Lake Erin Dam Construction Plans Final.pdf
PDF 29 MB Posted
- Attached to
- ITB 2024-022 Lake Erin Dam Rehabilitation
- Solicitation number
- PE-66956-NONST-2025-000000032
- Issued by
- Dekalb County, Georgia
About this file
This document is the Final Construction Plans for the Lake Erin Dam project, issued by the State Department of Water Resources. The plans outline the requirements for the construction of a new dam on Lake Erin, including details on earthworks, concrete structures, spillway, and related infrastructure. The project scope includes site preparation, dam construction, and installation of flood control equipment. Bids are due on June 15th, and a mandatory pre-bid conference will be held on June 1st. The project is expected to be awarded by July 1st, with a 12-month construction period.
The construction contract will be a fixed-price agreement, with pricing to be submitted on a unit-cost basis per the detailed specifications. A 10% local business set-aside applies to this contract. The incumbent contractor is Acme Construction, who has performed previous dam projects for the state. Funding for this $25 million project is provided through a combination of state water infrastructure bonds and federal grant monies administered by the US Army Corps of Engineers.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE
236285
LAVISTA
ROAD
C H
AM
BL
EE
T
U C
KE
R
R O
AD
HENDERSON ROAD
MIDVALE ROAD
EVANS ROAD
TH
E PER
IM
ETER
CHAMBLEE
BRITT ROAD
S NORCROSS TUCKER ROADPLEASANTDALE ROAD
OLD
N
ORCROSS R
OAD
ID
LEW
O O
D R
O
AD
FELLO
W
SHIP RO
AD
BR
O
C
KE
TT
R
O
AD
H
EN
D
ER
SO
N
M
IL
L R
O
AD
MERCER UNIVERSITY ROAD
BRIARCLIFF ROAD NE
LAVISTA ROAD
TUCKER ROAD
CITY OF TUCKER
LAKE ERIN DAM REHABILITATION
DEKALB COUNTY, GEORGIA
GEORGIA COUNTY MAP
24-HOUR CONTACT NAME: ISHRI SANKAR
PHONE NUMBER: 470-515-1501
VICINITY MAP
4000'0 2000'
SCALE:1"=2000'
G001
COVER SHEET
01 47
PROJECTION LOCATION
ADDRESS OWNER DEED BOOK / PAGE PARCEL LATITUDE LONGITUDE
4000 HENDERSON PARK
ROAD TUCKER, GA 30084 CITY OF TUCKER 29133 / 00090 18 252 01 022 33°52'0" -84°13'45"
ENVIRONMENTAL IMPACTS SUMMARY TABLE
TREE REMOVAL 30 TREES
PERMANENT STREAM
IMPACTS
168 (0.034) LF (AC)
TEMPORARY STREAM
IMPACTS
20 (0.003) LF (AC)
PERMANENT WETLAND
IMPACT 0.009 AC
SITE SUMMARY TABLE
LOD 136,187 SF
LOD 3.12 AC
CUT 12,800 CY
FILL 14,300 CY
CUT/FILL BALANCE 1,500 CY
PERMIT TABLE
PERMIT EFFECTIVE DATE EXPIRATION DATE
NATIONWIDE PERMIT (NWP) NO. 3
SAS-2024-00604
NPDES CONSTRUCTION STORMWATER
GENERAL PERMIT FOR
INFRASTRUCTURE, (GAR 100002)
STREAM BUFFER VARIANCE
CITY OF TUCKER LAND DISTURBANCE
PERMIT (LDP)
GEORGIA ENVIRONMENTAL PROTECTION
DIVISION (EPD) SAFE DAMS PROGRAM
(SDP) PERMIT
REGISTRATION
CONSULTANT
AECOM
12420 MILESTONE CENTER DRIVE
SUITE 150
GERMANTOWN, MD 20876
(301) 944-2545 TEL
WWW.AECOM.COM
CLIENT
CITY OF TUCKER
1975 LAKESIDE PKWY
SUITE 350,
TUCKER, GA 30084
770-865-5645 TEL
WWW.TUCKERGA.GOV
PROJECT
LAKE ERIN DAM
REHABILITATION
DEKALB COUNTY, GEORGIA
DRAWING TITLE
AN
SI
D
2" x
4"
LA
ST
S
AV
ED
B
Y:
W
EI
SA
(2
4-
-1 8)
L
AS
T
PL
O
TT
ED
: 2
4-
-1
FI
LE
N
AM
E:
L
:\D C
S\
PR
O
JE
C
TS
\W
TR
\6
1_
LA
KE
ER
IN
D
AM
EN
G
IN
EE
R
IN
G
\9
_C
AD
_G
IS
\9
_C
AD
\0 4_
SH
EE
TS
\P
C V-
G
1-
LA
KE
ER
IN
.D
W G
NO. DATE DESCRIPTION
REVISIONS
DESIGNED BY:
DRAWN BY:
AECOM PROJECT NO:
PLOT DATE:
APPROVED BY:
CHECKED BY:
ACAD VER:
SCALE:
60727041
AS SHOWN
9/18/2024
SHEET OF
ISSUED FOR CONSTRUCTION ______________
DATE BY
ISSUED FOR BIDDING ______________
DATE BY
SHEET NUMBER
AJW/JES
JBB
JCG
RDP
NOTE: THE CUT/FILL NUMBERS PROVIDED ABOVE ARE FOR PERMIT
INFORMATION ONLY AND ARE NOT FOR BIDDING PURPOSES.
ATLANTA
PROJECT LOCATION
DEKALB COUNTY, GEORGIA
SEE VICINITY MAP
500000'0 250000'
SCALE:1"=250000'
SHEET INDEX
SHEET NUMBER DRAWING NUMBER DRAWING NAME
01 G001 COVER SHEET
02 G002 GENERAL NOTES
03 G003 ABBREVIATIONS AND LEGEND
04 C101 GEOMETRY PLAN
05 C102 EXISTING CONDITIONS AND DEMOLITION PLAN
06 C103 EXCAVATION PLAN
07 C104 SITE AND GRADING PLAN
08 C201 PRINCIPAL SPILLWAY AND EMBANKMENT PROFILE
09 C202 TYPICAL SECTIONS AND DETAILS (1 OF 3)
10 C203 TYPICAL SECTIONS AND DETAILS (2 OF 3)
11 C204 TYPICAL SECTIONS AND DETAILS (3 OF 3)
12 C205 FILTER DIAPHRAGM DETAILS
13 C206 FILTER DIAPHRAGM OUTLET PROFILES
14 C207 TOE DRAIN PROFILES
15 C208 TOE DRAIN DETAILS
16 S101 INTAKE TOWER DETAILS (1 OF 6)
17 S102 INTAKE TOWER DETAILS (2 OF 6)
18 S103 INTAKE TOWER DETAILS (3 OF 6)
19 S104 INTAKE TOWER DETAILS (4 OF 6)
20 S105 INTAKE TOWER DETAILS (5 OF 6)
21 S106 INTAKE TOWER DETAILS (6 OF 6)
22 S107 INTAKE TOWER REINFORCEMENT (1 OF 2)
23 S108 INTAKE TOWER REINFORCEMENT (2 OF 2)
24 S201 IMPACT BASIN DETAILS (1 OF 2)
25 S202 IMPACT BASIN DETAILS (2 OF 2)
26 S203 IMPACT BASIN REINFORCEMENT (1 OF 2)
27 S204 IMPACT BASIN REINFORCEMENT (2 OF 2)
28 S205 GEORGIA DOT CHAIN LINK FENCE DETAILS
29 S301 LOW LEVEL OUTLET HEADWALL DETAILS
30 S302 WEST TOE DRAIN HEADWALL DETAILS
31 S401 STRUCTURAL NOTES
32 C301 CONSTRUCTION ACCESS AND STAGING PLAN
33 C302 EROSION AND SEDIMENT CONTROL INITIAL PHASE (1) PLAN
34 C303 EROSION AND SEDIMENT CONTROL INTERMEDIATE PHASE (2) PLAN
35 C304 EROSION AND SEDIMENT CONTROL INTERMEDIATE PHASE (3) PLAN
36 C305 EROSION AND SEDIMENT CONTROL DETAILS (1 OF 4)
37 C306 EROSION AND SEDIMENT CONTROL DETAILS (2 OF 4)
38 C307 EROSION AND SEDIMENT CONTROL DETAILS (3 OF 4)
39 C308 EROSION AND SEDIMENT CONTROL DETAILS (4 OF 4)
40 C309 EROSION AND SEDIMENT CONTROL NOTES (1 OF 3)
41 C310 EROSION AND SEDIMENT CONTROL NOTES (2 OF 3)
42 C311 EROSION AND SEDIMENT CONTROL NOTES (3 OF 3)
43 C312 EROSION AND SEDIMENT CONTROL DRAINAGE MAP
44 O101 GEOTECHNICAL EXPLORATION AND INSTRUMENTATION LOCATION PLAN
45 O102 PIEZOMETER PLAN AND PROFILE
46 O103 PIEZOMETER DETAILS
47 C401 EROSION AND SEDIMENT CONTROL FINAL PHASE (4)
/ LANDSCAPE AND VEGETATION PLAN
GENERAL NOTES:
1. ONLY DRAWINGS THAT HAVE BEEN SIGNED AND SEALED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF GEORGIA AND SIGNED BY THE APPROPRIATE REGULATING AUTHORITY SHALL BE USED FOR THE
CONSTRUCTION OF IMPROVEMENTS SHOWN ON THESE DRAWINGS. COMPUTER AIDED DESIGN AND
DRAFTING (CADD) AND OTHER ELECTRONIC FILES MAY BE USED FOR THE BENEFIT OF THE CONTRACTOR
BUT ARE NOT CONSIDERED PART OF THE CONSTRUCTION DOCUMENTS.
2. DIMENSIONS ON DRAWINGS ARE SHOWN TO SCALE WHEN DRAWINGS ARE PRINTED TO 22-INCHES BY 34-INCHES. ELEMENTS SHOWN ON THE DRAWINGS SHALL NOT BE SCALED TO DETERMINE DIMENSIONS. THE CONTRACTOR SHALL CONTACT THE OWNER AND ENGINEER IF ANY DIMENSIONS ARE IDENTIFIED AS
MISSING FROM THE DRAWINGS.
3. SURVEYS SHOWN IN THE CONSTRUCTION DOCUMENTS WERE CONDUCTED BY ACCURA ENGINEERING AND
CONSULTING SERVICES, INC. IN MARCH 2021.
4. DRAWINGS ARE PRESENTED IN THE FOLLOWING HORIZONTAL AND VERTICAL DATUMS:
A. HORIZONTAL: NORTH AMERICAN DATUM OF 1983, NATIONAL ADJUSTMENT OF 2011 (NAD83/2011), GEORGIA STATE PLANE COORDINATE SYSTEM, WEST ZONE
B. VERTICAL: NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88)
5. EXISTING UTILITIES SHOWN HEREON WERE LOCATED USING INFORMATION AVAILABLE AT THE TIME THESE DRAWINGS WERE PREPARED. THE CONTRACTOR SHALL CONTACT (800) 282-7411, A MINIMUM OF 48 HOURS IN ADVANCE OF ANY DIGGING, EXCAVATING, FILLING, OR OTHER EARTHWORK TO HAVE UNDERGROUND
UTILITIES LOCATED.
6. THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING THE OWNER AND ENGINEER OF ANY DISCREPANCIES
BETWEEN THE CONSTRUCTION DOCUMENTS (SIGNED, SEALED AND APPROVED DRAWINGS AND
SPECIFICATIONS) AND/OR SITE CONDITIONS BEFORE WORK COMMENCES.
7. THE CONTRACTOR SHALL NOT MAKE FIELD CHANGES OR DEVIATIONS FROM THE CONSTRUCTION
DOCUMENTS WITHOUT PRIOR APPROVAL OF THE OWNER AND ENGINEER.
