager (CM) will be responsible for delivering the project efficiently, economically, and on time. The CM will manage construction activities within the approved timeline and budget while meeting high-quality standards. Responsibilities include collaborating with the school and architect on pre-construction planning, developing proposal packages, awarding trade contracts, and managing construction through final occupancy.

Firms must demonstrate a strong track record of successfully completing similar school renovation or adaptive reuse projects, particularly under fast-track timelines.

Experience, quality, customer service, and price will be key determining factors, among others, in the evaluation of proposals submitted in response to this RFQ. The selection criteria that

Liberation Academy will be considering/evaluating in its selection process include:

● Proposal Quality & Project Understanding

○ Alignment with the RFQ bid document requirements

○ Demonstrated understanding of the project scope

○ Clarity of assumptions, exclusions, and qualifications.

● Relevant experience

○ Experience working on construction projects with charter school organizations that were delivered on time and on budget.

○ Experience working with charter school projects with compressed timelines that were delivered on time and on budget.

○ Preference will be given to firms demonstrating successful experience relating to construction management services for a minimum of 3 similar projects (fast-tracked, summer school renovation projects, etc.)

○ Demonstrate successful experience in providing construction management services under a CM at Risk/GMP form of contract.

● Project Team/Personnel Qualifications

○ Team structure and strength of proposed team

○ Qualifications of the persons designated to form the proposer’s staff for the services required under the RFQ.

● References/Past Performance

○ A record of past performances as demonstrated by client references

○ References from at least two (2) different charter schools for which the proposer has performed renovation work. (preferred)

● Schedule Capability

○ Ability to perform to schedule parameters

● Pricing/Budget/Value Engineering

○ CM fee proposal Exhibit A

○ Competitiveness of proposal

○ Experience with a value engineering approach, demonstrating the ability to meet budget requirements.

● Business Qualifications (bonding, local presence and longevity)

○ Demonstrate continuous business operations for not less than five (5) years.

○ Provide qualifications to conduct business in the State of Georgia and demonstrate the ability to maintain a presence near the project site.

○ Demonstrate bonding capacity for 100% of the total estimated construction value of the project.

● Other

○ Willingness to adhere to the attached standard Liberation Academy Contract terms

○ Demonstrate a record of support for and involvement with, and commit to aggressively soliciting bids from Minority and Women Business Enterprises.

○ Demonstrate other intangibles that best demonstrate the proposer’s ability to provide services to the school.

Evaluations will be performed by a committee. Following completion of the initial evaluations, if deemed necessary by the committee, a shortlist of candidates may be invited for an interview with the Evaluation Committee. The anticipated date for the interview is scheduled for December 14-15, 2026.

After evaluation, the committee will identify the CM firm it will recommend based on the information contained in the proposal, reference analysis, and interviews, if required. The committee will base its final selection on what it considers to be most advantageous to the school. Final fees, general conditions, and reimbursables will be negotiated with the selected firm upon selection. If negotiations fail, the second-ranked firm will be considered. Liberation Academy reserves the right to accept or reject any and all proposals in response to this RFQ.

2.5 Bid Opening Process

All proposals will be opened and recorded in-person on Wednesday, December 9, 2026 at 10 am ET.

2.6 Confidentiality

All documents included in this RFQ and any verbally gathered information are confidential and proprietary and are furnished to the CMs solely for the purpose of enabling it to prepare a

Proposal. The RFQ is not to be used for any other purpose or disclosed to a third party or any contractor’s employees, agents, or representatives other than those who have a need to know such information while preparing the proposal. The CM agrees not to disclose the content of and existence of such RFQ to any non-permitted third party.

All information contained in this RFQ and subsequent documents / discussions are to be kept confidential. This includes, but is not limited to, information about Liberation Academy, its affiliates, subsidiaries, business lines, etc. Bidders shall not disclose any information contained within this RFQ/RFQ, other than to its employees directly connected with responding to this

RFQ. Unauthorized duplication and / or release of all or part of the information provided in this RFQ, without prior written permission from Liberation Academy, may disqualify the bidder from consideration.

2.7 Rights & Responsibilities

Liberation Academy reserves the right to amend or cancel this RFQ in any manner prior to award. Any amendments will be submitted as a formal addendum, and the CM will be required to confirm adjustments to their RFQ response.

