This is a project plan and specification document prepared by the City of Covington, Georgia for the LAS Culvert Replacement Phase 2 project (BID NO. 2026-15). The project encompasses the removal of existing corrugated metal pipe (CMP) culverts and installation of two new 36-inch Class III reinforced concrete pipe (RCP) culverts with associated headwalls at the Las Service Road location (11085 Flat Shoals Road, Covington, GA 30016). The work includes excavation, construction of 36-inch RCP headwalls with energy dissipation blocks, installation of a gravel access drive, and all required grading, erosion and sedimentation control measures. The project is located in Land Lot 207 of the 9th Land District of Newton County and includes portions within a FEMA floodplain (Map Panel 13217CO136D, effective 3/17/2014). Sealed bids are due by 10:00 a.m. on Tuesday, August 25, 2026, at Covington City Hall, with public opening at 10:30 a.m. The project engineer is Michael Todd Parker (Georgia PE #036155), and the City's 24-hour contact is Darrin Smith at (678) 878-5687.
The scope of work requires removal of 28 linear feet and 35 linear feet of 18-inch CMP, 43 linear feet of I-beam, and 27 square yards of gravel access drive. Installation includes 24 feet of 36-inch Class III RCP at 0.50% slope for each of two culvert runs, with invert elevations specified in the plans. The contractor must provide all labor, materials, equipment, permitting, erosion and sedimentation control measures, dewatering, dust control, topsoiling with a minimum of 4 inches in landscaped areas, and restoration. Environmental compliance measures include erosion control blankets (50 square yards total), silt fence (366 linear feet), and temporary or permanent vegetation stabilization. The contractor is responsible for verifying the location and depth of the existing 20-inch ductile iron pipe force main prior to construction and protecting it throughout all construction phases. All work must conform to City and State standards, with shop drawings and product certifications required prior to material ordering.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| las service rd culvert replacement phase 2_sp.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE INFORMATION
LANDLOT 207 OF THE 9 LAND DISTRICT
LATITUDE: 33.5394° LONGITUDE: -83.8668°
PROJECT ISSUE SEQUENCE
GWES PROJECT NUMBER: 060.41.3.26
LAS SERVICE ROAD CULVERT REPLACEMENT PHASE 2
FOR THE
CITY OF COVINGTON
11085 FLAT SHOALS RD, COVINGTON, GA 30016
24-HOUR CONTACT: DARRIN SMITH
TELEPHONE: (678) 878-5687
EMAIL: DMSMITH@CITYOFCOVINGTON.ORG
CITY OF COVINGTON BID NO. 2026-15
VICINITY MAP
NOT TO SCALE
HW
Y
HWY213
PROJECT
AREA
NO. DATE DESCRIPTION
COVINGTON BYPASS RD
EAGLE DR
DEARING ST
D
EAR
IN
G
ST
HW
Y
FLAT SH
O
ALS
R
D
WOODFIELD
RD
D R
IED
IN
D
IAN
C R
EEK
MABRY
RD
DRAWING NUMBER DRAWING TITLE
C-1 COVER SHEET
C-2 GENERAL NOTES
C-3 GENERAL LOCATION MAP
C-4 DEMOLITION AND REMOVAL PLAN
C-5 CULVERT REPLACEMENT PLAN AND PROFILES
C-6 SITE DETAILS 1
C-7 SITE DETAILS 2
C-8 SITE DETAILS 3
PORTIONS OF THIS PROJECT LIE WITHIN A FLOODPLAIN, PER FEMA
FLOOD MAP PANEL 13217CO136D, EFFECTIVE DATE: 3/17/2014
PROJECT
AREA
0 7-6-2026 FOR BID
E N G I N E E R
M I C H A E L T O D D P A R K E R
G E O R GIA
REGISTERED
No. PE036155
PROFESSIONAL
7/6/2026
SS
LEGEND
STORMWATER PIPING
TREE
CONTROL POINT
BENCHMARK
SANITARY SEWER W/ MANHOLE
PROPERTY LINE W/ PIN
EXISTING PROPOSED
LOD LOD
LIMITS OF CLEARING
AND
CONSTRUCTION
OHP
W
OVERHEAD POWER/POWER POLE
WATER LINE
GAS METER
GRAVEL
FIRE HYDRANT
ASPHALT PAVING
LIGHT POLE/GUY WIRE
SIGN
IPF
S
VALVE
18" HARDWOOD
TREELINE
MAIL BOX
GM
HEADWALL
FLARED END SECTION
CONTOUR 400 400
DEMOLITION
SS
TELEPHONE PEDESTAL
FIBER OPTIC MARKER
RIGHT OF WAY (R/W)
CFS - CUBIC FEET PER SECOND
CONC - CONCRETE
CMP - CORRUGATED METAL PIPE
CP - CONTROL POINT
DIP - DUCTILE IRON PIPE
EL - ELEVATION
ESPCP - EROSION, SEDIMENTATION, AND POLLUTION CONTROL PLAN
GDOT - GEORGIA DEPARTMENT OF TRANSPORTATION
HDPE - HIGH-DENSITY POLYETHYLENE
INV - INVERT
LF - LINEAR FEET
PVC - POLYVINYL CHLORIDE
OC - ON-CENTER
FPS - FEET PER SECOND
RCEP - REINFORCED CONCRETE ELLIPTICAL PIPE
RCP - REINFORCED CONCRETE PIPE
SF - SQUARE FEET
MH - MANHOLE
STD - STANDARD
SY - SQUARE YARDS
STA - STATION
TYP - TYPICAL
VF - VERTICAL FEET
ABBREVIATION LEGEND
GENERAL NOTES:
1. THE CONTRACTOR TO COORDINATE ALL CONSTRUCTION WITH THE OWNER, CITY OF COVINGTON. COVINGTON
LAS ADDRESS IS 11085 FLAT SHOALS RD, COVINGTON, GA 30016. THE 24-HOUR CONTACT, DARRIN SMITH,
(678) 878-5687.
2. ALL CONSTRUCTION SHALL CONFORM TO THE PLANS, SPECIFICATIONS, CITY AND STATE STANDARDS. IN THE
EVENT OF CONFLICTS, THE STRICTER OF THE STANDARDS SHALL APPLY.
3. ANY REFERENCE TO “CONTRACTOR” SHALL BE ASSUMED TO ALSO APPLY TO ANY AND ALL OF THE
CONTRACTOR'S VENDORS, SUPPLIERS, AND SUBCONTRACTORS.
4. THIS PROJECT IS LOCATED IN THE 9TH LAND DISTRICT AND LAND LOT 207 OF NEWTON COUNTY, GA. PORTIONS OF THIS PROPERTY LIE WITHIN A FLOODPLAIN PER FEMA MAP PANEL(S) 13217CO136D, EFFECTIVE DATE:
3/17/2014.
5. THE LOCATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS HAVE BEEN DETERMINED FROM THE BEST AVAILABLE INFORMATION AND IS GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. ENGINEER AND OWNER
DO NOT ASSUME RESPONSIBILITY OF THE ACCURACY OF THE LOCATIONS SHOWN.
6. THE TOPOGRAPHIC SURVEY WAS PREPARED BY STRANGE LAND SURVEYING, DATED 1/30/2026. STRANGE LAND SURVEYING NOR THE LICENSED PROFESSIONAL ASSUME ANY LIABILITY FOR THE EXISTENCE, LOCATION, MATERIAL OR SIZE OF ANY UNDERGROUND UTILITY SHOWN ON THIS SURVEY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE, EXACT LOCATION, MATERIAL AND SIZE OF ANY UNDERGROUND UTILITY BEFORE BIDDING OR EXCAVATING ON THIS PROJECT. THE TOPOGRAPHIC AND ELEVATION DATA SHOWN HEREON WAS OBTAINED FROM STRANGE LAND SURVEYING AND IS NOT CERTIFIED AS CORRECT BY THIS
ENGINEER. USERS OF THIS DATA DO SO AT THEIR OWN RISK.
7. THE CONTRACTOR SHALL CONTACT GEORGIA 811, EITHER BY DIALING 811 OR BY SUBMITTING A DIG TICKET ONLINE, A MINIMUM OF THREE (3) BUSINESS DAYS PRIOR TO THE START OF ANY EXCAVATION ACTIVITIES. THE CONTRACTOR SHALL PROVIDE ALL REQUIRED INFORMATION, INCLUDING CONTACT INFORMATION, EXACT WORK LOCATION, DIRECTIONS TO THE SITE, TYPE OF WORK TO BE PERFORMED, ANTICIPATED START DATE, AND EXPECTED DURATION OF WORK. THE CONTRACTOR SHALL ALLOW UTILITY OWNERS THE LEGALLY REQUIRED RESPONSE TIME TO LOCATE AND MARK UNDERGROUND UTILITIES AND SHALL VERIFY ALL UTILITY RESPONSES THROUGH THE POSITIVE RESPONSE INFORMATION SYSTEM (PRIS) BEFORE COMMENCING ANY WORK.
EXCAVATION SHALL NOT BEGIN UNTIL ALL UTILITIES HAVE RESPONDED AND NO UNMARKED BUT VISIBLY APPARENT UNDERGROUND UTILITIES ARE PRESENT. IF UTILITY MARKINGS ARE MISSING, UNCLEAR, OR RESPONSES ARE INCOMPLETE, THE CONTRACTOR SHALL CONTACT GEORGIA 811 FOR RE-NOTIFICATION PRIOR TO PROCEEDING. ALL EXCAVATION ACTIVITIES SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE TOLERANCE ZONE REQUIREMENTS AND SAFE DIGGING PRACTICES, PARTICULARLY WHEN OPERATING
MECHANIZED EQUIPMENT.
8. THE CONTRACTOR SHALL VERIFY LOCATIONS AND SIZES OF EXISTING UTILITIES. IF A DISCREPANCY EXISTS WITH THE UTILITY LOCATIONS, THE CONTRACTOR SHALL CONTACT THE OWNER BEFORE BEGINNING CONSTRUCTION.
THE CONTRACTOR SHALL VERIFY ALL POTENTIAL UTILITY CONFLICTS AND SHALL IMMEDIATELY NOTIFY THE
OWNER OF ANY DISCREPANCIES BETWEEN THE PLANS AND THE ACTUAL FIELD CONDITIONS.
9. THE CONTRACTOR SHALL RETAIN A LICENSED SURVEYOR TO PROVIDE THE HORIZONTAL AND VERTICAL CONTROL DATA FOR THE PROJECT. BENCHMARK AND SURVEY CONTROL POINT INFORMATION SHALL BE PROVIDED TO THE CONTRACTOR BY THE OWNER OR OWNER'S SURVEYOR. DISCREPANCIES BETWEEN FIELD MEASUREMENTS AND CONSTRUCTION PLAN INFORMATION SHALL BE BROUGHT TO THE ATTENTION OF THE
OWNER IMMEDIATELY.
10. ANY REFERENCE POINTS, RIGHT-OF-WAY MONUMENTS, PROPERTY CORNERS, BENCHMARKS OR OTHER MONUMENTS DISTURBED AS A RESULT OF CONSTRUCTION SHALL BE RESTORED BY A REGISTERED LAND SURVEYOR LICENSED TO PRACTICE IN THE STATE OF GEORGIA, WITH ALL ASSOCIATED COSTS BORNE BY THE CONTRACTOR. LIKEWISE, ALL LANDSCAPES, STREET SIGNS, MAILBOXES, TRAFFIC SIGNS AND OTHER STREET FURNITURE AND APPURTENANCES DISTURBED BY CONSTRUCTION OPERATIONS SHALL BE RESTORED BY THE
CONTRACTOR TO THEIR ORIGINAL CONDITION.
11. ALL CONSTRUCTION ON PRIVATE PROPERTY REQUIRES A TEMPORARY OR PERMANENT EASEMENT. THE OWNER
WILL OBTAIN SUCH EASEMENTS.
12. THE CONTRACTOR SHALL NOTIFY APPROPRIATE INSPECTORS AT LEAST TWO (2) BUSINESS DAYS PRIOR TO COMMENCING CONSTRUCTION. THE CONTRACTOR SHALL COORDINATE WORK SCHEDULE DAILY WITH INSPECTORS ONCE CONSTRUCTION COMMENCES UNTIL PROJECT COMPLETION. THE CONTRACTOR SHALL REVIEW WORK COMPLETED QUANTITIES WITH INSPECTORS PRIOR TO SUBMISSION OF MONTHLY PAY
APPLICATION REQUEST.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ARRANGING AND SECURING ANY NECESSARY STORAGE AND STAGING AREAS FOR CONSTRUCTION EQUIPMENT AND MATERIAL. SECURITY OF EQUIPMENT AND MATERIAL
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
14. CONSTRUCTION AND STORAGE AREAS SHALL BE KEPT NEAT AND CLEAN AT ALL TIMES.
15. SHOP DRAWINGS AND CERTIFICATIONS FOR ALL CONSTRUCTION MATERIALS ARE REQUIRED. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND PRODUCT LITERATURE TO THE ENGINEER FOR REVIEW PRIOR TO
ORDERING THE MATERIALS REQUIRED FOR CONSTRUCTION.
16. THE CLEARING AND CONSTRUCTION LIMITS ARE SHOWN ON THE PLANS. THE CONTRACTOR SHALL CONTAIN ALL CONSTRUCTION ACTIVITIES WITHIN THESE LIMITS. AT NO TIME SHALL THE CONTRACTOR DISTURB SURROUNDING PROPERTIES OR TRAVEL ON SURROUNDING AREAS WITHOUT WRITTEN CONSENT FROM THE OWNER AND THE PROPERTY OWNER. ANY REPAIR OR RECONSTRUCTION OF DAMAGED AREAS IN SURROUNDING PROPERTIES SHALL BE COMPLETED BY THE CONTRACTOR IMMEDIATELY. ALL COSTS FOR REPAIRS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND NO EXTRA COMPENSATION SHALL BE ALLOWED. DO NOT REMOVE TREES, ORNAMENTALS, LANDSCAPING, OR OTHER LANDSCAPE ITEMS WITHOUT PRIOR APPROVAL FROM
THE OWNER.
17. THE CONTRACTOR SHALL MAINTAIN ACCESS TO PUBLIC, PRIVATE, AND COMMERCIAL PROPERTIES AT ALL TIMES
DURING CONSTRUCTION.
18. THE CONTRACTOR SHALL BE REQUIRED TO MAINTAIN AND REPAIR ALL ROADS DAMAGED DURING THE CONSTRUCTION PERIOD. IN SO DOING, THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE BEFORE AND AFTER VIDEOS OF ROAD CONDITION FROM THE PROJECT SITE TO THE NEAREST STATE HIGHWAY. THE PUBLIC WORKS AND ROAD DEPARTMENTS OF THE RESPECTIVE CITIES AND COUNTIES SHALL BE CONTACTED BEFORE CONSTRUCTION BEGINS AND VIDEOS PROVIDED FOR THEIR REVIEW AND ACCEPTANCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING AND PROVIDING ANY REPAIR BONDS REQUIRED BY THE RESPECTIVE ROAD DEPARTMENTS. LOAD LIMITS ON EXISTING ROADS SHALL BE OBSERVED BY THE CONTRACTORS.
19. THE CONTRACTOR SHALL KEEP EXISTING CHANNELS AND DITCHES OPEN TO STORMWATER PASSAGE AT ALL
TIMES DURING THE PROJECT.
20. THE CONTRACTOR SHALL DEWATER WORK AREA TO PROVIDE DRY EXCAVATION AT ALL TIMES. THE CONTRACTOR SHALL PROVIDE ALL PIPE, PUMPS, MATS, STONE, SAND, EXCAVATION, LABOR, ETC. TO ADEQUATELY DEWATER WORK AREA. IF CONTRACTOR ENCOUNTERS GROUNDWATER, GEOTEXTILE MUST BE LAID BELOW PIPE BEDDING MATERIALS. DEWATERING AND GEOTEXTILE COSTS SHALL BE INCIDENTAL TO BID
ITEMS PRICES.
21. ALL WASTE MATERIALS EXCAVATED FROM THE SITE SHALL BE REMOVED AND PROPERLY DISPOSED OFF-SITE BY THE CONTRACTOR. MATERIALS SHALL BE STOCKPILED SEPARATELY AS TO USABLE (NON-ORGANIC) FILL STOCKPILES AND ORGANIC (MUCK) STOCKPILES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL
OF ALL UNSUITABLE FILL MATERIALS FROM OR STOCKPILED ON THE SITE.
22. EROSION, SEDIMENTATION AND POLLUTION CONTROL MEASURES SHALL BE PROVIDED AND INSTALLED BY CONTRACTOR WITHIN THE LIMITS OF CLEARING AND CONSTRUCTION PRIOR TO OR CONCURRENT WITH THE COMMENCEMENT OF CONSTRUCTION. THESE MEASURES SHALL BE INSTALLED, AND INSPECTED BY THE CONTRACTOR ON A REGULAR BASIS AND ARE TO BE MAINTAINED OR REPAIRED IMMEDIATELY. SEE DRAWING NUMBER C-5 FOR EROSION, SEDIMENTATION, AND POLLUTION CONTROL MEASURES, NOTES AND DETAILS.
23. ALL DISTURBED AREAS SHALL BE RE-VEGETATED IMMEDIATELY AFTER CONSTRUCTION IN A MANNER CONSISTENT WITH THE MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA. ALL EROSION AND SEDIMENT CONTROLS SHALL BE INSTALLED PRIOR TO OR CONCURRENT WITH THE START OF CONSTRUCTION.
24. THE CONTRACTOR SHALL STOCKPILE AND LATER SPREAD A MINIMUM OF 4 INCHES OF TOPSOIL IN AREAS TO BE
LANDSCAPED OR SEEDED.
E N G I N E E R
M I C H A E L T O D D P A R K E R
G E O R GIA
REGISTERED
No. PE036155
PROFESSIONAL
OF
ISSUE SEQUENCE
NO. DATE DESCRIPTION
DRAWING NO.
SHEET:
P:
\A cti ve
\06 0.4
1.3 .26
LA
S
Cu lve rt Ph as e 2
\ci vil
\dr aw ing \sh ee t_f ile s\0
_C V_
CU
LV
ER
T
PH
2.
dw g
/07 /17
2:
P M
By : C od y G riff or e
© Copyright GWES (all rights reserved)
CHECKED:
APPROVED:
DESIGNED:
PROJECT NO.:
DATE:
LA
S
SE
RV
IC
E
RO
AD
C
UL
VE
RT
R
EP
LA
CE
ME
NT
PH
AS
E
FO
R
TH
E
CI
TY
O F
CO
VI
NG
TO
N
MWT
MTP
060.41.3.26
MTP
JULY 2026
GSWCC LEVEL II CERTIFICATION 64207
EXPIRATION DATE: 6-23-2029
0 7-6-2026 FOR BID
7/6/2026
GENERAL NOTES
C-2
E N G I N E E R
M I C H A E L T O D D P A R K E R
G E O R GIA
REGISTERED
No. PE036155
PROFESSIONAL
OF
ISSUE SEQUENCE
NO. DATE DESCRIPTION
DRAWING NO.
SHEET:
P:
\A cti ve
\06 0.4
1.3 .26
LA
S
Cu lve rt Ph as e 2
\ci vil
\dr aw ing \sh ee t_f ile s\0
_C V_
CU
LV
ER
T
PH
2.
dw g
/07 /17
2:
P M
By : C od y G riff or e
© Copyright GWES (all rights reserved)
CHECKED:
APPROVED:
DESIGNED:
PROJECT NO.:
DATE:
LA
S
SE
RV
IC
E
RO
AD
C
UL
VE
RT
R
EP
LA
CE
ME
NT
PH
AS
E
FO
R
TH
E
CI
TY
O F
CO
VI
NG
TO
N
MWT
MTP
060.41.3.26
MTP
JULY 2026
GSWCC LEVEL II CERTIFICATION 64207
EXPIRATION DATE: 6-23-2029
0 7-6-2026 FOR BID
7/6/2026
GENERAL LOCATION MAP
C-3
GENERAL LOCATION MAP
C-3GENERAL LOCATION MAP
DRIED INDIAN CREEK
FLAT SHOALS RD
HW
Y
AN
D
ER
SO
N C
IR
VARNER ST
ST
EP
HE
NS
O N
RD
1ST ST
STEELE
RD
PROJECT
AREA
BACHELOR RD
ANDERSON CT
DYLANS CT
LAS OFFICE
11085 FLAT SHOALS RD
FL
AT S
HOALS
R
D
LAS ACCESS RD
LA
S
AC
C
ES
S
R D
N/F
THE CITY OF COVINGTON
TAX PARCEL
0066 002A
N/F
THE CITY OF COVINGTON
TAX PARCEL
0066 002A
N/F
THE CITY OF COVINGTON
TAX PARCEL
0065 007
N/F
THE CITY OF COVINGTON
TAX PARCEL
0065 007
N/F
THE CITY OF COVINGTON
TAX PARCEL
0065 007
SCALE: NOT TO SCALE
18"CMP INV.=580.42'
18"CMP INV.=580.17'
18"CMP INV.=580.22'
18"CMP INV.=580.49'
I-BEAM
58258
APPROXIMATE LOCATION 20" DIP FORCE MAIN
E N G I N E E R
M I C H A E L T O D D P A R K E R
G E O R GIA
REGISTERED
No. PE036155
PROFESSIONAL
OF
ISSUE SEQUENCE
NO. DATE DESCRIPTION
DRAWING NO.
SHEET:
P:
\A cti ve
\06 0.4
1.3 .26
LA
S
Cu lve rt Ph as e 2
\ci vil
\dr aw ing \sh ee t_f ile s\0
_S P_
SI
TE
P
LA
N_
CU
LV
ER
T
PH
2.
dw g
/07
/17 2:
P
M By
: C od y G riff or e
© Copyright GWES (all rights reserved)
CHECKED:
APPROVED:
DESIGNED:
PROJECT NO.:
DATE:
LA
S
SE
RV
IC
E
RO
AD
C
UL
VE
RT
R
EP
LA
CE
ME
NT
PH
AS
E
FO
R
TH
E
CI
TY
O F
CO
VI
NG
TO
N
MWT
MTP
060.41.3.26
MTP
JULY 2026
GSWCC LEVEL II CERTIFICATION 64207
EXPIRATION DATE: 6-23-2029
0 7-6-2026 FOR BID
7/6/2026
DEMOLITION AND REMOVAL
PLAN
C-4
REMOVE 28 LF 18" CMP
REMOVE 35 LF 18" CMP
REMOVE 43 LF I-BEAM
WETLANDS
CR
EE
K
BA
NK
CR
EE
K
BA
NK
CR
EE
K
BA
NK
CR
EE
K
BA
NK
WETLANDS
WETLANDS
WETLANDS
LIMIT OF WETLANDS
LIMIT OF WETLANDS
SERVICE ROAD
DEMOLITION AND REMOVAL PLAN
SCALE:
0 10' 20'
REMOVE 15 SY GRAVEL
ACCESS DRIVE
REMOVE 12 SY GRAVEL
ACCESS DRIVE
+0
+4
+0
+4
CULVERT A
CULVERT B
10' TYP
58258
584 585
585584583
B1
HEADWALL
STA:20+11
INV:580.20
A2
HEADWALL
STA:10+31
INV:580.32
B2
HEADWALL
STA:20+35
INV:580.32
A1
HEADWALL
STA:10+07
INV:580.20
LOD
LOD
LO
D
LO
D
LOD
LOD
LO
D
LO
DLO
D
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD LOD
LO
D
LOD LOD
LOD
LOD LO
D
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LO
D
LO
DLOD
LO
D
LODLOD
LOD
LOD
LOD
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX XX
XX
XX
XX XX XX XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX XX XX XX XX XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XXXX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XXXX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
APPROXIMATE LOCATION 20" DIP FORCE MAIN
10+00 10+20 10+40 10+50
20+00 20+20 20+40 20+50
A2 H
EA
D W
AL
L
ST
A:
+3
IN
V:
0.