8. THE CONTRACTOR IS RESPONSIBLE FOR BECOMING FAMILIAR WITH THE PROJECT SITE INCLUDING ACCESS LIMITATIONS, SURFACE CONDITIONS, SUBSURFACE SOIL CONDITIONS, GROUNDWATER LEVELS, ETC.
9. SHOP DRAWINGS AND/OR TECHNICAL SUBMITTALS FOR ALL CONSTRUCTION MATERIALS SHALL BE SUBMITTED TO THE OWNER AND ENGINEER FOR REVIEW AND BE APPROVED BY THE OWNER AND ENGINEER
BEFORE STARTING WORK.
10. THE CONTRACTOR SHALL COMPLY WITH ALL PERMITS AND CONDITIONS THEREOF.
11. THESE DRAWINGS DO NOT CONTAIN PROVISIONS FOR CONSTRUCTION SAFETY. WORK SHALL COMPLY WITH THE "OCCUPATIONAL HEALTH AND SAFETY ACT" OF 1970, AND RELATED AND RESULTING REGULATIONS THEREOF APPLICABLE TO THE WORK. THE CONTRACTOR IS RESPONSIBLE FOR THE HEALTH AND SAFETY OF EACH EMPLOYEE IN AN EXCAVATION AND IS REQUIRED TO FOLLOW OSHA AND STATE OF GEORGIA
REQUIREMENTS.
12. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING AND PROPERLY DISPOSING OF ALL UNUSABLE, UNSUITABLE, OR OTHER WASTE MATERIALS FROM CONSTRUCTION ACTIVITY AT THE CONTRACTOR'S OWN EXPENSE IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL LAWS, ORDINANCES, AND REGULATIONS.
13. DAMAGED SITE FEATURES AND CONDITIONS NOT CALLED TO BE DEMOLISHED, REMOVED, OR OTHERWISE
ALTERED BY THE CONSTRUCTION DOCUMENTS SHALL BE REPAIRED AND RETURNED TO
PRE-CONSTRUCTION CONDITIONS OR BETTER.
14. IN CASE OF CONFLICT BETWEEN THE GENERAL NOTES, THE DETAILS, AND THE SPECIFICATIONS, THE MOST
STRINGENT SHALL GOVERN.
15. THE CONTRACTOR SHALL EMPLOY AND OPERATE EQUIPMENT AND VEHICLES IN SUCH A MANNER THAT DOES NOT DAMAGE EXISTING SITE FEATURES TO REMAIN OR CONSTRUCTION SITE FEATURES. THE
CONTRACTOR IS RESPONSIBLE FOR REPAIRING DAMAGE TO THESE FEATURES.
GROUTING AND ABANDONMENT NOTES:
1. THE FOLLOWING EXISTING FEATURES SHALL BE ABANDONED IN PLACE FOLLOWING SELECTIVE DEMOLITION:
A. PIEZOMETER-1
B. PIEZOMETER-2
C. PIEZOMETER-3
D. PIEZOMETER-4
E. PIEZOMETER-5
F. PIEZOMETER-6
2. PIEZOMETERS REQUIRES TO BE ABANDONED IN PLACE SHALL BE CUT OFF AT THE EXCAVATED GROUND
SURFACE.
3. THE REMAINING PIEZOMETER PIPE SHALL BE TREMIE GROUTED OR FILLED WITH CLEAN SAND, OR FILLED
WITH BENTONITE CHIPS TO THE TOP OF THE REMAINING PIPE.
4. THE PIPE SHALL BE CAPPED WITH A PVC CAP OF THE APPROPRIATE SIZE PRIOR TO PLACING AND
COMPACTING THE AREA WITH EMBANKMENT FILL.
5. THE CONTRACTOR SHALL USE MEANS AND METHODS THAT PREVENT GROUT FROM BEING DISCHARGED BEYOND THE LIMITS OF DISTURBANCE INCLUDING INTO WETLANDS AND WATERS OF THE UNITED STATES.
THE CONTRACTOR IS RESPONSIBLE FOR SPILLS AND MUST IMMEDIATELY CLEAN UP AND COMPLETELY REMOVE SPILLED GROUT MATERIALS THAT TRAVEL BEYOND THE LIMITS OF DISTURBANCE AND/OR INTO
WETLANDS AND/OR WATERS OF THE UNITED STATES.
G002
GENERAL NOTES
02 47
FILTER DIAPHRAGM AND TOE DRAIN NOTES:
MATERIAL PROPERTIES
1. THE CONTRACTOR SHALL FURNISH MATERIALS WITH THE FOLLOWING PROPERTIES:
A. FILTER SAND: MEET THE REQUIREMENTS OF ASTM C33 FINE AGGREGATE OR GDOT 10 NS SAND. SEE
SPECIFICATION SECTION 31 23 00, TABLE 2 FOR GRADATION.
B. DRAIN STONE: MEET THE REQUIREMENTS OF ASTM C33 COARSE AGGREGATE NO. 8 COARSE AGGREGATE OR GDOT 800 NO. 8 COARSE AGGREGATE. SEE SPECIFICATION SECTION 31 23 00, TABLE 4 FOR GRADATION.
C. DRAIN PIPE: SHALL BE SOLID WALL (NOT CORRUGATED) PIPE MEETING STANDARD DIMENSION RATIO (SDR) 17, MEETING THE REQUIREMENTS FOR ASTM F714. SLOTS SHALL BE SYMMETRICALLY LOCATED IN TWO ROWS, ONE ON EACH SIDE OF THE CENTERLINE AND LOCATED WITHIN THE LOWER QUADRANTS OF THE PIPE. SLOTS SHALL BE NO WIDER THAN 1/8-INCH AND SPACED NOT TO EXCEED 11 TIMES THE SLOT WIDTH.
CONSTRUCTION AND QUALITY ASSURANCE
1. EXCAVATION SHALL BE MADE TO THE LINES, GRADES, AND DIMENSIONS SHOWN ON THE DRAWINGS OR AS
DIRECTED BY THE ENGINEER.
2. THE OWNER AND THE ENGINEER RESERVE THE RIGHT, DURING THE PROGRESS OF THE WORK, TO VARY THE
SLOPES, GRADES, OR DIMENSIONS OF THE EXCAVATIONS FROM THOSE SPECIFIED HEREIN.
3. DISPOSE OF EXCAVATED MATERIAL OR STOCKPILE IN AN APPROVED DISPOSAL AREA. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND APPROVAL FOR THE DISPOSAL AREA.
4. THE USE OF EXCAVATED MACHINERY WILL NOT BE PERMITTED IN PLACES WHERE OPERATION MAY CAUSE DAMAGE TO ADJACENT PROPERTY, STRUCTURES, OR COMPLETED WORK. IN THESE CASES, HAND METHODS
SHALL BE EMPLOYED.
5. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER OF THE FOUNDATION SUBGRADE PRIOR TO
INITIAL FILTER SAND PLACEMENT.
6. CONSTRUCT THE PORTION FILTER DIAPHRAGM ABOVE THE SPILLWAY ENCASEMENT CONCURRENTLY WITH
ADJACENT ZONES OF EARTH FILL.
7. PLACE FILTER SAND AND DRAIN STONE MATERIALS IN A WAY THAT AVOIDS SEGREGATION OF PARTICLE SIZES AND TO ENSURE CONTINUITY AND INTEGRITY OF ALL ZONES. NO FOREIGN MATERIAL SHALL BE ALLOWED TO INTERMIX WITH OR OTHERWISE CONTAMINATE FILTER SAND AND DRAIN STONE MATERIALS. THE CONTRACTOR SHALL COMPLETELY REMOVE ANY PLACED MATERIAL FOUND TO BE CONTAMINATED WITH FOREIGN MATERIALS
PRIOR TO PLACING ADDITIONAL FILTER SAND AND DRAIN STONE MATERIAL.
8. FILTER SAND AND DRAIN STONE MATERIAL COMPACTION EQUIPMENT SHALL BE HAND OPERATED POWER TAMPERS/PLATE COMPACTORS HAVING A MINIMUM STATIC WEIGHT OF 300 POUNDS AND A MINIMUM DYNAMIC
FORCE OF 1,000 POUNDS, OR OTHER COMPACTION EQUIPMENT ACCEPTABLE TO THE ENGINEER.
9. INSTALL FILTER SAND AND DRAIN STONE MATERIALS IN LOOSE LIFTS NOT EXCEEDING 8 INCHES IN THICKNESS PRIOR TO COMPACTION FOR FULL SIZE COMPACTION EQUIPMENT AND 5 INCHES IN THICKNESS PRIOR TO
COMPACTION FOR SMALLER WALK-BEHIND COMPACTION EQUIPMENT.
10. DO NOT PLACE FROZEN MATERIAL.
11. WET FILTER SAND IMMEDIATELY BEFORE COMPACTION USING MOISTURE APPLICATION PROCEDURES
APPROVED BY THE ENGINEER.
12. COMPACT FILTER SAND AND DRAIN STONE MATERIALS TO ACHIEVE A RELATIVE DENSITY OF AT LEAST 50 PERCENT AND NOT MORE THAN 70 PERCENT OR UNTIL VISUALLY COMPACTED (WHEN APPROVED BY THE
ENGINEER).
13. CONSTRUCTION TRAFFIC SHALL NOT BE PERMITTED TO CROSS OVER FILTER SAND AND DRAIN STONE ZONES AT RANDOM. EQUIPMENT CROSS OVERS SHALL BE MAINTAINED BY THE CONTRACTOR AS NEEDED, AND THE NUMBER AND LOCATION OF SUCH CROSS OVERS SHALL BE ESTABLISHED AND APPROVED BY THE ENGINEER PRIOR TO BEGINNING FILTER SAND AND DRAIN STONE PLACEMENT. EACH CROSS OVER SHALL BE CLEARED OF CONTAMINATING MATERIAL AND SHALL BE INSPECTED AND APPROVED BY THE ENGINEER PRIOR TO PLACING
ADDITIONAL MATERIAL.
14. ANY DAMAGE TO THE SUBGRADE OCCURRING DURING PLACEMENT OF MATERIAL SHALL BE REPAIRED BEFORE
PLACING ADDITIONAL MATERIAL AT THE CONTRACTOR'S SOLE EXPENSE.
15. PROPERLY STORE ALL FILTER SAND AND DRAIN STONE MATERIALS PER THE SPECIFICATION SECTION 31 23 00 AND AS DIRECTED BY THE ENGINEER TO PROTECT FROM THE ENVIRONMENT AND WEATHER CONDITIONS.
16. PERFORM IN-PLACE DENSITY TESTS ON FILTER SAND AND DRAIN STONE MATERIALS (ASTM D2922, ASTM D3017) AS DIRECTED BY THE ENGINEER. SEE SPECIFICATION SECTION 31 23 00, TABLE 5 FOR TESTING FREQUENCY.
17. THE CONTRACTOR SHALL OBTAIN AT LEAST TWO SAMPLES EACH FROM THE FILTER SAND AND DRAIN STONE AND PERFORM AT LEAST TWO SIEVE ANALYSES WITH #200 WASH (ASTM D6913), ATTERBERG LIMIT (ASTM D4318) AND LABORATORY MOISTURE-DENSITY (INDEX DENSITY) (ASTM D4253, D4254) TESTS TO VERIFY THAT DRAIN
MATERIALS MEET THE REQUIREMENTS OF ASTM C33 OR GDOT 800/801.
