LCSD - RFP - Doors and Windows.pdf
PDF 919 KB Posted
- Attached to
- Lake Country School District Doors and Windows
- Solicitation number
- LCSD-10172025-3
- Issued by
- Waukesha County, Hartford City, Wisconsin
About this file
This is a Request for Proposal (RFP) issued by the Lake Country School District for doors and windows replacement as part of district-wide infrastructure improvements funded through an April 2024 capital referendum. The project involves replacement of the main entrance (Door A) exterior glass doors and storefront with interior vestibule doors, plus 15 exterior doors (Doors B-P) with associated hardware and frames. The district seeks a single prime contractor responsible for all scope, trades, subcontractors, local approvals, and project permitting. A pre-proposal conference is scheduled for Friday, October 24, 2025, at 9:00 a.m. with site access and building tours. The deadline for written questions is 5:00 p.m. on Wednesday, November 5, 2025. Proposals are due by 3:00 p.m. on Monday, November 17, 2025, submitted digitally to Jordan Steger, Director of Buildings and Grounds. Contract award is anticipated in December 2025, with planning and procurement occurring January through May 2026 (noting District Spring Break March 30–April 3, 2026). Construction is scheduled to commence June 8, 2026, and be completed by August 2026.
Proposals must include an itemized cost breakdown with separate line items for the main entrance, exterior doors, and interior vestibule doors as an alternate bid, along with preliminary construction timelines. All costs are to be inclusive of fees, materials, labor, services, and rentals necessary to complete the work. The submitted cost proposals will serve as the basis for budget establishment and support the district in refining design scope and establishing final contract value. Bidders must complete the provided Bid Form as a proposal summary and are encouraged to provide supplemental materials. Vendors are required to acknowledge site visits and attendance at the pre-bid conference. The project scope includes demolition and disposal of existing doors and frames, replacement with thermally broken systems featuring 1-inch insulated glass at the main entrance, ballistic film on all exterior and interior glass, all required hardware, closers, thresholds, weather stripping, caulking, and sealing. Coordination with access control systems by others is expected.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prepared by Cadence Consulting on behalf of the Lake Country School District.
Request for Proposal
Doors and Windows Friday, October 17, 2025
Lake Country School District
1800 Vettelson Road, Hartland, WI 53029
Proposals are due by: Monday, November 17, 2025.
A digital proposal copy is to be submitted via email to Jordan Steger, Director of Buildings and Grounds – Lake Country School
District (stegerj@mylakecountryschool.org). Any submittals are subject to the terms and conditions contained herein and will become the property of the Lake Country School District. The district retains the right to accept, or reject, any submittal received after the above deadline, and/or, that does not comply with the requested format or content.
Scope of Proposal
The Lake Country School District seeks a construction partner to complete a capital improvement projects as part of a district-wide infrastructure improvements effort. These investments are associated with the April 2024 capital referendum. The District intends to partner with a single prime contractor who would be responsible for all associated scope, trades, and subcontractors related to the project below. The vendor would be responsible for all local approvals and project-related permitting. Project construction and possible phasing to be coordinated closely with the district in alignment with the school schedule, and campus activities.
Interested contractors to submit an itemized cost proposal for projects described below, and include preliminary timeline for construction. Proposals should be inclusive of all fees, materials, labor, services, rentals, ect. to complete the work as outlined.
The district has provided a project narrative which outlines project scope to the best of the district’s current direction. Vendor is required to submit for any additional information, or clarifications, needed; and should provide a detailed proposal outlining all assumptions. Submitted costs proposals expected to become the basis for budget establishment with the selected partner supporting the district in refining the design scope and establishing a final contract value.
Project Narrative
Project Schedule:
- Contract Award: December 2025
- Planning and Procurement: January – May 2026
Note: District Spring Break: March 30 – April 3 2026
- Commence Construction: June 8, 2026
- Construction Completion: August 2026
Project Scope:
1. Exhibit A – Scope Narrative
RFP Exhibits:
1. Exhibit B – Scope Diagram
Proposal Submittal Requirements
Requests for Clarification: All questions, or needed clarifications should be directed to Jordan Steger, Director of Buildings and
Grounds – Lake Country School District (stegerj@mylakecountryschool.org) in writing via email. Questions will be gathered with formal responses being issued to all interested parties. The deadline for submitted questions is: 5:00pm on Wednesday, November 5, 2025.
Pre-proposal Conference: Friday, October 24. Enter at Door A. The District will conduct a brief RFP overview, answer any preliminary questions, and conclude with a building / site tour as needed. This will be the only opportunity to access the site within the RFP timeframe, attendance is highly encouraged.
- 9:00am: Doors and Windows & Site Exterior
- 10:30am: Mechanical Systems
Submittal: A digital proposal copy is to be submitted via email to Jordan Steger, Director of Buildings and Grounds – Lake
Country School District (stegerj@mylakecountryschool.org) by 3:00pm on Monday, November 17, 2025. Submitting Vendors are required to complete the attached Bid Form as a summary of their final proposal; and are encouraged to supplement this with any additional materials needed to outline a complete proposal.
mailto:stegerj@mylakecountryschool.org mailto:stegerj@mylakecountryschool.org
Bid Form | Doors and Windows
Referendum Project Scope
Bids Due: Monday, November 17, 2025
To: Lake Country School District
Attention: Jordan Steger, Director of Buildings and Ground
Name of Corporation, Partnership, Sole Owner of ________________________________________________________________________
Street City Zip Phone hereby agree(s) to execute proposed contract and to furnish all labor and materials required for the construction of the project designed above for the prices set forth below, in accordance with the construction bid documents supplied.
