Lake Loop SOI - Copy.xlsx

XLSX spreadsheet 249 KB Posted

Attached to
Trail Hardening MUT, Lake Loop Section Federal contract opportunity
Solicitation number
127EAV26R0010
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

About this file

This file is a Schedule of Items (SOI) for trail hardening work on the Lake Loop trail (Trail No. 833), detailing estimated quantities and unit pricing for construction activities spanning approximately 77 miles of trail work. The SOI includes line items across multiple work categories: Surface Blading (14.60 miles), Spot Surface Course Placement including hard stone and base materials (3,105 tons and 5.4 tons respectively), Select fill for culverts (157 cubic yards), Drainage Structures encompassing drain dips (493 each), furrow ditches (28,050 linear feet), and culvert installation for 96-inch diameter (22 linear feet) and 48-inch diameter (14 linear feet) aluminized pipes, Trail Mowing and Clearing at 6-foot right-of-way (27 acres), Seeding at culverts (0.25 acres), and Miscellaneous Structures including replacement of stop signs (10 each), FRP bridge decking (110 linear feet), and planked low water crossings (149 linear feet), plus trail closure and traffic control (5 each). The schedule does not provide unit prices or total amounts, indicating this is a preliminary estimate document.

The detailed work breakdown organized by station locations (beginning at 0+00 near the trailhead parking lot and ending at 77+95 at the junction with Boy Scout and Sandy trails) specifies construction requirements at each segment, including drainage dip construction and reconstruction, ballast placement depths (ranging from 2 inches to 6 inches), ditch work, and specialized installations such as bridge decking replacements and stream crossing structures. Estimated quantities by sheet section range from zero to 374 tons of ballast material, with seeding acres varying from 100 to 1,250 acres per section, reflecting the varying terrain and maintenance needs across the trail's length.

View the file

Other files for this federal contract opportunity

Other files attached to Trail Hardening MUT, Lake Loop Section, newest first.
File Type Posted
Amendment 127EAV26R0010 P00001.pdf PDF
Vicinity map.pdf PDF
127EAV26R0010 Trail Hardening MUT Lake Loop Section 3.16.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOI

SCHEDULE OF ITEMS

ACTIVITY DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

1020 Surface Blading (Dozer) 14.60 Mi.

1040Spot Surface Course Placement
3X5 Hard stone TCS #53105Ton
1-3/4" Super Flex base TCS 1115.4Ton
Ton
Ton
Ton
Select fill for culverts (Compacted in 8" lifts in place)157CY
CY
3010Drainage Structures
Drain Dips493Ea.
Furrow Ditch28050L.F.
Culvert (12GA aluminized) 96" dia22L.F.
Culvert (12GA aluminized) 48" dia14L.F.

4020 Trail Mowing and Clearing (16'RW) 27.00 Ac.

4050 Seeding (at culverts) 0.25 Ac.

6020Miscellaneous Structures
Remove Cattle Guard0Ea.
Replace Stop Sign10Ea.
Replace 16' Farm Gate0Ea.
Replace16' Pipe Gate0Ea.
3"x12"x6' FRP bridge decking110L.F.
Planked LWC Concrete149L.F.

7070 Trail Closure / traffic control 5 EA

TOTAL

TR 833

DESCRIPTION OF WORKMUT, Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

50 17+76 LA Construct Dip

17+24 Clean out HPDE culvert

17+03 JCT CL FSR233C

16+6913End ballast, clean out
HPDE culvert
5015+53LA4"Construct drainage dip
Begin 4" ballast.

50 15+00 Ditch left

50 14+60 LA Reconstruct drainage dip

13+57 RA 50 Reconstruct drainage dip

50 12+37 Ditch left

50 11+20 D Ditch left

50 10+38 LA Reconstruct drainage dip

9+70 14 End 4" ballast

508+45LA4"Reconstruct Dip, Begin 4"
ballast

50 7+93 Ditch left, JCT Zebra trail

50 7+30 LB Construct rolling drain dip

6+80 10 End ballast

6+55 JCT powerline RW

50 5+91 LA 4" Begin 3x5 ballast

50 3+15 Ditch Left

50 2+06 LA Construct rolling drain dip

50 1+05 LA Reconstruct drain dip

5'0+006'5'Begin at trail head parking
lot sign "Lake Loop Trail
NO.814". Begin mowing
Begin brushing Left and
Right 5'
7001150Estimated Quantities37TonTrail NO.Sheet No.No. of Sheets
750Estimated Seeding AcresTR 833131

TR 833 (2)

DESCRIPTION OF WORKMUT, Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

39+46 4" Begin ballast

38+50 RB 50 Construct drainage dip

37+81 50 Ditch right

37+50 RA 50 Reconstruct drainage dip

36+99 RA 50 Construct drainage dip

36+13 RA 50 Reconstruct drainage dip

34+19 RB 50 Reconstruct drainage dip

33+48 50 Ditch right

33+09 33 End ballast

32+79 RA 50 Construct drainage dip

30+14 4" Begin ballast

29+49 RA 50 Reconstruct drainage dip

28+47 RA 50 Construct drainage dip

27+49 CL Trail bridge 12

50 25+98 LA Reconstruct drainage dip

50 25+45 LA Construct drainage dip

24+51 8 End ballast

50 24+36 LA Reconstruct drainage dip

23+80 4" Begin ballast

50 23+19 Ditch left

50 22+20 LA Construct Drainage dip

50 21+16 LA Construct Drainage dip

20+55 17 End ballast

50 19+46 Ditch left

5' 19+00 6' 5' 4" Begin ballast

35013500Estimated Quantities58TonTrail NO.Sheet No.No. of Sheets
850Estimated Seeding AcresTR 833231