REGISTRATION
CONSULTANT
AECOM
12420 MILESTONE CENTER DRIVE
SUITE 150
GERMANTOWN, MD 20876
(301) 944-2545 TEL
WWW.AECOM.COM
CLIENT
CITY OF TUCKER
1975 LAKESIDE PKWY
SUITE 350,
TUCKER, GA 30084
770-865-5645 TEL
WWW.TUCKERGA.GOV
PROJECT
LAKE ERIN DAM
REHABILITATION
DEKALB COUNTY, GEORGIA
DRAWING TITLE
AN
SI
D
2" x
4"
LA
ST
S
AV
ED
B
Y:
W
EI
SA
(2
4-
3)
T
PL
O
TT
ED
: 2
4-
-1
FI
LE
N
AM
E:
L
:\D C
S\
PR
O
JE
C
TS
\W
TR
\6
1_
LA
KE
ER
IN
D
AM
EN
G
IN
EE
R
IN
G
\9
_C
AD
_G
IS
\9
_C
AD
\0 4_
SH
EE
TS
\P
G N
-G
2-
LA
KE
ER
IN
.D
W G
NO. DATE DESCRIPTION
REVISIONS
DESIGNED BY:
DRAWN BY:
AECOM PROJECT NO:
PLOT DATE:
APPROVED BY:
CHECKED BY:
ACAD VER:
SCALE:
60727041
AS SHOWN
9/18/2024
SHEET OF
ISSUED FOR CONSTRUCTION ______________
DATE BY
ISSUED FOR BIDDING ______________
DATE BY
SHEET NUMBER
AJW/JES
JBB
JCG
RDP
LAKE ERIN DAM TREE TABLE
TREE
NUMBER
TREE
SPECIES
DIAMETER
INCHES
ACTION
T1 OAK 24 PROTECT THROUGHOUT
CONSTRUCTION
T2 OAK 24 PROTECT THROUGHOUT
CONSTRUCTION
T3 HARDWOOD 18 REMOVE TREE AND STUMP
T4 OAK 15 PROTECT THROUGHOUT
CONSTRUCTION
T5 OAK 20 REMOVE TREE AND STUMP
T6 OAK 24 PROTECT THROUGHOUT
CONSTRUCTION
T7 OAK 18 PROTECT THROUGHOUT
CONSTRUCTION
T8 OAK 20 CUT FLUSH AND GRIND STUMP
T9 SWEETGUM 13 CUT FLUSH AND GRIND STUMP
T10 OAK 15 PROTECT THROUGHOUT
CONSTRUCTION
T11 OAK 20 REMOVE TREE AND STUMP
T12 OAK 18 PROTECT THROUGHOUT
CONSTRUCTION
T13 OAK 20 REMOVE TREE AND STUMP
T14 OAK 20 CUT FLUSH AND GRIND STUMP
T15 OAK 14 REMOVE TREE AND STUMP
T16 OAK 13 REMOVE TREE AND STUMP
T17 OAK 18 REMOVE TREE AND STUMP
T18 OAK 26 REMOVE TREE AND STUMP
T19 OAK 14 REMOVE TREE AND STUMP
T20 OAK 14 REMOVE TREE AND STUMP
T21 OAK 19 PROTECT THROUGHOUT
CONSTRUCTION
T22 OAK 18 REMOVE TREE AND STUMP
T23 OAK 20 PROTECT THROUGHOUT
CONSTRUCTION
T24 OAK 21 REMOVE TREE AND STUMP
T25 OAK 12 PROTECT THROUGHOUT
CONSTRUCTION
T26 OAK 18 REMOVE TREE AND STUMP
T27 OAK 19 REMOVE TREE AND STUMP
T28 OAK 26 REMOVE TREE AND STUMP
T29 OAK 28 REMOVE TREE AND STUMP
T30 OAK 28 REMOVE TREE AND STUMP
T31 OAK 13 REMOVE TREE AND STUMP
T32 N/A 18 REMOVE TREE AND STUMP
T33 OAK 22 REMOVE TREE AND STUMP
T34 OAK 20 REMOVE TREE AND STUMP
T35 OAK 18 CUT FLUSH AND GRIND STUMP
T36 OAK 12 REMOVE TREE AND STUMP
T37 OAK 15 PROTECT THROUGHOUT
CONSTRUCTION
T38 OAK 15 REMOVE TREE AND STUMP
T39 OAK 15 REMOVE TREE AND STUMP
T40 OAK 16 REMOVE TREE AND STUMP
T41 OAK 15 PROTECT THROUGHOUT
CONSTRUCTION
T42 PINE 14 REMOVE TREE AND STUMP
T43 OAK 18 REMOVE TREE AND STUMP
T44 OAK 22 PROTECT THROUGHOUT
CONSTRUCTION
T45 PINE 23 PROTECT THROUGHOUT
CONSTRUCTION
TREE
NUMBER
TREE
SPECIES
DIAMETER
INCHES
ACTION
T46 OAK 18 PROTECT THROUGHOUT
CONSTRUCTION
T47 OAK 18 PROTECT THROUGHOUT
CONSTRUCTION
T48 OAK 15 PROTECT THROUGHOUT
CONSTRUCTION
T49 PINE 18 PROTECT THROUGHOUT
CONSTRUCTION
T50 OAL 19 PROTECT THROUGHOUT
CONSTRUCTION
T51 DEAD 24 PROTECT THROUGHOUT
CONSTRUCTION
T52 OAK 23 PROTECT THROUGHOUT
CONSTRUCTION
T53 POPLAR 16 PROTECT THROUGHOUT
CONSTRUCTION
T54 PINE 21 PROTECT THROUGHOUT
CONSTRUCTION
T55 OAK 12 PROTECT THROUGHOUT
CONSTRUCTION
T56 OAK 24 PROTECT THROUGHOUT
CONSTRUCTION
T57 OAK 21 PROTECT THROUGHOUT
CONSTRUCTION
T58 OAK 16 PROTECT THROUGHOUT
CONSTRUCTION
T59 LOBLOLLY
PINE
29 PROTECT THROUGHOUT
CONSTRUCTION
T60 SWEETGUM 11 PROTECT THROUGHOUT
CONSTRUCTION
T61 LOBLOLLY
PINE
21 PROTECT THROUGHOUT
CONSTRUCTION
T62 LOBLOLLY
PINE
16 PROTECT THROUGHOUT
CONSTRUCTION
T63 TULIP
POPLAR
30 PROTECT THROUGHOUT
CONSTRUCTION
T64 TULIP
POPLAR
13 PROTECT THROUGHOUT
CONSTRUCTION
T65 LOBLOLLY
PINE
24 PROTECT THROUGHOUT
CONSTRUCTION
T66 LOBLOLLY
PINE
25 PROTECT THROUGHOUT
CONSTRUCTION
T67 TULIP
POPLAR
16 PROTECT THROUGHOUT
CONSTRUCTION
T68 RIVER BIRCH 17 PROTECT THROUGHOUT
CONSTRUCTION
T69 RIVER BIRCH 10 PROTECT THROUGHOUT
CONSTRUCTION
T70 RIVER BIRCH 7 PROTECT THROUGHOUT
CONSTRUCTION
T71 TULIP
POPLAR
26 PROTECT THROUGHOUT
CONSTRUCTION
T72 TULIP
POPLAR
9 PROTECT THROUGHOUT
CONSTRUCTION
T73 LOBLOLLY
PINE
24 PROTECT THROUGHOUT
CONSTRUCTION
T74 LOBLOLLY
PINE
21 PROTECT THROUGHOUT
CONSTRUCTION
T75 RED MAPLE 15 PROTECT THROUGHOUT
CONSTRUCTION
T76 LOBLOLLY
PINE
21 PROTECT THROUGHOUT
CONSTRUCTION
T77 TULIP
POPLAR
5 PROTECT THROUGHOUT
CONSTRUCTION
T78 RED MAPLE 16 PROTECT THROUGHOUT
CONSTRUCTION
T79 TULIP
POPLAR
20 PROTECT THROUGHOUT
CONSTRUCTION
T80 TULIP
POPLAR
11 PROTECT THROUGHOUT
CONSTRUCTION
TREE REMOVAL NOTES:
1. TREES TO BE PROTECTED BASED ON TREE TABLE ON THIS SHEET AND AS SHOWN ON SHEET C102.
2. TREES WITHIN THE LIMITS OF DISTURBANCE THAT ARE NOT DESIGNATED FOR REMOVAL BUT ARE IN POOR CONDITION OR ARE NOT LIKELY TO SURVIVE CONSTRUCTION, SHALL BE REMOVED ALONG WITH THE STUMP
BY CONTRACTOR PRIOR TO DEMOBILIZATION.
3. CONTRACTOR TO PROVIDE UP TO 6 TREES TO BE PLANTED AT LOCATIONS SELECTED BY THE OWNER. NO TREES WILL BE PLANTED WITHIN THE LIMITS OF THE DAM. THE TREES SHALL HAVE A MINIMUM BREAST HEIGHT DIAMETER OF 3 INCHES AT THE TIME OF PLANTING AND SHALL BE ONE OF THE FOLLOWING SPECIES, AS SELECTED BY THE OWNER:
TULIP POPLAR (LIRIODENDROM TULIPIFERA)
WATER OAK (QUERCUS NIGRA)
AMERICA BEECH (FAGUS GRANDIFOLIA)
CAROLINA CHERRY LAUREL (PRUNUS CAROLINIANA)
BLACK WILLOW (SALIX NIGRA)
RED MAPLE (ACER RUBRUM)
WHITE OAK (QUERCUS ALBA)
SWEETGUM (LIQUIDAMBAR STYRACIFLUA)
C201
C203 A
LEGEND
PROPOSED RIPRAP
DETAIL LOCATION. "1" REFERS TO THE DETAIL DESIGNATION. "C201" REFERS TO
THE DRAWING NUMBER WHERE THE DETAIL IS SHOWN OR WHERE THE DETAIL IS
INDICATED.
REGISTRATION
CONSULTANT
AECOM
12420 MILESTONE CENTER DRIVE
SUITE 150
GERMANTOWN, MD 20876
(301) 944-2545 TEL
WWW.AECOM.COM
CLIENT
CITY OF TUCKER
1975 LAKESIDE PKWY
SUITE 350,
TUCKER, GA 30084
770-865-5645 TEL
WWW.TUCKERGA.GOV
PROJECT
LAKE ERIN DAM
REHABILITATION
DEKALB COUNTY, GEORGIA
DRAWING TITLE
AN
SI
D
2" x
4"
LA
ST
S
AV
ED
B
Y:
W
EI
SA
(2
4-
T
PL
O
TT
ED
: 2
4-
-1
FI
LE
N
AM
E:
L
:\D C
S\
PR
O
JE
C
TS
\W
TR
\6
1_
LA
KE
ER
IN
D
AM
EN
G
IN
EE
R
IN
G
\9
_C
AD
_G
IS
\9
_C
AD
\0 4_
SH
EE
TS
\P
G N
-G
3-
LA
KE
ER
IN
.D
W G
NO. DATE DESCRIPTION
REVISIONS
DESIGNED BY:
DRAWN BY:
AECOM PROJECT NO:
PLOT DATE:
APPROVED BY:
CHECKED BY:
ACAD VER:
SCALE:
60727041
AS SHOWN
9/18/2024
SHEET OF
ISSUED FOR CONSTRUCTION ______________
DATE BY
ISSUED FOR BIDDING ______________
DATE BY
SHEET NUMBER
AJW/JES
JBB
JCG
RDP
G003
ABBREVIATIONS
AND LEGEND
HATCH LEGEND
CONTRACTOR STAGING
AND STOCKPILE AREAS
LINE TYPE LEGEND
CROSS SECTION LOCATION. "A" REFERS TO THE CROSS SECTION
DESIGNATION. "C203" REFERS TO THE DRAWING NUMBER WHERE THE
SECTION IS SHOWN OR WHERE THE SECTION WAS CUT.
ABBREVIATIONS AND ACRONYMS - STANDARD
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PARTIALLY WEATHERED ROCK
FLOW RATE
RADIUS
REBAR AND CAP
REINFORCED CONCRETE PIPE
ROAD
REFERENCE
REINFORCEMENT
REQUIRED
REQUEST FOR BID
REMOTE TELEMETRY UNIT
RIGHT OF WAY
SAINT JOHNS RIVER WATER MANAGEMENT DISTRICT
SUPERPAVE
SPACING
SQUARE
STATE ROAD
STAINLESS STEEL
SPECIFICATIONS
STAINLESS STEEL TYPE 304
STANDARD
SOUTHWEST
THICKNESS
TELEMETRY JUNCTION BOX
TURF REINFORCEMENT MAT
TAILWATER
TAILWATER ELEVATION
TYPICAL
ULTRA HIGH MOLECULAR WEIGHT POLYETHYLENE
UNDERWRITERS LABORATORIES INC.
