LATEST CEP- PROPOSED NEW OXYGEN LINE-2020 drawings.pdf
PDF 393 KB Posted
- Solicitation number
- 36C25621Q0639
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25621Q0639 0003.docx | DOCX document | |
| Copy of ICRA ILSM.xlsx | XLSX spreadsheet | |
| 36C25621Q0639 0002.docx | DOCX document | |
| 36C25621Q0639 0001.docx | DOCX document | |
| Wage Determination 15-5189.txt | TXT text file | |
| 36C25621Q0639.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Y2
Y4
YB
YC
YD
YF
XA
AL RECYCLE HOLD
1N115
LINEN CHUTE
COLLECTION
1N113
VEST
1N-C02A
STORAGE MED GAS-1
1N104-1
UTILITY ACCESS
1N102
CORR
1N-C02
WASH AREA
1N109A
CART WASH
1N109
ELEC
1N100
SHAFT-2
SHN103-2
CORR
1N141
FIRE PUMP SHAFT
SHN-1
FLAM STORAGE
1N106
UP
existing 4" oxygen line existing 4" oxygen line
EXISTING HANGERS
existing 4" oxygen line underslab
4" O-DN
O
FUEL OIL TRANSFER
PUMP ROOM
1N152
TANK FARM
REFER TO
DWG BELOW
existing 4" oxygen line
EXISTING HANGERS
NEW PIPE 4" dia.
DOWN
NEW 90
NEW 90
DOWN
NEW 90
NEW 90
L
C
NEW CONTROL AND
CHECK VALVES
NEW "T"
NEW CABINET
NEW 4"METAL STUDS
" GYP.BD.
VERIFY
FIELD
NEW PROTECTION
BOLLARDS (TYP.)
LEVEL 2
FINISH FLOOR LINE
existing
4" dia.
oxygen line
NEW 4" T
NEW CONTROL VALVE AND CKECK VALVE
New 4" dia oxygen line col.
wall beyond wall
NEW 90
NEW 90
NEW 90
NEW 90
PORTION OF PIPE REMOVED
NEW PIPE SADDLE
E Q
E
Q
E Q
CLAMPING
BRACKETS
NEW 90
NEW ENCLOSURE STUD WALL
NEW CABINET
L
C
NEW PROTECTION BOLLARDS (TYP.)
WITH LOCK
PIPE LEGEND
= EXISTING PIPE
= NEW PIPE
Q
D2 D1
E2 E1
F2 F1
G2 G1
A2
A4
A5
A1
A6
B1
C1 C2
B2
H
J1 J2
L
K
M1 M2
M3
P
N1 N2
A7
D3
E3
F3
R1
R4
R2
R3
A3
PLAN
NORTH
DATE
LOCATION
CHECKED DRAWN
PROJECT TITLE PROJECT NUMBER
DOCUMENT SET PACKAGE
DRAWING NUMBERAPPROVED: PROJECT DIRECTOR
DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:
REVISIONS: DATE
VA FORM 08-6231
O N
E
EI
G H
T
IN
C H
O
N E
FO
O
T O
N E
Q U
AR
TE
R
IN
C H
O
N E
FO
O
T O
N E
H
AL
F
IN
C H
O
N E
FO
O
T
TH
R
EE
Q U
AR
TE
R S
IN
C
H
O N
E
FO
O T
TH
R
EE
IN
C H
ES
O N
E
FO
O T
O N
E
IN
C H
F
O R
TY
F
EE
T
(1
0'
6"
6"
0'
0'
123456
O N
E
SI
XT
EE
N
TH
IN
C
H
O N
E
FO
O T
O N
E
AN
D O
N E
H
AL
F
IN
C H
ES
O N
E
FO
O T
6"
BUILDING NUMBER
NEW ORLEANS, LOUISIANA
7PL101-N1
BLDG 7 FIRST FLOOR PLUMBING PLAN - AREA
N1
GF EBDEC. 5,2019
7SLVHCS REPLACEMENT MEDICAL
CENTER PROJECT
Department of Veterans Affairs
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
CONSTRUCTION DOCUMENTS 1
SCALE: 1/8" = 1'-0"
CEP- PARTIAL EXISTING PIPING LAYOUT
SCALE: 1/2" = 1'-0"
CEP- PROPOSED PIPING LAYOUT
SCALE: 1/4" = 1'-0"
CEP- PROPOSED OXYGEN LINE ELEVATION1
NOT TO SCALE
PROPOSED NEW OXYGEN CONNECTION
SIMILAR TO PICTURE
| Sheets and Views |
| 7PL101-N1-XTRA |
File details come from the government source that posted it. Updated .