TR 833 (3)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

56+35 RA 50 Reconstruct drainage dip

55+43 RA 50 Reconstruct drainage dip

54+63 RA 50 Construct drainage dip

54+51 6 End ballast

53+94 4" Begin ballast

53+32 50 Ditch right

52+60 RB 50 Construct drainage dip

51+20 50 Ditch right

50+88 9 End ballast

50+05RB504"Reconstruct drainage dip
Begin 4" ballast

49+44 RB 50 Construct drainage dip

48+56 Powerline RW

50 47+95 LB Reconstruct drainage dip

50 47+24 LB Construct drainage dip

50 46+57 LB Reconstruct drainage dip

46+24 32 End ballast

50 45+99 LB Reconstruct drainage dip

50 44+81 LB Reconstruct drainage dip

44+25 1 End planked LWC

44+15 CL LWC

44+04 2" Begin planked LWC

5043+37LB4"Reconstruct drainage dip
Begin ballast

41+21 RB 50 Construct drainage dip

5' 40+92 6' 5' 16 End ballast

30013450Estimated Quantities63TonTrail NO.Sheet No.No. of Sheets
750Estimated Seeding AcresTR 833331

TR 833 (4)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES
78+1550Ditch right

50 77+36 LA Construct drainage dip

50 76+74 LA Construct drainage dip

50 75+72 LA Reconstruct drainage dip

73+60 50 Ditch right

72+65 RB 50 Construct drainage dip

71+55 RB 50 Construct drainage dip

70+89 50 Ditch right

69+77 RB 50 Construct drainage dip

69+21 50 Ditch right

68+54 RA 50 Construct drainage dip

67+57 RB 50 Reconstruct drainage dip

66+75 RB 50 Reconstruct drainage dip

65+47 63 End ballast

64+75RB50End grading, Reconstruct
drainage dip.

63+64 RB 50 Construct drainage dip

63+03 RB 50 Reconstruct drainage dip

62+32 RB 50 Reconstruct drainage dip

61+99 RB 50 Construct drainage dip

61+33RB50Begin grading. Construct
drainage dip
59+82504"Ditch right and begin
ballast

59+21 RA 50 Construct drainage dip

58+43 CL TB 11 X-ing

5' 57+08 6' RA 50 5' Construct drainage dip

15017950Estimated Quantities63TonTrail NO.Sheet No.No. of Sheets
1100Estimated Seeding AcresTR 833431

TR 833 (5)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES
97+00RB50Construct drainage dip

96+53 18 End ballast

95+45RA506"Reconstruct drainage dip
Begin ballast

94+71 RA 50 Reconstruct drainage dip

94+25 RA 50 Construct drainage dip

50 93+51 LA Reconstruct drainage dip

92+11 RA 50 Reconstruct drainage dip

90+71 11 End ballast

90+60 RA 50 Reconstruct drainage dip

89+89 RA 50 Reconstruct drainage dip

89+69 4" Begin ballast

89+20 50 Ditch right

88+23 RA 50 Reconstruct drainage dip

50 87+07 LA Reconstruct drainage dip

86+36 7 End ballast

86+29 RA 50 Reconstruct drainage dip

85+71 4" Begin ballast

84+22RB5019Construct drainage dip
End ballast
82+55RB504"Construct drainage dip.
Begin ballast

81+95 RB 50 Construct drainage dip

81+35 RB 50 Construct drainage dip

79+97 RB 50 Construct drainage dip

79+00 RB 50 Construct drainage dip

5' 78+58 6' 5' Ditch Right

10017800Estimated Quantities55TonTrail NO.Sheet No.No. of Sheets
900Estimated Seeding AcresTR 833531

TR 833 (6)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

132+60 RB 50 Construct drainage dip

128+86 13 End ballast

50127+68504"Reconstruct drainage dip
begin ballast

50 126+01 LB Construct drainage dip

122+64 50 Ditch right

50 120+65 LB Reconstruct drainage dip

50 119+83 LB Construct drainage dip

117+66 RB 50 Reconstruct drainage dip

116+1 RB 50 Reconstruct drainage dip

113+82 RB 50 Reconstruct drainage dip

111+25 11 End ballast

110+25 4" Begin ballast

108+33 RB 50 Reconstruct drainage dip

107+13 RB 50 Reconstruct drainage dip

106+13 RB 50 Reconstruct drainage dip

50 103+72 LB Reconstruct drainage dip

103+33 9 End ballast

103+23 RB 50 Construct drainage dip

Reconstruct drainage dip
102+52RB504"Begin ballast

101+59 RB 50 Reconstruct drainage dip

100+88 RB 50 Reconstruct drainage dip

100+32 RB 50 Reconstruct drainage dip

99+45 RB 50 Reconstruct drainage dip

5' 98+55 6' RB 50 5' Construct drainage dip

25018800Estimated Quantities33TonTrail NO.Sheet No.No. of Sheets
1050Estimated Seeding AcresTR 833631