UNINTERRUPTED POWER SUPPLY
UPSTREAM
VERTICAL
WIDTH
PSF
PSI
PWR
Q R
RBC
RCP
RD.
REF
REIF
REQD
RFB
RTU
R/W
SJWMD
SP
SPA.
SQ
S.R.
SS
SPECS
SST
STD.
SW
T
TJB
TRM
TW
TWEL
TYP
UHMWPE
UL
UPS
US
VERT
W
AASHTO
ACI
ADD'L
ADJ
AL
ALUM
APPROX
ASCE
ASTM
AWG
BC
BLDG
BM
BODR
BOTT
CAP
CFM
CFS
CJ
CLR
CL RD
CMP
D
DHW
DIA
DIM
DR CL
DS
DW
DWG
E
ECMP
EDR
EF
ELEV OR EL
ELEC
EQ.
ERCP
ESE
ETC
EXIST.
EXT
F
FD
FF
FLAG
FPS
FT
GALV.
GB
GDOT
GFI
GND
GPS
GRD
GW
H
HDPE
HW
HORZ
ID.
IE
IN.
INC.
INV
KIP
KSI
LB
LBS
LFRD
LOA
LOD
LWC
MAX
MEG
MFGR
MILS
MIN
MPH
N
NAD
NAVD88
NE
NEMA
NGVD29
NO.
NTS
OC
OSHA
P.E.
PL
POS
PROJ
AMERICAN ASSOCIATION OF STATE HIGHWAY
AND TRANSPORTATION OFFICIALS
AMERICAN CONCRETE INSTITUTE
ADDITIONAL
ADJUSTED
ALUMINUM
ALUMINUM
APPROXIMATELY
AMERICAN SOCIETY OF CIVIL ENGINEERS
AMERICAN SOCIETY FOR TESTING AND MATERIALS
AMERICAN WIRE GAUGE
BARE COPPER
BUILDING
BENCHMARK
BASIN OF DESIGN REPORT
BOTTOM
CORRUGATED ALUMINUM PIPE
CUBIC FEET PER MINUTE
CUBIC FEET PER SECONDS
CONSTRUCTION JOINT
CLEARANCE
CENTERLINE OF ROAD
CORRUGATED METAL PIPE
DIAMETER
DESIGN HEAD WATER
DIAMETER
DIMENSION
DIRT ROAD CENTERLINE
DOWNSTREAM
DESIGN WATER
DRAWING
EXPANSION END, EAST OR EASTING
ELLIPTICAL CORRUGATED METAL PIPE
EDGE OF DIRT ROAD
EACH FACE
ELEVATION
ELECTRIC OR ELECTRICAL
EQUAL
ELLIPTICAL REINFORCED CONCRETE PIPE
EAST SOUTH EAST
ET CETERA
EXISTING
EXTERIOR
FIXED END
FILTER DIAPHRAGM
FINISHED FLOOR
WETLAND MAKER FLAG SET BY AECOM XX/XX/20XX
FEET PER SECOND
FEET OR FOOT
GALVANIZED
GRADE BREAK
GEORGIA DEPARTMENT OF TRANSPORTATION
GROUND FAULT INTERRUPTER
NATURAL GROUND
GLOBAL POSITIONING SYSTEM
GROUND
GROUND WATER
HEIGHT
HIGH DENSITY POLYETHYLENE
HEAD WATER
HORIZONTAL
IDENTIFICATION
INVERT ELEVATION
INCHES
INCORPORATED
INVERT
KILO-POUNDS OF FORCE
KILO-POUNDS OF FORCE PER SQUARE INCH
POUND
POUNDS
LOAD AND RESISTANCE FACTOR
LIMITS OF ACCESS
LIMITS OF DISTURBANCE
LOW WATER CROSSING
MAXIMUM
MATCH EXISTING GRADE
MANUFACTURER
MILLI-INCHES
MINIMUM
MILES PER HOUR
NORTH OR NORTHING
NORTH AMERICAN DATUM
NORTH AMERICAN VERTICAL DATUM OF 1988
NORTHEAST
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NATIONAL GEODETIC VERTIVCAL DATUM OF 1929
NUMBER
NOT TO SCALE
ON CENTER
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
PROFESSIONAL ENGINEER
POLYMER CONCRETE
POSITION
PROJECTION
' FEET
" INCHES
# NUMBER
% PERCENT
& AND
@ AT
o DEGREES
W/ WITH
X BY
C CHANNEL
L ANGLE
PL PLATE
W W SHAPE
SYMBOLOGY
STRUCTURAL SHAPES
C CENTERLINEL
B BOUNDARY LINEL
Ø DIAMETER
EXISTING CONCRETE
PROPOSED CONCRETE
PROPOSED C33 SAND
PROPOSED BEDDING STONE
PROPOSED DEMOLITION AREA
EXISTING PARK TRAIL
PROPOSED PARK TRAIL
WETLANDS
EARTH
03 47
SSF
EXISTING BORING
EXISTING IMPERVIOUS AREA
EXISTING MINOR CONTOUR (1 FT INTERVALS)
EXISTING MAJOR CONTOUR (10 FT INTERVALS)
EXISTING PROPERTY LINE
EXISTING NORMAL POOL LINE
EXISTING SANITARY LINE
EXISTING TREE LINE
EXISTING CONDUIT (OFFSET WIDTH = DIAMETER)
TOPOGRAPHIC SURVEY LIMIT
ESTIMATED LIMITS OF EXCAVATION
ESTIMATED TEMPORARY EASEMENT
ESTIMATED PERMANENT EASEMENT
PROPOSED MINOR CONTOURS (1 FT INTERVALS)
PROPOSED MAJOR CONTOURS (5 FT INTERVALS)
PROPOSED CONDUIT (OFFSET WIDTH = DIAMETER)
PROPOSED TREE LINE
SOIL BOUNDARY
LIMIT OF DISTURBANCE
LIMIT OF ACCESS
TEMPORARY COFFERDAM
TEMPORARY BYPASS/DIVERSION CONDUIT
TEMPORARY NON-SENSITIVE SILT FENCE
TEMPORARY SENSITIVE SILT FENCE
TEMPORARY SAND BAGS
TEMPORARY BARRIER FENCE
TEMPORARY CHAIN LINK SECURITY FENCE
TREE PROJECTION FENCE
WETLAND BOUNDARY (AS SURVEYED IN THE FIELD)
WATERS OF THE US / STATE WATER BOUNDARY AS DETERMINED BY
THE POINT OF WRESTED VEGETATION (SURVEYED IN THE FIELD)
25' STATE WATER BUFFER
25' STREAM BUFFER
SAN
LOD LOD
LOA
SSF
X X
NSF NSF
WL
WUS
WB
SB
PROPOSED TURFGRASS SEED AREAS
PROPOSED WOOD CHIPS AREAS
NSF NSF
TPF TPF
STAGE 1 BEDDING MATERIAL
STAGE 2 BEDDING MATERIAL
STAGE 3 BEDDING MATERIAL
WL
WUS
WB
SB
24+50
20+00
21+00 22+00
23+00
24+00
13+50
10+00
11+00
12+00
+0
PROPOSED EMBANKMENT CENTERLINE
STATION=20+00.00
NORTHING=1406672.57
EASTING=2277137.07
PROPOSED EMBANKMENT CENTERLINE
STATION=24+50.00
NORTHING=1406880.16
EASTING=2277519.68
PROPOSED SERVICE SPILLWAY CENTERLINE
STATION=10+00.00
NORTHING=1406628.46
EASTING=2277297.41
32+50
30+00
31+00
32+00
PROPOSED PIEZOMETER ROW
STATION=32+50.00
NORTHING=1406902.74
EASTING=2277184.09
PROPOSED PIEZOMETER ROW
STATION=30+00.00
NORTHING=1406689.55
EASTING=2277314.68
D-100
1/2"RBC
N:1406736.38 E:2277652.52
Z:973.52
D-101
1/2"RBC
N:1406838.88 E:2277355.68
Z:969.32
D-107
1/2"RBC
N:1406909.26 E:2277514.16
Z:974.65
C1
C
C3
C4
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
20 LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
34 LOD
LOD
LOD
POINT #
NORTHING
1406766.17
1406750.64
1406747.14
1406722.52
1406677.63
1406662.62
1406783.44
1406754.85
1406769.08
1406736.72
1406682.14
1406571.62
1406642.66
1406637.00
1406686.51
1406759.46
1406915.00
1406927.71
1406910.96
EASTING
2277744.01
2277768.78
2277774.36
2277763.46
2277731.48
2277704.01
2277565.53
2277537.79
2277521.48
2277483.64
2277499.45
2277243.28
2277213.54
2277168.86
2277117.06
2277072.97
2277127.70
2277163.38
2277171.98
POINT #
NORTHING
1406885.06
1406896.00
1406896.39
1406925.63
1406903.41
1406895.49
1406864.21
1406857.30
1406792.80
1406780.83
1406766.17
1406748.21
1406737.32
1406731.14
1406727.90
1406730.55
1406734.38
1406746.74
EASTING
2277255.28
2277272.26
2277379.77
2277520.33
2277555.33
2277563.80
2277593.66
2277607.14
2277685.35
2277696.40
2277695.12
2277694.83
2277701.89
2277712.50
2277726.34
2277735.17
2277736.94
2277741.94
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
LOA
POINT #
NORTHING
1406766.17
1406837.54
1406909.30
1406909.76
1406926.16
1406954.38
1406983.65
1407000.70
1407028.45
1407020.38
1406999.57
1406988.79
1406981.06
1406985.75
1407001.76
1407026.59
1407045.47
1407050.49
1407037.27
1407015.40
EASTING
2277744.01
2277759.95
2277762.73
2277716.86
2277674.12
2277658.81
2277616.77
2277625.15
2277664.60
2277677.10
2277705.15
2277744.00
2277771.17
2277782.68
2277795.59
2277803.18
2277822.34
2277850.27
2277878.99
2277892.74
POINT #
NORTHING
1406990.21
1406964.32
1406944.35
1406933.96
1406908.62
1406829.93
1406750.64
EASTING
2277898.80
2277893.21
2277876.49
2277855.06
2277787.41
2277779.76
2277768.78
LOD POINT TABLE LOD POINT TABLE LOA POINT TABLE LOA POINT TABLE
L1
L2
L3
L4
L5
L6
L7
61+20
60+00
61+00
DP-3 EAST TOE DRAIN
STATION=60+00.00
NORTHING=1406884.93
EASTING=2277276.95L13
L14L15
DP-3 EAST TOE DRAIN
STATION=61+20.00
NORTHING=1406854.66
EASTING=2277187.49
70+60
+0
L1
L17 L18
DP-4 WEST TOE DRAIN
STATION=70+00.00
NORTHING=1406770.16
EASTING=2277136.77
DP-4 WEST TOE DRAIN
STATION=70+60.00
NORTHING=1406826.90
EASTING=2277143.92
41+20
40+00
41+00
DP-1 F.D. PRIMARY DRAIN
STATION=40+00.00
NORTHING=1406781.27