It is Liberation Academy’s intention to evaluate the proposals with the goal of securing efficient, economical, and reliable services. Liberation Academy intends to appoint a sole CM to provide the services requested in this RFQ. Should the CM provide unsatisfactory services during the preconstruction service phase of the project, Liberation Academy reserves the right to solicit alternate General Contractor Lump Sum bids from alternative vendors and discontinue the services with the selected CM.

Should the CM provide satisfactory services during the pre-construction phase, Liberation

Academy will request either a Cost-Plus Fixed Fee with a Guaranteed Maximum Price (“GMP”) contract with the CM. By responding to this RFQ, the CM confirms that they are amenable to providing either of these contract structures, assuming final agreement with Liberation

Academy’s contract terms.

The CM is responsible for all costs incurred in the preparation of its proposals and any subsequent interview presentation, whether or not the CM is successful. CM’s should note that Liberation Academy reserves the right to disqualify a CM if any material misrepresentation is made in its proposals or subsequently in the presentation interview.

The Liberation Academy shall not be responsible or liable in any manner for any risks, costs or expenses incurred by any prospective or selected CM’s in conjunction with its response to this

RFQ.

2.8 Offer Validity

The CM’s proposals constitute an offer to contract which shall remain open for a period of 120 calendar days from the date of submission.

2.9 Additional Information

All offers and any other materials submitted in response to this RFQ will become the property of Liberation Academy and may be returned only at its option and at the prospective CM’s expense.

Liberation Academy has no obligation or commitment to make an award or enter into a contract with any CM submitting a proposal, and Liberation Academy does hereby expressly reserve the right not to select any CM responding to this RFQ or otherwise not to proceed with the Services as contemplated in this RFQ.

Unsuccessful respondents will be notified in writing within two weeks of the award.

Section 3 – Construction Manager Scope of Services

3.1 PROCUREMENT DEFINITIONS (Division 00 23 00 – Procurement Definitions)

GMP - Guaranteed Maximum Price. Sets a maximum price for a construction project, beyond which the contractor absorbs additional costs.

CM- Construction Manager

CMAR- Construction Manager at Risk. Delivery method which entails a commitment by the Construction Manager (CM) to deliver the project within a Guaranteed Maximum Price (GMP) which is based on the construction documents and specifications at the time of the GMP plus any reasonably inferred items or tasks.

3.2 SCOPE AND STYLE OF SERVICES TO BE PERFORMED (Division 00 24 13 – Scopes of Bids)

In issuing the RFQ , it is the intent of Liberation Academy that the successful CM will provide the required services for a fixed fee to be mutually agreed upon by the parties. It is further the intent of Liberation Academy that the successful CM will provide a GMP for the cost of construction of the projects and include a Guaranteed Delivery Date (GDD). Liberation Academy also requires that the successful CM accept the following stipulations:

1. Provide performance and material and labor payment bonds in the amount of 100% of the GMP pursuant to O.C.G.A. 36-91-40, et. seq.

2. Inclusion of a Bid-Bond with the proposal pursuant to O.C.G.A. 36-91-50, et. seq.

3. Individual trade contracts will be between the CM and trade contractors, subject to

Liberation Academy approval.

4. The CM will not perform any portion of the project with its own forces except as may be mutually agreed to by the school and the CM.

5. The CM will be “at risk” in the proposed undertaking and will be responsible for completing the project within the GMP.

6. Should the final cost of the project be less than the GMP, all savings shall revert to

Liberation Academy

7. A mandatory pre-bid conference will be held at 2600 Flat Shoals Rd. on Monday, November 30, 2026 12 pm ET. Only interested contractors/subcontractors shall attend the meeting. Attendance at this pre-bid conference is a mandatory prerequisite to submitting a bid. Please confirm your attendance by adding your information to this attendance sheet by 12 pm ET on Wednesday, November 25.

8. An agreed 10% of pay applications will be held in retention.

9. Liberation Academy shall have the authority to suspend, terminate, or supplement the performance of the project.

10.The Construction Manager will share with Liberation Academy the calculations and assumptions on which the CM’s proposed GMP is based.

The following defines the overall responsibilities, expectations, and services expected from the appointed CM. Liberation Academy is seeking a CM with extensive expertise and experience in providing services inclusive of, but not limited to, the list below. It must be recognized by the CM that it is difficult to delineate each and every specific service and task that will be required of the CM. By submitting a proposal response, the CM acknowledges that it will provide the necessary ancillary and secondary services necessary to compliment the required Scope of Services outlined herein and will not seek additional compensation.

3.3 CM Expectations

3.3.1 Quality

The CM will be responsible for achieving the highest quality throughout the construction process. Liberation Academy’s dedication to quality may necessitate multiple submittals and revisions, a crucial factor that should be accounted for in your proposal. We believe that achieving the highest standards often requires fine - tuning and adjustments and this should https://docs.google.com/spreadsheets/d/1YVsdrozaG1ebGZDqAQKyBH76C3xNdvM_iNnX6nHXvIo/edit?usp=sharing come at no additional cost to meet quality expectations.

3.3.2 Building Rules & Regulations

The Owner for the project is Liberation Academy (“Owner”). The Owner building requirements will dictate work hours, utility shutdown procedures, freight scheduling, and etc.

3.3.3 Site Coordination

The CM is solely responsible for parking construction workforce, scheduling, meeting, offloading, and securing all material deliveries. The CM is solely responsible for the safety of all materials, tools and equipment stored onsite. All Items of value shall be securely locked, removed from the site daily or otherwise protected from theft or damage.

The CM must provide traffic control plans, flagmen, street cleaning, pedestrian safety and any other special activities as required to ensure the safe and efficient performance of work and compliance with DeKalb County regulations.

The CM will be required to provide offsite storage for any materials that cannot be stored in the construction scope of work areas themselves. Liberation Academy has limited storage capability elsewhere while construction is ongoing. CM to deliver materials for installation as needed during construction if the available space is insufficient.

3.3.4 Safety (Division 00 73 19 – Health and Safety Requirements)

The CM is responsible for the installation, maintenance, and removal of all safety barricades, fencing, bracing, temporary shoring and/or safety rails as required, along with strict adherence to all OSHA and state, city, and job-specific safety requirements.

Any accidents that occur must be immediately reported to Facility Resource Center and

Liberation Academy and followed up with a written report within 24 hours of the incident.

Weekly safety huddles must be held with all construction workers that are on site. Safe access and paths of travel must be maintained at all times for the Owner, consultants, vendors, and visitors.

The CM is solely responsible for safety equipment, hard hats, safety glasses, fall protection, etc., including fire watch for any hot work. The CM shall contract to provide site security and

Firewatch services.

Please note that the beginning of construction will take place during an active school year where students, faculty, and parents may be present.

3.3.5 Project Risk Management

The CM shall attend and contribute to risk management workshops to capture all apparent and foreseeable risks. The CM, as required, shall Contribute to risk registers, forward look schedules and contingency reconciliations for recording and mitigating risks.

3.3.6 Preconstruction Services

The Construction Manager (CM) shall commence preconstruction services immediately upon engagement. These services include, but are not limited to:

3.3.6.1 Design Document Review & Estimating

● Review design documents.

● Advise on constructability, availability of materials and labor, tariffs and feasibility of construction.

3.3.6.2 Site & Existing Conditions

● Survey the site and perform field analysis to identify existing conditions that may impact construction activities, mobilization, and material movement.

3.3.6.3 Schedule Planning

● Develop a Construction Schedule inclusive of all owner-supplied vendor activities. Update this schedule weekly, comparing baseline vs. current.

● Advise on critical path activities and sequencing.

● Identify risks and communicate them to the project team.

3.3.6.4 Pre-Construction Coordination

● Engage project team to coordinate sequencing.

● Attend weekly coordination meetings.

3.3.6.5 Bid Package & Subcontractor Strategy

● Develop and finalize subcontractor bid lists

● Prepare bid schedules, instructions to bidders, and pre-bid meeting agendas.

● Solicit bids and conduct bid analysis. Present recommendations to the Owner and Facility Resource Center for approval prior to award.

● Clearly identify allowances and contingencies in all subcontract agreements and include them in the GMP or cost of work proposal.

3.3.6.6 Permitting & Authority Coordination

● If requested, attend pre-application meetings with city agencies.

● Coordinate with AHJs for permitting strategies. Design-assist/build subs shall obtain permits applicable to their scope unless otherwise specified.

3.3.7 Construction Services

The Construction Manager (CM) shall provide comprehensive construction services from Notice to

Proceed through project completion and closeout. These services include, but are not limited to:

3.3.7.1 Mobilization & Contract Administration

● Manage execution of all Subcontractor Agreements, ensuring inclusion of competitive unit pricing, labor rates, and alternates for contract administration.

● Within five (5) business days of receiving Notice to Proceed:

○ Submit a complete submittal log identifying all shop drawings and product data requirements.

○ Submit a preliminary construction schedule and procurement log.

3.3.7.2 Document Management

● Maintain a document control system (e.g., Procore or industry-accepted software) for tracking RFIs, submittals, shop drawings, meeting minutes, and approvals.

● Schedule, monitor, and implement the flow of all documents to maintain timely approvals.

3.3.7.3 Onsite Management & Supervision

● Multiple crews to manage separate scopes.

● Provide full-time, or as required, onsite Project Manager and Superintendent.

● Coordinate and supervise all subcontractor and vendor field activities from mobilization through substantial completion.

● Observe and ensure compliance with all Contract Documents, schedule milestones, and quality standards.

● Establish clear lines of authority and responsibilities for all site personnel.

● Maintain daily logs, meeting minutes, manpower reports, delivery tickets, weather logs, and photo documentation.

3.3.7.4 Meetings & Coordination

■ Chair and document the following meetings:

■ Weekly Owner/CM Progress Meetings (with Owner, Facility Resource

Center, Architect, and Engineers)

■ Weekly Foremen’s Coordination Meetings (with subcontractors and suppliers)

■ Weekly Submittal/Procurement Tracking Meetings (internal)

■ Coordinate with Owner’s designated vendors (e.g., furniture, AV, security, movers) regarding field conditions, hoisting logistics, and installation procedures.

3.3.7.5 Quality Assurance

■ Proactively manage and resolve any quality or code compliance issues in the field.

3.3.7.6 Safety & Site Conditions

■ Implement and manage a site-specific safety plan in compliance with applicable codes and regulations.

■ Ensure subcontractor adherence to safety protocols.

■ Provide regular safety audits and documentation.

■ Maintain a clean, organized site and coordinate central waste management for all vendors.

■ As the school will be occupied during the beginning of construction, ensuring the safety of students is a priority and all access points and pathways should be kept clear. Noisy and/or high impact work should be completed outside of school hours when possible.

3.3.7.7 Schedule & Progress Monitoring

■ Maintain and update a detailed project schedule. Report progress regularly to Facility Resource Center and the Owner.

■ Incorporate subcontractor activities and long-lead items into the master schedule.

■ Compare baseline vs. actual performance and identify corrective actions as needed.

3.3.7.8 Submittals & Procurement

■ Maintain and update a procurement tracking log. Submit updates to Facility Resource Center and Owner at regular intervals.

■ Coordinate timely delivery of all Owner-furnished equipment and materials.

■ Track and manage all submittals, ensuring timely approval and fabrication.

3.3.7.9 Issue Resolution

● Manage and resolve construction issues including unforeseen conditions, design conflicts, and field coordination challenges.

● Communicate and clarify scope interpretations to all subcontractors.

Elevate to Architect/Engineer as needed for resolution.

3.3.8 Project Closeout & Post-Construction Support

The Construction Manager (CM) shall lead and manage a structured, timely project closeout process that includes final inspections, documentation, Owner handoff, and post-move support. Closeout responsibilities include:

3.3.8.1 Final Inspections & Punch List

■ Coordinate the development and distribution of a comprehensive punch list to all parties (Facility Resource Center, Architect, Engineers, and Owner).

■ Architect will supplement the punch list with additional items, if necessary, following review of GC-generated list.

■ CM to coordinate and supervise all punch list correction work, ensuring timely and complete resolution prior to final inspection.

■ Ensure all sign-offs, permits, and Certificates of Occupancy (or equivalents) are obtained.

3.3.8.2 Final Documentation

■ Prepare and deliver a bound and indexed Closeout Package containing:

● As-built drawings (redline set, electronic and hard copy)

● Operation and Maintenance (O&M) manuals

● Warranty documentation

● Final inspection reports and testing certifications

● Subcontractor and vendor contact lists

● Final lien waivers and release documentation

● Final cost review report with reconciled budget vs. actuals

● Submit final Certificates of Insurance and all project-required legal documentation.

3.3.8.3 Owner Training & Handover

■ Organize and conduct Owner and facilities staff training for installed systems as required.

■ Submit training documentation and video recordings (if applicable) as part of O&M manual deliverables.

■ Ensure all system operations are fully explained and accepted by Owner’s facilities/maintenance team.

3.3.8.4 Post-Move Support

■ Provide post-move support services as required to address any issues related to systems, finishes, or coordination with Owner’s vendors.

■ Maintain key team members on standby for rapid response to post-occupancy issues within the first 30 days after move-in.

3.3.8.5 Security Compliance

■ Ensure full compliance with the Owner’s security protocols following activation of Owner's security system.

■ Includes personnel badging, restricted area access procedures, and designated construction parking protocols.

■ Ensure subcontractors and vendors comply with ongoing site security requirements until project closeout is complete.

3.3.9 Change Orders (Division 00 94 63 – Record Change Orders)

CM is required to provide a detailed cost breakdown and supporting documentation for all requested or proposed change order pricing. Backup must include labor hours, hourly rates, materials, equipment, mark-ups, invoices, etc. Change Orders submitted without this supporting documentation will be rejected. The CM is expected to review, challenge, or validate all sub-contractor proposals before it is sent to the client rep for review and recommendation. This includes but is not limited to marked drawings of changes, take off’s showing quantities for large change orders, and field pictures of changes or conditions not shown on drawings. The change order process for submittal, review and rejection or approval is to be defined and agreed following CM procurement.

The CM shall include project management, estimating time, and processing of change orders in base bid general conditions fees. Additional fees from the CM for providing change orders will be rejected. All change orders submitted to Liberation Academy for approval must be properly vetted and validated by the CM prior to being submitted.

Miscellaneous tack-on or percentage-based costs are not acceptable change order costs.

Included in this category are Project Manager time; travel time; trip charges; fuel or mileage;

cartage; consumables; small tools; and warranty.

In a submittal review or RFI response triggers a cost or schedule increase, Facility Resource

Center and Liberation Academy must be notified immediately, and approval must be granted for the cost increase before the CM or subcontractor orders materials or otherwise moves forward with the change. If this process is not followed, the cost increase shall not be paid by

Liberation Academy and shall be absorbed by the CM.

Delay claims will only be considered if a) Liberation Academy is notified in writing that a delay is imminent or already occurring and b) the CM and subcontractor took all necessary and reasonable measures at their disposal to prevent the delay. Delay claims will not be considered if the alleged delay occurred without Liberation Academy knowledge or if pricing or other information could have been but was not furnished in a timely manner to prevent the delay from occurring.

3.3.10 Payments

Interim Payments: CM must prepare and submit a monthly Application for Payment. Retainage of 5% of the total value of work completed to date must be held until final application and completion of all punch list activities for said subcontractor. Lien waivers must be issued promptly for the previous months work completed before that month will be approved.

Final Payment: Following Final Completion, Construction Manager must prepare the final statement of all the Cost of the Work, including a detailed statement of any costs incurred since the last Application for Payment through the date of Final Completion, a final computation of all savings and a statement of the resolution of all claims relating to the Work, as well as the final release of all retention. The CM shall supply a final unconditional lien waiver with the final requisition for payment.

Project Savings: Contingency values may be included in the contract for use in change control and unforeseen conditions if a GMP contract is sought. All savings realized throughout the

Project must be allocated to contingency. All remaining contingency and/or savings at the time of Final Completion must be returned to Liberation Academy. No contingency cost sharing incentives will be provided in a GMP contract situation.

Section 4 - EXHIBITS

▪ Exhibit A - CM Bid Form/Fee Proposal Form

▪ Exhibit B – Certification Form (this is the form below)

EXHIBIT A - CM FEE PROPOSAL BID FORM (Division 00 41 13 – Bid Form)

CM’s Fee: Provide a breakdown of all proposed construction management fees beyond direct subcontractor costs, including general conditions, reimbursable/general allowances, contingencies, etc., with the definitions of each. Provide a fee breakdown for the project budget of $1,500,000. The CM fee should be reflected in the schedule outlined in the bid.

GC Proposed Preconstruction Duration The preconstruction duration is estimated to last no longer than 2 weeks.

GC Proposed Construction Duration The construction duration is estimated to last no longer than 4 months.

BASIS OF FEE:

Basis of Fee: The CM’s fee is the amount, established by and agreed to by both parties, which is the full amount of compensation due to the CM as gross profit, and for all expenses of the Project not included and identified as a Cost of the Work, provided that the CM performs all the requirements of the Contract Documents within the time limits established.

A. Preconstruction Fee:

Preconstruction Fee: For the preconstruction consulting services provided by the CM/GC, the owner shall pay the CM a preconstruction fee:

Preconstruction Fee (fixed fee)

B. Construction Fee:

Construction Fee. Representing the Gross profit for the construction services provided by CM, the owner shall pay the CM/GC a construction fee.

Construction Fee (percentage)

CM’S EXPENSES AND OVERHEAD COSTS (Preconstruction and Construction):

The CM’s Overhead Costs. The maximum amount for the CM’s preconstruction costs and expenses and construction overhead costs is inclusive of all direct and incidental expenses as described in Attachment A.

Maximum Preconstruction Costs and Expenses from Exhibit A Breakdown Spreadsheet Attachment. (Do not include the Pre-construction fee listed above in this amount)

Maximum Construction Overhead Costs.

(Do not include the Pre-construction fee listed above in this amount.)

Exhibit A-1 CM Fee Breakdown Spreadsheet Attachment

Include:

● Pre-Purchase Strategies (ex. Doors)

● General Conditions & General Requirements cost lump sum: provide a lump sum general conditions cost to complete the project. General conditions costs must include costs for staff, materials, facilities, utilities and equipment, rentals, labor, field office expenses, debris removal, emergencies/safety equipment, storage, taxes, warranties, and trade contract enforcement. A schedule of personnel is to be submitted and agree burden and fee mark-up are to be attached as an exhibit to the RFQ response.

● CM Markup: Provide a fixed fee percentage markup on subcontractor costs for CM Services during the construction and closeout phases.

● CM Insurance: Provide a fixed rate markup on the subcontractor costs.

● Change order holiday: Amount of initial change order value the CM Markup shall be waived upon.

● Labor Rates: Provide a labor rate table for all CM staff billing to the project including project executive, project manager, project engineer, superintendent, assistant superintendent, project accountant, foreman, labourers, etc. Include straight, overtime and double time rates for hourly personnel.

● Escalation: Costs must account for and include any potential increases in labor, materials, equipment, commodities, fuel, etc. over the proposed duration of the project. No consideration will be given for cost increases due to material shortages, price spikes, subcontractor changes, or failure to lock in bid prices.

● Project Schedule: Provide a schedule for the project that represents your firm’s https://docs.google.com/spreadsheets/d/e/2PACX-1vQqgwoxBtKgtGJEFIbE1pNe8ADgCPqWXt27TgpLFq-SWgvIBOUpBVwoc2phn8rrimkkg32UCcu1gt46/pub?output=xlsx scheduling capabilities. The agreed upon schedule will serve as the Baseline

Construction Schedule and be incorporated into the Project Master Schedule.

Additional intermediary project milestones will be sought in the final CM contract.

● Project schedule must include details on pre-purchase methodology and details for each phase. Please include substantial completion and punch list dates for each phase.

● Assumptions, Exclusions & Qualifications: Provide all assumptions that your organization has made while responding to this RFQ that might have impacted the quote you have provided. Include assumptions on required support (including resources) from Liberation Academy during the execution of the Services. Describe any exceptions that you have to the information provided by Liberation Academy in this

RFQ.

● Insurance Evidence of insurances: Valid insurance certificates must be provided, clearly stating the type of policy, financial limits, and type of claims they cover (each occurrence or aggregate values). Liberation Academy will not provide builders risk insurance. This is the responsibility of the CM. Liberation Academy does not intend to solicit subcontractor default insurance as part of the CM RFQ but reserves the right to include it at a future date if this becomes a project requirement.

Exhibit B - Certification Form

I, , being duly sworn, state that I am (title) of

(firm) and hereby duly certify that I have read and understand the information presented in the attached proposal and any enclosure and exhibits thereto.

I further certify that to the best of my knowledge the information given in response to the request for proposals is full, complete, and truthful.

I further certify that the proposer and any principal employee of the proposer have not, in the immediately preceding five years, been convicted of any crime of moral turpitude or any felony offense, nor has had their professional license suspended, revoked, or been subjected to disciplinary proceedings.

I further certify that the proposer has not, in the immediately preceding five years, been suspended, or debarred from contracting with any federal, state or local government agency, and further, that the proposer is not now under consideration for suspension or debarment from any such agency.

I further certify that the proposer has not in the immediately preceding five years been defaulted in any federal, state, or local government agency contract, and further, that the proposer is not now under any notice of intent to default on any such contract.

I acknowledge, agree, and authorize, and certify that the proposer acknowledges, agrees, and authorizes, that Liberation Academy may, by means that Liberation Academy deems appropriate, determine the accuracy and truth of the information provided by the proposer and that Liberation Academy or their agents may contact any individual or entity named in the

Statement of Qualifications for the purpose of verifying the information supplied therein.

I acknowledge and agree that all of the information contained in the Statement of

Qualifications is submitted for the express purpose of inducing the Owner to award a contract.

A materially false statement or omission made in conjunction with this proposal is sufficient cause for suspension or debarment from further contracts, or denial of rescission of any contract entered into based upon this proposal thereby precluding the firm from doing business with, or performing work for, Liberation Academy. In addition, such false statement or omission may subject the person and entity making the proposal to criminal prosecution under the laws of the State of Georgia of the United States, including but not limited to

O.C.G.A. §16-10-20, 18 U.S.C. §§1001 or 1341.

Signature

Sworn and subscribed before me This day of , 20 .

NOTARY PUBLIC

NOTARY SEAL

My Commission Expires

Section 1
1.1 Introduction (Division 00 11 13 – Advertisement for Bids)
1.2 Request for Qualifications (Division 00 11 53 – Request for Qualifications)
1.3 Project Information/Description (Division 00 30 00 – Available Information)
1.3.1 Project Description
1.3.2 Project Budget 00 31 16 – Project Budget Information
1.3.3 Project Team
1.3.4 Project Schedule (Division 00 31 13.13 – Preliminary Project Schedule, 00 31 13.16 – Preliminary Construction Schedule)
1.3.5 RFQ/RFQ Timeline/Critical Dates

Section 2 (Division 00 21 13 – Instructions to Bidders)

2.1 RFQ/RFQ Question/Response Process
2.2 Receipt of Proposals/RFQ/RFQ Submission Instructions
2.3 RFQ/RFQ Content of Proposals/Construction Manager Services Proposal Requirements
2.4 CM Selection Criteria
2.5 Bid Opening Process
2.6 Confidentiality
2.7 Rights & Responsibilities
2.8 Offer Validity
2.9 Additional Information
Section 3 – Construction Manager Scope of Services
3.1 PROCUREMENT DEFINITIONS (Division 00 23 00 – Procurement Definitions)
3.2 SCOPE AND STYLE OF SERVICES TO BE PERFORMED (Division 00 24 13 – Scopes of Bids)
3.3 CM Expectations
3.3.1 Quality
3.3.2 Building Rules & Regulations
3.3.3 Site Coordination
3.3.4 Safety (Division 00 73 19 – Health and Safety Requirements)
3.3.5 Project Risk Management
3.3.6 Preconstruction Services
3.3.6.1 Design Document Review & Estimating
3.3.6.2 Site & Existing Conditions
3.3.6.3 Schedule Planning
3.3.6.4 Pre-Construction Coordination
3.3.6.5 Bid Package & Subcontractor Strategy
3.3.6.6 Permitting & Authority Coordination
3.3.7 Construction Services
3.3.7.1 Mobilization & Contract Administration
3.3.7.2 Document Management
3.3.7.3 Onsite Management & Supervision
3.3.7.4 Meetings & Coordination
3.3.7.5 Quality Assurance
3.3.7.6 Safety & Site Conditions
3.3.7.7 Schedule & Progress Monitoring
3.3.7.8 Submittals & Procurement
3.3.7.9 Issue Resolution
3.3.8 Project Closeout & Post-Construction Support
3.3.8.1 Final Inspections & Punch List
3.3.8.2 Final Documentation
3.3.8.3 Owner Training & Handover
3.3.8.4 Post-Move Support
3.3.8.5 Security Compliance
3.3.9 Change Orders (Division 00 94 63 – Record Change Orders)
3.3.10 Payments