LARAMIE P00006 JA-Redacted.pdf
PDF 211 KB Posted
- Attached to
- USNS LARAMIE ROH/DD FY 26
- Solicitation number
- N3220526C1226P00006
About this file
This is a Class Justification and Approval (J&A) document for use of other than full and open competition issued by the Department of the Navy, Military Sealift Command (MSC) Norfolk.
The document authorizes award modifications under contract N3220526C1226 to Alabama Shipyard (ASY) for the Regular Overhaul Drydocking Availability of the USNS LARAMIE (T-AO 203). The original contract was competitively awarded on February 26, 2026, for $18,205,703.00, with a performance period of April 20, 2026 through July 29, 2026 (revised to April 23, 2026 through August 01, 2026). The modifications will incorporate work items required to comply with regulatory requirements of the U.S. Navy, U.S. Coast Guard, and American Bureau of Shipping, including Safety Management System objectives and vessel configuration maintenance. The total estimated dollar value for the work items is not specified in the document. Funding will be provided through fiscal year 2026 Operations and Maintenance, Navy (O&M,N) funds. The justification for non-competitive award cites unusual and compelling urgency under 10 U.S.C. 3204(a)(2), specifically citing a 381-day procurement lead time that would delay operational readiness, with per diem losses to the Government estimated at $210,167.00 per day. A presolicitation notice was posted on sam.gov on September 23, 2025. The Contracting Officer certified the cost as fair and reasonable in accordance with FAR 15.404-1(b)(5), and the Government plans to develop technical data packages or performance specifications to support future competition.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LARAMIE Mod 06 New Work Encl-Redacted.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J&A No. N10426C1226P00006
CLASS JUSTIFICATION AND APPROVAL (J&A)
FOR USE OF OTHER THAN FULL AND OPEN COMPETITION
1. Contracting Activity: Department of the Navy, Military Sealift Command (MSC) Norfolk
2. Description of the Action Being Approved: Award modifications under contract N3220526C1226, for the Regular Overhaul Drydocking Availability of the USNS LARAMIE (T-AO 203), to Alabama Shipyard (ASY), incorporating work items needed to comply with regulatory requirements. The contract was awarded for $18,205,703.00 on the basis of adequate competition.
3. Description of Supply Services: To accomplish the work items detailed in the enclosure, which are needed to comply with regulatory requirements of the U.S. Navy, U.S. Coast Guard, and American Bureau of Shipping. The total estimated dollar value for all such work items is _______, which will be funded utilizing fiscal year 2026 Operations and Maintenance, Navy (O&M,N) funds. The authority to act under this Class J&A expires one year after the date on which it is approved by the Competition Advocate.
4. Statutory Authority Permitting Other Than Full and Open Competition: 10 U.S.C 3204(a)(2) Unusual and compelling urgency.
5. Rationale Justifying Use of Cited Authority
a. The contracting activity competitively awarded the contract consisting of 122 work items on February 26, 2026, with a period of performance of April 20, 2026 through July 29, 2026. Revised period of performance is now April 23, 2026 through August 01, 2026.
b. The U.S. Coast Guard and/or American Bureau of Shipping along with the crew and ashore under contract N3220526C1226 to comply with Safety Management System objectives, attain Operational Availability, and maintain vessel configuration.
c. Competitively soliciting these work items is not feasible as it would delay returning to a mission-ready posture since award of a procurement package of this magnitude will require a procurement action lead time of 381 days plus the time to accomplish repairs. The per diem rate is $210,167.00 per day, which is the estimated losses to the Government for each day of delay. Additionally, given the current status with interferences removed, staging installed, and equipment open for inspection, this is the most cost-effective opportunity for maintenance and repairs.
6. Description of Efforts Made to Solicit Offers from as Many Offerors as Practicable: The pre-solicitation notice was posted on the Government Point of Entry website (sam.gov) on September 23, 2025, and the award notice was posted on February 26, 2026. For reasons set forth in Paragraph 5, this particular requirement is not presently a candidate for full and open competition.
7. Determination of Fair and Reasonable Cost: The Contracting Officer has determined the anticipated cost to the Government of the supplies/services covered by this J&A will be fair and reasonable IAW FAR 15.404-1(b)(5).
8. Actions to Removed Barriers to Future Competition: The Government expects to obtain a technical data package or develop a performance specification that will support competition for future acquisitions of the same or similar items.
CERTIFICATION AND APPROVALS
Contracting Officer Certification:
I certify that this justification is accurate and complete to the best of my knowledge and belief.
Signature/Date Name (Printed) Phone No.
| CLASS JUSTIFICATION AND APPROVAL (J&A) |
| 5. Rationale Justifying Use of Cited Authority |
| CERTIFICATION AND APPROVALS |
| Contracting Officer Certification: |
File details come from the government source that posted it. Updated .