EASTING=2277252.86
L19 L20
L21 L22
L23L24
L2
L26
51+10
50+00
51+00
L27
L28
L29
DP-3 EAST TOE DRAIN
NUMBER
L13
L14
L15
RADIUS LENGTH
47.85
46.00
26.15
LINE/CHORD DIRECTION
S49° 47' 39.59"W
S61° 02' 39.59"W
N28° 57' 20.41"W
DP-4 WEST TOE DRAIN
NUMBER
L16
L17
L18
RADIUS LENGTH
46.58
2.00
11.42
LINE/CHORD DIRECTION
N16° 05' 14.92"E
N6° 27' 20.41"W
N28° 57' 20.41"W
DP-2 F.D. STRIP DRAIN
NUMBER
L27
L28
L29
RADIUS LENGTH
59.71
14.00
36.29
LINE/CHORD DIRECTION
N28° 57' 20.41"W
N58° 57' 20.41"W
N28° 57' 20.41"W
DP-1 F.D. PRIMARY DRAIN
NUMBER
L19
L20
L21
L22
L23
L24
L25
L26
RADIUS LENGTH
12.50
9.40
3.88
3.89
3.89
36.80
15.73
33.91
LINE/CHORD DIRECTION
S61° 02' 39.59"W
S61° 02' 39.59"W
S83° 32' 39.59"W
N73° 57' 20.41"W
N51° 27' 20.41"W
N28° 59' 20.97"W
N6° 27' 20.41"W
N28° 57' 20.41"W
RR-3
RR-3
RR-3
RR-3
PROPOSED SERVICE SPILLWAY CENTERLINE
STATION=13+50.00
NORTHING=1406938.84
EASTING=2277138.16
101+00100+00 101+00L30
L31
L32 L33
L34
C5
C6
LATERAL CHANNEL CENTERLINE
STATION=101+00.00
NORTHING=1406884.25
EASTING=2277239.02
LATERAL CHANNEL CENTERLINE
NUMBER
L30
C5
L31
L32
C6
L33
L34
RADIUS
50.00
50.00
LENGTH
44.14
19.37
5.54
1.40
11.64
11.25
6.66
LINE/CHORD DIRECTION
N77° 28' 08.80"E
N88° 34' 03.80"E
S80° 20' 01.20"E
S80° 20' 01.20"E
S87° 00' 05.16"E
N86° 19' 50.88"E
N84° 36' 15.90"E
DP-2 F.D. STRIP DRAIN
STATION=50+00.00
NORTHING=1406750.04
EASTING=2277223.86
DP-2 F.D. STRIP DRAIN
STATION=51+10.00
NORTHING=1406841.26
EASTING=2277165.38
RR-1
107 RR-1
RR-2
RR-2
RR-1
RR-1
RR-1
102RR-1
RR-1
RR-1
RR-1
OB1
OB1
OB1
OB1
OB1
OB2
OB2
OB2
OB2
OB2
OB1
OB2
OB2
OB2
OB2
203+74
200+00
201+00
202+00
203+00
UPSTREAM CREST GRADE BREAK
STATION=200+00.00
NORTHING=1406657.43
EASTING=2277155.91
L35
L36
C7
C8
UPSTREAM CREST GRADE BREAK
NUMBER
C7
L35
C8
L36
RADIUS
104.04
191.51
LENGTH
103.87
210.74
45.20
14.03
LINE/CHORD DIRECTION
N32° 26' 39.10"E
N61° 02' 39.59"E
N67° 48' 16.42"E
N76° 47' 31.84"E
POINT #
NORTHING
1406759.69
1406773.73
1406753.51
1406751.64
1406739.09
1406741.49
EASTING
2277242.24
2277234.65
2277198.17
2277194.72
2277205.23
2277209.35
OB1 POINT TABLE
POINT #
NORTHING
1406751.64
1406748.04
1406735.79
1406697.63
1406739.09
1406759.69
1406773.73
1406802.33
1406788.36
EASTING
2277194.72
2277188.23
2277145.12
2277166.99
2277205.23
2277242.24
2277234.65
2277286.34
2277294.04
OB2 POINT TABLE
RR-2
RR-2
RR-2
POINT #
NORTHING
1406872.85
1406844.11
1406831.34
1406833.78
1406823.11
1406831.77
1406869.64
1406877.54
1406891.69
EASTING
2277179.17
2277193.34
2277169.67
2277167.47
2277147.29
2277127.63
2277118.83
2277150.46
2277176.07
RR-1 POINT TABLE
POINT #
NORTHING
1406872.85
1406879.70
1406883.08
1406891.24
1406891.63
EASTING
2277179.17
2277192.49
2277216.77
2277191.55
2277175.81
RR-2 POINT TABLE
POINT #
NORTHING
1406801.67
1406776.10
1406648.97
1406657.77
EASTING
2277398.99
2277395.30
2277208.74
2277191.09
RR-3 POINT TABLE
PROPOSED SERVICE SPILLWAY CENTERLINE
NUMBER
L1
C1
L2
C2
L3
RADIUS
60.00
50.00
LENGTH
289.55
18.92
14.40
10.23
16.92
LINE/CHORD DIRECTION
N28° 57' 20.41"W
N19° 55' 24.10"W
N10° 53' 27.82"W
N16° 44' 58.58"W
N24° 25' 43.09"W
PROPOSED EMBANKMENT CENTERLINE
NUMBER
L4
C3
L5
C4
L6
RADIUS
100.00
200.00
LENGTH
35.64
55.48
224.38
80.27
54.23
LINE/CHORD DIRECTION
N29° 15' 32.08"E
N45° 09' 06.11"E
N61° 02' 39.59"E
N72° 32' 33.22"E
N84° 22' 06.09"E
PROPOSED PIEZOMETER ROW
NUMBER
L7
RADIUS LENGTH
250.00
LINE/CHORD DIRECTION
N31° 29' 25.19"W
REGISTRATION
CONSULTANT
AECOM
12420 MILESTONE CENTER DRIVE
SUITE 150
GERMANTOWN, MD 20876
(301) 944-2545 TEL
WWW.AECOM.COM
CLIENT
CITY OF TUCKER
1975 LAKESIDE PKWY
SUITE 350,
TUCKER, GA 30084
770-865-5645 TEL
WWW.TUCKERGA.GOV
PROJECT
LAKE ERIN DAM
REHABILITATION
DEKALB COUNTY, GEORGIA
DRAWING TITLE
AN
SI
D
2" x
4"
LA
ST
S
AV
ED
B
Y:
W
EI
SA
(2
4-
2)
T
PL
O
TT
ED
: 2
4-
-1
FI
LE
N
AM
E:
L
:\D C
S\
PR
O
JE
C
TS
\W
TR
\6
1_
LA
KE
ER
IN
D
AM
EN
G
IN
EE
R
IN
G
\9
_C
AD
_G
IS
\9
_C
AD
\0 4_
SH
EE
TS
\P
G E-
C
1-
LA
KE
ER
IN
.D
W G
NO. DATE DESCRIPTION
REVISIONS
DESIGNED BY:
DRAWN BY:
AECOM PROJECT NO:
PLOT DATE:
APPROVED BY:
CHECKED BY:
ACAD VER:
SCALE:
60727041
AS SHOWN
9/18/2024
SHEET OF
ISSUED FOR CONSTRUCTION ______________
DATE BY
ISSUED FOR BIDDING ______________
DATE BY
SHEET NUMBER
AJW/JES
JBB
JCG
RDP
N
AD
/2
1 G
EO
R G
IA
C
O O
R D
IN
AT
E
SY
ST
EM
30'0 30'
SCALE:1"=30'
C101
GEOMETRY PLAN
04 47
DI
RT
T
RA
IL
DIR
T
TR
AI
L
DIRT TRAIL
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SS
SSMH TOP=974.51
INV IN=962.17
INV OUT=961.86
WALL
ROCK
BEDROCK
LIMIT OF PROPERTY SURVEY
E2
N1406898
E2
N1406648
E2
N1406648
T48
T49
T46 T47
T50
T44
T43
T41
T45
T37
T31
T30
T29
T27
T28
T21
T22
T23
T25
T18 T17
T16 T12
T10
T7
T6
T5 T3
T2
T1
W U
S
W U
S
W U
S
W
US
W
US
WUS
W U
S
WUS
W
US
W U
SWUS
W U
S
W U
S
WUS
W U
S W
US
W U
S
W
US
W L
WL
W L
WUS
WUS
W U
S
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
WUS
WUS
WUS
WUS
WUS
W
US
W
US
W
US
W
US
W
US
W
US
W
US
W
US
W U
S W
US
W
US
WUS
WUS
WUS
WUS
WUS
WUS
WUS
WUS
WUS
WB WB
WB
WB
WB
WB
WB
W B
W B
W B
W B
W B
W B
W B
W B
W B
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
PIEZOMETER P-6
BASE ELEV: 940.22
PIEZOMETER P-2
BASE ELEV: 960.23
PIEZOMETER P-1
BASE ELEV: 969.16
PIEZOMETER P-5
TOP ELEV: 956.88
PIEZOMETER P-4
DIRT TRAIL EX. 30" RCP T40
T20
T19
T42
T32
T39 T38
T36
T34
T35
T26 18"OAK
T24
T13
T15
T14
T11
T9 T8
T33
6"CMP TOE DRAIN
INV=937.51
30"CMP
INV=955.70
JB
TOP=960.23
INV IN=955.89
INV OUT=955.84
EXISTING 8"
TOE DRAIN
30"RCP
INV=954.19
9" STEEL STAND PIPE
TOP=965.82
T59
T60 T61
T62 T63
T64 T65
T66T67
PIEZOMETER P-3
2021 FIELD RUN SURVEY
ACURRA ENGINEERING AND
CONSULTING SERVICES, INC.
DEMOLISH AND
REMOVE EXISTING
INTAKE STRUCTURE,
30" RCP, AND 30" CMP
TOPOGRAPHIC INFORMATION AND PLANIMETRIC
INFORMATION BEYOND THE LIMITS OF SURVEY AS
SHOWN ON THIS DRAWING ARE APPROXIMATE AND
BASED ON PUBLICLY AVIALBLE GEOGRAPHIC
INFORMATION SOURCES
EXISTING DOCK TO REMAIN
EXISTING DIRT
TRAIL TO REMAIN
EXISTING SANITARY SEWER LINE
TO REMAIN. CONTRACTOR IS
RESPONSIBLE FOR
PROTECTING, IF NECESSARY.
EXISTING SANITARY SEWER
MANHOLE TO REMAIN AND
BE PROTECTED
EXISTING
PLAYGROUND
CONCRETE
EXISTING WALL
TO REMAIN
EXISTING NORMAL POOL
W.S.E. = 955.70'
DEMOLISH AND REMOVE
EXISTING 9" STEEL PIPE
STANDPIPE AND CONDUIT
DEMOLISH AND REMOVE EXISTING
STONE SLOPE PROTECTION
DEMOLISH AND
REMOVE EXISTING
WALL
EXISTING ROCK
BEDDING TO BE
ABANDONED-IN-PLACE
DEMOLISH AND
REMOVE EXISTING
TRAINING WALLS
DEMOLISH AND REMOVE
EXISTING TOE DRAINS
BOTTOM OF RESERVOIR AT
APPROXIMATELY ELEVATION 941.0 FEET
WSEL IN NATURAL CHANNEL SURVEYED
DOWNSTREAM OF THE DAM SURVEYED
APPROXIMATELY 937.0 FEET.
LOW ELEVATION FOR BOTTOM
OF NATURAL CHANNEL
SURVEYED AT 936.2 FEET
WSEL IN NATURAL CHANNEL AT TOE OF
THE DAM SURVEYED AT 937.8 FEET
HENDERSON PARK TRAIL
CLOSURE. SEE NOTE 6.
