Landscaping_Hwy._331_from_Short_Ave._-_Bay_Grove_Rd..pdf
PDF 170 KB Posted
- Solicitation number
- 9-26
- Issued by
- Walton County, Florida
About this file
Summary
This is a Request for Quotation (RFQ) issued by Walton County, Florida for routine landscape maintenance services along Highway 331 from Short Avenue to Bay Grove Road. The county seeks qualified vendors to provide one year of landscape maintenance services to ensure the long-term health, appearance, and functionality of the designated corridor. The RFQ was released on April 9, 2026, with responses due by April 16, 2026, at 12:00 p.m. The scope of work includes weekly mowing from April through September and monthly mowing from October through March, fertilizer application in March and September, edging a minimum of 12 times per year, weeding and herbicide/pesticide application, selective hand pruning, mulch maintenance at 3-inch compressed depth with annual reapplication, litter removal, and general maintenance to protect hardscape features. All work must be performed Monday through Friday during daylight hours, with lane closures prohibited between 7:00 a.m. and 9:30 p.m. unless approved by the county representative.
The RFQ requires vendors to submit a separate cost proposal and complete a vendor questionnaire that includes lead time, quote validity period, references from similar projects, and certification of agreement with solicitation terms. Respondents must indicate prior business experience with Walton County and, if selected, provide liability insurance naming Walton County and proof of workers' compensation coverage. No specific pricing information, set-asides, or funding amounts are detailed in the solicitation. Electronic submissions are required through the OpenGov Procurement portal at https://procurement.opengov.com/portal/waltoncountyfl, and all work must comply with FDOT standards and specifications outlined in the FDOT Landscape Care Guide.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Hwy_331_Landscape_Maintenance_Notes.png | PNG image | |
| Hwy_331_Landscape_Maintenance_Project_Limits.png | PNG image | |
| landscape-guide_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For more information, please visit our online supplier portal, located at https://procurement.opengov.com/portal/waltoncountyfl
Walton County
REQUEST FOR QUOTATION
9-26
LANDSCAPING HWY. 331 FROM SHORT AVE. - BAY GROVE RD.
RELEASE DATE: April 9, 2026
RESPONSE DEADLINE: April 16, 2026, 12:00 pm
Please refer to the project timeline in this document for all important deadlines.
Request For Quotation #9-26 Title: Landscaping Hwy. 331 from Short Ave. - Bay Grove Rd.
Table of Contents
1. Introduction
2. Project Details
3. Vendor Questionnaire
4. Attachments
Attachments:
A - landscape-guide
B - Hwy 331 Landscape Maintenance Project Limits
C - Hwy 331 Landscape Maintenance Notes
1. Introduction
1.1 Summary
Walton County is seeking qualified vendors to provide routine landscape maintenance services to ensure the long-term health, appearance, and functionality along Hwy 331 from Short Ave to Bay Grove Rd for 0ne (1) year.
1.2 Timeline
Quote Release Date: April 9, 2026
Quote Requested Due Date: April 16, 2026, 12:00pm
1.3 Project Contact
Scott Caraway
Deputy Public Works Director
117 Montgomery Circle
Defuniak Springs, FL 32435
Email: scott.caraway@mywaltonfl.gov
Phone: (850) 892-8108
1.4 Procurement Contact
Jordan Lee
Procurement Analyst
176 Montgomery circle
DEFUNIAK SPRINGS, FL 32435
Email: jordan.lee@mywaltonfl.gov
Phone: (850) 892-8176 Ext: 1214
2. Project Details
Walton County Purchase Order Terms and Conditions Link:
https://www.co.walton.fl.us/DocumentCenter/View/41270/Purchase-Order-Terms-and- Conditions?bidId=
2.1 Important Instructions for Electronic Submittals
The Walton County is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov
Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid.
2.2 Quote Request Details (Scope of work):
Minimum maintenance activity of these areas is identified in the attached Landscape Plans, page 23 section 3-
14. In addition, to meeting the minimum maintenance activities, meet any other FDOT standards and specifications, as well as stipulations as may be outlined in the FDOT Landscape Care Guide book.
THE FOLLOWING LISTS MINIMUM MAINTENANCE ACTIVITY REQUIREMENTS FOR CONTINUING LONG-TERM
HEALTH AND VIABILITY AND ATTRACTIVENESS OF THE PROJECT. ACTIVITIES DESCRIBED ARE FOR A YEAR
TIME PERIOD, TO BE REPEATED EACH YEAR:
2.3 MOWING
• Mow all turf areas:
o Weekly (April through September) o Monthly (October through March)
• Maintain uniform turf height and overall appearance
• Remove or disperse clippings from hard surfaces
2.4 FERTILIZER
• Apply fertilizer to all plant material in accordance with:
o Landscape specifications o Manufacturer recommendations o Direction of County Representative https://procurement.opengov.com/signup
• Minimum applications in March and September
2.5 EDGING
• Edge all sidewalks, curbs, and planting beds
• Minimum of 12 times per year
• Maintain clean, defined edges
2.6 WEEDING
• Remove weeds from all landscaped and mulched areas
• Utilize hand removal and/or herbicides as needed
• Apply pre-emergent and post-emergent treatments as required
• Prevent damage to surrounding vegetation
2.7 HERBICIDE/PESTICIDE
• Remove invasive and exotic species
• Monitor and treat for insects and disease as needed
2.8 PRUNING
• Perform selective hand pruning as needed to maintain plant health and shape
• No shearing as the primary method
• Maintain vines with a clear trunk up to 3 ft and max height of 8 ft
• Cut back native grasses annually (early March or as needed)
2.9 MULCH
• Maintain mulch at a 3-inch compressed depth
• Reapply as needed (minimum once per year)
• Do not place mulch against plant trunks
• Use clean, approved mulch materials only
2.10 GENERAL MAINTENANCE REQUIREMENTS
• Protect all hardscape features during maintenance
• Maintain a clean and professional appearance at all times
• Repair any damage caused by Contractor at no cost to the County
2.11 LITTER PICK-UP
• Remove litter and debris from landscaped areas and medians during each visit
2.12 Additional Details
• Monday through Friday during daylight hours unless otherwise approved
• Lane closures are prohibited between 7:00 AM and 9:30 PM unless otherwise approved by the County
Representative
• All lanes must be reopened to normal traffic within 12 hours of an evacuation notice for a hurricane or other emergency event and shall remain open for the duration of the event as directed by the County
Representative
2.13 Contractor required documentation: (upon award)
• Liability Insurance naming Walton County
• Proof of Workman’s Compensation Coverage
3. Vendor Questionnaire
3.1 Respondent Submittals (without Cost)
Please Upload your response, including any and all required forms listed in the solicitation and the corresponding attachments.
(Do not upload cost information in here)
3.2 Separate Cost Proposal*
Confirm that your fee proposal is not attached in your Proposal and is attached separately here.
*Response required
3.3 I certify that I have read, understood and agree to the terms in this solicitation, and that I am authorized to submit this response on behalf of my company.*
☐ Please confirm
*Response required
3.4 Lead Time *
*Response required
3.5 Quote Validity*
*Response required
3.6 Has your company done business with Walton County before?*
If no, upon award we would need a copy of your company’s W-9 and ask you too complete an ACH form.
☐ Yes
☐ No
*Response required
3.7 Please provide two references with contact information from customers you’ve done similar scope of work for:*
*Response required
File details come from the government source that posted it. Updated .