Base Bid:
1. Main Entrance (Door A): $____________________________
2. Exterior Doors (Doors B-P): $____________________________
Total Base Bid: $____________________________
(written)_______________________________________________________________________________
Alternate Bid:
1. Interior Vestibule Doors: $____________________________
The undersigned acknowledges having visited the project site, become familiar with existing conditions and having attended the Pre-bid Conference. If awarded the contract, the undersigned agrees to commence work upon receipt of Owner’s written ‘Notice to Proceed’ or award of Contract.
Signature:
Firm Name: _______________________________
Signature: _______________________________
Title: _______________________________
Date: _______________________________
Exhibit A - Scope Narrative | Doors and Windows Friday, October 17, 2025
1800 Vettelson Road, Hartland, WI 53029
Scope Disclaimer
The scope summary provided herein is intended to serve as a foundational framework for the overall project scope. It is the vendor’s responsibility to develop and deliver solutions that are fully compliant with applicable codes and regulations, thoughtfully coordinated with all relevant building systems and components, and designed to be both cost-effective and durable over the long term. The vendor is expected to proactively seek any necessary clarifications to ensure a complete and integrated solution that aligns with project objectives and stakeholder expectations.
Scope Narrative
1. Main Entrance (Door A): Replace exterior glass doors, storefront, and interior vestibule doors creating a secure entry sequence through the vestibule. In addition, replacement of the interior office door to include a secure transaction window.
a. Demolish and dispose of existing doors, windows, and associated frames
b. Replace existing exterior storefront system in-kind, matching door quantities and sizes
c. System to be thermally broken and include 1” insulated glass
d. Include all required door hardware, closers, thresholds, etc.
e. Include all needed weather stripping, caulking, sealing, and finishing
f. All exterior, and interior, glass (in doors and windows) to include ballistic film
2. Exterior Doors (Doors B, C, D, E, F, G, H, I, J, K, L, M, N, O, P): Replace exterior doors, door hardware, and associated frames.
a. Demolish and dispose of exiting doors and associated frames
b. Replace existing exterior door and frame, matching door quantities and sizes
c. Include all required door hardware, closers, thresholds, etc.
i. See diagram for door access control locations, automation system by others – coordination expected
d. Include all needed weather stripping, caulking, sealing, and finishing
e. At conditions with an interior vestibule, exterior doors only
Alternate Bid
1. Interior Vestibule Doors (Doors B, H, I, L): Replace interior doors, door hardware and associated frames.
Note, all locations are existing interior vestibule door locations.
a. Demolish and dispose of exiting doors and associated frames
b. Replace existing exterior door and frame, matching door quantities and sizes
c. Include all required door hardware, closers, thresholds, etc.
i. See diagram for door access control locations, automation system by others – coordination expected
d. Include all needed weather stripping, caulking, sealing, and finishing caden Text Box Lake Country School District Referendum Project caden Text Box Project:
caden Text Box
OR1.0
caden Text Box Plans provided as diagrammatic tools for project narrative / description purposes only. Not for Construction. Not to Scale.
caden Line caden Line
Owner Image
Owner Line
Owner Text Box Disclaimer:
Owner Text Box No.:
Owner Text Box Exhibit B: Scope Diagram Doors and Windows
Owner Text Box Drawing:
Owner Line
Owner Text Box 10/17/2025
Owner Text Box Date:
Owner Image
Owner Image
Owner Text Box Enlarged Plan - Main Entrance
Owner Pen
Owner Rectangle
Owner Text Box P
Owner Ellipse
Owner Rectangle
Owner Ellipse
Owner Text Box O
Owner Ellipse
Owner Text Box N
Owner Rectangle
Owner Ellipse
Owner Text Box M
Owner Rectangle
Owner Ellipse
Owner Text Box L
Owner Rectangle
Owner Ellipse
Owner Text Box K
Owner Rectangle
Owner Ellipse
Owner Text Box J
Owner Rectangle
Owner Ellipse
Owner Text Box I
Owner Rectangle
Owner Ellipse
Owner Text Box H
Owner Rectangle
Owner Rectangle
Owner Rectangle
Owner Rectangle
Owner Rectangle
Owner Ellipse
Owner Text Box A
Owner Text Box B
Owner Ellipse
Owner Ellipse
Owner Text Box C
Owner Rectangle
Owner Ellipse
Owner Text Box D
Owner Rectangle
Owner Ellipse
Owner Ellipse
Owner Ellipse
Owner Text Box E
Owner Text Box F
Owner Text Box G
Owner Ellipse
Owner Text Box Door and Frame Replacement
Owner Ellipse
Owner Text Box Door and Frame Replacement - Door Access Control
Owner Text Box Legend