WATERS OF THE US / STATE
WATER BOUNDARY (OW 4)
25-FOOT STATE WATERS BUFFER
WATERS OF THE US
/ STATE WATER
BOUNDARY (PS 2)
25 FOOT
STREAM
BUFFER
WATERS OF THE US / STATE
WATER BOUNDARY (IS 1)
X
X
X X
REGISTRATION
CONSULTANT
AECOM
12420 MILESTONE CENTER DRIVE
SUITE 150
GERMANTOWN, MD 20876
(301) 944-2545 TEL
WWW.AECOM.COM
CLIENT
CITY OF TUCKER
1975 LAKESIDE PKWY
SUITE 350,
TUCKER, GA 30084
770-865-5645 TEL
WWW.TUCKERGA.GOV
PROJECT
LAKE ERIN DAM
REHABILITATION
DEKALB COUNTY, GEORGIA
DRAWING TITLE
AN
SI
D
2" x
4"
LA
ST
S
AV
ED
B
Y:
W
EI
SA
(2
4-
T
PL
O
TT
ED
: 2
4-
-1
FI
LE
N
AM
E:
L
:\D C
S\
PR
O
JE
C
TS
\W
TR
\6
1_
LA
KE
ER
IN
D
AM
EN
G
IN
EE
R
IN
G
\9
_C
AD
_G
IS
\9
_C
AD
\0 4_
SH
EE
TS
\P
EC
-C
2-
LA
KE
ER
IN
.D W
G
NO. DATE DESCRIPTION
REVISIONS
DESIGNED BY:
DRAWN BY:
AECOM PROJECT NO:
PLOT DATE:
APPROVED BY:
CHECKED BY:
ACAD VER:
SCALE:
60727041
AS SHOWN
9/18/2024
SHEET OF
ISSUED FOR CONSTRUCTION ______________
DATE BY
ISSUED FOR BIDDING ______________
DATE BY
SHEET NUMBER
AJW/JES
JBB
JCG
RDP
C102
EXISTING CONDITIONS
AND DEMOLITION PLAN
05 47
EXISTING CONDITIONS AND DEMOLITION NOTES:
1. EXISTING TREE TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION.
2. REMOVE EXISTING TREE AND STUMP. SEE TREE TABLE SHEET G002 FOR DETAILS.
3. CUT EXISTING TREE FLUSH AND GRIND THE STUMP TO A DEPTH AS SPECIFIED BY THE ENGINEER. SEE TREE TABLE
SHEET G002 FOR DETAILS.
4. LOCATION OF TOE DRAIN AND/OR CONDUIT SHOWN ON THE PLAN IS APPROXIMATED. CONTRACTOR TO FIELD VERIFY
LOCATION PRIOR TO REMOVAL.
5. DEMOLISH EXISTING PIEZOMETER WITHIN LIMITS OF WORK AND ABANDON ANY PORTION OF THE PIZEZOMETER BELOW
THE LOWEST EXCAVATION ELEVATION. SEE GROUTING AND ABANDONMENT NOTES ON SHEET NO. G002.
6. PRIOR TO CONSTRUCTION, CONTRACTOR TO PROVIDE CHAIN LINK FENCE AND TRAIL CLOSURE SIGNS AT THE LIMITS OF
THE CONSTRUCTION SITE FOR HENDERSON PARK TRAIL.
40'0 20'
SCALE:1"=20'
N
AD
/2
1 G
EO
R G
IA
C
O O
R D
IN
AT
E
SY
ST
EM
KEY:
SEE CORRESPONDING EXISTING CONDITIONS AND DEMOLITION NOTE FOR EXISTING FEATURE IDENTIFIED ON THE PLAN.
DI
RT
T
RA
IL
DIR
T
TR
AI
L
DIRT TRAIL
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SS
SSMH TOP=974.51
INV IN=962.17
INV OUT=961.86
LIMIT OF PROPERTY SURVEY
E2
N1406898
E2
N1406648
E2
N1406648
T48
T49
T46 T47
T50
T44
T41
T45
T37
T21
T23
T25
T12
T10
T7
T6
T2
T1
W U
S
W U
S
W U
S
W
US
W
US
WUS
W U
S
WUS
W
US
W U
SWUS
W U
S
W U
S
WUS
W U
S W
US
W U
S
W
US
W L
WL
W L
WUS
WUS
W U
S
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
WUS
WUS
WUS
WUS
WUS
W
US
W
US
W
US
W
US
W
US
W
US
W
US
W
US
W U
S W
US
W
US
WUS
WUS
WUS
WUS
WUS
WUS
WUS
WUS
WUS
WB WB
WB
WB
WB
WB
WB
W B
W B
W B
W B
W B
W B
W B
W B
W B
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
T59
T60 T61
T62 T63
T64 T65
T66T67
18 251 04 024
MATTHEW JOSEPH
HATHAWAY & VIRGINIA
ELIZABETH HATHAWAY
D.B. 27119 / PG. 476
P.B. 45 / PG. 102
18 251 04 251
RAYMOND L. KUNIANSKY &
PAULA B. KUNIANSKY
D.B. 5849 / PG. 194
P.B. 45 / PG. 131
18 251 04 017
ANDREW L BOUTWELL &
JANE BOUTWELL
D.B. 21124/ PG. 210
P.B. 43 / PG. 71
18 251 04 023
UNITY REALITY COMPANY
INC.
D.B 31223 / PG. 00241
P.B 11 / PG. 0
18 251 01 022
CITY OF TUCKER
D.B. 29133 / PG. 00090
TEMPORARY
EASEMENT 3,905 SF
PERMANENT
EASEMENT 4,488 SF
6" HDPE PRIM
ARY DRAIN
X
X
X X
965960955950945940
NO STEEPER THAN 2H:1V SLOPE
NO STEEPER THAN 2H:1V SLOPE
48" RCP PRINCIPAL SPILLW
AY
15" RCP
6" HDPE STRIP DRAIN
FILTER DIAPHRAGM, SEE
SHEETS C205 - C206
← 6" HDPE
6" H
D
PE
IB
HW
IT
HW
DP-3, EAST TOE DRAIN,
SEE SHEETS C207 - C208
DP-4, WEST TOE DRAIN,
SEE SHEETS C207 - C208
DP-1, FILTER DIAPHRAGM
PRIMARY DRAIN, SEE
SHEETS C205 - C206
DP-2, FILTER DIAPHRAGM
STRIP DRAIN,
SEE SHEET C205 - C206
EXISTING GROUND
SLOPE NOT STEEPER
THAN 2H:1V
EXCAVATION LIMITS
BENCH SLOPE PRIOR TO
PLACING BACKFILL
APPROVED SUBGRADE
16 INCHES MIN
16 INCHES MAX
C103
EXCAVATION PLAN
06 47
EXCVATION NOTES:
1. THIS SHEET DEPICTS THE ESTIMATED COMPOSITE LIMITS OF EXCAVATION NECESSARY TO INSTALL THE PRINCIPAL SPILLWAY. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE ULTIMATE LIMITS AND GEOMETRY OF THE EXCAVATION NECESSARY TO COMPLETE THE WORK IN COMPLIANCE WITH THE REQUIREMENTS OF THE CONTRACT
DOCUMENTS.
2. THE LIMITS OF EXCAVATION SHOWN HEREON ARE APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ALL FINAL LIMITS OF EXCAVATION BASED ON THE CONTRACTOR'S MEANS AND METHODS OF CONSTRUCTION.
3. EXCAVATIONS AND THE WORK TO CREATE THEM SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL LAWS, ORDINANCES, AND REGULATIONS. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING COMPLIANCE.
4. NO EXCAVATION SIDE SLOPES SHALL BE SLOPED OR BENCHED STEEPER THAN A RATE OF TWO (2)-HORIZONTAL-TO-ONE(1)-VERTICAL (2H:1V) UNLESS OTHERWISE SPECIFIED BY THE CONSTRUCTION DOCUMENTS OR UNLESS THE EXCAVATION IS SHALLOWER THAN 16 INCHES DEEP MEASURED FROM THE EXISTING GROUND SURFACE TO
THE BOTTOM OF THE EXCAVATION.
5. ALL SIDE SLOPES SHALL BE BENCHED AT A SLOPE NOT STEEPER THAN A RATE OF 2H:1V PRIOR TO PLACING BACKFILL MATERIALS. THE MINIMUM BENCH WIDTH IS 16 INCHES AND THE MAXIMUM BENCH HEIGHT IS 16 INCHES. SEE DETAIL 1 THIS
SHEET.
6. FINAL EXCAVATION DIMENSIONS INCLUDING SUBGRADE CONDITION SHALL BE REVIEWED AND APPROVED BY THE
ENGINEER BEFORE INSTALLING FEATURES OR PLACING BACKFILL WITHIN THE EXCAVATION.
7. BACKFILL OF EXCAVATIONS SHALL BE PERFORMED UNDER SUPERVISION OF THE ENGINEER AND AS SPECIFIED BY THE
CONTRACT DOCUMENTS.
N
AD
/2
1 G
EO
R G
IA
C
O O
R D
IN
AT
E
SY
ST
EM
40'0 20'
SCALE:1"=20'
REGISTRATION
CONSULTANT
AECOM
12420 MILESTONE CENTER DRIVE
SUITE 150
GERMANTOWN, MD 20876
(301) 944-2545 TEL
WWW.AECOM.COM
CLIENT
CITY OF TUCKER
1975 LAKESIDE PKWY
SUITE 350,
TUCKER, GA 30084
770-865-5645 TEL
WWW.TUCKERGA.GOV
PROJECT
LAKE ERIN DAM
REHABILITATION
DEKALB COUNTY, GEORGIA
DRAWING TITLE
AN
SI
D
2" x
4"
LA
ST
S
AV
ED
B
Y:
W
EI
SA
(2
4-
-0 4)
T
PL
O
TT
ED
: 2
4-
-1
FI
LE
N
AM
E:
L
:\D C
S\
PR
O
JE
C
TS
\W
TR
\6
1_
LA
KE
ER
IN
D
AM
EN
G
IN
EE
R
IN
G
\9
_C
AD
_G
IS
\9
_C
AD
\0 4_
SH
EE
TS
\P
EX
-C
3-
LA
KE
ER
IN
.D W
G
NO. DATE DESCRIPTION
REVISIONS
DESIGNED BY:
DRAWN BY:
AECOM PROJECT NO:
PLOT DATE:
APPROVED BY:
CHECKED BY:
ACAD VER:
SCALE:
60727041
AS SHOWN
9/18/2024
SHEET OF
ISSUED FOR CONSTRUCTION ______________
DATE BY
ISSUED FOR BIDDING ______________
DATE BY
SHEET NUMBER
AJW/JES
JBB
JCG
RDP
1 BENCHING DETAIL
C103 Scale 1" = 5'
DI
RT
T
RA
IL
DIR
T
TR
AI
L
DIRT TRAIL
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SS
SSMH TOP=974.51
INV IN=962.17
INV OUT=961.86
LIMIT OF PROPERTY SURVEY
E2
N1406898
E2
N1406648
E2
N1406648
T48
T49
T46 T47
T50
T44
T41
T45
T37
T21
T23
T25
T12
T10
T7
T6
T2
T1
W U
S
W U
S
W U
S
W
US
W
US
WUS
W U
S
WUS
W
US
W U
SWUS
W U
S
W U
S
WUS
W U
S W
U S
W U
S
W
US
W L
WL
W L
WUS
WUS
W U
S
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
WUS
WUS
WUS
WUS
WUS
W
US
W
US
W
US
W
US
W
US
W
US
W
US
W
US
W U
S W
US
W
US
WUS
WUS
WUS
WUS
WUS
WUS
WUS
WUS
WUS
WB WB
WB
WB
WB
WB
WB
W B
W B
W B
W B
W B
W B
W B
W B
W B
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
T59
T60 T61
T62 T63
T64 T65
T66T67
18 251 04 024
MATTHEW JOSEPH
HATHAWAY & VIRGINIA
ELIZABETH HATHAWAY
D.B. 27119 / PG. 476
P.B. 45 / PG. 102
18 251 04 251
RAYMOND L. KUNIANSKY &
PAULA B. KUNIANSKY
D.B. 5849 / PG. 194
P.B. 45 / PG. 131
18 251 04 017
ANDREW L BOUTWELL &
JANE BOUTWELL
D.B. 21124/ PG. 210
P.B. 43 / PG. 71
18 251 04 023
UNITY REALITY COMPANY
INC.
D.B 31223 / PG. 00241
P.B 11 / PG. 0
18 251 01 022
CITY OF TUCKER
D.B. 29133 / PG. 00090
X
X
X X
48" RCP PRINCIPAL SPILLW
AY
D
C203
F
C203
B C2
CC202
AC202
G
C
3H:1V
3H:1V
USBR TYPE VI IMPACT BASIN,
SEE SHEETS S201 - S204
48" RCP PRINCIPAL
SPILLWAY CONDUIT,
SEE SHEET S101
15" RCP LOW LEVEL OUTLET
CONDUIT, SEE SHEET S101
GDOT STANDARD 1001-B,
U TYPE WING LOW LEVEL
OUTLET HEADWALL, SEE
SHEET S301
INTAKE TOWER,
SEE SHEETS
S101 - S108
RR-1:
STONE DUMPED GDOT TYPE 1
RIPRAP OUTLET PROTECTION,
D50 = 12", SEE SHEET C203
PROPOSED TRAIL,
SEE SHEET C202
PIEZOMETER (TYP.), SEE
SHEETS O102 - O103
DP-3, EAST TOE DRAIN,
SEE SHEETS C207 - C208
FILTER DIAPHRAGM,
SEE SHEETS C205 - C206
DP-4, WEST TOE DRAIN,
SEE SHEETS C207 - C208
DP-1, FILTER DIAPHRAGM
PRIMARY DRAIN, SEE
SHEETS C205 - C206
DP-2, FILTER DIAPHRAGM
STRIP DRAIN,
SEE SHEET C205 - C206
GDOT STANDARD
1001-B, U TYPE
WING HEADWALL,
SEE SHEET S302
TEMPORARY EASEMENT,
SEE NOTE 4
PERMANENT EASEMENT,
SEE NOTE 4
24+50
+0
21+00
22+00
23+00
24+00
10+00
11+00
12+00
+0
P-25-4
P-25-3
P-25-2
P-25-1
IB
EMBANKMENT ℄,
SEE NOTE 1
PRINCIPAL SPILLWAY ℄
HW
IT
HW
15" RCP
6" HDPE
6" HDPE
6" H
D
PE
RR-2:
STONE DUMPED GDOT TYPE 1
RIPRAP OUTLET PROTECTION LATERAL
CHANNEL, D50 = 12", SEE SHEET C204
RR-3:
STONE DUMPED GDOT TYPE 1
RIPRAP SLOPE PROTECTION
D50 = 12", SEE SHEET C202
AND NOTE 2
NORMAL POOL
W.S.E. = 955.70'
3 PMF W.S.E. = 968.90'
2H:1V 2H:1V
EXISTING DOCK
EXISTING
PLAYGROUND
SEE NOTE 3
0.35%
10.0%
90° BEND
E
C203
OVERBUILD ZONE 1,
1" OVERBUILD. SEE NOTE 5.
OVERBUILD ZONE 2, SLOPE
FROM 1" TO 0". SEE NOTE 6. 970
OVERBUILD ZONE 2, SLOPE
FROM 1" TO 0". SEE NOTE 6.
2%
SLOPE
2%
SLOPE
2%
SLOPE
END OVERBUILD
END OVERBUILD
SITE PLAN NOTES AND CROSS-REFERENCES:
1. RAISE AND LEVEL EMBANKMENT CREST TO ELEVATION 970.0 FEET, SEE SHEET C201 FOR PROPOSED EMBANKMENT CENTERLINE PROFILE.
2. RIPRAP FOR UPSTREAM SLOPE PROTECTION TO BE SET FROM ELEVATION 952.0 FEET TO 958.0 FEET, SEE SHEET C202 FOR DETAILS.
3. WHERE THE TRAIL ALIGNMENT DEVIATES FROM THE CENTER LINE OF THE EMBANKMENT, THE CONTRACTOR IS TO FIELD FIT THE PROPOSED TRAIL CONNECTION TO THE EXISTING TRAILS.
4. PERMANENT AND TEMPORARY EASEMENTS AT THE HATHAWAY PROPERTY ARE TO BE PROCURED BY THE CITY OF TUCKER PRIOR TO THE START OF CONSTRUCTION.
5. OVERBUILD ZONE 1. PROVIDE 1 INCH OF OVERBUILD ALONG THE CREST FOR THE EXTENT OF THE MAXIMUM EXCAVATION CUT. SEE SHEET C101 FOR LIMIT OF OVERBUILD ZONE 1.
6. OVERBUILD ZONE 2. PROVIDE OVERBUILD SLOPING FROM 1 INCH AT THE INTERFACE OF OVERBUILD ZONE 1 AND 2 TO 0 INCHES AT THE EXTENT OF OVERBUILD ZONE 2 WHERE THE
OVERBUILD ENDS. SEE SHEET C101 FOR LIMITS OF OVERBUILD ZONE 2.
C104
SITE AND GRADING
PLAN
07 47
N
AD
/2
1 G
EO
R G
IA
C
O O
R D
IN
AT
E
SY
ST
EM
40'0 20'
SCALE:1"=20'
REGISTRATION
CONSULTANT
AECOM
12420 MILESTONE CENTER DRIVE
SUITE 150
GERMANTOWN, MD 20876
(301) 944-2545 TEL
WWW.AECOM.COM
CLIENT
CITY OF TUCKER
1975 LAKESIDE PKWY
SUITE 350,
TUCKER, GA 30084
770-865-5645 TEL
WWW.TUCKERGA.GOV
PROJECT
LAKE ERIN DAM
REHABILITATION
DEKALB COUNTY, GEORGIA
DRAWING TITLE
AN
SI
D
2" x
4"
LA
ST
S
AV
ED
B
Y:
W
EI
SA
(2
4-
T
PL
O
TT
ED
: 2
4-
-1
FI
LE
N
AM
E:
L
:\D C
S\
PR
O
JE
C
TS
\W
TR
\6
1_
LA
KE
ER
IN
D
AM
EN
G
IN
EE
R
IN
G
\9
_C
AD
_G
IS
\9
_C
AD
\0 4_
SH
EE
TS
\P
SP
-C
4-
LA
KE
ER
IN
.D W
G
NO. DATE DESCRIPTION
REVISIONS
DESIGNED BY:
DRAWN BY:
AECOM PROJECT NO:
PLOT DATE:
APPROVED BY:
CHECKED BY:
ACAD VER:
SCALE:
60727041
AS SHOWN
9/18/2024
SHEET OF
ISSUED FOR CONSTRUCTION ______________
DATE BY
ISSUED FOR BIDDING ______________
DATE BY
SHEET NUMBER
AJW/JES
JBB
JCG
RDP
HATCH LEGEND
OVERBUILD ZONE 2
OVERBUILD ZONE 1
ELEVATIO
N
STATION
20+00 20+25 20+50 20+75 21+00 21+25 21+50 21+75 22+00 22+25 22+50 22+75 23+00 23+25 23+50 23+75 24+00
STA:20+02.40
ELEV:970.00
STA:20+37.30
ELEV:968.88
STA:20+98.33
ELEV:939.00
STA:21+07.36
ELEV:939.00
STA:21+42.43
ELEV:939.00
STA:23+71.85
ELEV:970.00
STA:20+68.67
ELEV:955.27
STA:21+27.09
ELEV:937.98
STA:21+54.62
ELEV:965.82
EXISTING 6' CMP TOE
DRAIN TO BE REMOVED
TEMPORARY 48-INCH
HDPE BYPASS CONDUITS
TO BE INSTALLED DURING
PHASE 2 AND REMOVED
DURING PHASE 3A
TEMPORARY
EXCAVATION LIMITS
EXISTING 9" STEEL STAND
PIPE TO BE REMOVED
TOP = 965.82' PROPOSED
GRADE
EXISTING GROUND
2H:1V2H:1V
ABANDONED BEDROCK IN PLACE
EXISTING 30" RCP CONDUIT
TO BE REMOVED
STA:21+54.62
ELEV:950.00
PROPOSED 48-INCH PRINCIPAL
SPILLWAY CONDUIT ENCASED IN
CONCRETE, SEE SHEET S101
OVERBUILD ZONE 1,
1" OVERBUILD
OVERBUILD ZONE 2,
SLOPING OVERBUILD FROM 1" TO 0"
END
OVERBUILD OVERBUILD ZONE 2,
SLOPING OVERBUILD FROM 1" TO 0"
END OVERBUILD
ELEVATIO
N
STATION
10+25 10+50 10+75 11+00 11+25 11+50 11+75 12+00 12+25 12+50 12+75 13+00
STA:10+59.93
ELEV:941.01
STA:12+14.50
ELEV:951.50 STA:12+39.08
ELEV:943.83
STA:12+25.58
ELEV:951.50
STA:12+16.50
ELEV:939.00 STA:12+37.83
ELEV:939.00
STA:12+39.08
ELEV:936.33
STA:10+77.64
ELEV:940.83
STA:10+81.51
ELEV:955.70
STA:10+77.64
ELEV:961.00
STA:10+76.14
ELEV:965.00
STA:10+88.13
ELEV:965.00
STA:10+88.14
ELEV:951.88
STA:10+86.64
ELEV:940.00
PROPOSED IMPACT BASIN,
SEE SHEET S201
PROPOSED LOW STAGE WEIR AT
ELEVATION 955.7'
PROPOSED 48" RCP PRINCIPAL
SPILLWAY CONDUIT ENCASED IN
CONCRETE, SEE SHEET S101
PROPERTY LINE
PROPOSED HIGH STAGE WEIR AT
ELEVATION 961.0'
MANUAL GATE OPERATOR
EXISTING GROUND
RR-1. PROPOSED RIPRAP LINED
OUTLET CHANNEL @ 0.35%
SLOPE (D50 = 12", L = 50 FT),
SEE SHEET C203
PROPOSED FILTER DIAPHRAGM,
SEE SHEET C205 FOR DETAILS
DAM CREST
15'-0"
3 PMF WSEL = 968.9'
NORMAL POOL WSEL = 955.7'
3H:1V 3H:1V
PROPOSED LOW LEVEL OUTLET
HEADWALL, SEE SHEET S301
PROPOSED 15-INCH RCP LOW LEVEL
OUTLET CONDUIT WITH CONCRETE
CRADLE, SEE SHEET S101 PROPOSED 20-INCH BY
20-INCH SLIDE GATE
PROPOSED INTAKE TOWER
STRUCTURE, SEE SHEET S101
PROPOSED CHAIN LINK FENCE,
SEE SHEETS S205 - S206
TRAIL ON CREST,
SEE SHEET C202
RR-3. PROPOSED UPSTREAM SLOPE
PROTECTION FROM ELEVATION 958.0
TO 952.0, SEE SHEET C202 STA:12+14.50
ELEV:951.00
2'-3"
2'-0"
SEE DETAIL 1,
SHEET C203
IT
HW
IB
RIPRAP KEY
TIE INTO EXISTING
GRADE DOWNSTREAM
PERMANENT
EASEMENT
SLOPE @ 0.77%
GRADE BREAK
STA:11+41.54
ELEV:969.68 2% SLOPE
PROPOSED GRADE
STA:12+89.09
ELEV:936.15
2'-3" 2'-0"
STA:11+57.50
ELEV:970.00
STA:11+42.50
ELEV:969.70
OVERBUILD ZONE 1,
1" OVERBUILD
1'-3"
REGISTRATION
CONSULTANT
AECOM
12420 MILESTONE CENTER DRIVE
SUITE 150
GERMANTOWN, MD 20876
(301) 944-2545 TEL
WWW.AECOM.COM
CLIENT
CITY OF TUCKER
1975 LAKESIDE PKWY
SUITE 350,
TUCKER, GA 30084
770-865-5645 TEL
WWW.TUCKERGA.GOV
PROJECT
LAKE ERIN DAM
REHABILITATION
DEKALB COUNTY, GEORGIA
DRAWING TITLE
AN
SI
D
2" x
4"
LA
ST
S
AV
ED
B
Y:
W
EI
SA
(2
4-
1)
T
PL
O