24' of 36" CLASS III RCP @ 0.50%
A1 H
EA
D W
AL
L
ST
A:
+0
IN
V:
0.
B2 H
EA
D W
AL
L
ST
A:
+3
IN
V:
0.
24' of 36" CLASS III RCP @ 0.50%
B1 H
EA
D W
AL
L
ST
A:
+1
IN
V:
0.
E N G I N E E R
M I C H A E L T O D D P A R K E R
G E O R GIA
REGISTERED
No. PE036155
PROFESSIONAL
OF
ISSUE SEQUENCE
NO. DATE DESCRIPTION
DRAWING NO.
SHEET:
P:
\A cti ve
\06 0.4
1.3 .26
LA
S
Cu lve rt Ph as e 2
\ci vil
\dr aw ing \sh ee t_f ile s\0
_S P_
SI
TE
P
LA
N_
CU
LV
ER
T
PH
2.
dw g
/07
/17 2:
P
M By
: C od y G riff or e
© Copyright GWES (all rights reserved)
CHECKED:
APPROVED:
DESIGNED:
PROJECT NO.:
DATE:
LA
S
SE
RV
IC
E
RO
AD
C
UL
VE
RT
R
EP
LA
CE
ME
NT
PH
AS
E
FO
R
TH
E
CI
TY
O F
CO
VI
NG
TO
N
MWT
MTP
060.41.3.26
MTP
JULY 2026
GSWCC LEVEL II CERTIFICATION 64207
EXPIRATION DATE: 6-23-2029
0 7-6-2026 FOR BID
7/6/2026
Ss
Sd1-S
CULVERT REPLACEMENT
PLAN AND PROFILES
C-5
3' SHOULDER
3' SHOULDER
EXISTING GRADE
PROPOSED GRADE
EXISTING GRADE
PROPOSED GRADE
Ds1 Ds2 Ds3
Du
ALL DISTURBED AREAS
Tp
Ds1 Ds2 Ds3
Du
ALL DISTURBED AREAS
Tp
Ss
Ss
Ss
CULVERT REPLACEMENT PLAN
CULVERT A PROFILE
0 10' 20'H:
0 5' 10'V:
6" GRADED AGGREGATE BASE
COMPACTED TO 100% MODIFIED
PROCTOR MAXIMUM DRY DENSITY
(265 SY)
LIMIT OF WETLANDS
STREAM
BANK
ST
RE
AM
B
AN
K
ST
RE
AM
B
AN
K
ST
RE
AM
B
AN
K
WETLANDS
WETLANDS
WETLANDS
WETLANDS
LIMIT OF WETLANDS
5 SF - WETLAND IMPACT 30 SF - STREAM IMPACT
89 SF - WETLAND IMPACT
71 SF - WETLAND IMPACT
18 SF - STREAM IMPACT
36" RCP HEADWALL WITH
ENERGY DISSIPATION
BLOCKS
LIMITS OF
DISTURBANCE
(0.15 ACRE)
WETLAND LIMIT
WETLAND LIMIT
16 SY EROSION
CONTROL BLANKET
4 SY EROSION
CONTROL BLANKET
15 SY EROSION
CONTROL BLANKET
15 SY EROSION
CONTROL BLANKET
CULVERT B PROFILE
93 LF TYPE "S" DOUBLE
ROW SILT FENCESd1-S
97 LF TYPE "S" DOUBLE
ROW SILT FENCESd1-S
43 LF TYPE "S" DOUBLE
ROW SILT FENCE Sd1-S
47 LF TYPE "S" DOUBLE
ROW SILT FENCE Sd1-S
99 LF TYPE "S" DOUBLE
ROW SILT FENCE
80 LF TYPE "S" DOUBLE
ROW SILT FENCE Sd1-S
CONTRACTOR SHALL
VERIFY EXACT LOCATION
AND DEPTH OF FORCE MAIN
(SEE NOTE 1)
36" RCP HEADWALL WITH
ENERGY DISSIPATION
BLOCKS
EXISTING 20" DIP FORCE MAINEXISTING 20" DIP FORCE MAIN
NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING
BOTH THE HORIZONTAL AND THE VERTICAL LOCATION OF THE
FORCE MAIN PRIOR TO CONSTRUCTION. THE FORCE MAIN
SHALL BE PROTECTED DURING ALL STAGES OF CONSTRUCTION.
G E O R GIA
REGISTERED
No. PE036155
PROFESSIONAL
OF
ISSUE SEQUENCE
NO. DATE DESCRIPTION
DRAWING NO.
SHEET:
P:
\A cti ve
\06 0.4
1.3 .26
LA
S
Cu lve rt Ph as e 2
\ci vil
\dr aw ing \sh ee t_f ile s\0
_D T_
DE
TA
ILS
_C
UL
VE
RT
P
H 2.d wg
/07
/17 2:
P
M By
: C od y G riff or e
© Copyright GWES (all rights reserved)
CHECKED:
APPROVED:
DESIGNED:
PROJECT NO.:
DATE:
LA
S
SE
RV
IC
E
RO
AD
C
UL
VE
RT
R
EP
LA
CE
ME
NT
PH
AS
E
FO
R
TH
E
CI
TY
O F
CO
VI
NG
TO
N
MWT
MTP
060.41.3.26
MTP
JULY 2026
GSWCC LEVEL II CERTIFICATION 64207
EXPIRATION DATE: 6-23-2029
0 7-6-2026 FOR BID
7/6/2026
SITE DETAILS 1
C-6
DETAIL - HEADWALL
NOT TO SCALE
12'-0"
6" GAB
EXISTING SUBGRADE
200 LB WOVEN FABRIC
DETAIL - GRAVEL ACCESS DRIVE SECTION
NOT TO SCALE
EXISTING GRADE
4 OZ. NON-WOVEN NEEDLE
PUNCHED GEOFABRIC
6" MIN. UNDER PIPE
NOTES:
1. PIPE SHALL BE WRAPPED WITH NON-WOVEN NEEDLE
PUNCHED FILTER FABRIC.
2. USE OF TYPE II BEDDING MUST BE APPROVED BY
ENGINEER.
6" MIN.
VARIES
UNDISTURBED SOIL COMPACTED BACKFILL
DEPTH VARIES
#57 STONE
EXISTING GRADE
1' TO HAVE 100% COMPACTION
BACKFILL REQUIREMENTS:
1. COMPACTED TO 95% STANDARD PROCTOR.
STORM DRAINAGE PIPE
SPRINGLINE
DETAIL - RCP BEDDING
NOT TO SCALE
DETAIL - HEADWALL WITH DISSIPATOR BLOCKS
NOT TO SCALE
1.0
G E O R GIA
REGISTERED
No. PE036155
PROFESSIONAL
OF
ISSUE SEQUENCE
NO. DATE DESCRIPTION
DRAWING NO.
SHEET:
P:
\A cti ve
\06 0.4
1.3 .26
LA
S
Cu lve rt Ph as e 2
\ci vil
\dr aw ing \sh ee t_f ile s\0
_D T_
DE
TA
ILS
_C
UL
VE
RT
P
H 2.d wg
/07
/17 2:
P
M By
: C od y G riff or e
© Copyright GWES (all rights reserved)
CHECKED:
APPROVED:
DESIGNED:
PROJECT NO.:
DATE:
LA
S
SE
RV
IC
E
RO
AD
C
UL
VE
RT
R
EP
LA
CE
ME
NT
PH
AS
E
FO
R
TH
E
CI
TY
O F
CO
VI
NG
TO
N
MWT
MTP
060.41.3.26
MTP
JULY 2026
GSWCC LEVEL II CERTIFICATION 64207
EXPIRATION DATE: 6-23-2029
0 7-6-2026 FOR BID
7/6/2026
SITE DETAILS 2
C-7
(WITH MULCHING ONLY)
DISTURBED AREA STABILIZATIONDs1
DEFINITION
APPLYING PLANT RESIDUES OR OTHER SUITABLE MATERIALS, PRODUCED ON THE SITE IF
POSSIBLE, TO THE SOIL SURFACE.
PURPOSE
· TO REDUCE RUNOFF AND EROSION
· TO CONSERVE MOISTURE
· TO PREVENT SURFACE COMPACTION OR CRUSTING
· TO CONTROL UNDESIRABLE VEGETATION
· TO MODIFY SOIL TEMPERATURE
· TO INCREASE BIOLOGICAL ACTIVITY IN THE SOIL
REQUIREMENT FOR REGULATORY COMPLIANCE
MULCH OR TEMPORARY GRASSING SHALL BE APPLIED TO ALL EXPOSED AREAS WITHIN 14 DAYS
OF DISTURBANCE. MULCH CAN BE USED AS A SINGULAR EROSION CONTROL DEVICE FOR UP TO SIX MONTHS, BUT IT SHALL BE APPLIED AT THE APPROPRIATE DEPTH, DEPENDING ON THE MATERIAL
USED, ANCHORED AND HAVE A CONTINUOUS 90% COVER OR GREATER OF THE SOIL SURFACE.
MAINTENANCE SHALL BE REQUIRED TO MAINTAIN APPROPRIATE DEPTH AND 90% COVER.
TEMPORARY VEGETATION MAY BE EMPLOYED INSTEAD OF MULCH IF THE AREA WILL REMAIN
UNDISTURBED FOR LESS THAN SIX MONTHS.
IF ANY AREA WILL REMAIN UNDISTURBED FOR GREATER THAN SIX MONTHS, PERMANENT
VEGETATIVE TECHNIQUES SHALL BE EMPLOYED. REFER TO DS2 -DISTURBED AREA STABILIZATION (WITH TEMPORARY SEEDING), DS3 - DISTURBED AREA STABILIZATION (WITH PERMANENT SEEDING), AND DS4 - DISTURBED AREA STABILIZATION (WITH SODDING).
SPECIFICATIONS
MULCHING WITHOUT SEEDING
THIS STANDARD APPLIES TO GRADED OR CLEARED AREAS WHERE SEEDINGS MAY NOT HAVE A
SUITABLE GROWING SEASON TO PRODUCE AN EROSION RETARDANT COVER, BUT CAN BE
STABILIZED WITH A MULCH COVER.
SITE PREPARATION
1. GRADE TO PERMIT THE USE OF EQUIPMENT FOR APPLYING AND ANCHORING MULCH.
2. INSTALL NEEDED EROSION CONTROL MEASURES AS REQUIRED SUCH AS DIKES, DIVERSIONS, BERMS, TERRACES AND SEDIMENT BARRIERS.
3. LOOSEN COMPACT SOIL TO A MINIMUM DEPTH OF 3 INCHES.
MULCHING MATERIALS
SELECT ONE OF THE FOLLOWING MATERIALS AND APPLY AT THE DEPTH INDICATED:
1. DRY STRAW OR HAY SHALL BE APPLIED AT A DEPTH OF 2 TO 4 INCHES PROVIDING COMPLETE
SOIL COVERAGE. ONE ADVANTAGE OF THIS MATERIAL IS EASY APPLICATION.
2. WOOD WASTE (CHIPS, SAWDUST OR BARK) SHALL BE APPLIED AT A DEPTH OF 2 TO 3 INCHES.
ORGANIC MATERIAL FROM THE CLEARING STAGE OF DEVELOPMENT SHOULD REMAIN ON
SITE, BE CHIPPED, AND APPLIED AS MULCH. THIS METHOD OF MULCHING CAN GREATLY
REDUCE EROSION CONTROL COSTS.
3. POLYETHYLENE FILM SHALL BE SECURED OVER BANKS OR STOCKPILED SOIL MATERIAL FOR
TEMPORARY PROTECTION. THIS MATERIAL CAN BE SALVAGED AND RE-USED.
APPLYING MULCH
WHEN MULCH IS USED WITHOUT SEEDING, MULCH SHALL BE APPLIED TO PROVIDE FULL
COVERAGE OF THE EXPOSED AREA.
1. DRY STRAW OR HAY MULCH AND WOOD CHIPS SHALL BE APPLIED UNIFORMLY BY HAND OR
BY MECHANICAL EQUIPMENT.
2. IF THE AREA WILL EVENTUALLY BE COVERED WITH PERENNIAL VEGETATION, 20-30 POUNDS
OF NITROGEN PER ACRE IN ADDITION TO THE NORMAL AMOUNT SHALL BE APPLIED TO
OFFSET THE UPTAKE OF NITROGEN CAUSED BY THE DECOMPOSITION OF THE ORGANIC
MULCHES.
3. APPLY POLYETHYLENE FILM ON EXPOSED AREAS.
ANCHORING MULCH
1. STRAW OR HAY MULCH CAN BE PRESSED INTO THE SOIL WITH A DISK HARROW WITH THE
DISK SET STRAIGHT OR WITH A SPECIAL PACKER DISK. DISKS MAY BE SMOOTH OR
SERRATED AND SHOULD BE 20 INCHES OR MORE IN DIAMETER AND 8 TO 12 INCHES APART.
THE EDGES OF THE DISK SHOULD BE DULL ENOUGH NOT TO CUT THE MULCH BUT TO PRESS
IT INTO THE SOIL LEAVING MUCH OF IT IN AN ERECT POSITION. STRAW OR HAY MULCH SHALL
BE ANCHORED IMMEDIATELY AFTER APPLICATION.
STRAW OR HAY MULCH SPREAD WITH SPECIAL BLOWER-TYPE EQUIPMENT MAY BE
ANCHORED. TACKIFERS, BINDERS AND HYDRAULIC MULCH WITH TACKIFIER SPECIFICALLY
DESGINED FOR TACKING STRAW CAN BE SUBSTITUTED FOR EMULSIFIED ASPHALT. PLEASE
REFER TO SPECIFICATION TAC-TACKIFERS. PLASTIC MESH OR NETTING WITH MESH NO
LARGER THAN ONE INCH BY ONE INCH SHALL BE INSTALLED ACCORDING TO
MANUFACTURER’S SPECIFICATIONS.
2. NETTING OF THE APPROPRIATE SIZE SHALL BE USED TO ANCHOR WOOD WASTE. OPENINGS
OF THE NETTING SHALL NOT BE LARGER THAN THE AVERAGE SIZE OF THE WOOD WASTE
CHIPS.
3. POLYETHYLENE FILM SHALL BE ANCHOR TRENCHED AT THE TOP AS WELL AS
INCREMENTALLY AS NECESSARY.
DEFINITION
THE ESTABLISHMENT OF TEMPORARY VEGETATIVE COVER WITH FAST GROWING SEEDINGS FOR
SEASONAL PROTECTION ON DISTURBED OR DENUDED AREAS.
PURPOSE
· TO REDUCE RUNOFF AND SEDIMENT DAMAGE OF DOWN STREAM RESOURCES
· TO PROTECT THE SOIL SURFACE FROM EROSION
· TO IMPROVE WILDLIFE HABITAT
· TO IMPROVE AESTHETICS
· TO IMPROVE TILTH, INFILTRATION AND AERATION AS WELL AS ORGANIC MATTER FOR
PERMANENT PLANTINGS
REQUIREMENT FOR REGULATORY COMPLIANCE
MULCH OR TEMPORARY GRASSING SHALL BE APPLIED TO ALL EXPOSED AREAS WITHIN 14 DAYS
OF DISTURBANCE. TEMPORARY GRASSING, INSTEAD OF MULCH, CAN BE APPLIED TO ROUGH
GRADED AREAS THAT WILL BE EXPOSED FOR LESS THAN SIX MONTHS. IF AN AREA IS EXPECTED TO BE UNDISTURBED FOR LONGER THAN SIX MONTHS, PERMANENT PERENNIAL VEGETATION SHALL BE USED. IF OPTIMUM PLANTING CONDITIONS FOR TEMPORARY GRASSING IS LACKING, MULCH CAN BE USED AS A SINGULAR EROSION CONTROL DEVICE FOR UP TO SIX MONTHS BUT IT SHALL BE APPLIED AT THE APPROPRIATE DEPTH, ANCHORED, AND HAVE A CONTINUOUS 90% COVER OR GREATER OF
THE SOIL SURFACE. REFER TO SPECIFICATION DS1-DISTURBED AREA STABILIZATION (WITH
TEMPORARY SEEDING).
CONDITIONS
TEMPORARY VEGETATIVE MEASURES SHOULD BE COORDINATED WITH PERMANENT MEASURES
TO ASSURE ECONOMICAL AND EFFECTIVE STABILIZATION. MOST TYPES OF TEMPORARY
VEGETATION ARE IDEAL TO USE AS COMPANION CROPS UNTIL THE PERMANENT VEGETATION IS
ESTABLISHED. NOTE: SOME SPECIES OF TEMPORARY VEGETATION ARE NOT APPROPRIATE FOR
COMPANION CROP PLANTINGS BECAUSE OF THEIR POTENTIAL TO OUT-COMPETE THE DESIRED
SPECIES (E.G. ANNUAL RYEGRASS). CONTACT NRCS OR THE LOCAL SWCD FOR MORE INFORMATION.
SPECIFICATIONS
GRADING AND SHAPING
EXCESSIVE WATER RUN-OFF SHALL BE REDUCED BY PROPERLY DESIGNED AND INSTALLED
EROSION CONTROL PRACTICES SUCH AS CLOSED DRAINS, DITCHES, DIKES, DIVERSIONS, SEDIMENT
BARRIERS AND OTHERS.
NO SHAPING OR GRADING IS REQUIRED IF SLOPES CAN BE STABILIZED BY HAND-SEEDED
VEGETATION OR IF HYDRAULIC SEEDING EQUIPMENT IS TO BE USED.
SEEDBED PREPARATION
WHEN A HYDRAULIC SEEDER IS USED, SEEDBED PREPARATION IS NOT REQUIRED. WHEN USING
CONVENTIONAL OR HAND-SEEDING, SEEDBED PREPARATION IS NOT REQUIRED IF THE SOIL
MATERIAL IS LOOSE AND NOT SEALED BY RAINFALL.
WHEN SOIL HAS BEEN SEALED BY RAINFALL OR CONSISTS OF SMOOTH CUT SLOPES, THE SOIL
SHALL BE PITTED, TRENCHED OR OTHERWISE SCARIFIED TO PROVIDE A PLACE FOR SEED TO LODGE
AND GERMINATE.
LIME AND FERTILIZER
AGRICULTURAL LIME IS REQUIRED UNLESS SOIL TESTS INDICATE OTHERWISE. APPLY
AGRICULTURAL LIME AT A RATE DETERMINED BY SOIL TEST FOR PH. QUICK ACTING LIME SHOULD BE INCORPORATED TO MODIFY PH DURING THE GERMINATION PERIOD. BIO STIMULANTS SHOULD ALSO BE CONSIDERED WHEN THERE IS LESS THAN 3% ORGANIC MATTER IN THE SOIL. GRADED AREAS
REQUIRE LIME APPLICATION. SOILS MUST BE TESTED TO DETERMINE REQUIRED AMOUNTS OF
FERTILIZER AND AMENDMENTS. FERTILIZER SHOULD BE APPLIED BEFORE LAND PREPARATION AND INCORPORATED WITH A DISK, RIPPER, OR CHISEL. ON SLOPES TOO STEEP FOR, OR INACCESSIBLE TO EQUIPMENT, FERTILIZER SHALL BE HYDRAULICALLY APPLIED, PREFERABLY IN THE FIRST PASS
WITH SEED AND SOME HYDRAULIC MULCH, THEN TOPPED WITH THE REMAINING REQUIRED
APPLICATION RATE
SEEDING
SELECT A GRASS OR GRASS-LEGUME MIXTURE SUITABLE TO THE AREA AND SEASON OF THE
YEAR. SEED SHALL BE APPLIED UNIFORMLY BY HAND, CYCLONE SEEDER, DRILL,
CULTIPACKER-SEEDER, OR HYDRAULIC SEEDER (SLURRY INCLUDING SEED AND FERTILIZER). DRILL
OR CULTIPACKER SEEDERS SHOULD NORMALLY PLACE SEED ONE-QUARTER TO ONE-HALF INCH
DEEP. APPROPRIATE DEPTH OF PLANTING IS TEN TIMES THE SEED DIAMETER. SOIL SHOULD BE
"RAKED" LIGHTLY TO COVER SEED WITH SOIL IF SEEDED BY HAND. SEE TABLE 6-4.1
MULCHING
TEMPORARY VEGETATION CAN, IN MOST CASES, BE ESTABLISHED WITHOUT THE USE OF
MULCH, PROVIDED THERE IS LITTLE TO NO EROSION POTENTIAL. HOWEVER, THE USE OF MULCH CAN
OFTEN ACCELERATE AND ENHANCE GERMINATION AND VEGETATION ESTABLISHMENT. MULCH
WITHOUT SEEDING SHOULD BE CONSIDERED FOR SHORT TERM PROTECTION. REFER TO DS1 -
DISTURBED AREA STABILIZATION (WITH MULCHING ONLY).
IRRIGATION
DURING TIMES OF DROUGHT, WATER SHALL BE APPLIED AT A RATE NOT CAUSING RUNOFF AND
EROSION. THE SOIL SHALL BE THOROUGHLY WETTED TO A DEPTH THAT WILL INSURE GERMINATION
OF THE SEED. SUBSEQUENT APPLICATIONS SHOULD BE MADE WHEN NEEDED.
RATE
40 LB.
(PER AC.)
50 LB.
60 LB.
TEMPORARY SEED
ANNUAL RYEGRASS
MONTH
JANUARY
SUDANGRASS
PEARL MILLET
MARCH
APRIL
MAY
FEBRUARY
50 LB.
60 LB.SUDANGRASS
PEARL MILLET
AUGUST
JULY
OCTOBER
NOVEMBER
DECEMBER
SEPTEMBER
RATE (PER AC.)TEMPORARY SEEDMONTH
40 LB.
40 LB.
JUNE 50 LB.
60 LB.SUDANGRASS
PEARL MILLET
50 LB.
60 LB.SUDANGRASS
PEARL MILLET
50 LB.
60 LB.
40 LB.
SUDANGRASS
ANNUAL RYE GRASS
PEARL MILLET
40 LB.
40 LB.
40 LB.
40 LB.
ANNUAL RYEGRASS
ANNUAL RYEGRASS
ANNUAL RYEGRASS
ANNUAL RYEGRASS
ANNUAL RYEGRASS
ANNUAL RYEGRASS
Ds2 (WITH TEMPORARY SEEDING)
DISTURBED AREA STABILIZATION
DUST CONTROL ON DISTURBED AREAS
DEFINITION
CONTROLLING SURFACE AND AIR MOVEMENT OF DUST ON CONSTRUCTION SITES, ROADS, AND
DEMOLITION SITES.
PURPOSE
•TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM EXPOSED SOIL SURFACES.
•TO REDUCE THE PRESENCE OF AIRBORNE SUBSTANCES THAT MAY BE HARMFUL OR INJURIOUS
TO HUMAN HEALTH, WELFARE, OR SAFETY, OR TO ANIMALS OR PLANT LIFE.
CONDITIONS
THIS PRACTICE IS APPLICABLE TO AREAS SUBJECT TO SURFACE AND AIR MOVEMENT OF DUST
WHERE ON AND OFF-SITE DAMAGE MAY OCCUR WITHOUT TREATMENT.
METHOD AND MATERIALS
A. TEMPORARY METHODS
MULCHES. SEE STANDARD DS1 - DISTURBED AREA STABILIZATION (WITH MULCHING ONLY).
SYNTHETIC RESINS MAY BE USED INSTEAD OF ASPHALT TO BIND MULCH MATERIAL. REFER TO
SPECIFICATION TAC - TACKIFIERS. RESINS SHOULD BE USED ACCORDING TO MANUFACTURER’S
RECOMMENDATIONS.
VEGETATIVE COVER. SEE SPECIFICATION DS2 - DISTURBED AREA STABILIZATION (WITH
TEMPORARY SEEDING).
SPRAY-ON ADHESIVES. THESE ARE USED ON MINERAL SOILS (NOT EFFECTIVE ON MUCK SOILS).
KEEP TRAFFIC OFF THESE AREAS. REFER TO SPECIFICATION TAC - TACKIFIERS.
TILLAGE. THIS PRACTICE IS DESIGNED TO ROUGHEN AND BRING CLODS TO THE SURFACE. IT IS AN EMERGENCY MEASURE THAT SHOULD BE USED BEFORE WIND EROSION STARTS. BEGIN PLOWING
ON WINDWARD SIDE OF SITE. CHISEL-TYPE PLOWS SPACED ABOUT 12 INCHES APART,
SPRING-TOOTHED HARROWS, AND SIMILAR PLOWS ARE EXAMPLES OF EQUIPMENT THAT MAY
PRODUCE THE DESIRED EFFECT.
IRRIGATION. THIS IS GENERALLY DONE AS AN EMERGENCY TREATMENT. SITE IS SPRINKLED
WITH WATER UNTIL THE SURFACE IS WET. REPEAT AS NEEDED.
BARRIERS. SOLID BOARD FENCES, SNOWFENCES, BURLAP FENCES, CRATE WALLS, BALES OF
HAY AND SIMILAR MATERIAL CAN BE USED TO CONTROL AIR CURRENTS AND SOIL BLOWING.
BARRIERS PLACED AT RIGHT ANGLES TO PREVAILING CURRENTS AT INTERVALS OF ABOUT 15 TIMES
THEIR HEIGHT ARE EFFECTIVE IN CONTROLLING WIND EROSION.
CALCIUM CHLORIDE. APPLY AT RATE THAT WILL KEEP SURFACE MOIST. MAY NEED
RETREATMENT.
B. PERMANENT METHODS
PERMANENT VEGETATION. SEE SPECIFICATION DS3 -DISTURBED AREA STABILIZATION (WITH
PERMANENT VEGETATION). EXISTING TREES AND LARGE SHRUBS MAY AFFORD VALUABLE
PROTECTION IF LEFT IN PLACE.
TOPSOILING. THIS ENTAILS COVERING THE SURFACE WITH LESS EROSIVE SOIL MATERIAL. SEE
SPECIFICATION TP - TOPSOILING.
STONE. COVER SURFACE WITH CRUSHED STONE OR COARSE GRAVEL. SEE SPECIFICATION
CR-CONSTRUCTION ROAD STABILIZATION.
Du
G E O R GIA
REGISTERED
No. PE036155
PROFESSIONAL
OF
ISSUE SEQUENCE
NO. DATE DESCRIPTION
DRAWING NO.
SHEET:
P:
\A cti ve
\06 0.4
1.3 .26
LA
S
Cu lve rt Ph as e 2
\ci vil
\dr aw ing \sh ee t_f ile s\0
_D T_
DE
TA
ILS
_C
UL
VE
RT
P
H 2.d wg
/07
/17 2:
P
M By
: C od y G riff or e
© Copyright GWES (all rights reserved)
CHECKED:
APPROVED:
DESIGNED:
PROJECT NO.:
DATE:
LA
S
SE
RV
IC
E
RO
AD
C
UL
VE
RT
R
EP
LA
CE
ME
NT
PH
AS
E
FO
R
TH
E
CI
TY
O F
CO
VI
NG
TO
N
MWT
MTP
060.41.3.26
MTP
JULY 2026
GSWCC LEVEL II CERTIFICATION 64207
EXPIRATION DATE: 6-23-2029
0 7-6-2026 FOR BID
7/6/2026
SITE DETAILS 3
C-8
PLAN
A
SECTION A-A
SECTION B-B
SEE DETAIL FOR
PLACEMENT OF BALES
D
C C
FLOW
FLOW
NOTES:
1. BALES SHOULD BE BOUND WITH WIRE OR NYLON STRING AND SHOULD BE PLACED IN ROWS
WITH BALE ENDS TIGHTLY ABUTTING THE ADJACENT BALES.
2. REMOVE #4 REBAR AFTER STRAW BALES ARE NO LONGER IN PLACE.
3. POINT C OF SECTION B-B SHOULD ALWAYS BE HIGHER THAN POINT D.
MIN. 18"MIN. 6"
B
A
B
FLOW
DETAIL - HAYBALE CHECK DAM
NOT TO SCALE
Cd-Hb
#4 REBAR
DETAIL - SLOPE STABILIZATION
NOT TO SCALE
1'-2"
1'-0"
6"
9"
1'-2'
1'-0" 15"
15'-20'
5'
UPSTREAM TERMINAL
TRANSVERSE CHECK SLOT
DOWNSTREAM TERMINAL
STEP 1 : CUT TERMINAL SLOT
STEP 2 : SNUG MAT INTO
SLOT
STEP 3 : A. STAKE MAT INTO SLOT.
B. USE 1"x3" PRESSURE-TREATED BOARD TO BRACE
MAT AGAINST VERTICAL CUT.
C. BACKFILL AND COMPACT.
STEP 4 : A. REVERSE MAT ROLL DIRECTION TO OVERLAY CHECK SLOT.
B. STAKE MAT TO ANCHOR TERMINAL.
STEP 1 : CUT CHECK SLOT.
TEMPORARY STAKE MAT
UNDER MODERATE TENSION.
STEP 2 : WORK UPSTREAM
ACROSS, CHECK SLOT
LAP BACK 18".
STEP 3 : TUCK MAT LAP INTO
SLOT AND STAKE.
STEP 4 : BACKFILL AND PROGRESS
UPSTREAM.
PULL OUT TEMPORARY STAKES WHEN NO LONGER
NEEDED FOR TENSIONING.
STEP 1 : CUT TERMINAL SLOT.
STEP 2 : STAKE MAT INTO SLOT.
STEP 3 : BACKFILL
TERMINAL SLOT.
STEP 4 : A. ROLL MAT UPSTREAM
OVER REFILLED TERMINAL.
B. STAKE MAT DOWN TO ANCHOR
TERMINAL.
C. PROGRESS UPSTREAM WITH ROLL.
SEE NOTE 3-8
INSTALLATION INSTRUCTIONS
1. START AT DOWNSTREAM TERMINAL AND PROGRESS UPSTREAM.
2. FIRST ROLL IS CENTERED LONGITUDINALLY IN MID CHANNEL AND PINNED WITH TEMPORARY STAKES TO
MAINTAIN ALIGNMENT.
3. SUBSEQUENT ROLLS FOLLOW IN STAGGERED SEQUENCE BEHIND FIRST ROLL. FOR ALIGNMENT TO
CHANNEL CENTER.
4. WORK OUTWARDS FROM CHANNEL CENTER TO EDGE.
5. USE 3" OVERLAP AND STAKE AT 5' INTERVAL ALONG SEAMS.
6. USE 3" OVERLAPS AND SHINGLE DOWNSTREAM TO CONNECT LINING AT ROLL ENDS.
SEQUENTIAL ROLL RUN OUT
IN CHANNELS
STAKE
38"
9"
8"
PICTORIAL VIEW OF TRANSVERSE SLOT
INSTALLATION NOTES
SITE PREPARATION
AFTER THE SITE HAS BEEN SHAPED AND GRADED TO THE APPROVED DESIGN, PREPARE A FRIABLE SEEDBED RELATIVELY FREE FROM CLODS AND ROCKS MORE THAN ONE INCH IN DIAM-ETER, AND ANY FOREIGN MATERIAL THAT WILL PREVENT CONTACT OF THE SOIL STABILIZATION MAT WITH THE SOIL SURFACE. SURFACE MUST BE SMOOTH TO ENSURE PROPER CONTACT OF BLANKETS OR MATTING TO THE SOIL SURFACE. IF
NECESSARY, REDIRECT ANY RUNOFF FROM THE DITCH OR SLOPE DURING INSTALLATION.
STAPLES
THE FOLLOWING ARE CONSIDERED APPROPRIATE STAPLING AND STAKING MATERIALS.
TEMPORARY BLANKETS
THIS INCLUDES STRAW, EXCELSIOR, COCONUT FIBER, AND WOOD FIBER BLANKETS. STAPLES SHALL BE USED TO ANCHOR TEMPORARY BLANKETS. U-SHAPED WIRE (11 GAUGE OR GREATER) STAPLES WITH LEGS AT LEAST 6 INCHES IN LENGTH AND A CROWN OF ONE INCH OR APPROPRIATE BIODEGRADABLE STAPLES CAN BE USED. STAPLES SHALL BE OF SUFFICIENT THICKNESS FOR SOIL PENETRATION WITHOUT UNDUE
DISTORTION.
PERMANENT MATTING
SOUND WOOD STAKES, 1X3 INCHES STOCK SAWN IN A TRIANGULAR SHAPE, SHALL BE USED. DEPENDING ON THE COMPACTION OF THE SOIL, SELECT STAKES WITH A LENGTH FROM 12 TO 18 INCHES. U-SHAPED STAPLES SHALL BE 11 GAUGE STEEL OR GREATER, WITH LEGS AT A MINIMUM OF 8 INCHES LENGTH WITH A
2 INCH CROWN.
PLANTING
LIME, FERTILIZER, AND SEED SHALL BE APPLIED IN ACCORDANCE WITH SEEDING OR OTHER TYPE OF PLANTING PLAN COMPLETED PRIOR TO INSTALLATION OF TEMPORARY COMBINATION BLANKETS OR JUTE MESH. FOR PERMANENT MATS, THE AREA MUST BE BROUGHT TO FINAL GRADE, PLOWED, LIMED, AND FERTILIZED. AFTER THE PERMANENT MAT HAS BEEN INSTALLED AND BACKFILLED, THE ENTIRE AREA SHALL BE GRASSED. REFER TO SPECIFICATION DS3 - DISTURBED AREA STABILIZATION ET (WITH PERMANENT VEGETATION).
MAINTENANCE
ALL EROSION CONTROL BLANKETS AND MATTING SHOULD BE INSPECTED PERIODICALLY FOLLOWING INSTALLATION, PARTICULARLY AFTER RAINSTORMS TO CHECK FOR EROSION AND UNDERMINING. ANY DISLOCATION OR FAILURE SHOULD BE REPAIRED IMMEDIATELY. IF WASHOUTS OR BREAKAGE OCCURS, REINSTALL THE MATERIAL AFTER REPAIRING DAMAGE TO THE SLOPE OR DITCH. CONTINUE TO MONITOR
THESE AREAS UNTIL THEY BECOME PERMANENTLY STABILIZED.
Ss
SIDE VIEW
FLOW
18" MIN.
30" MIN. 28"
6"
2"
4' MAX. O.C.
FABRIC
(WOVEN WIRE FENCE
OR ALTERNATIVE
BACKING)
TRENCH
6"
18" MIN.
30" MIN.
FRONT VIEW
DETAIL - SILT FENCE - TYPE SENSITIVE
NOT TO SCALE
Sd1-S
NOTES:
1. USE STEEL OR WOOD POSTS OR AS SPECIFIED BY THE EROSION, SEDIMENTATION, AND POLLUTION CONTROL PLAN.
2. HEIGHT (*) IS TO BE SHOWN ON THE EROSION, SEDIMENTATION, AND POLLUTION CONTROL PLAN.
WOODEN
POSTS (TYP.)
FABRIC
DETAIL - CONSTRUCTION EXIT
NOT TO SCALE
EXIT DIAGRAM
NOTES:
1. AVOID LOCATING ON STEEP SLOPES OR AT CURVES ON PUBLIC ROADS.
2. REMOVE ALL VEGETATION AND OTHER UNSUITABLE MATERIAL FROM THE FOUNDATION AREA, GRADE, AND CROWN FOR POSITIVE DRAINAGE.
3. AGGREGATE SIZE SHALL BE IN ACCORDANCE WITH NATIONAL STONE ASSOCIATION R-2 (1.5"-3.5" STONE).
4. GRAVEL PAD SHALL HAVE A MINIMUM THICKNESS OF 6".
5. PAD WIDTH SHALL BE EQUAL FULL WIDTH AT ALL POINTS OF VEHICULAR EGRESS, BUT NO LESS THAN 20'.
6. A DIVERSION RIDGE SHOULD BE CONSTRUCTED WHEN GRADE TOWARD PAVED AREA IS GREATER THAN 2%..
7. INSTALL PIPE UNDER THE ENTRANCE IF NEEDED TO MAINTAIN DRAINAGE DITCHES.
8. WHEN WASHING IS REQUIRED, IT SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN (DIVERT ALL SURFACE RUNOFF AND
DRAINAGE FROM THE ENTRANCE TO A SEDIMENT CONTROL DEVICE).
9. WASHRACKS AND/OR TIRE WASHERS MAY BE REQUIRED DEPENDING ON SCALE AND CIRCUMSTANCE. IF NECESSARY, WASHRACK DESIGN MAY CONSIST OF ANY MATERIAL SUITABLE FOR TRUCK TRAFFIC THAT
REMOVE MUD AND DIRT.
10. MAINTAIN AREA IN A WAY THAT PREVENTS TRACKING AND/OR FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP
SEDIMENT.
6" MIN.
6" MIN.
50' MIN.
20' MIN.
FLOW
FLOW
ENTRANCE ELEVATION
Co
CULVERT UNDER
ENTRANCE (IF NEEDED)
DIVERSION RIDGE
(SEE NOTE 6)
N.S.A. R-2 (1.5"-3.5")
COARSE AGGREGATE
GEOTEXTILE UNDERLINER
TIRE WASHRACK AREA/
TIRE WASHERS
SUPPLY WATER TO WASH
WHEELS IF NECESSARY
HARD SURFACE PUBLIC ROAD
SEDIMENT TRAP
(SEE NOTE 8)
GEOTEXTILE UNDERLINER
COARSE AGGREGATE
(N.S.A. R-2)
ORIGINAL GRADE
| Sheets and Views |
| C-1 COVER SHEET |
| C-2 GENERAL NOTES |
| C-3 GENERAL LOCATION MAP |
| C-4 DEMOLITION AND REMOVAL PLAN |
| C-5 CULVERT REPLACEMENT PLAN AND PROFILES |
| C-6 SITE DETAILS 1 |
| C-7 SITE DETAILS 2 |
| C-8 SITE DETAILS 3 |