REQUEST FOR INFORMATION / PRE-SOLICITATION

LBNL_ALS-U_COSMIC MONOCHROMATOR_HW

2/21/2019 1 | P a g e

REQUEST FOR INFORMATION / PRE-SOLICITATION INSTRUCTIONS

Project Magnitude: est. $1.6M -2.5M Schedule: Potential for an RFP and Award estimated for FY22-FY26 Intent: Information Gathering

Please review all the detail provided to ensure you have a complete understanding of this RFI / Pre-Solicitation Notice.

This is a Request for Information / Pre-Solicitation announcement only. This is not a solicitation of proposals and no subcontract will be awarded from this Request. No reimbursement will be made for any costs associated with providing information in response to this Request or any follow-up information requests related to this RFI / Pre-Solicitation. No telephone calls will be accepted requesting a bid package or solicitation because there is no bid package or solicitation available. In order to protect the procurement integrity of any future procurement, if any, that may arise from this Request, information regarding the technical point of contact will not be given and no appointments for presentations will be made.

Responding to this RFI / Pre-Solicitation does not provide any advantage or disadvantage to potential offerors if LBNL chooses to issue a solicitation for the delivery of goods or services regarding the subject matter.

Proprietary Information: Because information received in response to this RFI / Pre- Solicitation may be used to structure future programs and may be made available to the public, respondents must NOT include any information in their responses that might be considered business sensitive, proprietary, or otherwise confidential. Responses must be submitted with the understanding that their contents may be publicly disclosed and, in the event of a public disclosure, LBNL will NOT notify respondents or provide any opportunity to revise or redact submitted information.

If your company believes it can provide Lawrence Berkeley National Lab (“Berkeley Lab” or “LBNL”) the goods or services described below, we encourage your company to:

• Complete this form electronically as comprehensively as possible ensuring that all details are typed out clearly, and return by 02/28/2020

2/21/2019 2 | P a g e

Submit this form and any attachments via email to the following address:

The main point of contact for this RFI / Pre-Solicitation is:

Howard Wilson Procurement Partner ALS-U Project Lawrence Berkeley National Laboratory hjwilson@lbl.gov

(510) 486-7987

OVERVIEW & BACKGROUND

The upgraded ALS (ALS-U) is designed to be unsurpassed by any currently envisioned technology and will enable world leading soft x-ray science for years to come. In June 2016, DOE’s Basic Energy Sciences Advisory Committee (BESAC) released the recommendations of the BES Facility Upgrade Prioritization Subcommittee, whose report deemed the ALS-U project “absolutely central” to contribute to world leading science and “ready to initiate construction”—the highest possible ratings in the prioritization process. In September 2016 DOE initiated the ALS-U project by approving its “mission need” and assigning it critical decision CD-0, the first milestone in making ALS-U a reality. In September 2018 DOE approved the critical decision CD-1 which establishes the conceptual design and the cost range of the project. In December 2019, critical decision CD-3a approval authorizes to start the construction of the accumulator ring. The project team is currently working towards completing of the preliminary design phase by the end of 2020.

The ALS-U project includes a package of new and upgraded insertion device beamlines that are intended to leverage the enormous gains in coherent brightness provided by the new source. The package consists of two new beamlines, and upgrades to two existing beamlines:

• Flexon, a soft X-ray beamline covering an energy range of 400-1800eV with two major branches

• Tender, a tender X-ray beamline covering an energy range of 1-8keV with two major branches

• Cosmic, an upgraded soft X-ray beamline with one branch

• Maestro, an upgraded soft X-ray beamline with two branches

2/21/2019 3 | P a g e

To this end, the ALS-U project includes the procurement of 5 new monochromators: two VIA- VLS monochromators for Flexon, one VIA-VLS monochromator and one DCM111 monochromator for Tender, one VIA-VLS monochromator for Cosmic. Maestro will reused its existing monochromator.

We are seeking information on:

• The willingness and capabilities of vendors to design, manufacture, test and deliver up to four VIA-VLS (Variable Included Angle – Variable Line Spacing) monochromators to meet ALS-U requirements;

• Pricing information for budgetary purposes;

• Time schedule for planning purposes;

• CAD models for the purposes of integration analysis and to facilitate discussion with vendors

SCOPE OF WORK

The vendors is expected to consider the design, manufacturing, testing, and delivery of four VIA-VLS monochromators. Complete systems consist of the in-UHV internal mechanisms, UHV vacuum chamber, the support structure, the control system and the system documentation.

The support structure shall be manually adjustable in the six degrees of freedom for alignment in the beamline (Typically, precision shall be 10µm/10µrad and range 2mm/2°)

• The systems shall meet the key system parameters shown in Table A, Table B, Table C and Table D;

• Pricing shall include motors, switches, encoders and control system, and bake out systems;

• Pricing shall not include pumps, pressure gauges, valves and their corresponding controllers and cables;

• Pricing shall not include the mirrors and gratings. Dummies shall be used by the vendors to calibrate, test and validate the key system parameters.

• Pricing shall include, as an option, interferometric encoders to measure the absolute pitch angle between the mirror and grating with a resolution of 0.01µrad.

Key system parameters:

The key system parameters derives from the Cosmic monochromator. They are expected to be representative of the other monochromators.

2/21/2019 4 | P a g e

Table A – General key system parameters

Parameter Value Unit

A.1 Monochromator type VIA-VLS A.2 Energy range 250–2500 eV

A.3 Beam size at first mirror at 250eV 5.1 mm-6σ rms A.4 Incoming power 54 W

A.5 Number of pre-mirror 1 A.6 Pre-mirror coating Gold (50nm)

A.7 Number of grating 3 A.8 Cooling Water A.9 Optical path (Mirror deflection) Upward

Table B – UHV requirements

Parameter Value Unit

B.1

Must adhere to Annex 1 "UHV Chamber and Component Production Requirements", AL-1220-7841, rev.A.: The document specifies the requirements and procedures that are to be used to produce the monochromator sub-assemblies that are operated in UHV. This document covers the requirement for design, fabrication, joining, cleaning, assembly, inspection, testing, packaging and shipping. Any substitutions or deviations from this document must be approved by LBNL.

B.2 Static pressure after bake out 5.00E-09 torr

Table C – Integration requirements and main dimensions of the system

Parameter Value Unit

C.1 Beam vertical offset (d) 10 mm

C.2 Entrance beam height 1397 mm

C.3 Max dimension - Beam direction (Z) 1200 mm

C.4 Max dimension - Horizontal (X) 1200 mm

C.5 Max dimension - Vertical (Y) N/A mm

2/21/2019 5 | P a g e

C.6 The outer dimensions of the system shall be validated after integration in the CAD beamline design

C.7 Mirror dimensions 300mm x 35mm C.8 Grating dimensions 160mm x 35mm

Table D – Functional requirements

FR1 Selection of the photon energy. The pre-mirror rotates about an off-axis point (M2) with respect to the grating to ensure that the ray intersects with the grating axis point (G1), see figure 1. Excellent pitch resolution and accuracy (from parallel mirror and grating position) are required to reach the advertised energy resolution levels. The requirements are expressed in the XYZ coordinate system, see figure 1.

Critical point Axis name Range [deg]

Resolution [μrad]

Accuracy [μrad]

Speed [deg-min]

M2 Rx (M2 pitch) 1.0-2.5 0.1 0.1 18 G1 Rx (G1 pitch) 1.3-3.1 0.1 0.1 18

FR2 Selection of one of the three gratings. The parasitic errors induced by the actuator must comply with the accuracy requirements in FR1. The requirements are expressed in the XYZ coordinate system (See figure).

Critical point Axis name Range

G1 X (G1 transverse) 3 grating positions

FR3 Assembly tolerances. The requirements are expressed in the UVW coordinate system, see figure 1. The active surfaces of the mirror and gratings must be contained within the specified 1-axis envelopes, from their nominal position (M2 and G1) with respect to the monochromator fiducial coordinate. The parasitic errors induced by the actuator (FR1 and FR2) must be included into the error budget.

Tolerances M2 G1 U [μm] 78 78 V [μm] N/A N/A W [μm] N/A N/A Ru [μrad] N/A N/A Rv [μrad] 1.6 1.6 Rw [μrad] 143 143

2/21/2019 6 | P a g e

Vibrations limits are not specified in this document despite being critical parameters to the performance of the beamline. For information, the beamline optical design aims at vibration amplitudes (RMS>10Hz) below 100nrad in pitch at the mirror and gratings.

Figure 1 – Working scheme of the VIA-VLS monochromator with the coordinate systems associated to the system (G1XYZ) and the optics (M2UmVmWm and G1UgVgWg). Z: longitudinal to the beam trajectory; Y: in the vertical direction; X: transverse to the beam trajectory.

2/21/2019 7 | P a g e

Company Information Form

SECTION 1 – COMPANY INFORMATION

Company Name Click here to enter text.

Address 1 Click here to enter text.

Address 2 Click here to enter text.

Street Click here to enter text.

City Click here to enter text.

State/Region Click here to enter text.

Zip/Postal Code Click here to enter text.

Country Click here to enter text.

Telephone Number Click here to enter text.

Email Click here to enter text.

Website Click here to enter text.

SECTION 2 – CONTACT INFORMATION

Contact Name Click here to enter text.

Title Click here to enter text.

Telephone Number Click here to enter text.

Fax Number Click here to enter text.

Email Click here to enter text.

SECTION 3 – ORGANIZATION & MANAGEMENT

IN 300 WORDS OR LESS (FOR EACH QUESTION IN THIS SECTION)

Is your company a small business under NAICS 334516 with a size standard of 1000 Employees?

Yes No

Type of Small Business Classification (Check all that apply)

Small Business 8(a) Small Disadvantaged Business Women-Owned Small Business HUB Zone Veteran-Owned Business Service Disabled Veteran-Owned

If not a small business, list small business partnership(s) or resellers.

Include the type of services provided and major projects/clients served.

Click here to enter text.

Primary NAICS Code(s) and Size Standards

Click here to enter text.

2/21/2019 8 | P a g e

How many years has your company been in business under its current name?

< 2 years 2-5 years 5-10 years >10 years

Single Limit Bonding Capacity (for construction only)

Click here to enter text.

Aggregate Limit Bonding Capacity (for construction only)

Click here to enter text.

Bond Surety (for construction only) Click here to enter text.

SECTION 4 – BUSINESS ACTIVITIES

IN 300 WORDS OR LESS (FOR EACH QUESTION IN THIS SECTION)

What are the core competencies of your company?

Click here to enter text.

Describe the management and operations capabilities your company currently provides in support of the ALS-U project

Click here to enter text.

Describe your customer service processes, capabilities, resources and how you measure your performance.

Click here to enter text.

Do you have project and performance reporting methods and tools?

Yes No

If yes, describe these methods and tools.

Click here to enter text.

SECTION 5 – TECHNICAL ABILITY

IN 300 WORDS OR LESS (FOR EACH QUESTION IN THIS SECTION)

Describe your prior experience and expertise in supplying optics and Instrumentation to soft X-ray beamlines?

Click here to enter text.

Have you previously supplied VIA- VLS monochromators with similar key system parameters? If yes, please provide details (Specifications, CAD models, test reports, etc…)

Click here to enter text.

Have you previously measured vibration amplitudes (RMS>10Hz)?

If yes, please provide details

2/21/2019 9 | P a g e

(Measurements performed on monochromators would be appreciated) Have you previously supplied VIA- VLS with interferometric encoders to measure the absolute angle between the mirror and grating? If yes, please provide details (design, resolution, etc…)

Has your company the resources to perform FEA? If yes, have you previously performed random vibration analysis given PSD inputs?

Or, thermo-mechanical analysis given power loads impinging on optical elements? If yes, please provide details.

Has your company performed previous subcontracts for this type of work, if yes, please discuss the scope and timeframe of the work?

Click here to enter text.

Any other considerations or items LBNL should be aware of?

List any attachments to the RFI including drawings, budgetary quotes, specifications documents, etc (please do not attach sales literature or white papers unless requested by LBNL):

1. Tom Swain, "UHV Chamber and Component Production Requirements", AL-1220-7841, rev.A, 22

Oct. 2019.

END RFI DOCUMENT