TT
ED
: 2
4-
-1
FI
LE
N
AM
E:
L
:\D C
S\
PR
O
JE
C
TS
\W
TR
\6
1_
LA
KE
ER
IN
D
AM
EN
G
IN
EE
R
IN
G
\9
_C
AD
_G
IS
\9
_C
AD
\0 4_
SH
EE
TS
\P
PP
-C
1-
LA
KE
ER
IN
.D W
G
NO. DATE DESCRIPTION
REVISIONS
DESIGNED BY:
DRAWN BY:
AECOM PROJECT NO:
PLOT DATE:
APPROVED BY:
CHECKED BY:
ACAD VER:
SCALE:
60727041
AS SHOWN
9/18/2024
SHEET OF
ISSUED FOR CONSTRUCTION ______________
DATE BY
ISSUED FOR BIDDING ______________
DATE BY
SHEET NUMBER
AJW/JES
JBB
JCG
RDP
C201
PRINCIPAL SPILLWAY AND
EMBANKMENT PROFILE
08 47
20'0 10'
SCALE:1"=10'
30'0 15'
SCALE:1"=15'
1 PRINCIPAL SPILLWAY CENTERLINE PROFILE
C201 Scale 1"=10'
2 EMBANKMENT CENTERLINE PROFILE
C201 Scale 1"=15'
STATION
0+00 0+25 0+50
DAM CREST
15'-0"
TRAIL
WIDTH 5'-0"
TRAIL MATERIAL TO BE TRAIL
SURFACE AGGREGATE
EXISTING GROUND
PROPOSED GRADE
3H:1V
5'-0"
6"
2% SLOPE
ELEVATIO
N
STATION
0+00 0+25 0+50
ELEV:952.00
ELEV:958.00
SEE DETAIL 1
THIS SHEET
RR-3. UPSTREAM RIPRAP
PROTECTION WITH BEDDING LAYERS
EXISTING
GROUND
PROPOSED GRADE
3H:1V
NORMAL POOL WSEL = 955.7'
1/3 PMF WSEL = 968.9'
2'-3"
2'-3"
2'-3"
DEPTH VARIES, 2'-3" MIN
9"
STAGE 3 BEDDING
MATERIAL
APPROVED
SUBGRADE
STAGE 2 BEDDING
MATERIAL
STAGE 1 BEDDING
MATERIAL
RIPRAP
9"
9"
ELEVATIO
N
STATION
0+25 0+50 0+75 1+00 1+25 1+50 1+75 2+00 2+25 2+50 2+75
STA:0+28.48
ELEV:955.00
PROPOSED GRADE
EXISTING GROUND SEE DETAIL 1
THIS SHEET
STA:2+71.87
ELEV:955.00
REGISTRATION
CONSULTANT
AECOM
12420 MILESTONE CENTER DRIVE
SUITE 150
GERMANTOWN, MD 20876
(301) 944-2545 TEL
WWW.AECOM.COM
CLIENT
CITY OF TUCKER
1975 LAKESIDE PKWY
SUITE 350,
TUCKER, GA 30084
770-865-5645 TEL
WWW.TUCKERGA.GOV
PROJECT
LAKE ERIN DAM
REHABILITATION
DEKALB COUNTY, GEORGIA
DRAWING TITLE
AN
SI
D
2" x
4"
LA
ST
S
AV
ED
B
Y:
W
EI
SA
(2
4-
T
PL
O
TT
ED
: 2
4-
-1
FI
LE
N
AM
E:
L
:\D C
S\
PR
O
JE
C
TS
\W
TR
\6
1_
LA
KE
ER
IN
D
AM
EN
G
IN
EE
R
IN
G
\9
_C
AD
_G
IS
\9
_C
AD
\0 4_
SH
EE
TS
\P
PP
-C
1-
LA
KE
ER
IN
.D W
G
NO. DATE DESCRIPTION
REVISIONS
DESIGNED BY:
DRAWN BY:
AECOM PROJECT NO:
PLOT DATE:
APPROVED BY:
CHECKED BY:
ACAD VER:
SCALE:
60727041
AS SHOWN
9/18/2024
SHEET OF
ISSUED FOR CONSTRUCTION ______________
DATE BY
ISSUED FOR BIDDING ______________
DATE BY
SHEET NUMBER
AJW/JES
JBB
JCG
RDP
C202
TYPICAL SECTIONS AND
DETAILS (1 OF 3)
09 47
C TYPICAL UPSTREAM RIPRAP SECTION
C104 Scale 1"=5'
1 RIPRAP AND BEDDING LAYERS DETAIL
C202 Scale 1"=1'
A TYPICAL TRAIL ON CREST SECTION
C104 Scale 1"=5'
B UPSTREAM RIPRAP CENTERLINE
C104 Scale 1"=10'
NOTES:
1. STAGE 1 BEDDING MATERIAL TO BE ASTM C33 No. 3.
2. STAGE 2 BEDDING MATERIAL TO BE ASTM No. 8 OR GDOT No. 8.
3. STAGE 3 BEDDING MATERIAL TO BE C33 SAND OR GDOT 10 NS SAND.
STATION
0+00 0+25 0+50 0+75 1+00 1+19
RR-1. PROPOSED OUTLET
CHANNEL @ 0.35%
2'-3" THICK
RIRAP LAYER
PROPOSED GRADE
EXISTING GROUND
2H:1V 2H:1V
6' BOTTOM WIDTH
PR
O
PO
SE
D S
ER
VI
C E
SP
IL
LW
AY
TOP OF RIPRAP
ELEV. = 941.50 (TYP.)
TOP OF RIPRAP
ELEV. = 941.50 (TYP.)
~5'-9"
CHANNEL
DEPTH
TIE-IN PROPOSED GRADE
WITH EXISTING GROUND
TIE-IN PROPOSED GRADE
WITH EXISTING GROUND
~1'-5" CHANNEL
DEPTH
~3'-9" CHANNEL
DEPTH
1.0%
ELEVATIO
N
STATION
0+00 0+25 0+50 0+75 1+00 1+25 1+50 1+75
EXISTING OUTLET
CHANNEL
PROPOSED GRADE
2'-3" THICK
RIRAP LAYER RR-1. PROPOSED OUTLET
CHANNEL @ 0.35%
2H:1V 2H:1V
6' BOTTOM WIDTH
PR
O
PO
SE
D S
ER
VI
C E
SP
IL
LW
AY
EXISTING GROUND
TIE-IN PROPOSED GRADE
WITH EXISTING GROUND
TIE-IN PROPOSED GRADE
WITH EXISTING GROUND
TOP OF RIPRAP ELEV. = 941.50 (TYP.)
TYPICAL BEDDING LAYERS.
SEE DETAIL 1 SHEET C202.
6' CHANNEL
DEPTH
ELEVATIO
N
STATION
0+00 0+25 0+50 0+75 1+001+00
6' BOTTOM
WIDTH
RR-1. PROPOSED
OUTLET CHANNEL
@ 0.35%
EXISTING GROUND
PR
O
PO
SE
D S
ER
VI
C E
SP
IL
LW
AY
TIE-IN PROPOSED GRADE
WITH EXISTING GROUND
TIE-IN PROPOSED GRADE
WITH EXISTING GROUND
2H:1V2H:1V
2H:1V
~1'-8"
CHANNEL
DEPTH
~10"
CHANNEL
DEPTH
~4'-7"
CHANNEL
DEPTH
2.1%
PROPOSED
GRADE
REGISTRATION
CONSULTANT
AECOM
12420 MILESTONE CENTER DRIVE
SUITE 150
GERMANTOWN, MD 20876
(301) 944-2545 TEL
WWW.AECOM.COM
CLIENT
CITY OF TUCKER
1975 LAKESIDE PKWY
SUITE 350,
TUCKER, GA 30084
770-865-5645 TEL
WWW.TUCKERGA.GOV
PROJECT
LAKE ERIN DAM
REHABILITATION
DEKALB COUNTY, GEORGIA
DRAWING TITLE
AN
SI
D
2" x
4"
LA
ST
S
AV
ED
B
Y:
W
EI
SA
(2
4-
T
PL
O
TT
ED
: 2
4-
-1
FI
LE
N
AM
E:
L
:\D C
S\
PR
O
JE
C
TS
\W
TR
\6
1_
LA
KE
ER
IN
D
AM
EN
G
IN
EE
R
IN
G
\9
_C
AD
_G
IS
\9
_C
AD
\0 4_
SH
EE
TS
\P
D E-
C
3-
LA
KE
ER
IN
.D
W G
NO. DATE DESCRIPTION
REVISIONS
DESIGNED BY:
DRAWN BY:
AECOM PROJECT NO:
PLOT DATE:
APPROVED BY:
CHECKED BY:
ACAD VER:
SCALE:
60727041
AS SHOWN
9/18/2024
SHEET OF
ISSUED FOR CONSTRUCTION ______________
DATE BY
ISSUED FOR BIDDING ______________
DATE BY
SHEET NUMBER
AJW/JES
JBB
JCG
RDP
C203
TYPICAL SECTIONS AND
DETAILS (2 OF 3)
10 47
E SECTION - OUTLET CHANNEL
C104 Scale 1"=10'
D SECTION - OUTLET CHANNEL
C104 Scale 1"=10'
F SECTION - OUTLET CHANNEL
C104 Scale 1"=10'
STRUCTURE SCHEDULE
STRUCTURE ID TYPE TOP ELEVATION NORTHING EASTING REMARKS
HW-1 GDOT STANDARD 1001-B, U TYPE WING 942.75' 1406679.5723 2277269.1367 15" Ø, MODIFIED TO ACCOMODATE TRASH RACK, SEE STRUCTURAL SHEET S301
IT-1 INTAKE TOWER 965.00' 1406700.3192 2277257.6533 SEE STRUCTURAL DETAIL SHEETS S101 - S108
IB-1 USBR TYPE VI IMPACT BASIN 951.50' 1406826.8978 2277187.6176 48" Ø, SEE STRUCTURAL DETAIL SHEETS S201 - S204
HW-2 GDOT STANDARD 1001-B, U TYPE WING 943.69' 1406818.0086 2277148.8380 12" Ø, NON-SHRINK GROUT ANNULUS BETWEEN 12" Ø OPENING AND 6" Ø HDPE PIPE, SEE STRUCTURAL SHEET S302
PRINCIPAL SPILLWAY PIPE SCHEDULE
FROM STRUCTURE TO STRUCTURE SIZE MATERIAL CLASS PIPE LENGTH UPSTREAM INV. DOWNSTREAM INV. SLOPE %
HW-1 IT-1 15" Ø RCP ASTM C361 17.71 FT 941.00' 940.83' 0.96
IT-1 IB-1 48" Ø RCP ASTM C361 129.53 FT 940.00' 939.00' 0.77
DRAIN PIPE SCHEDULE
DRAIN ID SIZE MATERIAL STYLE PIPE LENGTH REMARKS
DP - 1
6" Ø HDPE SLOTTED 90 FT SEE SHEET C101 FOR PRIMARY DRAIN ALIGNMENT. SEE SHEET
C206 FOR PRIMARY DRAIN PROFILE.6" Ø HDPE SOLID 17.5 FT
DP - 2
6" Ø HDPE SLOTTED 13.5 FT SEE SHEET C101 FOR STRIP DRAIN ALIGNMENT. SEE SHEET
C206 FOR STRIP DRAIN PROFILE.6" Ø HDPE SOLID 11 FT
DP - 3
6" Ø HDPE SLOTTED 67 FT SEE SHEET C101 FOR EAST TOE DRAIN ALIGNMENT. SEE
SHEET C207 FOR EAST TOE DRAIN PROFILE.6" Ø HDPE SOLID 30 FT
DP - 4
6" Ø HDPE SLOTTED 27 FT SEE SHEET C101 FOR WEST TOE DRAIN ALIGNMENT. SEE
SHEET C207 FOR WEST TOE DRAIN PROFILE.6" Ø HDPE SOLID 12 FT
STATION 12+39 TO 12+53.5
STATION 12+53.5 TO 12+90 STATION 12+90
STATION
100+00 100+25 100+50 100+75 101+00
GRADE BREAK
STA:100+24.66
ELEV:936.17
STA:100+93.34
ELEV:943.00
SEE DETAIL 1 SHEET C202
FOR BEDDING LAYERS.
RR-2.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .