This is a Request for Information (RFI) issued by Fermi Forward Discovery Group LLC, the manager and operator of Fermi National Accelerator Laboratory (Fermilab), under DOE Prime Contract Number 89243024CSC000002. The RFI seeks industry input regarding alternative concepts for the Near Detector Complex (NDC) at the Long-Baseline Neutrino Facility (LBNF) Project in Batavia, Illinois.
Fermilab is evaluating replacing two drop shafts and an underground cavern in the current design with one or multiple larger shafts approximately 210 feet deep, consisting of approximately 80 feet of soil excavation and 130 feet of rock excavation. The RFI presents four specific variants: (1) a single ~83-foot diameter shaft resulting in approximately 10% overall excavation reduction; (2) the same single shaft shifted 300 feet upstream, reducing rock excavation depth by 30 feet and volume by 23%; (3) two shafts (~83-foot and ~67-foot diameters) increasing overall excavation by one-third while reducing rock excavation by one-third; and (4) the two-shaft configuration shifted 300 feet upstream with the same rock excavation reductions. For each variant, Fermilab requests input on schedule duration compared to the baseline 36-month RFP duration, cost impacts relative to the prior design, and specific cost savings magnitude (±5%). Additional questions address construction methodology, specifically the prevalence and cost differential of slurry-shaft-diaphragm versus ring-beam-and-lagging permanent retention systems in the Chicago underground construction market. Responses must be submitted in writing by March 5, 2026, to Craig G. Schmitz at schmitzc@fnal.gov. The RFI is for information-gathering purposes only and does not commit the Government to pay costs or confer advantages in future procurements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
February 18, 2026
Request for Information (RFI) LBNF/DUNE-US Near Detector Complex Large Shaft Concept
1. Purpose
Fermi Forward Discovery Group LLC (“FFDG”), the manager and operator of Fermi National Accelerator Laboratory (“FERMILAB”), under its Prime Contract Number 89243024CSC000002 with the United States Department of Energy (“DOE”), is leading the Long-Baseline Neutrino Facility (LBNF) Project to enable a world-class program in neutrino physics. The LBNF Project (https://lbnf-dune.fnal.gov/) provides the infrastructure for a new high-intensity neutrino beam generated at Fermilab to be aimed at neutrino detectors located nearly a mile underground at the Sanford Underground Research Facility (SURF) in Lead, SD.
The LBNF Near Site Conventional Facilities (NSCF) Subproject at Fermilab in Batavia, IL would like your thoughts and opinions concerning some questions on the LBNF/DUNE-US Project. The purpose of this Request for Information (RFI) is to obtain industry input regarding an alternative concept for the Near Detector Complex (NDC).
2. Background
Fermilab is evaluating the feasibility of an alternative concept for the NDC that includes replacement of two drop shafts and underground cavern included in Fermilab’s prior design of the Complex with a single or multiple larger approximately 210ft deep shafts, each requiring approximately 80ft of soil excavation depth and approximately 130ft of rock excavation depth. Under this alternative concept, instead of excavating an underground cavern, only the portion of rock needed to accommodate the roughly rectangular footprint of the detector string would be excavated within the footprint(s) of the larger shaft(s).
Craig G. Schmitz LBNF NSCF Procurement Manager
LBNF/DUNE-US /
Procurement P.O. Box 500, MS 123 Kirk Road and Pine Street Batavia, Illinois 60510-5011
USA
Mobile: 630.992.0933 schmitzc@fnal.gov mailto:schmitzc@fnal.gov
In one variant of this concept, a single shaft having a diameter of roughly 83ft would require about three times the soil excavation but only about one-half the rock excavation relative to Fermilab’s prior design.
The overall quantity of soil and rock excavation would be reduced by a small margin (a bit more than 10%).
In a second variant of this concept, two shafts would be required, one with a diameter of approximately 83ft and a second with a diameter of approximately 67ft. In this case, the volume of soil excavation would increase over five times, the volume of rock excavation would decrease by about one-third (relative to the current design), and the overall quantity of soil and rock excavation is about one-third greater.
Additionally, either of these two variants could potentially be shifted to the east up to 300ft. Since the beamline is on a 10% slope, a shift of 300ft would result in shaft and rock depth excavation of 30ft.
Because the alternative concept eliminates the underground cavern, off-axis measurements will have to be made by shifting the detectors vertically, rather than horizontally, requiring a vertical transport system for the detectors. This aspect of the concept is outside the scope of this RFI.
Fermilab is seeking to understand, in general terms, if any overall decreases in large shaft construction cost and/or savings from schedule efficiency under the alternative concepts would offset the increases in soil and/or total soil and rock excavation. Is the large shaft concept a significantly more economical approach relative to the current design? Fermilab is not soliciting proposals or seeking specific pricing data for its alterative design, but is rather seeking to understand whether, in the contractor’s judgment, either version of the proposed alternative concepts is likely to have a material effect on the overall project cost.
3. Respondents are encouraged to provide input on the following:
3.1 Single ~83 ft. dia. Shaft:
a. Would this new concept result in a longer or shorter duration than the 36-month duration represented in the previously issued RFP (see enclosed drawings)? If so, by how much?
b. Would this new concept result in a higher or lower proposal cost relative to the previously issued RFP (see enclosed drawings)?
c. If a cost reduction is applicable based on the new concept, what cost magnitude +/- 5% would the savings represent?
3.2 Single ~83 ft. dia. Shaft Shifted 300 ft. Upstream:
If the shaft is shifted upstream 300 ft., the depth of rock excavation would be reduced by 30 ft. and the volume of rock excavation for this shaft reduced by approximately 23%.
a. Would this new concept result in a longer or shorter duration than the 36-month duration represented in the previously issued RFP (see enclosed drawings)? If so, by how much?
b. Would this new concept result in a higher or lower proposal cost relative to the previously issued RFP (see enclosed drawings)?
c. If a cost reduction is applicable based on the new concept, what cost magnitude +/- 5% would the savings represent?
3.3 ~83 ft. dia. Shaft & ~67 ft. dia. Shaft:
a. Would this new concept result in a longer or shorter duration than the 36-month duration represented in the previously issued RFP (see enclosed drawings)? If so, by how much?
b. Would this new concept result in a higher or lower proposal cost relative to the previously issued RFP (see enclosed drawings)?
c. If a cost reduction is applicable based on the new concept, what cost magnitude +/- 5% would the savings represent?
3.4 ~83 ft. dia. Shaft & ~67 ft. dia. Shaft Shifted 300 ft. Upstream:
If the shafts are shifted upstream 300 ft., the depth of rock excavation would be reduced by 30 ft.
and the volume of rock excavation reduced by approximately 23%.
a. Would this new concept result in a longer or shorter duration than the 36-month duration represented in the previously issued RFP (see enclosed drawings)? If so, by how much?
b. Would this new concept result in a higher or lower proposal cost relative to the previously issued RFP (see enclosed drawings)?
c. If a cost reduction is applicable based on the new concept, what cost magnitude +/- 5% would the savings represent?
3.5 Construction Methodology:
The A/E-of-Record is proposing using slurry-shaft-diaphragm construction as a potentially economical alternative to ring beams-and-lagging and permanent liner for larger diameter shaft construction.
a. In the Chicago Underground Construction Market, are slurry shaft diaphragms commonly installed?
b. In the Chicago Underground Construction Market, are ring beams and lagging commonly installed?
c. In the Chicago Underground Construction Market, which permanent retention system (slurry versus ring beam) is more economically installed associated with the large shaft concept? If there is a cost differential, what is the difference +/- 5%?
4. Response Instructions
• Responses should be submitted in writing.
• Clearly identify your company name and point of contact.
• Submission deadline: March 5, 2026
• Submit responses electronically to: schmitzc@fnal.gov
5. Disclaimer
This RFI is issued for information-gathering purposes only. Participation is voluntary and does not confer any advantage or disadvantage in any future procurement. This RFI does not commit the United States Government to pay any costs incurred in the preparation or submission of any response to procure any supplies or services.
Respectfully, Craig G. Schmitz
LBNF/DUNE-US Near Site Procurement Manager
Enclosures:
1. Drawing G-ND-009, Rev. 4 dated May 20, 2024
2. Drawing S-ND-205, Rev. 4 dated May 20, 2024
3. Drawing S-ND-206, Rev. 4 dated May 20, 2024
4. Drawing SW-ND-300, Rev. 4 dated May 20, 2024 mailto:schmitzc@fnal.gov
EASEMENT
RIGHT OF WAY
K
IR
K R
O A
D
BEAMLINE
75' - 4" 50' - 0"
KIRK RD.
NEAR DETECTOR
(UNDERGROUND)
(LBNF 40)
NEAR DETECTOR
SERVICE BUILDING
ABSORBER HALL
(UNDERGROUND)
(LBNF 30)
ABSORBER
SERVICE BUILDING
DECAY REGION
(UNDERGROUND
(LBNF 20)
TARGET COMPLEX
PRIMARY BEAM
ENCLOSURE
(UNDERGROUND)
(LBNF 5)
PRIMARY BEAM
SERVICE BUILDING
MAIN
INJECTOR
EXTRACTION
ENCLOSURE
(UNDERGROUND)
MI-14
MI-10
POND G & H
INDIAN CREEK RD.
IN
D
IA
N
C R
E E K
R D
P O
N D
E
BEAMLINE
GIE
SE R
D.
EASEMENT
RIGHT OF WAY
303 East Wacker Drive Suite 1400 Chicago, IL 60601
312-373-7700 tel 312-373-6800 fax www.aecom.com
DRAWING NO.
SCALE:
REV.
REVISIONS
DESIGNED
DRAWN
CHECKED
Fermilab Long-Baseline Neutrino Facility
ISSUED FOR SOLICITATION
/2
/2
:4
:2
P
M B
IM
/6
-F e rm ila b L
B N
F N
S C
F /F
N A
L -1
-1
A v .r v t
/2 /2
G-ND-009
PROJECT NO. 6-15-12
LBNF NEAR SITE CONVENTIONAL FACILITIES
01D. PERRY
M. BINET/Z. ZHANG
G. GELDIS 05/2024
05/2024
05/2024
6-15-12_131.01.03.02.04.04.01_00_G-ND-009
OVERALL SITE PRESENTATION
G-ND-009SCALE: 1/64" = 1'-0" G-ND-009G-ND-009
ND + NDSB
OVERVIEW 11
ND + NDSB
OVERVIEW
NOT IN SCOPE
6-15-11
REV. DATE DESCRIPTIONS
04 05/20/24 ISSUED FOR SOLICITATION
SCALE: 1/4" = 1'-0"
SECTIONG
S-ND-202
(12) 7'-0" LONG ROCK
BOLTS EQ. SPC'D. @ 5'-0"
ELEVATIONS, STAGGERED
3" FIBER REINFORCED
SHOTCRETE (TYP)
20'-0" [6.10m] EXCAVATED DIAMETER
S-ND-207
SCALE: NOT TO SCALE
SECTIONF
S-ND-202
18'-0" [5.49m] INSIDE DIAMETER (CLEAR)
FLANGE BOLT
SETS OR JACK
AND WELD AS
REQUIRED GRADE 50 STEEL RIB
SETS W8x31 AT 4-FT
ELEVATIONS
K
S-ND-205
1/2" MIN STEEL TIE RODS
STAGGER EACH SET (TO
BE DESIGNED BY
CONTRACTOR)
WOOD LAGGING OR
STEEL LINER PLATE
CONCRETE COLLAR AND
FINAL SHAFT LINER BELOW
(SEE DETAIL 3 S-ND-207)
20'-6" [6.25m] MIN. INSIDE RING DIAMETER
℄ SECONDARY
EGRESS SHAFT
SCALE: 1/4" = 1'-0"
SECTIONK
S-ND-205
WOOD SHIM AS
REQUIRED (TYP)
TIE ROD
(STAGGERED)
TIE ROD
GRADE 50 STEEL RIB
SETS W8x31
4' -0
1.
m
(T
YP
4-FLANGE BOLTED
LINER PLATE
2' -0
0.
m
(T
YP
S-ND-207
20'-6" [6.25m] MIN. INSIDE RING DIAMETER
℄ SECONDARY
EGRESS SHAFT
TIE ROD
(STAGGERED)
TIE ROD
GRADE 50 STEEL RIB
SETS W8x31
4' -0
1.
m
(T
YP
S-ND-207
3" MIN WOOD
LAGGING (TYP)
LINER PLATE ALTERNATE
TIMBER LAGGING ALTERNATE
TO BE DESIGNED BY CONTRACTOR
TO BE DESIGNED BY CONTRACTOR
SECONDARY
EGRESS SHAFT
SCALE: 1/8" = 1'-0"
SECTIONN
S-ND-202
21'-0" [6.40m]
SEE SECTION G
15' LONG ROCK BOLTS
@ 6'x6' SPACING
NOTE:
ADJUST ROCK BOLT LOCATIONS
LOCALLY TO AVOID INTERFERENCE.
SCALE: 1/4" = 1'-0"
TYPICAL SPILING LAYOUT AT INTERSECTIONS1
S-ND-202
2' -0
0.
m
20°0'0"
STEEL SPILE
PRE-REINFORCEMENT
(SEE SPECIFICATIONS)
ADJUST POSITION (±1 FOOT
VERTICALLY AND/OR
HORIZONTALLY) OF SPILES
TO AVOID INTERFERING
WITH ROCK BOLTS
60°
3' -0
0.
m
1'-31 2" [0.39m] VARIES
3" FIBER-REINF
SHOTCRETE
SCALE: 1/4" = 1'-0"
DETAIL - ROCK SHEAR KEY1
S-ND-202
TEMPORARY SEAL
LOCAL EXCAVATION
AFTER STABILIZATION
OF SHAFT WALL
SEE STRUCTURAL
DRAWINGS FOR
DIMENSIONS OF FINAL
SHAFT LINER
FEETSCALE
1/4"=1'-0"
SCALE:
REV.
REVISIONS
DESIGNED
DRAWN
CHECKED
7/ 3/
:5
1:
P M
REV. DATE DESCRIPTIONS
L:
\D
C S\
Pr oj ec ts
\B D
L\
_F er m iL
BN
F\
0- C
AD
-G
IS
\9
C
AD
\2
0_ St ru ct ur al
\S -N
D -2
N
EA
R
D
ET
EC
TO
R E
G R
ES
S
SH
AF
T
SE
C
TI
O N
S.
dw g
ISSUED FOR SOLICITATION
303 East Wacker Drive Suite 1400 Chicago, IL 60601
312-373-7700 tel 312-373-6800 fax www.aecom.com
DRAWING NO.
Fermilab Long-Baseline Neutrino Facility
KEY PLAN
KIRK RD
6-15-12_131.01.03.02.04.04.03.01_07_
I. HALIM
J. BUCHER
D. CREGGER
10/2023
10/2023
10/2023
LBNF NEAR SITE CONVENTIONAL FACILITIES
NEAR DETECTOR
SECONDARY EGRESS SHAFT SECTIONS
6-15-12
S-ND-205 01
/1
/2
S-ND-205
PROJECT NO.
PLAN
NORTH
S
W ESITE
N
FEETSCALE
1/8"=1'-0"
01 10/13/23 ISSUED FOR SOLICITATION4 05/20/2024
05/2024
05/2024
05/2024 0 /2
/2
SCALE: 1/4" = 1'-0"
SECTIONI
S-ND-202
(26) 14'-0" LONG ROCK BOLTS
EQ. SPC'D. @ 5'-0" ELEVATIONS,
STAGGERED
41'-0" [12.50m] EXCAVATED DIAMETER
3" FIBER REINFORCED
SHOTCRETE (TYP)
S-ND-207
SCALE: 1/4" = 1'-0"
SECTIONH
S-ND-203
FLANGE BOLT SETS OR
JACK AND WELD AS
REQUIRED
GRADE 50 STEEL RIB
SETS W14x109 @ 4'
ELEVATIONS
STEEL TIE RODS
STAGGER EACH SET
(TO BE DESIGNED BY
CONTRACTOR)
38'-0" [11.58m] INSIDE DIAMETER (CLEAR)
J
S-ND-206
WOOD LAGGING OR
STEEL LINER PLATES
CONCRETE COLLAR AND
FINAL SHAFT LINER BELOW
(SEE DETAIL 3 S-ND-207)
SCALE: 1/8" = 1'-0"
SECTIONJ
S-ND-206
41'-6" [12.65m] MIN. INSIDE RING DIAMETER
℄ PRIMARY SHAFT
WOOD SHIM
AS REQ'D.
TIE ROD
(STAGGERED) TIE ROD
4' -0
1.
m
(T
YP
GRADE 50 STEEL RIB
SETS W14x109 (TYP.)
CORRUGATED
LINER PLATE
S-ND-207
℄ PRIMARY SHAFT
TIE ROD
(STAGGERED)
TIE ROD
4' -0
1.
m
(T
YP
GRADE 50 STEEL RIB
SETS W14x109 (TYP.)
S-ND-207
3" MIN THICK WOOD
LAGGING (TO BE
DESIGNED BY
CONTRACTOR)
LINER PLATE ALTERNATIVETIMBER LAGGING ALTERNATIVE
41'-6" [12.65m] MIN. INSIDE RING DIAMETER
TO BE DESIGNED BY CONTRACTOR TO BE DESIGNED BY CONTRACTOR
FEETSCALE
12 2004 1/8"=1'-0"
6-15-12_131.01.03.02.04.04.03.01_07_
I. HALIM
J. D. McCoy
D. CREGGER
10/2023
10/2023
10/2023
LBNF NEAR SITE CONVENTIONAL FACILITIES
NEAR DETECTOR
PRIMARY SHAFT SECTIONS
S-ND-206 01
/1
/2
S-ND-206
PROJECT NO.SCALE:
REV.
REVISIONS
DESIGNED
DRAWN
CHECKED
7/ 3/
:5
1:
P M
REV. DATE DESCRIPTIONS
L:
\D
C S\
Pr oj ec ts
\B D
L\
_F er m iL
BN
F\
0- C
AD
-G
IS
\9
C
AD
\2
0_ St ru ct ur al
\S -N
D -2
N
EA
R
D
ET
EC
TO
R S
ER
VI
C E
SH
AF
T
SE
C
TI
O N
S.
dw g
ISSUED FOR SOLICITATION
303 East Wacker Drive Suite 1400 Chicago, IL 60601
312-373-7700 tel 312-373-6800 fax www.aecom.com
DRAWING NO.
Fermilab Long-Baseline Neutrino Facility
KEY PLAN
KIRK RD
PLAN
NORTH
S
W ESITE
N
FEETSCALE
6 1002 1/4"=1'-0"
01 10/13/23 ISSUED FOR SOLICITATION4 05/20/2024
05/2024
05/2024
05/2024 0 /2
/2
761.2
759.4
758.3
758.8
759.8
763.2
753.3
755.7
755.7 757.5
761.6
760.2
765.9
765.4
K
IR
K R
D
C H
E R
R Y
D R
PEDPED
752.7
752.6
749.4
749.1
750.7
749.5
749.6
749.2 749.1
748.6
748.9
748.5
748.6
746.3
746.5
747.5
745.5
746.5
745.4 747.5
747.5
743.8
742.6745.5
746.6
747.7
747.4
747.5
749.9
753.2
6.
757.3 757.8
758.2 758.8
752.7
754.5
753.1
754.5
755.5
759.3 757.9
760.5
758.4
756.7
757.7
GIESE RD.
743.1743.6
742.2
741.1 741.6
742.8
741.7
742.7742.2
742.9
743.5
749.3
753.4
752.4
752.4
752.2
752.6
751.7
750.4
750.6 751.7
753.4
749.8
751.5
751.3
751.7
753.2
752.6
752.3
752.4
753.5 753.1
754.8
755.7
752.1
752.4
755.7
754.4
740.3
739.2
740.6
739.6
741.7
740.4
741.5
743.6
742.9
740.3
738.4
737.6
738.7
740.3
736.8
737.4
737.4
741.1
740.6
740.4
736.8
736.4
738.4
740.7
740.3
739.7
749.4
740.4
739.9
746.7
6.
742.8
744.1
743.3
741.3
740.6
740.9
740.8
738.7
747.2
746.4
746.5
752.6
737.9
741.2
T
W
W
W
V
V
V
WV
WV
WV
WV
WV
WV
WV
WV
WV
739.3
740.2
S U
M P
DW
S
D W
S
D W
S
DWS
DWS
DWS
DWS
DWS
DWS
UG
P
/C
ICW
C P
W S
DWS
DW
S
ST
ST
GAS
S U
M P
UG P/C
A
5 750
O H
O H
O H
O H
O H
O H
O H
O H
O H
O H
O H
O H
OH
OH
OH
OH
INDIAN CREEK
CULVERT
EXIST
MI-14
EXIST
MI-10
CPTP
U G
P C
P W
R
CPWR
ICW
IC
W
ICW
S U
M P
S U
M P
CPTP
CPWS
C
PW
S
CPW
S
CPW
S
CPWS
CPWS
C
PW
S
C P
W S
CPWS
CPWS
CPW
S
CPW
S
C
PW
S
ICW
IC
W
IC
W
IC
W
UG P
IC
W
IC
W
IC
W
EXIST POND G
BOOSTER
NEUTRINO
BEAM
74574
UG P
UG P
T Comms
T Comms
T C om m s
T Comms T Comms
T C omms
T C om m s
O H
O H
O H
O H
O H
O H
O H
P/L
P/L
P/L
P /L
P /L
P /L
P /L
P /L
P /L
P /L
P \E
P \E
P \E
P \E
P \E
P \E
P \E
CPWR
C P
W R
CPWR
CPWR
CPW
R
IC
W
IC
W
IC
W
IC
W
CPWS
CPW
S
0+
1+
2+
0+
1+
2+
735740
720725730735740 715
720725730735740
100+00101+00102+00103+00104+00105+00106+00107+00108+00109+00110+00111+00112+00113+00114+00115+00116+00117+00118+00119+00120+00121+00122+00123+00124+00125+00126+00127+00128+00129+00130+00131+00
31+00
30+00
29+00
28+00 27+00
26+00 25+00
24+00 23+00
22+00 21+00
20+00
19+00 18+00
17+00 16+00
15+00
14+00 13+00
12+00
11+00 10+00
9+00 8+00 7+00
6+00
5+00
3+00 4+00
2+00 1+00 0+00
ASB WBS DK WBS
T/ROCK EL. VARIES
675 NEAR NDH TO
680 NEAR AH
NDSB WBS
NDH WBS
T/C EL. 759.00'
PRIMARY BEAM
ENCLOSURE (PBE)
PBE WBS
(BY OTHERS)
FEETSCALE
10050050 1" = 50'-0"
SCALE:
REV.
REVISIONS
DESIGNED
DRAWN
CHECKED
/2
/2
:0
:0
P M
REV. DATE DESCRIPTIONS
Z
C h ic a g o
-U S
C H
G
\L e g a cy \u sc h g fs
\P ro d \P ro je ct s\
F e rm i T a sk
.0 F in a l D e si g n \9
C
A D
G
IS
\9
C
A D
\2
-S H
E E
T S
\C \S
W -3
-6 -1
-1
.d w g
303 East Wacker Drive Suite 1400 Chicago, IL 60601
312-373-7700 tel 312-373-6800 fax www.aecom.com
DRAWING NO.
Fermilab Long-Baseline Neutrino Facility
ISSUED FOR SOLICITATION
04 05/20/2024 ISSUED FOR SOLICITATION
PLAN VIEW & PROFILE HORIZONTAL SCALE (22x34)
PROFILE VERTICAL SCALE (22x34)
FEETSCALE
2001000100 1" = 100'-0"
SITE
N
TRUE
NORTH
S
W E
EXIS
T M
AIN
IN
JE
CTOR R
IN
G
NEAR DETECTOR HALL
(UNDERGROUND)
(NDH)
NDH WBS
K
IR
K R
D
TO FAR
DETECTOR
BEAMLINE
ABSORBER HALL
(UNDERGROUND)
(AH)
AH WBS
(BY OTHERS)
(LBNF 30)
ABSORBER SERVICE
BUILDING (ASB)
ASB WBS
(BY OTHERS)
DECAY REGION
(DK)
DK WBS
(BY OTHERS)
(LBNF 20)
TARGET COMPLEX
(TC)
(LBNF 5)
PRIMARY BEAM SERVICE
BUILDING (PBSB)
PBSB WBS
(BY OTHERS)
INDIAN CREEK
EXTRACTION ENCLOSURE
(EE)
EE WBS
(BY OTHERS)
EXIST MAIN
INJECTOR
PRIMARY BEAM
ENCLOSURE (PBE)
PBE WBS
(LBNF 40)
NEAR DETECTOR SERVICE BUILDING
(NDSB)
NDSB WBS
NEAR DETECTOR
HALL (NDH)
NDH WBS
ABSORBER HALL (AH)
AH WBS
(BY OTHERS)
(LBNF 30)
ABSORBER SERVICE
BUILDING (ASB)
ASB WBS
(BY OTHERS)
MUON SHEILDING
(BY OTHERS)
SCALE: 1" = 100'
PLAN
SCALE: 1" = 100'
PROFILE
BEAMLINE
DECAY REGION (DK)
DK WBS
(BY OTHERS)
(LBNF 20)
TARGET COMPLEX
(TC)
TC WBS
(BY OTHERS)
(LBNF 5)
PRIMARY BEAM
SERVICE BUILDING
(PBSB)
PBSB WBS
(BY OTHERS)
EXTRACTION
ENCLOSURE (EE)
EE WBS
(BY OTHERS)
EXTRACTION
ENCLOSURE
EGRESS
(BY OTHERS)
SEE SHEET SW-101 FOR
STATIONING NOTES
(LBNF 40)
NEAR DETECTOR
SERVICE BUILDING (NDSB)
NDSB WBS
PRO-ECT NO.
SW-ND-300
LBNF NEAR SITE CONVENTIONAL FACILITIES
NEAR DETECTOR SITE DESIGN
EXCAVATION PLAN AND PROFILE
H. CHU
D. EGGERDING
F. LOUIS
05/2024
05/2024
05/2024
/2
/2
-1
-1
SW-ND-3006-15-12_131.01.03.02.04.04.02.01_05_
N E
A R
D E
T E
C T
O R
P R
O
JE
C T
B Y
O T
H E
R S
N E
A R
D E
T E
C T
O R
P R
O
JE
C T
B Y
O T
H E
R S
EXISTING INDIAN
CREEK CULVERT
EXISTING INDIAN
CREEK CULVERT
SEE SW-136 FOR
TEMPORARY
CULVERT PIPING
REV. 0104
| 2026-02-18T16:01:36-0600 | |
| Craig G. Schmitz |
File details come from the government source that posted it. Updated .