TR 833 (7)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

50 16743+ LA Reconstruct drainage dip

16737+ 4" Begin ballast

50 16693+ LA Reconstruct drainage dip

50 16345+ LA Reconstruct drainage dip

16107+ 14 End ballast

16098+ RA 50 Reconstruct drainage dip

16024+ RA 50 Construct drainage dip

15979+ 4" Begin ballast

15612+ 14 End ballast

15484+ 4" Begin ballast

15430+ 50 Ditch right

15385+ RA 50 Reconstruct drainage dip

15320+ RA 50 Reconstruct drainage dip

15176+ 50 Ditch right

15021+ 50 Ditch right

14841+ RB 50 Reconstruct drainage dip

14771+ 50 Ditch right

14629+ RA 50 Construct drainage dip

14466+ RA 50 Construct drainage dip

14110+ RB 50 Construct drainage dip

13991+ RA 50 Reconstruct drainage dip

13767+ 13 End ballast

50 13757+ LA Reconstruct drainage dip

13650+ 4" Begin ballast

5' 13568+ 6' 5' JCT CL FSR 233C

20013650Estimated Quantities41TonTrail NO.Sheet No.No. of Sheets
850Estimated Seeding AcresTR 833731

TR 833 (8)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

19274+ RB 50 Reconstruct drainage dip

19250+ 4" Begin ballast

18904+ CL trail bridge 9

18700+ RA 50 Construct drainage dip

18648+ RA 50 Reconstruct drainage dip

18507+ RB 50 Construct drainage dip

18352+ 0.4 6 End planked LWC

18344+ 2" Begin planked LWC

18300+ 4" Begin ballast

18223+ RB 50 Reconstruct drainage dip

18129+ 5 End ballast

18080+ 4" Begin ballast

17979+ CL Trail bridge 10

17922+ RA 50 Reconstruct drainage dip

50 17852+ LA Construct drainage dip

5017783+LA32Construct drainage dip
End ballast

17494+ 4" Begin ballast

50 17484+ LA Reconstruct drainage dip

50 17420+ Ditch left

50 17265+ Ditch left

50 17165+ LB Reconstruct drainage dip

50 17086+ LB Reconstruct drainage dip

5017060+LB36Reconstruct drainage dip
End ballast

5' 16885+ 6' RB 50 5' Reconstruct drainage dip

40013350Estimated Quantities78TonTrail NO.Sheet No.No. of Sheets
750Estimated Seeding AcresTR 833831

TR 833 (9)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

22331+ 25 End ballast

22321+ RB 50 Construct drainage dip

22253+ RB 50 Reconstruct drainage dip

22105+ 4" Begin ballast

22070+9End ballast at edge of road
FM 1374

21991+ 4" Begin ballast

21922+ 9 End ballast

21843+ 4" Begin 4" ballast

21534+ RB 50 Reconstruct drainage dip

21455+ RB 50 Construct drainage dip

5021080+LB19Construct drainage dip
End ballast

50 21009+ LB Reconstruct drainage dip

5020906+LA4"Construct drainage dip
Begin ballast

50 20795+ LA Reconstruct drainage dip

50 206+98 LA Construct drainage dip

50 201+13 LA Reconstruct drainage dip

20036+ LB 50 Construct drainage dip

19958+ RB 50 Construct drainage dip

19688+ RB 50 Construct drainage dip

19542+ 32 End ballast

19506+ RB 50 Reconstruct drainage dip

19396+ RB 50 Reconstruct drainage dip

5' 19341+ 6' RB 50 5' Reconstruct drainage dip

30016500Estimated Quantities94TonTrail NO.Sheet No.No. of Sheets
800Estimated Seeding AcresTR 833931

TR 833 (10)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

50 26550+ LB Reconstruct drainage dip

25640+ 4" Begin ballast

50 26409+ LB Construct drainage dip

26116+ RB 50 Construct drainage dip

25922+ 22 End ballast

50 25909+ LB Construct drainage dip

50 25854+ LB Reconstruct drainage dip

50 25729+ LB Reconstruct drainage dip

25718+ 4" Begin ballast

50 25653+ LB Reconstruct drainage dip

25529+ CL creek @ Bridge site

25414+ 13 End ballast at pavers

25300+ 4" Begin ballast

50 24920+ LA Construct drainage dip

50 24622+ Ditch left

24500+ 8 End ballast

50 24490+ LB Construct drainage dip

5024425+LA4"Reconstruct drainage dip
Begin ballast

23964+ CL trail bridge 8

23954+ 44 End ballast

23550+ 4" Begin ballast

50 23347+ LA Construct drainage dip

23214+RB5077Construct drainage dip
End ballast

5' 22517+ 6' 5' 4" Begin ballast

55012100Estimated Quantities164TonTrail NO.Sheet No.No. of Sheets
650Estimated Seeding AcresTR 8331031

TR 833 (11)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

50 30456+ LB Reconstruct drainage dip

50 30374+ LB Construct drainage dip

30270+ 7 End ballast

30210+ 4" Begin ballast

50 30119+ Ditch left

50 29931+ LA Construct drainage dip

50 29704+ Ditch left

50 29437+ LA Construct drainage dip

29368+ RA 50 Construct drainage dip

50 29166+ LB Reconstruct drainage dip

28991+ 43 End ballast

28597+ 6" Begin ballast

28409+ 18 End ballast

28394+ RB 50 Reconstruct drainage dip

28248+ 4" Begin ballast

28082+ 10 End ballast

28062+ RA 50 Reconstruct drainage dip

27990+ 4" Begin ballast

27731+ RA 50 Construct drainage dip

27466+ RB 50 Reconstruct drainage dip

27418+ RB 50 Reconstruct drainage dip

27339+ RB 50 Construct drainage dip

27243+ RB 50 Reconstruct drainage dip

27106+ RB 50 Construct drainage dip

5' 26743+ 6' 5' 121 End ballast

35014450Estimated Quantities199TonTrail NO.Sheet No.No. of Sheets
800Estimated Seeding AcresTR 8331131

TR 833 (12)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

32814+ 4" Begin ballast

50 32735+ LA Reconstruct drainage dip

32524+Cleanout 18" HPDE pipe
at carsonite marker

32510+ JCT CL FSR 234

32500+ 175 End ballast

32436+ RB 50 Construct drainage dip

32350+ 50 Ditch right

32262+ RB 50 Reconstruct drainage dip

32198+ RB 50 Construct drainage dip

32085+ RB 50 Construct drainage dip

31972+ RB 50 Construct drainage dip

31892+ RB 50 Reconstruct drainage dip

31845+ RB 50 Reconstruct drainage dip

31775+ RB 50 Construct drainage dip

31709+ RB 50 Reconstruct drainage dip

50 31636+ LB Reconstruct drainage dip

50 31493+ LB Reconstruct drainage dip

50 31393+ LB Reconstruct drainage dip

30906+ 4" Begin ballast

30829+CL trail bridge 7 replace
40 3"x12"x6' deck boards

50 30735+ LA Construct drainage dip

50 30647+ LA Construct drainage dip

50 30615+ LA Reconstruct drainage dip

5' 50 30566+ 6' LA 5' Construct drainage dip

40017500Estimated Quantities175TonTrail NO.Sheet No.No. of Sheets
900Estimated Seeding AcresTR 8331231

TR 833 (13)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

35798+ RA 50 Reconstruct drainage dip

35708+ RA 50 Construct drainage dip

35500+ 4" Begin ballast

35333+ 24 End ballast

35323+ RB 50 Reconstruct drainage dip

35119+ 4" Begin ballast

34953+ RB 50 Reconstruct drainage dip

34882+ RB 50 Reconstruct drainage dip

50 34597+ LB Reconstruct drainage dip

50 34495+ LB Reconstruct drainage dip

34418+ JCT CL FSR 234B

50 34219+ LB Reconstruct drainage dip

50 34150+ LB Reconstruct drainage dip

50 34040+ LB Reconstruct drainage dip

50 33800+ LB Reconstruct drainage dip

50 33732+ LA Reconstruct drainage dip

50 33620+ LB Reconstruct drainage dip

50 33583+ Ditch left

50 33496+ LA Reconstruct drainage dip

50 33422+ LA Reconstruct drainage dip

50 33303+ LB Construct drainage dip

50 33223+ Ditch left

50 33088+ LA Construct drainage dip

32938+ 14 End ballast

5' 50 32925+ 6' LA 5' Reconstruct drainage dip

75018250Estimated Quantities37TonTrail NO.Sheet No.No. of Sheets
1000Estimated Seeding AcresTR 8331331

TR 833 (14)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

40165+ RB 50 Construct drainage dip

40125+ RB 50 Reconstruct drainage dip

40095+ RB 50 Construct drainage dip

40056+ RB 50 Construct drainage dip

40003+ 4" Begin ballast

39952+ 8 End ballast

39897+ RB 50 Reconstruct drainage dip

39883+ 4" Begin ballast

38279+ 12 End ballast

38169+ 4" Begin ballast

38094+ RA 50 Construct drainage dip

37970+ RA 50 Construct drainage dip

37867+ RA 50 Construct drainage dip

50 37608+ LA Construct drainage dip

37210+ 50 Ditch right

37168+ 44 End ballast

50 37147+ LA Construct drainage dip

36770+ 4" Begin ballast

36711+ RA 50 Construct drainage dip

36642+ 12 End ballast

36530+ 4" Begin ballast

36414+ 5 End ballast

36373+ 4" Begin ballast

36321+ JCT CL FSR 234B

5' 36291+ 6' 5' 87 End ballast

10011500Estimated Quantities167TonTrail NO.Sheet No.No. of Sheets
600Estimated Seeding AcresTR 8331431

TR 833 (15)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES
42252+15End ballast

50 42163+ LA Reconstruct drainage dip

42116+ 4" Begin ballast

50 41990+ LA Construct drainage dip

41807+ RA 50 Reconstruct drainage dip

41640+ RB 50 Reconstruct drainage dip

50 41555+ Construct drainage dip

50 41502+ LB 50 Reconstruct drainage dip

41375+ RB 50 Construct drainage dip

41345+ 7 End ballast

41283+ 4" Begin ballast

41249+ RB 50 Construct drainage dip

41191+ RB 50 Construct drainage dip

50 41133+ LB Construct drainage dip

50 41087+ LB Construct drainage dip

50 41032+ LB Construct drainage dip

50 40966+ LB Construct drainage dip

50 40926+ LB Reconstruct drainage dip

50 40872+ LB Reconstruct drainage dip

40666+ RB 50 Reconstruct drainage dip

40556+ CL missing Trail bridge 6

40450+ 19 End ballast

50 40325+ LA Construct drainage dip

40278+RA504"Reconstruct drainage dip
Begin ballast

5' 40177+ 6' 5' 19 End ballast

55017400Estimated Quantities60TonTrail NO.Sheet No.No. of Sheets
950Estimated Seeding AcresTR 8331531

TR 833 (16)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES
5044231+LAConstruct drainage dip

50 44123+ LA Construct drainage dip

50 43975+ LB Construct drainage dip

50 43898+ LB Construct drainage dip

43817+ RB 50 Reconstruct drainage dip

43754+ 21 End ballast

43727+ RB 50 Reconstruct drainage dip

43635+ RB 50 Reconstruct drainage dip

43561+RB504"Reconstruct drainage dip
Begin ballast

43520+ RB 50 Construct drainage dip

43457+ RB 50 Reconstruct drainage dip

43333+ RB 50 Construct drainage dip

43277+ RB 50 Construct drainage dip

43231+ 10 End ballast

43142+ 4" Begin ballast

43085+ RA 50 Reconstruct drainage dip

42947+ 50 Construct drainage dip

42877+ 7 End ballast

42816+ 4" Begin ballast

42776+ RA 50 Construct drainage dip

42627+ 8 End ballast

42556+ 4" Begin ballast

42443+ 10 End ballast

42351+ 4" Begin ballast

5' 42288+ 6' 5' CL trail bridge 5

20014550Estimated Quantities56TonTrail NO.Sheet No.No. of Sheets
750Estimated Seeding AcresTR 8331631

TR 833 (17)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

46950+ 50 Ditch right

50 46872+ LB Construct drainage dip

46630+ RB 50 Construct drainage dip

46538+ RB 50 Construct drainage dip

46486+ RB 50 Construct drainage dip

50 46433+ LB Construct drainage dip

46352+ RB 50 Construct drainage dip

50 46280+ LB Construct drainage dip

46206+ 15 4"

46114+ 6" Begin ballast at bridge

45994+CL trail bridge 3 replace
40-3"x12"x6' deck planks

45974+ 78 End ballast at bridge

45505+ 6" Begin ballast

45422+ RA 50 Reconstruct drainage dip

45389+ 14 End ballast

45313+ RA 50 Reconstruct drainage dip

45260+RA50Construct drainage dip
4"Begin ballast

45156+ RB 50 Reconstruct drainage dip

45035+ RB 50 Reconstruct drainage dip

44803+ CL trail bridge 3

44630+ RA 50 Construct drainage dip

44523+ RA 50 Construct drainage dip

44449+ RA 50 Construct drainage dip

5' 44339+ 6' RA 50 5' Construct drainage dip

15016700Estimated Quantities108TonTrail NO.Sheet No.No. of Sheets
850Estimated Seeding AcresTR 8331731

TR 833 (18)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

50 49244+ LB Construct drainage dip

50 49153+ Ditch left

50 49116+ LA Reconstruct drainage dip

48940+ RB 50 Reconstruct drainage dip

48895+ RB 50 Construct drainage dip

48816+ 50 Ditch right

48696+ RA 50 Construct drainage dip

48522+ 50 Ditch right

48460+ RA 50 Reconstruct drainage dip

48336+ RB 50 Construct drainage dip

48270+ RB 50 Reconstruct drainage dip

48224+ RB 50 Reconstruct drainage dip

50 48165+ LB Construct drainage dip

50 48109+ LB Reconstruct drainage dip

50 48019+ LB Construct drainage dip

47838+ RB 50 Reconstruct drainage dip

47797+ RB 50 Reconstruct drainage dip

50 47720+ LB Construct drainage dip

50 47655+ LB Construct drainage dip

47445+ RB 50 Construct drainage dip

50 47331+ LB Construct drainage dip

50 47202+ LA Reconstruct drainage dip

50 47100+ LB Construct drainage dip

47051+ RB 50 Construct drainage dip

5' 47009+ 6' 50 5' Ditch right

55021700Estimated Quantities0TonTrail NO.Sheet No.No. of Sheets
1250Estimated Seeding AcresTR 8331831

TR 833 (19)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

50 51363+ LB Construct drainage dip

50 51293+ LB Reconstruct drainage dip

50 51227+ LB Construct drainage dip

50 51178+ LB Construct drainage dip

50 51044+ Ditch left

50 50984+ LA Construct drainage dip

50 50903+ LB Construct drainage dip

50 50850+ LB Construct drainage dip

50 50780+ Ditch left

50 50693+ LA Construct drainage dip

50 50624+ LA Construct drainage dip

50536+ RA 50 Construct drainage dip

50380+ RB 50 Construct drainage dip

50325+ RB 50 Construct drainage dip

50266+ RB 50 Construct drainage dip

50180+ RB 50 Construct drainage dip

50077+ RB 50 Construct drainage dip

50022+ RB 50 Construct drainage dip

49950+ RA 50 Construct drainage dip

49883+ RA 50 Construct drainage dip

49606+ 374 End ballast

50 49512+ LB Construct drainage dip

50 48463+ LB Construct drainage dip

50 49390+ LB Construct drainage dip

5' 50 49350+ 6' LB 5' Construct drainage dip

75022450Estimated Quantities374TonTrail NO.Sheet No.No. of Sheets
1200Estimated Seeding AcresTR 8331931

TR 833 (20)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES
5053096+LBReconstruct drainage dip

50 52997+ LB Construct drainage dip

52919+ 26 End ballast

50 52898+ LB Construct drainage dip

52761+4"JCT Gas RW begin
ballast

50 52682+ LA Reconstruct drainage dip

52602+ 50 Ditch right

52536+ 25 End ballast

52519+ RA 50 Reconstruct drainage dip

52393+ RA 50 Construct drainage dip

5052309+LA4"Reconstruct drainage dip
Begin ballast

50 52186+ LA Reconstruct drainage dip

52160+ Cleanout 18" CMP

52146+ JCT CL FSR 238

52133+ Cleanout 18" CMP

50 52074+ LA Reconstruct drainage dip

50 51988+ LA Reconstruct drainage dip

50 51885+ LA Reconstruct drainage dip

50 51797+ LA Construct drainage dip

51709+ 39 End ballast

50 51692+ LB Construct drainage dip

50 51609+ LB Construct drainage dip

5051477+LB4"Construct drainage dip
Begin ballast

5' 50 51436+ 6' LB 5' Construct drainage dip

70016150Estimated Quantities90TonTrail NO.Sheet No.No. of Sheets
850Estimated Seeding AcresTR 8332031

TR 833 (21)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES
54975+1.2End planked LWC

54953+ 2" Begin planked LWC

54830+ RA 50 Reconstruct drainage dip

54791+ RA 50 Reconstruct drainage dip

54680+ RB 50 Construct drainage dip

54585+ RA 50 Reconstruct drainage dip

54475+ RB 50 Reconstruct drainage dip

54399+ RB 50 Construct drainage dip

54321+ 50 Ditch right

54258+ RA 50 Construct drainage dip

50 54142+ LA Reconstruct drainage dip

50 54063+ LA Construct drainage dip

50 53983+ Ditch left

50 53899+ Ditch left

50 53866+ Ditch left

50 53840+ LA Construct drainage dip

50 53762+ LA Construct drainage dip

50 53678+ Ditch left

50 53587+ LA Reconstruct drainage dip

50 53510+ LA Construct drainage dip

53444+ 16 End ballast

53420+ RA 50 Reconstruct drainage dip

53384+ RA 50 Reconstruct drainage dip

5053298+LA4"Reconstruct drainage dip
Begin ballast

5' 53238+ 6' RA 50 5' Reconstruct drainage dip

55017550Estimated Quantities16TonTrail NO.Sheet No.No. of Sheets
1100Estimated Seeding AcresTR 8332131

TR 833 (22)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

56850+ RA 50 Reconstruct drainage dip

56793+ RA 50 Reconstruct drainage dip

50 56767+ LA Construct drainage dip

56625+ RB 50 Construct drainage dip

56478+ RB 50 Reconstruct drainage dip

56354+ RB 50 Construct drainage dip

56286+ RB 50 Construct drainage dip

56185+ RA 50 Construct drainage dip

50 56094+ LA Construct drainage dip

55898+ RB 50 Reconstruct drainage dip

50 55821+ LB Construct drainage dip

50 55651+ LB Reconstruct drainage dip

55627+ 27 End ballast

50 55611+ LB Construct drainage dip

50 55534+ LB Construct drainage dip

50 55455+ LB Reconstruct drainage dip

50 55419+ LB Reconstruct drainage dip

55380+ 4" Begin ballast

50 55343+ LB Reconstruct drainage dip

50 55272+ LB Reconstruct drainage dip

55167+ 21 End ballast

50 55157+ LB Reconstruct drainage dip

55072+ RB 50 Construct drainage dip

55005+ RB 50 Reconstruct drainage dip

5' 54975+ 6' 5' 4" Begin ballast

55021500Estimated Quantities48TonTrail NO.Sheet No.No. of Sheets
1050Estimated Seeding AcresTR 8332231

TR 833 (23)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

59604+ RB 50 Construct drainage dip

50 59473+ LB Construct drainage dip

59377+ RB 50 Construct drainage dip

59206+ 50 Ditch right

58980+ RA 50 Construct drainage dip

58873+ 50 Ditch right

58742+ 4" Begin ballast

58654+ RA 50 Construct drainage dip

58544+ RB 50 Construct drainage dip

58470+ 13 End ballast

58460+ RA 50 Construct drainage dip

58350+ 4" Begin ballast

58303+ RB 50 Construct drainage dip

58231+ RB 50 Construct drainage dip

58152+ 10 End ballast

58057+ 4" Begin ballast

57976+ RB 50 Reconstruct drainage dip

57889+ RA 50 Reconstruct drainage dip

57828+ RB 50 Construct drainage dip

57728+ RB 50 Reconstruct drainage dip

57515+ RB 50 Construct drainage dip

57419+ RB 50 Reconstruct drainage dip

57345+ RB 50 Reconstruct drainage dip

57293+ 35 End ballast

5'56976+6'505'4"Ditch right. Begin
ballast
5016900Estimated Quantities59TonTrail NO.Sheet No.No. of Sheets
950Estimated Seeding AcresTR 8332331

TR 833 (24)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES
62114+RB50Construct drainage dip

50 62038+ LB Construct drainage dip

50 61918+ LB Construct drainage dip

50 61822+ Ditch left

50 61759+ LA Reconstruct drainage dip

50 61670+ LA Reconstruct drainage dip

61581+ JCT CL FSR 238

61551+ 109 End ballast

50 61231+ LB Construct drainage dip

50 61142+ LB Construct drainage dip

50 61051+ LB Reconstruct drainage dip

50 60949+ LB Reconstruct drainage dip

60845+ RB 50 Reconstruct drainage dip

60727+ RB 50 Construct drainage dip

60648+ RA 50 Reconstruct drainage dip

60560+RA504"Reconstruct drainage dip
Begin ballast

60477+ RA 50 Construct drainage dip

60370+ 50 Ditch right

60163+ 50 Ditch right

60124+ RB 50 Construct drainage dip

60043+ 50 Ditch right

59970+ 50 Ditch right

59780+ RB 50 Construct drainage dip

59712+ RB 50 Reconstruct drainage dip

5' 59672+ 6' 5' 102 End ballast

45017650Estimated Quantities211TonTrail NO.Sheet No.No. of Sheets
1100Estimated Seeding AcresTR 8332431

TR 833 (25)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

64601+ RA 50 Reconstruct drainage dip

64568+ RA 50 Reconstruct drainage dip

64334+ RB 50 Construct drainage dip

64291+ RB 50 Reconstruct drainage dip

64183+ 4" Begin ballast

64137+ RA 50 Reconstruct drainage dip

63955+ RA 50 Construct drainage dip

63902+ 88 End ballast

63879+ RA 50 Construct drainage dip

63728+ RB 50 Reconstruct drainage dip

63661+ RB 50 Reconstruct drainage dip

63640+ End planked LWC

63605+ Begin planked LWC

63553+ RA Reconstruct drainage dip

50 63331+ Ditch left

50 63286+ LA Construct drainage dip

63100+ 4" Begin ballast

50 63028+ Ditch left

50 62917+ LA Construct drainage dip

50 62790+ LA Construct drainage dip

62593+ RB 50 Construct drainage dip

62516+ 50 Ditch right

62436+ RA 50 Construct drainage dip

62303+ RB 50 Reconstruct drainage dip

5' 62214+ 6' RB 50 5' Construct drainage dip

25017700Estimated Quantities88TonTrail NO.Sheet No.No. of Sheets
950Estimated Seeding AcresTR 8332531

TR 833 (26)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

67057+ RB 50 Reconstruct drainage dip

66870+ RB 50 Reconstruct drainage dip

66486+ CL Trail bridge 1

65936+CL Trail bridge 2. Replace
30 - 3"x12"x6' decking

50 65862+ LA Reconstruct drainage dip

65830+ 4" Begin ballast

50 65704+ LB Construct drainage dip

50 65621+ Construct drainage dip

50 65571+ LB Construct drainage dip

50 65518+ Ditch left

65443+ LA Reconstruct drainage dip

50 65416+ LA Construct drainage dip

50 65335+ LA Construct drainage dip

50 65292+ LA Reconstruct drainage dip

50 65213+ LA Construct drainage dip

50 65096+ LB Reconstruct drainage dip

65016+ RB 50 Construct drainage dip

64920+ 81 End ballast

64910+ RB 50 Construct drainage dip

50 64841+ LB Reconstruct drainage dip

50 64793+ LB Construct drainage dip

50 64723+ LB Construct drainage dip

64681+ 1.4 End planked LWC

5' 64655+ 6' 5' Begin planked LWC

65016200Estimated Quantities81TonTrail NO.Sheet No.No. of Sheets
850Estimated Seeding AcresTR 8332631

TR 833 (27)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES
69231+31End ballast

50 69110+ LA Reconstruct drainage dip

50 68967+ LB Reconstruct drainage dip

68946+ 4" Begin ballast

50 68880+ LB Construct drainage dip

50 68802+ LB Construct drainage dip

50 68720+ Ditch left

50 68663+ LB Construct drainage dip

50 68575+ LB Construct drainage dip

50 68490+ Ditch left

50 68438+ LB Construct drainage dip

50 68245+ LB Construct drainage dip

68185+ 259 End ballast

68141+ RB 50 Reconstruct drainage dip

68045+ RB 50 Reconstruct drainage dip

50 67988+ LB Reconstruct drainage dip

67840+130Install 96" diameter X 22'
12 GA aluminum CMP

50 67790+ LB Construct drainage dip

50 67727+ LB Construct drainage dip

50 67615+ LB Construct drainage dip

50 67513+ LB Construct drainage dip

50 67442+ LB Reconstruct drainage dip

50 67349+ LB Reconstruct drainage dip

50 67213+ LB Construct drainage dip

5' 50 67112+ 6' LB 5' Construct drainage dip

95019100Estimated Quantities290TonTrail NO.Sheet No.No. of Sheets
1050Estimated Seeding AcresTR 8332731

TR 833 (28)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES
5070963+Ditch left

70931+ 28 End ballast

50 70908+ LA Construct drainage dip

70855+ End planked LWC

70818+ Begin planked LWC

50 70766+ LA Reconstruct drainage dip

70675+ 4" Begin ballast

50 70604+ LB Reconstruct drainage dip

50 70545+ LB Reconstruct drainage dip

50 70478+ LA Construct drainage dip

50 70276+ LB Construct drainage dip

50 70206+ LB Construct drainage dip

70162+ 22 End ballast

50 70146+ LB Reconstruct drainage dip

70077+27Install 48" dia X 14' 12 GA
Aluminum CMP

69960+ 4" Begin ballast

50 69921+ LB Construct drainage dip

50 69771+ LB Construct drainage dip

50 69723+ LB Construct drainage dip

50 69677+ LB Construct drainage dip

50 69598+ Ditch left

50 69520+ LA Construct drainage dip

50 69445+ LB Construct drainage dip

50 69330+ Ditch left

5' 50 69267+ 6' 5' Ditch left

900140Estimated Quantities50TonTrail NO.Sheet No.No. of Sheets
900Estimated Seeding AcresTR 8332831

TR 833 (29)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

74427+ RB 50 Construct drainage dip

74330+ RB 50 Reconstruct drainage dip

74250+ RB 50 Construct drainage dip

74166+ RB 50 Construct drainage dip

74063+ CL FM 1375

73815+ RB 50 Reconstruct drainage dip

73750+ RB 50 Reconstruct drainage dip

50 73705+ LB Construct drainage dip

73651+ RB 50 Reconstruct drainage dip

73512+ 172 End ballast

73414+ RB 50 Reconstruct drainage dip

50 73200+ LB Construct drainage dip

50 72891+ LB Construct drainage dip

50 72675+ LB Construct drainage dip

50 72604+ LB Construct drainage dip

50 72513+ LB Reconstruct drainage dip

50 72332+ LB Construct drainage dip

72238+ 2 Fill hole

50 72201+ Ditch left

5071950+LA4"Reconstruct drainage dip
Begin ballast

71741+ 72 End ballast

50 71490+ LB Construct drainage dip

50 71171+ LB Construct drainage dip

5'5071086+6'LB5'4"Reconstruct drainage dip
Begin ballast
60019400Estimated Quantities246TonTrail NO.Sheet No.No. of Sheets
1000Estimated Seeding AcresTR 8332931

TR 833 (30)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES

50 76468+ LA Construct drainage dip

76372+ RB 50 Construct drainage dip

76300+ RB 50 Construct drainage dip

50 76201+ LB Construct drainage dip

50 76157+ LB Reconstruct drainage dip

50 76100+ LB Construct drainage dip

76053+ 46 End ballast

50 76040+ LB Construct drainage dip

50 75877+ LB Construct drainage dip

50 75744+ LA Reconstruct drainage dip

50 75651+ Ditch left

75635+ 4" Begin ballast

50 75602+ LB Construct drainage dip

50 75463+ LB Construct drainage dip

50 75274+ LB Construct drainage dip

50 75204+ LB Construct drainage dip

50 75111+ LB Construct drainage dip

50 75033+ LB Construct drainage dip

74942+ RB 50 Reconstruct drainage dip

74854+ RB 50 Reconstruct drainage dip

74814+ RB 50 Reconstruct drainage dip

74716+ RB 50 Reconstruct drainage dip

74652+ 17 End ballast

74633+ 50 Ditch right

5'74501+6'RA505'4"Construct drainage dip
Begin ballast
70020400Estimated Quantities63TonTrail NO.Sheet No.No. of Sheets
1100Estimated Seeding AcresTR 8333031

TR 833 (31)

DESCRIPTION OF WORKMUT Lake Loop
S&F = Seed and FertilizeTW = Travelway
FD=Furrow Ditch (Linear Feet)6' = Travelway
C= Clearing (and Grubbing of Subgrade)New trail - See Typical ____
(Measured from Centerline - on New Trail)Existing trail - See Typical ____
(Measured from Edge of Existing Trail )Dip - L, R, I = Drain Dip - Left, Right, Intercepting
A, B = Ahead, Back
CA GR: R, P, OR = Crushed Aggregate Grade: R, P, or OR
WG = Washed Gravel
LEFTROAD BEDRIGHT
SSS U R F A C I N G
&FDTWFD&CA GR: RCA GR: ABCCA GR:ORWGBORROW
FCLTSTATIONDIPRTCFTonInTonInTonInCYInCYInNOTES
77095+EOP at JCT with Boy
Scout and Sandy trails

77022+ RA 50 Reconstruct drainage dip

50 76986+ LA Construct drainage dip

50 76902+ LA Construct drainage dip

50 76808+ LA Construct drainage dip

50…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .