LGMPCS II_Final RFP_SF1449_Continuation.pdf
PDF 5 MB Posted
- Attached to
- Final Request for Proposal for NASA LaRC Grounds Maintenance and Pest Control Support Services II (LGMPCS II) Federal contract opportunity
- Solicitation number
- 80LARC23R0010
About this file
This document is a final request for proposal for grounds maintenance and pest control support services at NASA Langley Research Center. The services include grounds maintenance such as mowing, edging, herbicide treatment, landscaping and ditch services, as well as pest control and task orders for additional work. The contract period is five years including options and has an estimated award date of April 30, 2024. The procurement is set aside for 8(a) small businesses and will use lowest price technically acceptable evaluation. Offerors must submit proposals by the specified due date and include pricing using the provided template.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP 80LARC23R0010 Amendment 00001.zip | ZIP file | |
| Coverletter_Final RFP 80LARC23R0010_LGMPCS II.pdf | ||
| RFP 80LARC23R0010 Exhibits.zip | ZIP file | |
| RFP 80LARC23R0010 Attachments.zip | ZIP file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STOCK RECORD (S/R)
STANDARD FORM 1449 (REV. 11/2021) BACK
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
80LARC23R0010 LGMPCS II 2/9/2024
Table of Contents
SECTION A - STANDARD FORM 1449 (SF 1449)
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 SERVICES TO BE PROVIDED
B.2 CONTRACT LINE-ITEM NUMBERS (CLIN) & PRICING SCHEDULE
B.3 NFS 1852.232-80 SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT (APR 2018)
B.4 PLACE OF PERFORMANCE – SERVICES
B.5 CONTRACT PERIOD OF PERFORMANCE
B.6 SPECIAL CONTRACT REQUIREMENTS
SECTION C - CONTRACT CLAUSES
C.1 CLAUSES INCORPORATED BY REFERENCE (52.252-2) (FEB 1998)
C.2 ADDENDUM TO 52.212-4 CONTRACT TERMS AND CONDITIONS - COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES. (DEC 2022)
C.3 FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (SEP 2023)
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
SECTION E - SOLICITATION PROVISIONS
E.2 ADDENDA TO FAR 52.212-1: INSTRUCTIONS TO OFFERORS – COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES. (MAR 2023)
E.3 ADDENDA TO 52.212-2 EVALUATION - COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES.
(NOV 2021)
E.4 REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
B.3 NFS 1852.232-80 SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT (APR 2018)
(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS 39529.
(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC’s Vendor Payment information web site at: https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact Center at 1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.
(c) Payment requests.
(1) The payment periods are stipulated in the payment clause(s) contained in this contract.
(2) Vouchers submitted under cost-type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:
(i) Vouchers.
(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.
(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.
(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.
(D) Progress reports, as required.
(ii) Invoices.
(A) Description of goods and services delivered as part of the contract’s terms and conditions, including the dates of delivery/performance.
(B) Progress reports, as required.
(C) Date goods and services were performed.
(iii) Fee vouchers.
(A) Listing of all provisionally-billed fee by period or date earned since contract award.,
(B) A reconciliation of all billed and earned fee.
(C) A clear explanation of the fee calculations.
(d) Non-electronic payment requests. The Contractor may submit a non-electronic voucher/invoice using the steps for non-electronic payment requests described at https://www.nssc.nasa.gov/vendorpayment, when any of the following conditions are met:
(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.
(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment requests. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.
(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.
(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.
(End of clause)
B.4 PLACE OF PERFORMANCE – SERVICES
The services to be performed under this contact shall be performed at the following location(s): NASA Langley Research Center (NASA LaRC) and property that has been permitted to NASA for its use and associated NASA buildings located on the adjacent Langley Air Force Base, Hampton, Virginia 23681.
(End of clause)
B.5 CONTRACT PERIOD OF PERFORMANCE
(a) The total potential period of performance for this contract includes a 13-month base period (to include 1-month phase-in) plus four (4) 1-year option periods, if exercised, from the effective date of the contract.
(b) In addition, the contract includes FAR 52.217-8, Extension of Services, that allows the Government to extend services for up to 6 months.
5.1 LARC 52.217-96 PERIOD OF PERFORMANCE WITH OPTIONS (JUN 2022)
Period of Performance Period Start End Duration
Base (including 1-month phase-in)
May. 1, 2024 June. 30, 2025 13 months
Option 1 July 1, 2025 June. 30, 2026 12 months
Option 2 July 1, 2026 June. 30, 2027 12 months
Option 3 July 1, 2027 June. 30, 2028 12 months
Option 4 July 1, 2028 June. 30, 2029 12 months
(End of clause)
B.6 SPECIAL CONTRACT REQUIREMENTS
6.1 CLAUSES INCORPORATED BY REFERENCE – SECTION B.6
Clause(s) at the beginning of this Section are incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (48 CFR Chapter 1) https://www.acquisition.gov/
NASA FAR Supplement (48 CFR Chapter 18) https://www.acquisition.gov/nfs
NFS 1852.223-70 SAFETY AND HEALTH MEASURES AND MISHAP
REPORTING.
(DEC 2015)
NFS 1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY. (FEB 2002) ALTERNATE I
(FEB 2006)
6.2 LARC 52.201-90 NAMING/NUMBERING SCHEME FOR CLAUSES IN FULL TEXT AND FOR CLAUSES
INCORPORATED BY REFERENCE (MAR 2012)
There are various types of clauses contained in the contract. Most clauses will reference a numbered cite such as:
Federal Acquisition Regulation (FAR 52.#); NASA FAR Supplement (NFS 1852.#); or Langley Research Center (LaRC 52.#). There are also clauses that have no numbered cite designation. Those clauses were written by LaRC for this specific contract or were written as generic Agency clauses specific for this contract type.
(End of clause)
6.3 LARC 52.213-90 ORDERS USING GOVERNMENT PURCHASE CARD (P-CARD) (MAY 2023)(APPLICABLE TO
CLIN X0002)
(a) The Contractor shall accept firm-fixed priced orders placed by authorized Government Purchase Card (P- Card) users for services under $10,000 (or other limits based on changes to P-Card purchase limitations set forth in FAR Part 2 Micro-purchase threshold definition). The Government P-Card is a purchasing instrument issued through a commercial bank to a Government Agency to facilitate micro purchases. In general, all P-Card orders will be issued by the Contracting Officer's Representative (COR). If orders are placed by other than the COR or for more than the stated limits, the Contractor shall obtain authorization (Technical Direction) from the COR or CO prior to accepting the order.
(b) The Contractor shall accept and perform only those services within the scope of the contract. In addition, the Contractor shall obtain all Government approvals (e.g., safety, environmental, health) required. Use of P- Card by Government personnel does not alter the requirements or the terms and conditions of this contract.
(c) The Contractor shall utilize rates established in Section B.2. for the pricing of services and supplies when Government personnel are ordering work directly via the Government P-Card. Any request for work that cannot be priced in accordance with Section B.2 requires advance approval of the Contracting Officer. The Contractor is responsible for tracking and reporting P-Card orders (See Exhibit C, Contract Documentation Requirements, for reporting requirements).
(d) The Government P-Card shall be billed by the Contractor when the work is completed and accepted by the customer.
(End of clause)
6.4 LARC 52.204-91 SECURITY PROGRAM/FOREIGN NATIONAL EMPLOYEE ACCESS
REQUIREMENTS (MAY 2023)
a) Applicable Definitions:
Foreign National: A foreign national is any person who is not a U.S. citizen, lawful permanent resident, or protected individual as defined by 8 U.S.C. 1101(a) (20) and 8 U.S.C. 1324b(a) (3). This also means any foreign corporation, business association, partnership, trust, or society, as well as any international organizations, any foreign government, and any agency or subdivision of foreign governments (e.g., diplomatic missions).
Lawful Permanent Resident (LPR): An LPR is any foreign person legally permitted to reside and work within the United States, to include protected individuals. LPRs are to be afforded all the rights and privileges of a U.S. citizen with the exception of voting, holding public office, access to classified national security information, and employment in the federal sector (except for specific needs or under temporary appointment per 5 CFR, Part 7, Section 7.4). LPRs are not prohibited from accessing export controlled items and information, but must have a work-related "need-to-know" for access. LPRs are considered foreign nationals under immigration laws. LPR, as defined herein, is to replace the term “Permanent Resident Alien” (PRA) in all NASA guidance that has not yet been updated to the use of LPR.
Visit: A visit is any means by which, and any duration for which, access is obtained to non-public NASA assets.
NASA Asset: A system, item, person or any combination thereof, that has importance or value to the NASA mission.
People, data, technology, buildings, property, vehicles, blueprints, contracts, records, and funds are examples of what may constitute a NASA asset.
Access: Access, with regard to NASA assets, is the explicit granting of permission to enter and/or use NASA facilities, interact with NASA personnel, and/ or use NASA information and related information processing services.
Physical Access: Physical access is the ability to touch, or walk into or up to, a NASA Asset. Physical access is controlled through the use of door locks, card readers, gates, fences, officers, walls. The purpose of these controls is to limit access to those persons who have been granted permission to access controlled assets.
Logical Access: Logical access, commonly referred to as IT access, is the ability to interact with electronic data, applications, or systems.
b) The Contractor shall adhere to Center and Agency-wide program policy and guidance for security operations and comply with current versions of the following:
NPR 1600.1, NASA Security Program Procedural Requirements
NPD 1600.9, NASA Insider Threat Program
NPD 1600.3, Policy on Prevention of and Response to Workplace Violence
NPR 1600.3, Personnel Security
NPR 1600.4, Identity and Credential Management.
c) For any contract requiring a Facility Clearance Level (FCL) for access to Classified National Security Information (CNSI), the Contractor shall adhere to the Agency-wide program policy and guidance related to the protection of CNSI by complying with NPR 1600.2, NASA Classified National Security Information (current version).
d) For any contract requiring an FCL for access to CNSI and requiring access to Communications Security (COMSEC) equipment, the Contractor shall adhere to the Agency-wide program policy and guidance related to the protection of COMSEC equipment by complying with NPR 1600.6, Communications Security (COMSEC) (NPR
1600.6 is a protected document that can be obtained by contractors that have a need-to- know. The LARC point of contact is the LARC COMSEC Account Manager (CAM)).
e) At all times while on NASA property, the Contractor, subcontractors, their employees, and agents shall wear NASA issued credentials. NASA credentials will be issued in accordance with NPR 1600.4A, Identity and Credential Management. The employee’s Facility Security Officer (FSO) and/or Designated Official (DO) will submit an identity request for temporary (between 29 and 179 days) or permanent (greater than 180 days) credentials within the NASA Identity and Access Management (IdMAX) system.
f) Credentials will be issued at the following locations: Langley Badge and Pass Office or other NASA Center as coordinated and approved by the Protective Services Office.
g) Requirements for Physical and Logical Access for Foreign Nationals:
a. Physical and logical access to the NASA Langley Research Center (LaRC) by foreign nationals shall be approved in accordance with NPR 1600.4. Chapter 4, “Identity and Credential Management” and the NASA Foreign National Access Management Operations Manual (May 2016), which can be found at NASA Foreign National Access Management Operations Manual (May 2016).
b. Center access approval requires a minimum of 5 (five) working days advance notice. Designated country nationals require a minimum of 30 (thirty) working days advance notice because of additional approval requirements. Information on Designated Countries is available at:
https://oiir.hq.nasa.gov/nasaecp/docs/DCList_10-24-2018.pdf.
c. Foreign nationals shall be escorted at all times while on Center by a NASA Civil Servant or permanently badged contractor who has completed the required escort training unless otherwise approved by the Center Chief of Protective Services. In exceptional cases as required by NASA Mission requirements, a waiver to the escort requirement may be granted by the Center Chief of Protective Services.
d. Foreign Nationals must request and obtain prior approval from Joint Base Langley-Eustis prior to entering Joint Base Langley-Eustis through the NASA LARC Protective Services Office International Visits Coordinator. Access is subject to conditions imposed by Joint Base Langley-Eustis and may require a U.S. citizen escort at all times.
Information is available at: https://lms.larc.nasa.gov/admin/documents/LF295_1.1.pdf. Note: Links to documents and forms accessed require the document/form to be downloaded/saved and then opened in Adobe acrobat to access the form's content. Document requires Adobe 8 or higher.
h) Requirements for Physical and Logical Access for LPRs:
a. Visit requests shall be submitted directly to the Badge and Pass Office (BPO) using an LF-103 NASA Langley Research Center Protective Services Office (PSO) U.S. Citizen Visitor Badge Request Form. LPRs may be sponsored for Center access by permanently badged contractor employees or NASA civil servants. Contractor LPRs shall be sponsored by the employing contractor. All LPRs must confirm their status by providing their ORIGINAL State Department Documentation (Green Card). (Copies, facsimiles, or photographs of the State Department Documentation will NOT be accepted).
b. LPRs who will be at LaRC in excess of 29 days will be processed through IdMAX.
c. LPRs who will be at LaRC in excess of 179 days will be processed for PIV credentials that will remain valid for 5 years.
d. The Contractor is responsible for ensuring credentials issued to LPRs sponsored by the Contractor are returned when the LPR no longer requires access to NASA LaRC under the contract or no longer works for the Contractor.
e. LPRs on a work related, "need-to-know” basis are allowed access to export-controlled commodities. It is incumbent on the Government Branch Head or Program Manager to determine who should have access to export-controlled information. The Protective Services Office, the Office of Chief Counsel, and the Center Export Administrator are available for guidance to the Government Branch Head or Program Manager.
f. LPRs are permitted to carry personal mobile devices on Center. Personal mobile devices are not be used to record, store, or process NASA data and are not to be used to take photographs within NASA facilities.
g. LPRs must request and obtain prior approval from Joint Base Langley-Eustis prior to entering Joint Base Langley- Eustis. Access is subject to conditions imposed by Joint Base Langley-Eustis and may require a U.S. citizen escort at all times. Information is available at: https://lms.larc.nasa.gov/admin/documents/LF295_1.1.pdf. Note: Links to documents and forms require the document/form to be downloaded/saved and then opened in Adobe acrobat to access the form's content. Document requires Adobe 8 or higher.
i) Violation of security policies by personnel may result in withdrawal of Center access for the offending personnel and/or contractual actions against the Contractor and possible criminal prosecution for violation of export control laws and laws regarding access to Government facilities.
(End of clause)
6.5 LARC 52.204-92 REQUIREMENTS FOR ACCESS TO NASA LANGLEY RESEARCH CENTER (AUG 2021)
(a) Visitors seeking entry to NASA Langley Research Center using a state-issued driver’s license or state-issued personal identification card are advised that identification documents must be compliant with the REAL ID Act of 2005, Public Law 109-13. Information on the REAL ID Act of 2005, Public Law 109-13 requirements can be found at: http://www.dhs.gov/real-id-public-faqs. Questions concerning REAL ID can be forwarded to the NASA Langley Badge and Pass Office via email at LaRC-RealId@mail.nasa.gov.
(b) A state-issued ID that is non-compliant with the REAL ID standards cannot be used for access to the Center.
(c) The following alternate forms of identification are accepted for NASA LaRC access:
(1) Federal employee badges,
(2) Passports,
(3) Military identification cards,
(4) Enhanced Driver’s Licenses,
(5) U.S. Coast Guard Merchant Mariner Card,
(6) Native American tribal document,
(7) School identification accompanied by an item from List C.
(d) Visitors without acceptable identity documents require specific authorization from the Center Chief of Protective Services and escort by permanently badged NASA employees or permanently badged contractor employees at all times while present on the NASA Langley Research Center.
(End of clause)
6.6 LARC 52.204-106 ANNUAL CYBERSECURITY TRAINING REQUIREMENTS (MAY 2023)
In accordance with NFS 1852.204-76, Security Requirements for Unclassified Information Technology Resources, all Contractor personnel requiring physical or logical access to NASA IT resources shall complete NASA’s annual on-line Cybersecurity Awareness training by the date the NASA LaRC Office of the Chief Information Officer (OCIO) specifies each year.
(End of clause)
6.7 LARC 52.211-104 OBSERVATION OF REGULATIONS AND IDENTIFICATION OF CONTRACTOR'S
EMPLOYEES (MAY 2023)
a) The Contractor shall require its employees to observe and obey all rules and regulations as prescribed by the authorities at LaRC and other installations including all applicable Federal, NASA, and Langley safety, health, environmental and security regulations.
b) At all times while on NASA property, the Contractor shall require its employees, subcontractors, and agents to display a valid NASA issued identification badge. Contractors shall be held accountable for these identification badges, and may be required to validate its active employees on an annual basis with the NASA LaRC Protective Services Office.
c) When authorization to possess an Identification Badge no longer exists (e.g., upon termination of employment or expiration of contract):
1. The Contractor shall submit a checkout request for the departing Contractor Employee(s) at https://checkout.arc.nasa.gov, prior to notifying the Contractor Employee of the employment termination or contract expiration, unless a security threat exists (See Item 2 Below) in which case the checkout may occur immediately following termination;
2. If the terminated Employee is considered a security threat, the Contractor shall immediately notify the NASA LaRC Protective Services Office and LaRC Chief Information Officer, and submit NAMS closures for AGCY0012 Basic Active Directory Account and all Center or Agency VPN, to suspend the user’s physical and logical access to the Center. Center Protective Services Personnel will escort the contractor employee off Center premises immediately;
3. The departing Contractor Employee shall surrender the NASA RSA token, NASA Smartcard, Agency Smart Badge, Government-Provided Equipment, and facility keys to the respective Contractor Supervisor;
4. The Contractor shall ensure all Contractor employees exit the NASA Langley Research Center premises within one (1) hour of termination of employment or at the end of a contractor employee’s standard work day upon contract expiration;
5. The Contractor shall return Contractor employee(s) NASA Identification Badges, Government-Provided equipment, and facility keys to the NASA LaRC Badge and Pass Office and Government-Equipment Points of Contact within two business days of employment termination or contract expiration.
d) All NASA identification badges and facility keys remain the property of NASA and the Government reserves the right to invalidate such badges at any time. In this event, the facility keys should be returned immediately with the invalidated badges to the NASA LaRC Badge and Pass Office.
(End of clause)
6.8 LARC 52.215-116 ENABLING CLAUSE BETWEEN GROUNDS MAINTENANCE AND PEST CONTROL
SUPPORT SERVICES CONTRACTOR AND OTHER LANGLEY CONTRACTORS (MAR 2012)
a) NASA has entered into the contracts listed below for other support services at Langley Research Center:
Contract Name Contractor
Center Maintenance, Operations, and Engineering (CMOE) Jacobs Technology Inc.
NASA End-User Services & Technologies (NEST) Leidos
Langley Information Technical Enhanced Services (LITES II) Science Applications International
NASA Protective Services - Eastern Region (NPS-ER) Chenega Global Protection, LLC.
Environmental Engineering Services HSG, LLC
Custodial Services Brevard Achievement Center, Inc
Langley Administrative, Media, and Professional Services (LAMPS 2) Alutiiq Fusion Joint Venture
Logistics Support Services Alutiiq Commercial Enterprises
Technology, Engineering and Aerospace Mission Support (TEAMS 3) Analytics Mechanics Association Inc.
Facility Assurance, Inspection, Monitoring, and Occupational Safety (FAIMOS 2) Mission Technology
b) In the performance of this contract, the Contractor agrees to cooperate with the Contractors or follow-on contractors for the above listed contracts by: responding to invitations from authorized personnel to attend meetings; providing access to technical information and research, development and planning data, test data and results, schedule and milestone data; limited financial data including estimates, all in original form or reproduced, discussing/coordinating matters related to projects; providing access to Contractor facilities utilized in the performance of this contract; and allowing observation of technical activities by appropriate support Contractor technical personnel.
c) The Contractor further agrees to include in each subcontract over $1 million or 10 percent of prime contract value, whichever is less, a clause requiring compliance by a subcontractor and succeeding levels of subcontractors with the response and access provisions of paragraph (b) above, subject to coordination with the Contractor. This agreement does not relieve the Contractor of responsibility to manage subcontracts effectively and efficiently, nor is it intended to establish privity of contracts between the Government or the service Contractor(s) and such subcontractors.
(End of clause)
6.9 LARC 52.217-99 (SEPT 2023)
In accordance with FAR 52.217-8, Option to Extend Services, the contractor agrees that the rates and prices for services, if exercised under this clause, will be within the limits and rates specified in the contract for the period awarded, including any options exercised, that were evaluated by the Government during the initial competition, determined reasonable by the Government prior to contract award, and any amounts exercised under this clause will be based on the terms of the contract. Therefore, the contract value of any extension pursuant to this clause is considered to have been part of the initial competition and contract award.
Because the Government cannot determine if, when, and for how long (months) this clause will be exercised, the contractor agrees that the contract value, rates, and other limits of any period exercised under this clause shall be within limits of the prevailing contract period. For example, if the contract includes a 1-year base period and 4-one-year option periods, and the Government only exercises the second option period, the contract price for any period exercised under this clause will be within the limits and rates specified in the contract for option-year 2. The contractor agrees that the rates/prices may be adjusted only as a result of prevailing labor rates provided by the Secretary of Labor.
6.10 LARC 52.223-92 CONTRACTOR EMPLOYEES' PARTICIPATION IN SAFETY & HEALTH AWARENESS
EVENTS (JUN 2016)
Langley Research Center (LaRC) safety and health awareness activities (e.g. training, safety events) are designed to develop an effective safety culture and to foster an environment of sharing best practices within the LaRC community of civil service and contractor employees. The Contractor shall participate in these activities when the LaRC Center Director and/or Safety and Mission Assurance Office (SMAO) Director designates particular safety and health training awareness activity(ies) as essential. The contractor shall ensure maximum participation of its employees and its subcontractor employees that perform duties on the Center, which includes on-site and near-site employees. For planning purposes, the contractor can expect to participate annually in approximately 2-4 events that could total approximately 6 work hours a calendar year.
(End of clause)
6.11 LARC 52.223-93 REPORTING OF INVOLUNTARY SEPARATIONS AND INCIDENTS INVOLVING WORKPLACE
VIOLENCE (MAY 2023)
a) Definition
Workplace Violence: Acts of violence, threats, harassment, intimidation, and other hostile or disruptive behavior.
Such behaviors include oral or written statements, gestures, or expressions that communicate a direct or indirect threat of physical harm or imminent violence, violent and provoking language, or displays of rage.
b) Requirements
1. The Contractor and its employees shall comply with LAPD 1600.5, Workplace Violence and Threatening Behavior. The Contractor shall conduct training on and develop procedures for recognizing, managing, and responding to incidents and threats of workplace violence as defined in LAPD 1600.5.
2. In accordance with LAPD 1600.5, if the LaRC Workplace Violence and Prevention Program (WVPP) Threat Assessment Team determines it is appropriate for the Contractor to participate in a WVPP Threat Assessment Team meeting, the Contractor shall comply with the request. The Contractor shall report the disposition of any incidents to the LaRC WVPP Threat Assessment Team.
3. The Contractor shall consider any personnel action resulting in the involuntary separation of a Contractor employee as a "potential violent situation" and follow the reporting procedures in LAPD 1600.5.
4. The Contractor shall report any such behavior either observed or experienced on LaRC premises immediately to the Center Chief of Protective Services. The Contractor shall also notify the Contracting Officer and the Contracting Officer’s Representative. All reports of incidents will be taken seriously and will be dealt with immediately and appropriately in accordance with LAPD 1600.5.
5. The Contractor shall include these requirements in all subcontracts; however, the Subcontractors shall provide reports through the prime Contractor.
(End of clause)
6.12 LARC 52.223-94 ENVIRONMENTAL MANAGEMENT (MAY 2023)
a) Located in the ecologically sensitive Chesapeake Bay watershed, Langley Research Center (LaRC) is committed to fulfilling its mission in a manner that promotes environmental stewardship, sustainability, and continual improvement while mitigating environmentally driven mission risks. LaRC expects its contractors to support LaRC in fulfilling this commitment.
b) The Contractor shall ensure that all onsite activities performed and equipment used to fulfill the requirements of the contract are in compliance with all local, state, and federal environmental laws and regulations as well as all Executive Orders, all NASA Policy Directives (NPDs), all NASA Procedural Requirements (NPRs), all Langley Policy Directives (LaPDs), and all Langley Procedural Requirements (LPRs) pertaining to environmental regulation and management. The NASA and LaRC regulatory authorities include, but are not limited to, the most recent versions of the following:
NPD 8500.1, NASA Environmental Management
NPR 8553.1, NASA Environmental Management System
NPR 8570.1, NASA Energy Management Program
NPR 8530.1, NASA Sustainable Acquisition
LAPD 8500.1, LaRC Environmental and Energy Management
LPR 8500.1, Environmental and Energy Program Manual
c) Contractor support of LaRC’s Environmental Management System (EMS), pursuant to NPR 8553.1 and LPR 8500.1, includes conducting operations in accordance with the requirements in NPR 8553.1 and LPR 8500.1, responding to information requests from LaRC environmental officials, and attendance at EMS team meetings when invited (up to 3 in-person meetings a year).
d) The Government is the operator of record for all environmental activities conducted at LaRC. Depending on location, the facilities and land are under exclusive or concurrent Federal jurisdiction. LaRC’s Environmental Management Office (EMO) is the single point of contact with federal, state, or local regulatory agencies and their representatives unless otherwise directed by the Contracting Officer. All onsite Contractor activities and personnel are subject to environmental compliance reviews, investigations, inspections, or similar inquiries which may be conducted by federal, state, or local regulatory agencies or LaRC EMO. The Contractor shall immediately notify LaRC EMO (LaRC-DL-Environmental-Staff@mail.nasa.gov) and the Contracting Officer when contacted by external regulatory agency representatives and shall cooperate fully with LaRC EMO in responding to regulatory agency representatives. The Contractor shall complete, maintain, and make available to the Contracting Officer and LaRC EMO, all documentation relating to environmental compliance required by law or regulation. As directed by the Contracting Officer, the Contractor shall make such documentation available to personnel of regulatory agencies. If a Notice of Violation, Notice of Noncompliance, Notice of Deficiency, or similar notice is received by the Contractor or one of its subcontractors in the performance of work under this contract, the Contractor shall immediately notify the Contracting Officer or the Contracting Officer’s Representative. The Contractor shall fully cooperate with LaRC in correcting any problems giving rise to any such notices and shall fully cooperate with LaRC personnel in their efforts to resolve any violations so that regulatory assessments of civil fines or penalties are minimized or avoided.
(End of clause)
6.13 LARC 52.242-70 TECHNICAL DIRECTION (MAY 2023)
a) Performance of the work under this contract is subject to the written technical direction of the Contracting Officer’s Representative (COR), who shall be specifically appointed by the Contracting Officer in writing.
"Technical direction" means a directive to the Contractor that approves approaches, solutions, designs, or refinements; fills in details or otherwise completes the general description of work or documentation items; shifts emphasis among work areas or tasks; or furnishes similar instruction to the Contractor. Technical direction includes requiring studies and pursuit of certain lines of inquiry regarding matters within the general tasks and requirements in Section C of this contract.
b) The COR does not have the authority to, and shall not, issue any instruction purporting to be technical direction that -
1. Constitutes an assignment of additional work outside the statement of work;
2. Constitutes a change as defined in the changes clause;
3. Constitutes a basis for any increase or decrease in the total estimated contract cost, the fixed fee (if any), or the time required for contract performance;
4. Changes any of the expressed terms, conditions, or specifications of the contract; or
5. Interferes with the contractor's rights to perform the terms and conditions of the contract.
c) All technical direction shall be issued in writing by the COR.
d) The Contractor shall proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within the COR's authority. If, in the Contractor's opinion, any instruction or direction by the COR falls within any of the categories defined in paragraph (b) of this clause, the Contractor shall not proceed but shall notify the Contracting Officer in writing within 5 working days after receiving it and shall request the Contracting Officer to take action as described in this clause. Upon receiving this notification, the Contracting Officer will either issue an appropriate contract modification within a reasonable time or advise the Contractor in writing within 30 days that the instruction or direction is -
1. Rescinded in its entirety; or
2. Within the requirements of the contract and does not constitute a change under the changes clause of the contract, and that the Contractor should proceed promptly with its performance.
e) A failure of the Contractor and Contracting Officer to agree that the instruction or direction is both within the requirements of the contract and does not constitute a change under the changes clause, or a failure to agree upon the contract action to be taken with respect to the instruction or direction, shall be subject to the Disputes clause of this contract.
f) Any action(s) taken by the Contractor in response to any direction given by any person other than the Contracting Officer or the COR shall be at the Contractor's risk.
6.14 LARC 52.245-98 NASA END USER SERVICES OFFICE (EUSO) SERVICES AND ASSETS (JUN 2022)
The Government will provide the Contractor with NASA EUSO services and assets, (which may include laptops, cell phones, tablets, and monitors). The specific listing of EUSO services/assets provided under this contract will be made available after contract award. The Contractor shall be responsible for any compromise, loss, theft, or damage of EUSO assets, and shall report such incidents to the NASA Security Operations Center (SOC), email, soc@nasa.gov, or phone 877-627-2732, no later than 24 hours after the incident. The Contractor shall comply with all required security patches, updates, and machine rebooting requirements as disseminated by NASA, and shall notify the Contracting Officer’s Representative (COR) and Contracting Officer if an asset will not be or has not been connected to the network for 60 days or longer.
(End of clause)
6.15 NFS 1852.204-76 SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION
TECHNOLOGY RESOURCES (APR 2021) (DEVIATION)
(a) The contractor shall protect the confidentiality, integrity, and availability of NASA Electronic Information and IT resources and protect NASA Electronic Information from unauthorized disclosure.
(b) This clause is applicable to all NASA contractors and sub-contractors that process, manage, access, or store unclassified electronic information, to include Sensitive But Unclassified (SBU) information or Controlled Unclassified Information (CUI), for NASA in support of NASA's missions, programs, projects and/or institutional requirements. Applicable requirements, regulations, policies, and guidelines are identified in the Applicable Documents List (ADL) provided as an attachment to the contract. The documents listed in the ADL can be found at: http://www.nasa.gov/offices/ocio/itsecurity/index.html For policy information considered sensitive, the documents will be identified as such in the ADL and made available through the Contracting Officer.
(c) Definitions.
(1) IT resources means any hardware or software or interconnected system or subsystem of equipment, that is used to process, manage, access, or store electronic information.
(2) NASA Electronic Information is any data (as defined in the Rights in Data clause of this contract) or information (including information incidental to contract administration, such as financial, administrative, cost or pricing, or management information) that is processed, managed, accessed or stored on an IT system(s) in the performance of a NASA contract.
(3) IT Security Management Plan. This plan shall describe the processes and procedures that will be followed to ensure appropriate security of IT resources that are developed, processed, or used under this contract. Unlike the IT security plan, which addresses the IT system, the IT Security Management Plan addresses how the contractor will manage personnel and processes associated with IT Security on the instant contract.
(4) IT Security Plan. This is a FISMA requirement; see the ADL for applicable requirements. The IT Security Plan is specific to the IT System and not the contract. Within 30 days after award, the contractor shall develop and deliver an IT Security Management Plan to the Contracting Officer; the approval authority will be included in the ADL.
All contractor personnel requiring physical or logical access to NASA IT resources must complete NASA's annual IT Security Awareness training. Refer to the IT Training policy located in the IT Security Web site at https://itsecurity.nasa.gov/policies/index.html.
(d) The contractor shall afford Government access to the Contractor's and subcontractors' facilities, installations, operations, documentation, databases, and personnel used in performance of the contract. Access shall be provided to the extent required to carry out a program of IT inspection (to include vulnerability testing), investigation and audit to safeguard against threats and hazards to the integrity, availability, and confidentiality of NASA Electronic Information or to the function of IT systems operated on behalf of NASA, and to preserve evidence of computer crime.
(e) At the completion of the contract, the contractor shall return all NASA information and IT resources provided to the contractor during the performance of the contract in accordance with retention documentation available in the ADL. The contractor shall provide a listing of all NASA Electronic information and IT resources generated in performance of the contract. At that time, the contractor shall request disposition instructions from the Contracting Officer. The Contracting Officer will provide disposition instructions within 30 calendar days of the contractor's request. Parts of the clause and referenced ADL may be waived by the contracting officer, if the contractor's ongoing IT security program meets or exceeds the requirements of NASA Procedural Requirements (NPR) 2810.1 in effect at time of award. The current version of NPR 2810.1 is referenced in the ADL. The contractor shall submit a written waiver request to the Contracting Officer within 30 days of award. The waiver request will be reviewed by the Center IT Security Manager. If approved, the Contractor Officer will notify the contractor, by contract modification, which parts of the clause or provisions of the ADL are waived.
(f) The contractor shall insert this clause, including this paragraph in all subcontracts that process, manage, access or store NASA Electronic Information in support of the mission of the Agency.
(End of clause)
6.16 NFS 1852.216-80 TASK ORDERING PROCEDURE (OCT 1996)
(a) Only the Contracting Officer may issue task orders to the Contractor, providing specific authorization or direction to perform work within the scope of the contract and as specified in the schedule. The Contractor may incur costs under this contract in performance of task orders and task order modifications issued in accordance with this clause. No other costs are authorized unless otherwise specified in the contract or expressly authorized by the Contracting Officer.
(b) Prior to issuing a task order, the Contracting Officer shall provide the Contractor with the following date:
(1) A functional description of the work identifying the objectives or results desired from the contemplated task order.
(2) Proposed performance standards to be used as criteria for determining whether the work requirements have been met.
(3) A request for a task plan from the Contractor to include the technical approach, period of performance, appropriate cost information, and any other information required to determine the reasonableness of the Contractor's proposal.
(c) Within 7 calendar days after receipt of the Contracting Officer's request, the Contractor shall submit a task plan conforming to the request.
(d) After review and any necessary discussions, the Contracting Officer may issue a task order to the Contractor containing, as a minimum, the following:
(1) Date of the order.
(2) Contract number and order number.
(3) Functional description of the work identifying the objectives or results desired from the task order, including special instructions or other information necessary for performance of the task.
(4) Performance standards, and where appropriate, quality assurance standards.
(5) Maximum dollar amount authorized (cost and fee or price). This includes allocation of award fee among award fee periods, if applicable.
(6) Any other resources (travel, materials, equipment, facilities, etc.) authorized.
(7) Delivery/performance schedule including start and end dates.
(8) If contract funding is by individual task order, accounting and appropriation data.
(e) The Contractor shall provide ackno5wledgement of receipt to the Contracting Officer within __ calendar days after receipt of the task order.
(f) If time constraints do not permit issuance of a fully defined task order in accordance with the procedures described in paragraphs (a) through (d), a task order which includes a ceiling price may be issued.
(g) The Contracting officer may amend tasks in the same manner in which they are issued.
(h) In the event of a conflict between the requirements of the task order and the Contractor's approved task plan, the task order shall prevail.
(End of clause)
6.17 NFS 1852.219-18 NOTIFICATION OF COMPETITION LIMITED TO ELIGIBLE 8(A)
CONCERNS. (APR 2015)
(a) Offers are solicited only from small business concerns expressly certified by the Small Business Administration (SBA) for participation in the SBA's 8(a) Program and which meet the following criteria at the time of submission of offer -
(1) The Offeror is in conformance with the 8(a) support limitation set forth in its approved business plan;
and
(2) The Offeror is in conformance with the Business Activity Targets set forth in its approved business plan or any remedial action directed by the SBA.
(b) By submission of its offer, the Offeror represents that it meets all of the criteria set forth in paragraph (a) of this clause.
(c) Any award resulting from this solicitation will be made directly by the Contracting Officer to the successful 8(a) Offeror selected through the evaluation criteria set forth in this solicitation.
(d)(1) Agreement. A small business concern submitting an offer in its own name shall furnish, in performing the contract, only end items manufactured or produced by small business concerns in the United States or its outlying areas. If this procurement is processed under simplified acquisition procedures and the total amount of this contract does not exceed $25,000, a small business concern may furnish the product of any domestic firm. This paragraph does not apply to construction or service contracts.
(2) The ______[insert name of SBA's contractor] will notify the NASA Contracting Officer in writing immediately upon entering an agreement (either oral or written) to transfer all or part of its stock or other ownership interest to any other party.
(End of clause)
6.18 NFS 1852.225-70 EXPORT LICENSES. (FEB 2000)
(a) The Contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR parts 120-130, and the Export Administration Regulations (EAR), 15 CFR parts 730-799, in the performance of this contract. In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.
(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at [insert name of NASA installation], where the foreign person will have access to export-controlled technical data or software.
(c) The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.
(d) The Contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.
6.19 NFS 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT (JAN 2011)
(a) The Contractor shall identify all equipment to be delivered to the Government using NASA Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard (NASA-STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.
(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item's operation.
(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:
(1) Item Description.
(2) Unique Identification Number (License Tag).
(3) Unit Price.
(4) An explanation of the data used to make the unique identification number.
(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:
(1) Date originally placed in service.
(2) Item condition.
(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:
NASA Langley Research Center Central Receiving Building 1206 Recipient Mail Code: ___TBA______ Name/Phone Number: ___TBA______ Contract or Purchase order #______________________ 4 South Marvin Street Hampton, VA 23681-2199
(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.
(End of clause)
6.20 NFS 1852.245-71 INSTALLATION-ACCOUNTABLE GOVERNMENT PROPERTY. (JUN 2018)
(a) The Government property described in paragraph (c) of this clause may be made available to the Contractor on a no-charge basis for use in performance of this contract. This property shall be utilized only within the physical confines of the NASA installation that provided the property unless authorized by the Contracting Officer under (b)(1)(iv). Under this clause, the Government retains accountability for, and title to, the property, and the Contractor shall comply with the following:
NASA Procedural Requirements (NPR) 4100.1, NASA Materials Inventory Management Manual;
NASA Procedural Requirements (NPR) 4200.1, NASA Equipment Management Procedural Requirements;
NASA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .