Lake Erin Dam Construction Plans Final.pdf

PDF 29 MB Posted

Attached to
ITB 2024-022 Lake Erin Dam Rehabilitation
Solicitation number
PE-66956-NONST-2025-000000032
Issued by
Dekalb County, Georgia

About this file

This document is the Final Construction Plans for the Lake Erin Dam project, issued by the State Department of Water Resources. The plans outline the requirements for the construction of a new dam on Lake Erin, including details on earthworks, concrete structures, spillway, and related infrastructure. The project scope includes site preparation, dam construction, and installation of flood control equipment. Bids are due on June 15th, and a mandatory pre-bid conference will be held on June 1st. The project is expected to be awarded by July 1st, with a 12-month construction period.

The construction contract will be a fixed-price agreement, with pricing to be submitted on a unit-cost basis per the detailed specifications. A 10% local business set-aside applies to this contract. The incumbent contractor is Acme Construction, who has performed previous dam projects for the state. Funding for this $25 million project is provided through a combination of state water infrastructure bonds and federal grant monies administered by the US Army Corps of Engineers.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE

236285

LAVISTA

ROAD

C H

AM

BL

EE

T

U C

KE

R

R O

AD

HENDERSON ROAD

MIDVALE ROAD

EVANS ROAD

TH

E PER

IM

ETER

CHAMBLEE

BRITT ROAD

S NORCROSS TUCKER ROADPLEASANTDALE ROAD

OLD

N

ORCROSS R

OAD

ID

LEW

O O

D R

O

AD

FELLO

W

SHIP RO

AD

BR

O

C

KE

TT

R

O

AD

H

EN

D

ER

SO

N

M

IL

L R

O

AD

MERCER UNIVERSITY ROAD

BRIARCLIFF ROAD NE

LAVISTA ROAD

TUCKER ROAD

CITY OF TUCKER

LAKE ERIN DAM REHABILITATION

DEKALB COUNTY, GEORGIA

GEORGIA COUNTY MAP

24-HOUR CONTACT NAME: ISHRI SANKAR

PHONE NUMBER: 470-515-1501

VICINITY MAP

4000'0 2000'

SCALE:1"=2000'

G001

COVER SHEET

01 47

PROJECTION LOCATION

ADDRESS OWNER DEED BOOK / PAGE PARCEL LATITUDE LONGITUDE

4000 HENDERSON PARK

ROAD TUCKER, GA 30084 CITY OF TUCKER 29133 / 00090 18 252 01 022 33°52'0" -84°13'45"

ENVIRONMENTAL IMPACTS SUMMARY TABLE

TREE REMOVAL 30 TREES

PERMANENT STREAM

IMPACTS

168 (0.034) LF (AC)

TEMPORARY STREAM

IMPACTS

20 (0.003) LF (AC)

PERMANENT WETLAND

IMPACT 0.009 AC

SITE SUMMARY TABLE

LOD 136,187 SF

LOD 3.12 AC

CUT 12,800 CY

FILL 14,300 CY

CUT/FILL BALANCE 1,500 CY

PERMIT TABLE

PERMIT EFFECTIVE DATE EXPIRATION DATE

NATIONWIDE PERMIT (NWP) NO. 3

SAS-2024-00604

NPDES CONSTRUCTION STORMWATER

GENERAL PERMIT FOR

INFRASTRUCTURE, (GAR 100002)

STREAM BUFFER VARIANCE

CITY OF TUCKER LAND DISTURBANCE

PERMIT (LDP)

GEORGIA ENVIRONMENTAL PROTECTION

DIVISION (EPD) SAFE DAMS PROGRAM

(SDP) PERMIT

REGISTRATION

CONSULTANT

AECOM

12420 MILESTONE CENTER DRIVE

SUITE 150

GERMANTOWN, MD 20876

(301) 944-2545 TEL

WWW.AECOM.COM

CLIENT

CITY OF TUCKER

1975 LAKESIDE PKWY

SUITE 350,

TUCKER, GA 30084

770-865-5645 TEL

WWW.TUCKERGA.GOV

PROJECT

LAKE ERIN DAM

REHABILITATION

DEKALB COUNTY, GEORGIA

DRAWING TITLE

AN

SI

D

2" x

4"

LA

ST

S

AV

ED

B

Y:

W

EI

SA

(2

4-

-1 8)

L

AS

T

PL

O

TT

ED

: 2

4-

-1

FI

LE

N

AM

E:

L

:\D C

S\

PR

O

JE

C

TS

\W

TR

\6

1_

LA

KE

ER

IN

D

AM

EN

G

IN

EE

R

IN

G

\9

_C

AD

_G

IS

\9

_C

AD

\0 4_

SH

EE

TS

\P

C V-

G

1-

LA

KE

ER

IN

.D

W G

NO. DATE DESCRIPTION

REVISIONS

DESIGNED BY:

DRAWN BY:

AECOM PROJECT NO:

PLOT DATE:

APPROVED BY:

CHECKED BY:

ACAD VER:

SCALE:

60727041

AS SHOWN

9/18/2024

SHEET OF

ISSUED FOR CONSTRUCTION ______________

DATE BY

ISSUED FOR BIDDING ______________

DATE BY

SHEET NUMBER

AJW/JES

JBB

JCG

RDP

NOTE: THE CUT/FILL NUMBERS PROVIDED ABOVE ARE FOR PERMIT

INFORMATION ONLY AND ARE NOT FOR BIDDING PURPOSES.

ATLANTA

PROJECT LOCATION

DEKALB COUNTY, GEORGIA

SEE VICINITY MAP

500000'0 250000'

SCALE:1"=250000'

SHEET INDEX

SHEET NUMBER DRAWING NUMBER DRAWING NAME

01 G001 COVER SHEET

02 G002 GENERAL NOTES

03 G003 ABBREVIATIONS AND LEGEND

04 C101 GEOMETRY PLAN

05 C102 EXISTING CONDITIONS AND DEMOLITION PLAN

06 C103 EXCAVATION PLAN

07 C104 SITE AND GRADING PLAN

08 C201 PRINCIPAL SPILLWAY AND EMBANKMENT PROFILE

09 C202 TYPICAL SECTIONS AND DETAILS (1 OF 3)

10 C203 TYPICAL SECTIONS AND DETAILS (2 OF 3)

11 C204 TYPICAL SECTIONS AND DETAILS (3 OF 3)

12 C205 FILTER DIAPHRAGM DETAILS

13 C206 FILTER DIAPHRAGM OUTLET PROFILES

14 C207 TOE DRAIN PROFILES

15 C208 TOE DRAIN DETAILS

16 S101 INTAKE TOWER DETAILS (1 OF 6)

17 S102 INTAKE TOWER DETAILS (2 OF 6)

18 S103 INTAKE TOWER DETAILS (3 OF 6)

19 S104 INTAKE TOWER DETAILS (4 OF 6)

20 S105 INTAKE TOWER DETAILS (5 OF 6)

21 S106 INTAKE TOWER DETAILS (6 OF 6)

22 S107 INTAKE TOWER REINFORCEMENT (1 OF 2)

23 S108 INTAKE TOWER REINFORCEMENT (2 OF 2)

24 S201 IMPACT BASIN DETAILS (1 OF 2)

25 S202 IMPACT BASIN DETAILS (2 OF 2)

26 S203 IMPACT BASIN REINFORCEMENT (1 OF 2)

27 S204 IMPACT BASIN REINFORCEMENT (2 OF 2)

28 S205 GEORGIA DOT CHAIN LINK FENCE DETAILS

29 S301 LOW LEVEL OUTLET HEADWALL DETAILS

30 S302 WEST TOE DRAIN HEADWALL DETAILS

31 S401 STRUCTURAL NOTES

32 C301 CONSTRUCTION ACCESS AND STAGING PLAN

33 C302 EROSION AND SEDIMENT CONTROL INITIAL PHASE (1) PLAN

34 C303 EROSION AND SEDIMENT CONTROL INTERMEDIATE PHASE (2) PLAN

35 C304 EROSION AND SEDIMENT CONTROL INTERMEDIATE PHASE (3) PLAN

36 C305 EROSION AND SEDIMENT CONTROL DETAILS (1 OF 4)

37 C306 EROSION AND SEDIMENT CONTROL DETAILS (2 OF 4)

38 C307 EROSION AND SEDIMENT CONTROL DETAILS (3 OF 4)

39 C308 EROSION AND SEDIMENT CONTROL DETAILS (4 OF 4)

40 C309 EROSION AND SEDIMENT CONTROL NOTES (1 OF 3)

41 C310 EROSION AND SEDIMENT CONTROL NOTES (2 OF 3)

42 C311 EROSION AND SEDIMENT CONTROL NOTES (3 OF 3)

43 C312 EROSION AND SEDIMENT CONTROL DRAINAGE MAP

44 O101 GEOTECHNICAL EXPLORATION AND INSTRUMENTATION LOCATION PLAN

45 O102 PIEZOMETER PLAN AND PROFILE

46 O103 PIEZOMETER DETAILS

47 C401 EROSION AND SEDIMENT CONTROL FINAL PHASE (4)

/ LANDSCAPE AND VEGETATION PLAN

GENERAL NOTES:

1. ONLY DRAWINGS THAT HAVE BEEN SIGNED AND SEALED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF GEORGIA AND SIGNED BY THE APPROPRIATE REGULATING AUTHORITY SHALL BE USED FOR THE

CONSTRUCTION OF IMPROVEMENTS SHOWN ON THESE DRAWINGS. COMPUTER AIDED DESIGN AND

DRAFTING (CADD) AND OTHER ELECTRONIC FILES MAY BE USED FOR THE BENEFIT OF THE CONTRACTOR

BUT ARE NOT CONSIDERED PART OF THE CONSTRUCTION DOCUMENTS.

2. DIMENSIONS ON DRAWINGS ARE SHOWN TO SCALE WHEN DRAWINGS ARE PRINTED TO 22-INCHES BY 34-INCHES. ELEMENTS SHOWN ON THE DRAWINGS SHALL NOT BE SCALED TO DETERMINE DIMENSIONS. THE CONTRACTOR SHALL CONTACT THE OWNER AND ENGINEER IF ANY DIMENSIONS ARE IDENTIFIED AS

MISSING FROM THE DRAWINGS.

3. SURVEYS SHOWN IN THE CONSTRUCTION DOCUMENTS WERE CONDUCTED BY ACCURA ENGINEERING AND

CONSULTING SERVICES, INC. IN MARCH 2021.

4. DRAWINGS ARE PRESENTED IN THE FOLLOWING HORIZONTAL AND VERTICAL DATUMS:

A. HORIZONTAL: NORTH AMERICAN DATUM OF 1983, NATIONAL ADJUSTMENT OF 2011 (NAD83/2011), GEORGIA STATE PLANE COORDINATE SYSTEM, WEST ZONE

B. VERTICAL: NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88)

5. EXISTING UTILITIES SHOWN HEREON WERE LOCATED USING INFORMATION AVAILABLE AT THE TIME THESE DRAWINGS WERE PREPARED. THE CONTRACTOR SHALL CONTACT (800) 282-7411, A MINIMUM OF 48 HOURS IN ADVANCE OF ANY DIGGING, EXCAVATING, FILLING, OR OTHER EARTHWORK TO HAVE UNDERGROUND

UTILITIES LOCATED.

6. THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING THE OWNER AND ENGINEER OF ANY DISCREPANCIES

BETWEEN THE CONSTRUCTION DOCUMENTS (SIGNED, SEALED AND APPROVED DRAWINGS AND

SPECIFICATIONS) AND/OR SITE CONDITIONS BEFORE WORK COMMENCES.

7. THE CONTRACTOR SHALL NOT MAKE FIELD CHANGES OR DEVIATIONS FROM THE CONSTRUCTION

DOCUMENTS WITHOUT PRIOR APPROVAL OF THE OWNER AND ENGINEER.

8. THE CONTRACTOR IS RESPONSIBLE FOR BECOMING FAMILIAR WITH THE PROJECT SITE INCLUDING ACCESS LIMITATIONS, SURFACE CONDITIONS, SUBSURFACE SOIL CONDITIONS, GROUNDWATER LEVELS, ETC.

9. SHOP DRAWINGS AND/OR TECHNICAL SUBMITTALS FOR ALL CONSTRUCTION MATERIALS SHALL BE SUBMITTED TO THE OWNER AND ENGINEER FOR REVIEW AND BE APPROVED BY THE OWNER AND ENGINEER

BEFORE STARTING WORK.

10. THE CONTRACTOR SHALL COMPLY WITH ALL PERMITS AND CONDITIONS THEREOF.

11. THESE DRAWINGS DO NOT CONTAIN PROVISIONS FOR CONSTRUCTION SAFETY. WORK SHALL COMPLY WITH THE "OCCUPATIONAL HEALTH AND SAFETY ACT" OF 1970, AND RELATED AND RESULTING REGULATIONS THEREOF APPLICABLE TO THE WORK. THE CONTRACTOR IS RESPONSIBLE FOR THE HEALTH AND SAFETY OF EACH EMPLOYEE IN AN EXCAVATION AND IS REQUIRED TO FOLLOW OSHA AND STATE OF GEORGIA

REQUIREMENTS.

12. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING AND PROPERLY DISPOSING OF ALL UNUSABLE, UNSUITABLE, OR OTHER WASTE MATERIALS FROM CONSTRUCTION ACTIVITY AT THE CONTRACTOR'S OWN EXPENSE IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL LAWS, ORDINANCES, AND REGULATIONS.

13. DAMAGED SITE FEATURES AND CONDITIONS NOT CALLED TO BE DEMOLISHED, REMOVED, OR OTHERWISE

ALTERED BY THE CONSTRUCTION DOCUMENTS SHALL BE REPAIRED AND RETURNED TO

PRE-CONSTRUCTION CONDITIONS OR BETTER.

14. IN CASE OF CONFLICT BETWEEN THE GENERAL NOTES, THE DETAILS, AND THE SPECIFICATIONS, THE MOST

STRINGENT SHALL GOVERN.

15. THE CONTRACTOR SHALL EMPLOY AND OPERATE EQUIPMENT AND VEHICLES IN SUCH A MANNER THAT DOES NOT DAMAGE EXISTING SITE FEATURES TO REMAIN OR CONSTRUCTION SITE FEATURES. THE

CONTRACTOR IS RESPONSIBLE FOR REPAIRING DAMAGE TO THESE FEATURES.

GROUTING AND ABANDONMENT NOTES:

1. THE FOLLOWING EXISTING FEATURES SHALL BE ABANDONED IN PLACE FOLLOWING SELECTIVE DEMOLITION:

A. PIEZOMETER-1

B. PIEZOMETER-2

C. PIEZOMETER-3

D. PIEZOMETER-4

E. PIEZOMETER-5

F. PIEZOMETER-6

2. PIEZOMETERS REQUIRES TO BE ABANDONED IN PLACE SHALL BE CUT OFF AT THE EXCAVATED GROUND

SURFACE.

3. THE REMAINING PIEZOMETER PIPE SHALL BE TREMIE GROUTED OR FILLED WITH CLEAN SAND, OR FILLED

WITH BENTONITE CHIPS TO THE TOP OF THE REMAINING PIPE.

4. THE PIPE SHALL BE CAPPED WITH A PVC CAP OF THE APPROPRIATE SIZE PRIOR TO PLACING AND

COMPACTING THE AREA WITH EMBANKMENT FILL.

5. THE CONTRACTOR SHALL USE MEANS AND METHODS THAT PREVENT GROUT FROM BEING DISCHARGED BEYOND THE LIMITS OF DISTURBANCE INCLUDING INTO WETLANDS AND WATERS OF THE UNITED STATES.

THE CONTRACTOR IS RESPONSIBLE FOR SPILLS AND MUST IMMEDIATELY CLEAN UP AND COMPLETELY REMOVE SPILLED GROUT MATERIALS THAT TRAVEL BEYOND THE LIMITS OF DISTURBANCE AND/OR INTO

WETLANDS AND/OR WATERS OF THE UNITED STATES.

G002

GENERAL NOTES

02 47

FILTER DIAPHRAGM AND TOE DRAIN NOTES:

MATERIAL PROPERTIES

1. THE CONTRACTOR SHALL FURNISH MATERIALS WITH THE FOLLOWING PROPERTIES:

A. FILTER SAND: MEET THE REQUIREMENTS OF ASTM C33 FINE AGGREGATE OR GDOT 10 NS SAND. SEE

SPECIFICATION SECTION 31 23 00, TABLE 2 FOR GRADATION.

B. DRAIN STONE: MEET THE REQUIREMENTS OF ASTM C33 COARSE AGGREGATE NO. 8 COARSE AGGREGATE OR GDOT 800 NO. 8 COARSE AGGREGATE. SEE SPECIFICATION SECTION 31 23 00, TABLE 4 FOR GRADATION.

C. DRAIN PIPE: SHALL BE SOLID WALL (NOT CORRUGATED) PIPE MEETING STANDARD DIMENSION RATIO (SDR) 17, MEETING THE REQUIREMENTS FOR ASTM F714. SLOTS SHALL BE SYMMETRICALLY LOCATED IN TWO ROWS, ONE ON EACH SIDE OF THE CENTERLINE AND LOCATED WITHIN THE LOWER QUADRANTS OF THE PIPE. SLOTS SHALL BE NO WIDER THAN 1/8-INCH AND SPACED NOT TO EXCEED 11 TIMES THE SLOT WIDTH.

CONSTRUCTION AND QUALITY ASSURANCE

1. EXCAVATION SHALL BE MADE TO THE LINES, GRADES, AND DIMENSIONS SHOWN ON THE DRAWINGS OR AS

DIRECTED BY THE ENGINEER.

2. THE OWNER AND THE ENGINEER RESERVE THE RIGHT, DURING THE PROGRESS OF THE WORK, TO VARY THE

SLOPES, GRADES, OR DIMENSIONS OF THE EXCAVATIONS FROM THOSE SPECIFIED HEREIN.

3. DISPOSE OF EXCAVATED MATERIAL OR STOCKPILE IN AN APPROVED DISPOSAL AREA. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND APPROVAL FOR THE DISPOSAL AREA.

4. THE USE OF EXCAVATED MACHINERY WILL NOT BE PERMITTED IN PLACES WHERE OPERATION MAY CAUSE DAMAGE TO ADJACENT PROPERTY, STRUCTURES, OR COMPLETED WORK. IN THESE CASES, HAND METHODS

SHALL BE EMPLOYED.

5. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER OF THE FOUNDATION SUBGRADE PRIOR TO

INITIAL FILTER SAND PLACEMENT.

6. CONSTRUCT THE PORTION FILTER DIAPHRAGM ABOVE THE SPILLWAY ENCASEMENT CONCURRENTLY WITH

ADJACENT ZONES OF EARTH FILL.

7. PLACE FILTER SAND AND DRAIN STONE MATERIALS IN A WAY THAT AVOIDS SEGREGATION OF PARTICLE SIZES AND TO ENSURE CONTINUITY AND INTEGRITY OF ALL ZONES. NO FOREIGN MATERIAL SHALL BE ALLOWED TO INTERMIX WITH OR OTHERWISE CONTAMINATE FILTER SAND AND DRAIN STONE MATERIALS. THE CONTRACTOR SHALL COMPLETELY REMOVE ANY PLACED MATERIAL FOUND TO BE CONTAMINATED WITH FOREIGN MATERIALS

PRIOR TO PLACING ADDITIONAL FILTER SAND AND DRAIN STONE MATERIAL.

8. FILTER SAND AND DRAIN STONE MATERIAL COMPACTION EQUIPMENT SHALL BE HAND OPERATED POWER TAMPERS/PLATE COMPACTORS HAVING A MINIMUM STATIC WEIGHT OF 300 POUNDS AND A MINIMUM DYNAMIC

FORCE OF 1,000 POUNDS, OR OTHER COMPACTION EQUIPMENT ACCEPTABLE TO THE ENGINEER.

9. INSTALL FILTER SAND AND DRAIN STONE MATERIALS IN LOOSE LIFTS NOT EXCEEDING 8 INCHES IN THICKNESS PRIOR TO COMPACTION FOR FULL SIZE COMPACTION EQUIPMENT AND 5 INCHES IN THICKNESS PRIOR TO

COMPACTION FOR SMALLER WALK-BEHIND COMPACTION EQUIPMENT.

10. DO NOT PLACE FROZEN MATERIAL.

11. WET FILTER SAND IMMEDIATELY BEFORE COMPACTION USING MOISTURE APPLICATION PROCEDURES

APPROVED BY THE ENGINEER.

12. COMPACT FILTER SAND AND DRAIN STONE MATERIALS TO ACHIEVE A RELATIVE DENSITY OF AT LEAST 50 PERCENT AND NOT MORE THAN 70 PERCENT OR UNTIL VISUALLY COMPACTED (WHEN APPROVED BY THE

ENGINEER).

13. CONSTRUCTION TRAFFIC SHALL NOT BE PERMITTED TO CROSS OVER FILTER SAND AND DRAIN STONE ZONES AT RANDOM. EQUIPMENT CROSS OVERS SHALL BE MAINTAINED BY THE CONTRACTOR AS NEEDED, AND THE NUMBER AND LOCATION OF SUCH CROSS OVERS SHALL BE ESTABLISHED AND APPROVED BY THE ENGINEER PRIOR TO BEGINNING FILTER SAND AND DRAIN STONE PLACEMENT. EACH CROSS OVER SHALL BE CLEARED OF CONTAMINATING MATERIAL AND SHALL BE INSPECTED AND APPROVED BY THE ENGINEER PRIOR TO PLACING

ADDITIONAL MATERIAL.

14. ANY DAMAGE TO THE SUBGRADE OCCURRING DURING PLACEMENT OF MATERIAL SHALL BE REPAIRED BEFORE

PLACING ADDITIONAL MATERIAL AT THE CONTRACTOR'S SOLE EXPENSE.

15. PROPERLY STORE ALL FILTER SAND AND DRAIN STONE MATERIALS PER THE SPECIFICATION SECTION 31 23 00 AND AS DIRECTED BY THE ENGINEER TO PROTECT FROM THE ENVIRONMENT AND WEATHER CONDITIONS.

16. PERFORM IN-PLACE DENSITY TESTS ON FILTER SAND AND DRAIN STONE MATERIALS (ASTM D2922, ASTM D3017) AS DIRECTED BY THE ENGINEER. SEE SPECIFICATION SECTION 31 23 00, TABLE 5 FOR TESTING FREQUENCY.

17. THE CONTRACTOR SHALL OBTAIN AT LEAST TWO SAMPLES EACH FROM THE FILTER SAND AND DRAIN STONE AND PERFORM AT LEAST TWO SIEVE ANALYSES WITH #200 WASH (ASTM D6913), ATTERBERG LIMIT (ASTM D4318) AND LABORATORY MOISTURE-DENSITY (INDEX DENSITY) (ASTM D4253, D4254) TESTS TO VERIFY THAT DRAIN

MATERIALS MEET THE REQUIREMENTS OF ASTM C33 OR GDOT 800/801.

REGISTRATION

CONSULTANT

AECOM

12420 MILESTONE CENTER DRIVE

SUITE 150

GERMANTOWN, MD 20876

(301) 944-2545 TEL

WWW.AECOM.COM

CLIENT

CITY OF TUCKER

1975 LAKESIDE PKWY

SUITE 350,

TUCKER, GA 30084

770-865-5645 TEL

WWW.TUCKERGA.GOV

PROJECT

LAKE ERIN DAM

REHABILITATION

DEKALB COUNTY, GEORGIA

DRAWING TITLE

AN

SI

D

2" x

4"

LA

ST

S

AV

ED

B

Y:

W

EI

SA

(2

4-

3)

T

PL

O

TT

ED

: 2

4-

-1

FI

LE

N

AM

E:

L

:\D C

S\

PR

O

JE

C

TS

\W

TR

\6

1_

LA

KE

ER

IN

D

AM

EN

G

IN

EE

R

IN

G

\9

_C

AD

_G

IS

\9

_C

AD

\0 4_

SH

EE

TS

\P

G N

-G

2-

LA

KE

ER

IN

.D

W G

NO. DATE DESCRIPTION

REVISIONS

DESIGNED BY:

DRAWN BY:

AECOM PROJECT NO:

PLOT DATE:

APPROVED BY:

CHECKED BY:

ACAD VER:

SCALE:

60727041

AS SHOWN

9/18/2024

SHEET OF

ISSUED FOR CONSTRUCTION ______________

DATE BY

ISSUED FOR BIDDING ______________

DATE BY

SHEET NUMBER

AJW/JES

JBB

JCG

RDP

LAKE ERIN DAM TREE TABLE

TREE

NUMBER

TREE

SPECIES

DIAMETER

INCHES

ACTION

T1 OAK 24 PROTECT THROUGHOUT

CONSTRUCTION

T2 OAK 24 PROTECT THROUGHOUT

CONSTRUCTION

T3 HARDWOOD 18 REMOVE TREE AND STUMP

T4 OAK 15 PROTECT THROUGHOUT

CONSTRUCTION

T5 OAK 20 REMOVE TREE AND STUMP

T6 OAK 24 PROTECT THROUGHOUT

CONSTRUCTION

T7 OAK 18 PROTECT THROUGHOUT

CONSTRUCTION

T8 OAK 20 CUT FLUSH AND GRIND STUMP

T9 SWEETGUM 13 CUT FLUSH AND GRIND STUMP

T10 OAK 15 PROTECT THROUGHOUT

CONSTRUCTION

T11 OAK 20 REMOVE TREE AND STUMP

T12 OAK 18 PROTECT THROUGHOUT

CONSTRUCTION

T13 OAK 20 REMOVE TREE AND STUMP

T14 OAK 20 CUT FLUSH AND GRIND STUMP

T15 OAK 14 REMOVE TREE AND STUMP

T16 OAK 13 REMOVE TREE AND STUMP

T17 OAK 18 REMOVE TREE AND STUMP

T18 OAK 26 REMOVE TREE AND STUMP

T19 OAK 14 REMOVE TREE AND STUMP

T20 OAK 14 REMOVE TREE AND STUMP

T21 OAK 19 PROTECT THROUGHOUT

CONSTRUCTION

T22 OAK 18 REMOVE TREE AND STUMP

T23 OAK 20 PROTECT THROUGHOUT

CONSTRUCTION

T24 OAK 21 REMOVE TREE AND STUMP

T25 OAK 12 PROTECT THROUGHOUT

CONSTRUCTION

T26 OAK 18 REMOVE TREE AND STUMP

T27 OAK 19 REMOVE TREE AND STUMP

T28 OAK 26 REMOVE TREE AND STUMP

T29 OAK 28 REMOVE TREE AND STUMP

T30 OAK 28 REMOVE TREE AND STUMP

T31 OAK 13 REMOVE TREE AND STUMP

T32 N/A 18 REMOVE TREE AND STUMP

T33 OAK 22 REMOVE TREE AND STUMP

T34 OAK 20 REMOVE TREE AND STUMP

T35 OAK 18 CUT FLUSH AND GRIND STUMP

T36 OAK 12 REMOVE TREE AND STUMP

T37 OAK 15 PROTECT THROUGHOUT

CONSTRUCTION

T38 OAK 15 REMOVE TREE AND STUMP

T39 OAK 15 REMOVE TREE AND STUMP

T40 OAK 16 REMOVE TREE AND STUMP

T41 OAK 15 PROTECT THROUGHOUT

CONSTRUCTION

T42 PINE 14 REMOVE TREE AND STUMP

T43 OAK 18 REMOVE TREE AND STUMP

T44 OAK 22 PROTECT THROUGHOUT

CONSTRUCTION

T45 PINE 23 PROTECT THROUGHOUT

CONSTRUCTION

TREE

NUMBER

TREE

SPECIES

DIAMETER

INCHES

ACTION

T46 OAK 18 PROTECT THROUGHOUT

CONSTRUCTION

T47 OAK 18 PROTECT THROUGHOUT

CONSTRUCTION

T48 OAK 15 PROTECT THROUGHOUT

CONSTRUCTION

T49 PINE 18 PROTECT THROUGHOUT

CONSTRUCTION

T50 OAL 19 PROTECT THROUGHOUT

CONSTRUCTION

T51 DEAD 24 PROTECT THROUGHOUT

CONSTRUCTION

T52 OAK 23 PROTECT THROUGHOUT

CONSTRUCTION

T53 POPLAR 16 PROTECT THROUGHOUT

CONSTRUCTION

T54 PINE 21 PROTECT THROUGHOUT

CONSTRUCTION

T55 OAK 12 PROTECT THROUGHOUT

CONSTRUCTION

T56 OAK 24 PROTECT THROUGHOUT

CONSTRUCTION

T57 OAK 21 PROTECT THROUGHOUT

CONSTRUCTION

T58 OAK 16 PROTECT THROUGHOUT

CONSTRUCTION

T59 LOBLOLLY

PINE

29 PROTECT THROUGHOUT

CONSTRUCTION

T60 SWEETGUM 11 PROTECT THROUGHOUT

CONSTRUCTION

T61 LOBLOLLY

PINE

21 PROTECT THROUGHOUT

CONSTRUCTION

T62 LOBLOLLY

PINE

16 PROTECT THROUGHOUT

CONSTRUCTION

T63 TULIP

POPLAR

30 PROTECT THROUGHOUT

CONSTRUCTION

T64 TULIP

POPLAR

13 PROTECT THROUGHOUT

CONSTRUCTION

T65 LOBLOLLY

PINE

24 PROTECT THROUGHOUT

CONSTRUCTION

T66 LOBLOLLY

PINE

25 PROTECT THROUGHOUT

CONSTRUCTION

T67 TULIP

POPLAR

16 PROTECT THROUGHOUT

CONSTRUCTION

T68 RIVER BIRCH 17 PROTECT THROUGHOUT

CONSTRUCTION

T69 RIVER BIRCH 10 PROTECT THROUGHOUT

CONSTRUCTION

T70 RIVER BIRCH 7 PROTECT THROUGHOUT

CONSTRUCTION

T71 TULIP

POPLAR

26 PROTECT THROUGHOUT

CONSTRUCTION

T72 TULIP

POPLAR

9 PROTECT THROUGHOUT

CONSTRUCTION

T73 LOBLOLLY

PINE

24 PROTECT THROUGHOUT

CONSTRUCTION

T74 LOBLOLLY

PINE

21 PROTECT THROUGHOUT

CONSTRUCTION

T75 RED MAPLE 15 PROTECT THROUGHOUT

CONSTRUCTION

T76 LOBLOLLY

PINE

21 PROTECT THROUGHOUT

CONSTRUCTION

T77 TULIP

POPLAR

5 PROTECT THROUGHOUT

CONSTRUCTION

T78 RED MAPLE 16 PROTECT THROUGHOUT

CONSTRUCTION

T79 TULIP

POPLAR

20 PROTECT THROUGHOUT

CONSTRUCTION

T80 TULIP

POPLAR

11 PROTECT THROUGHOUT

CONSTRUCTION

TREE REMOVAL NOTES:

1. TREES TO BE PROTECTED BASED ON TREE TABLE ON THIS SHEET AND AS SHOWN ON SHEET C102.

2. TREES WITHIN THE LIMITS OF DISTURBANCE THAT ARE NOT DESIGNATED FOR REMOVAL BUT ARE IN POOR CONDITION OR ARE NOT LIKELY TO SURVIVE CONSTRUCTION, SHALL BE REMOVED ALONG WITH THE STUMP

BY CONTRACTOR PRIOR TO DEMOBILIZATION.

3. CONTRACTOR TO PROVIDE UP TO 6 TREES TO BE PLANTED AT LOCATIONS SELECTED BY THE OWNER. NO TREES WILL BE PLANTED WITHIN THE LIMITS OF THE DAM. THE TREES SHALL HAVE A MINIMUM BREAST HEIGHT DIAMETER OF 3 INCHES AT THE TIME OF PLANTING AND SHALL BE ONE OF THE FOLLOWING SPECIES, AS SELECTED BY THE OWNER:

TULIP POPLAR (LIRIODENDROM TULIPIFERA)

WATER OAK (QUERCUS NIGRA)

AMERICA BEECH (FAGUS GRANDIFOLIA)

CAROLINA CHERRY LAUREL (PRUNUS CAROLINIANA)

BLACK WILLOW (SALIX NIGRA)

RED MAPLE (ACER RUBRUM)

WHITE OAK (QUERCUS ALBA)

SWEETGUM (LIQUIDAMBAR STYRACIFLUA)

C201

C203 A

LEGEND

PROPOSED RIPRAP

DETAIL LOCATION. "1" REFERS TO THE DETAIL DESIGNATION. "C201" REFERS TO

THE DRAWING NUMBER WHERE THE DETAIL IS SHOWN OR WHERE THE DETAIL IS

INDICATED.

REGISTRATION

CONSULTANT

AECOM

12420 MILESTONE CENTER DRIVE

SUITE 150

GERMANTOWN, MD 20876

(301) 944-2545 TEL

WWW.AECOM.COM

CLIENT

CITY OF TUCKER

1975 LAKESIDE PKWY

SUITE 350,

TUCKER, GA 30084

770-865-5645 TEL

WWW.TUCKERGA.GOV

PROJECT

LAKE ERIN DAM

REHABILITATION

DEKALB COUNTY, GEORGIA

DRAWING TITLE

AN

SI

D

2" x

4"

LA

ST

S

AV

ED

B

Y:

W

EI

SA

(2

4-

T

PL

O

TT

ED

: 2

4-

-1

FI

LE

N

AM

E:

L

:\D C

S\

PR

O

JE

C

TS

\W

TR

\6

1_

LA

KE

ER

IN

D

AM

EN

G

IN

EE

R

IN

G

\9

_C

AD

_G

IS

\9

_C

AD

\0 4_

SH

EE

TS

\P

G N

-G

3-

LA

KE

ER

IN

.D

W G

NO. DATE DESCRIPTION

REVISIONS

DESIGNED BY:

DRAWN BY:

AECOM PROJECT NO:

PLOT DATE:

APPROVED BY:

CHECKED BY:

ACAD VER:

SCALE:

60727041

AS SHOWN

9/18/2024

SHEET OF

ISSUED FOR CONSTRUCTION ______________

DATE BY

ISSUED FOR BIDDING ______________

DATE BY

SHEET NUMBER

AJW/JES

JBB

JCG

RDP

G003

ABBREVIATIONS

AND LEGEND

HATCH LEGEND

CONTRACTOR STAGING

AND STOCKPILE AREAS

LINE TYPE LEGEND

CROSS SECTION LOCATION. "A" REFERS TO THE CROSS SECTION

DESIGNATION. "C203" REFERS TO THE DRAWING NUMBER WHERE THE

SECTION IS SHOWN OR WHERE THE SECTION WAS CUT.

ABBREVIATIONS AND ACRONYMS - STANDARD

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

PARTIALLY WEATHERED ROCK

FLOW RATE

RADIUS

REBAR AND CAP

REINFORCED CONCRETE PIPE

ROAD

REFERENCE

REINFORCEMENT

REQUIRED

REQUEST FOR BID

REMOTE TELEMETRY UNIT

RIGHT OF WAY

SAINT JOHNS RIVER WATER MANAGEMENT DISTRICT

SUPERPAVE

SPACING

SQUARE

STATE ROAD

STAINLESS STEEL

SPECIFICATIONS

STAINLESS STEEL TYPE 304

STANDARD

SOUTHWEST

THICKNESS

TELEMETRY JUNCTION BOX

TURF REINFORCEMENT MAT

TAILWATER

TAILWATER ELEVATION

TYPICAL

ULTRA HIGH MOLECULAR WEIGHT POLYETHYLENE

UNDERWRITERS LABORATORIES INC.

UNINTERRUPTED POWER SUPPLY

UPSTREAM

VERTICAL

WIDTH

PSF

PSI

PWR

Q R

RBC

RCP

RD.

REF

REIF

REQD

RFB

RTU

R/W

SJWMD

SP

SPA.

SQ

S.R.

SS

SPECS

SST

STD.

SW

T

TJB

TRM

TW

TWEL

TYP

UHMWPE

UL

UPS

US

VERT

W

AASHTO

ACI

ADD'L

ADJ

AL

ALUM

APPROX

ASCE

ASTM

AWG

BC

BLDG

BM

BODR

BOTT

CAP

CFM

CFS

CJ

CLR

CL RD

CMP

D

DHW

DIA

DIM

DR CL

DS

DW

DWG

E

ECMP

EDR

EF

ELEV OR EL

ELEC

EQ.

ERCP

ESE

ETC

EXIST.

EXT

F

FD

FF

FLAG

FPS

FT

GALV.

GB

GDOT

GFI

GND

GPS

GRD

GW

H

HDPE

HW

HORZ

ID.

IE

IN.

INC.

INV

KIP

KSI

LB

LBS

LFRD

LOA

LOD

LWC

MAX

MEG

MFGR

MILS

MIN

MPH

N

NAD

NAVD88

NE

NEMA

NGVD29

NO.

NTS

OC

OSHA

P.E.

PL

POS

PROJ

AMERICAN ASSOCIATION OF STATE HIGHWAY

AND TRANSPORTATION OFFICIALS

AMERICAN CONCRETE INSTITUTE

ADDITIONAL

ADJUSTED

ALUMINUM

ALUMINUM

APPROXIMATELY

AMERICAN SOCIETY OF CIVIL ENGINEERS

AMERICAN SOCIETY FOR TESTING AND MATERIALS

AMERICAN WIRE GAUGE

BARE COPPER

BUILDING

BENCHMARK

BASIN OF DESIGN REPORT

BOTTOM

CORRUGATED ALUMINUM PIPE

CUBIC FEET PER MINUTE

CUBIC FEET PER SECONDS

CONSTRUCTION JOINT

CLEARANCE

CENTERLINE OF ROAD

CORRUGATED METAL PIPE

DIAMETER

DESIGN HEAD WATER

DIAMETER

DIMENSION

DIRT ROAD CENTERLINE

DOWNSTREAM

DESIGN WATER

DRAWING

EXPANSION END, EAST OR EASTING

ELLIPTICAL CORRUGATED METAL PIPE

EDGE OF DIRT ROAD

EACH FACE

ELEVATION

ELECTRIC OR ELECTRICAL

EQUAL

ELLIPTICAL REINFORCED CONCRETE PIPE

EAST SOUTH EAST

ET CETERA

EXISTING

EXTERIOR

FIXED END

FILTER DIAPHRAGM

FINISHED FLOOR

WETLAND MAKER FLAG SET BY AECOM XX/XX/20XX

FEET PER SECOND

FEET OR FOOT

GALVANIZED

GRADE BREAK

GEORGIA DEPARTMENT OF TRANSPORTATION

GROUND FAULT INTERRUPTER

NATURAL GROUND

GLOBAL POSITIONING SYSTEM

GROUND

GROUND WATER

HEIGHT

HIGH DENSITY POLYETHYLENE

HEAD WATER

HORIZONTAL

IDENTIFICATION

INVERT ELEVATION

INCHES

INCORPORATED

INVERT

KILO-POUNDS OF FORCE

KILO-POUNDS OF FORCE PER SQUARE INCH

POUND

POUNDS

LOAD AND RESISTANCE FACTOR

LIMITS OF ACCESS

LIMITS OF DISTURBANCE

LOW WATER CROSSING

MAXIMUM

MATCH EXISTING GRADE

MANUFACTURER

MILLI-INCHES

MINIMUM

MILES PER HOUR

NORTH OR NORTHING

NORTH AMERICAN DATUM

NORTH AMERICAN VERTICAL DATUM OF 1988

NORTHEAST

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

NATIONAL GEODETIC VERTIVCAL DATUM OF 1929

NUMBER

NOT TO SCALE

ON CENTER

OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

PROFESSIONAL ENGINEER

POLYMER CONCRETE

POSITION

PROJECTION

' FEET

" INCHES

# NUMBER

% PERCENT

& AND

@ AT

o DEGREES

W/ WITH

X BY

C CHANNEL

L ANGLE

PL PLATE

W W SHAPE

SYMBOLOGY

STRUCTURAL SHAPES

C CENTERLINEL

B BOUNDARY LINEL

Ø DIAMETER

EXISTING CONCRETE

PROPOSED CONCRETE

PROPOSED C33 SAND

PROPOSED BEDDING STONE

PROPOSED DEMOLITION AREA

EXISTING PARK TRAIL

PROPOSED PARK TRAIL

WETLANDS

EARTH

03 47

SSF

EXISTING BORING

EXISTING IMPERVIOUS AREA

EXISTING MINOR CONTOUR (1 FT INTERVALS)

EXISTING MAJOR CONTOUR (10 FT INTERVALS)

EXISTING PROPERTY LINE

EXISTING NORMAL POOL LINE

EXISTING SANITARY LINE

EXISTING TREE LINE

EXISTING CONDUIT (OFFSET WIDTH = DIAMETER)

TOPOGRAPHIC SURVEY LIMIT

ESTIMATED LIMITS OF EXCAVATION

ESTIMATED TEMPORARY EASEMENT

ESTIMATED PERMANENT EASEMENT

PROPOSED MINOR CONTOURS (1 FT INTERVALS)

PROPOSED MAJOR CONTOURS (5 FT INTERVALS)

PROPOSED CONDUIT (OFFSET WIDTH = DIAMETER)

PROPOSED TREE LINE

SOIL BOUNDARY

LIMIT OF DISTURBANCE

LIMIT OF ACCESS

TEMPORARY COFFERDAM

TEMPORARY BYPASS/DIVERSION CONDUIT

TEMPORARY NON-SENSITIVE SILT FENCE

TEMPORARY SENSITIVE SILT FENCE

TEMPORARY SAND BAGS

TEMPORARY BARRIER FENCE

TEMPORARY CHAIN LINK SECURITY FENCE

TREE PROJECTION FENCE

WETLAND BOUNDARY (AS SURVEYED IN THE FIELD)

WATERS OF THE US / STATE WATER BOUNDARY AS DETERMINED BY

THE POINT OF WRESTED VEGETATION (SURVEYED IN THE FIELD)

25' STATE WATER BUFFER

25' STREAM BUFFER

SAN

LOD LOD

LOA

SSF

X X

NSF NSF

WL

WUS

WB

SB

PROPOSED TURFGRASS SEED AREAS

PROPOSED WOOD CHIPS AREAS

NSF NSF

TPF TPF

STAGE 1 BEDDING MATERIAL

STAGE 2 BEDDING MATERIAL

STAGE 3 BEDDING MATERIAL

WL

WUS

WB

SB

24+50

20+00

21+00 22+00

23+00

24+00

13+50

10+00

11+00

12+00

+0

PROPOSED EMBANKMENT CENTERLINE

STATION=20+00.00

NORTHING=1406672.57

EASTING=2277137.07

PROPOSED EMBANKMENT CENTERLINE

STATION=24+50.00

NORTHING=1406880.16

EASTING=2277519.68

PROPOSED SERVICE SPILLWAY CENTERLINE

STATION=10+00.00

NORTHING=1406628.46

EASTING=2277297.41

32+50

30+00

31+00

32+00

PROPOSED PIEZOMETER ROW

STATION=32+50.00

NORTHING=1406902.74

EASTING=2277184.09

PROPOSED PIEZOMETER ROW

STATION=30+00.00

NORTHING=1406689.55

EASTING=2277314.68

D-100

1/2"RBC

N:1406736.38 E:2277652.52

Z:973.52

D-101

1/2"RBC

N:1406838.88 E:2277355.68

Z:969.32

D-107

1/2"RBC

N:1406909.26 E:2277514.16

Z:974.65

C1

C

C3

C4

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

20 LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

34 LOD

LOD

LOD

POINT #

NORTHING

1406766.17

1406750.64

1406747.14

1406722.52

1406677.63

1406662.62

1406783.44

1406754.85

1406769.08

1406736.72

1406682.14

1406571.62

1406642.66

1406637.00

1406686.51

1406759.46

1406915.00

1406927.71

1406910.96

EASTING

2277744.01

2277768.78

2277774.36

2277763.46

2277731.48

2277704.01

2277565.53

2277537.79

2277521.48

2277483.64

2277499.45

2277243.28

2277213.54

2277168.86

2277117.06

2277072.97

2277127.70

2277163.38

2277171.98

POINT #

NORTHING

1406885.06

1406896.00

1406896.39

1406925.63

1406903.41

1406895.49

1406864.21

1406857.30

1406792.80

1406780.83

1406766.17

1406748.21

1406737.32

1406731.14

1406727.90

1406730.55

1406734.38

1406746.74

EASTING

2277255.28

2277272.26

2277379.77

2277520.33

2277555.33

2277563.80

2277593.66

2277607.14

2277685.35

2277696.40

2277695.12

2277694.83

2277701.89

2277712.50

2277726.34

2277735.17

2277736.94

2277741.94

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

LOA

POINT #

NORTHING

1406766.17

1406837.54

1406909.30

1406909.76

1406926.16

1406954.38

1406983.65

1407000.70

1407028.45

1407020.38

1406999.57

1406988.79

1406981.06

1406985.75

1407001.76

1407026.59

1407045.47

1407050.49

1407037.27

1407015.40

EASTING

2277744.01

2277759.95

2277762.73

2277716.86

2277674.12

2277658.81

2277616.77

2277625.15

2277664.60

2277677.10

2277705.15

2277744.00

2277771.17

2277782.68

2277795.59

2277803.18

2277822.34

2277850.27

2277878.99

2277892.74

POINT #

NORTHING

1406990.21

1406964.32

1406944.35

1406933.96

1406908.62

1406829.93

1406750.64

EASTING

2277898.80

2277893.21

2277876.49

2277855.06

2277787.41

2277779.76

2277768.78

LOD POINT TABLE LOD POINT TABLE LOA POINT TABLE LOA POINT TABLE

L1

L2

L3

L4

L5

L6

L7

61+20

60+00

61+00

DP-3 EAST TOE DRAIN

STATION=60+00.00

NORTHING=1406884.93

EASTING=2277276.95L13

L14L15

DP-3 EAST TOE DRAIN

STATION=61+20.00

NORTHING=1406854.66

EASTING=2277187.49

70+60

+0

L1

L17 L18

DP-4 WEST TOE DRAIN

STATION=70+00.00

NORTHING=1406770.16

EASTING=2277136.77

DP-4 WEST TOE DRAIN

STATION=70+60.00

NORTHING=1406826.90

EASTING=2277143.92

41+20

40+00

41+00

DP-1 F.D. PRIMARY DRAIN

STATION=40+00.00

NORTHING=1406781.27

EASTING=2277252.86

L19 L20

L21 L22

L23L24

L2

L26

51+10

50+00

51+00

L27

L28

L29

DP-3 EAST TOE DRAIN

NUMBER

L13

L14

L15

RADIUS LENGTH

47.85

46.00

26.15

LINE/CHORD DIRECTION

S49° 47' 39.59"W

S61° 02' 39.59"W

N28° 57' 20.41"W

DP-4 WEST TOE DRAIN

NUMBER

L16

L17

L18

RADIUS LENGTH

46.58

2.00

11.42

LINE/CHORD DIRECTION

N16° 05' 14.92"E

N6° 27' 20.41"W

N28° 57' 20.41"W

DP-2 F.D. STRIP DRAIN

NUMBER

L27

L28

L29

RADIUS LENGTH

59.71

14.00

36.29

LINE/CHORD DIRECTION

N28° 57' 20.41"W

N58° 57' 20.41"W

N28° 57' 20.41"W

DP-1 F.D. PRIMARY DRAIN

NUMBER

L19

L20

L21

L22

L23

L24

L25

L26

RADIUS LENGTH

12.50

9.40

3.88

3.89

3.89

36.80

15.73

33.91

LINE/CHORD DIRECTION

S61° 02' 39.59"W

S61° 02' 39.59"W

S83° 32' 39.59"W

N73° 57' 20.41"W

N51° 27' 20.41"W

N28° 59' 20.97"W

N6° 27' 20.41"W

N28° 57' 20.41"W

RR-3

RR-3

RR-3

RR-3

PROPOSED SERVICE SPILLWAY CENTERLINE

STATION=13+50.00

NORTHING=1406938.84

EASTING=2277138.16

101+00100+00 101+00L30

L31

L32 L33

L34

C5

C6

LATERAL CHANNEL CENTERLINE

STATION=101+00.00

NORTHING=1406884.25

EASTING=2277239.02

LATERAL CHANNEL CENTERLINE

NUMBER

L30

C5

L31

L32

C6

L33

L34

RADIUS

50.00

50.00

LENGTH

44.14

19.37

5.54

1.40

11.64

11.25

6.66

LINE/CHORD DIRECTION

N77° 28' 08.80"E

N88° 34' 03.80"E

S80° 20' 01.20"E

S80° 20' 01.20"E

S87° 00' 05.16"E

N86° 19' 50.88"E

N84° 36' 15.90"E

DP-2 F.D. STRIP DRAIN

STATION=50+00.00

NORTHING=1406750.04

EASTING=2277223.86

DP-2 F.D. STRIP DRAIN

STATION=51+10.00

NORTHING=1406841.26

EASTING=2277165.38

RR-1

107 RR-1

RR-2

RR-2

RR-1

RR-1

RR-1

102RR-1

RR-1

RR-1

RR-1

OB1

OB1

OB1

OB1

OB1

OB2

OB2

OB2

OB2

OB2

OB1

OB2

OB2

OB2

OB2

203+74

200+00

201+00

202+00

203+00

UPSTREAM CREST GRADE BREAK

STATION=200+00.00

NORTHING=1406657.43

EASTING=2277155.91

L35

L36

C7

C8

UPSTREAM CREST GRADE BREAK

NUMBER

C7

L35

C8

L36

RADIUS

104.04

191.51

LENGTH

103.87

210.74

45.20

14.03

LINE/CHORD DIRECTION

N32° 26' 39.10"E

N61° 02' 39.59"E

N67° 48' 16.42"E

N76° 47' 31.84"E

POINT #

NORTHING

1406759.69

1406773.73

1406753.51

1406751.64

1406739.09

1406741.49

EASTING

2277242.24

2277234.65

2277198.17

2277194.72

2277205.23

2277209.35

OB1 POINT TABLE

POINT #

NORTHING

1406751.64

1406748.04

1406735.79

1406697.63

1406739.09

1406759.69

1406773.73

1406802.33

1406788.36

EASTING

2277194.72

2277188.23

2277145.12

2277166.99

2277205.23

2277242.24

2277234.65

2277286.34

2277294.04

OB2 POINT TABLE

RR-2

RR-2

RR-2

POINT #

NORTHING

1406872.85

1406844.11

1406831.34

1406833.78

1406823.11

1406831.77

1406869.64

1406877.54

1406891.69

EASTING

2277179.17

2277193.34

2277169.67

2277167.47

2277147.29

2277127.63

2277118.83

2277150.46

2277176.07

RR-1 POINT TABLE

POINT #

NORTHING

1406872.85

1406879.70

1406883.08

1406891.24

1406891.63

EASTING

2277179.17

2277192.49

2277216.77

2277191.55

2277175.81

RR-2 POINT TABLE

POINT #

NORTHING

1406801.67

1406776.10

1406648.97

1406657.77

EASTING

2277398.99

2277395.30

2277208.74

2277191.09

RR-3 POINT TABLE

PROPOSED SERVICE SPILLWAY CENTERLINE

NUMBER

L1

C1

L2

C2

L3

RADIUS

60.00

50.00

LENGTH

289.55

18.92

14.40

10.23

16.92

LINE/CHORD DIRECTION

N28° 57' 20.41"W

N19° 55' 24.10"W

N10° 53' 27.82"W

N16° 44' 58.58"W

N24° 25' 43.09"W

PROPOSED EMBANKMENT CENTERLINE

NUMBER

L4

C3

L5

C4

L6

RADIUS

100.00

200.00

LENGTH

35.64

55.48

224.38

80.27

54.23

LINE/CHORD DIRECTION

N29° 15' 32.08"E

N45° 09' 06.11"E

N61° 02' 39.59"E

N72° 32' 33.22"E

N84° 22' 06.09"E

PROPOSED PIEZOMETER ROW

NUMBER

L7

RADIUS LENGTH

250.00

LINE/CHORD DIRECTION

N31° 29' 25.19"W

REGISTRATION

CONSULTANT

AECOM

12420 MILESTONE CENTER DRIVE

SUITE 150

GERMANTOWN, MD 20876

(301) 944-2545 TEL

WWW.AECOM.COM

CLIENT

CITY OF TUCKER

1975 LAKESIDE PKWY

SUITE 350,

TUCKER, GA 30084

770-865-5645 TEL

WWW.TUCKERGA.GOV

PROJECT

LAKE ERIN DAM

REHABILITATION

DEKALB COUNTY, GEORGIA

DRAWING TITLE

AN

SI

D

2" x

4"

LA

ST

S

AV

ED

B

Y:

W

EI

SA

(2

4-

2)

T

PL

O

TT

ED

: 2

4-

-1

FI

LE

N

AM

E:

L

:\D C

S\

PR

O

JE

C

TS

\W

TR

\6

1_

LA

KE

ER

IN

D

AM

EN

G

IN

EE

R

IN

G

\9

_C

AD

_G

IS

\9

_C

AD

\0 4_

SH

EE

TS

\P

G E-

C

1-

LA

KE

ER

IN

.D

W G

NO. DATE DESCRIPTION

REVISIONS

DESIGNED BY:

DRAWN BY:

AECOM PROJECT NO:

PLOT DATE:

APPROVED BY:

CHECKED BY:

ACAD VER:

SCALE:

60727041

AS SHOWN

9/18/2024

SHEET OF

ISSUED FOR CONSTRUCTION ______________

DATE BY

ISSUED FOR BIDDING ______________

DATE BY

SHEET NUMBER

AJW/JES

JBB

JCG

RDP

N

AD

/2

1 G

EO

R G

IA

C

O O

R D

IN

AT

E

SY

ST

EM

30'0 30'

SCALE:1"=30'

C101

GEOMETRY PLAN

04 47

DI

RT

T

RA

IL

DIR

T

TR

AI

L

DIRT TRAIL

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SS

SSMH TOP=974.51

INV IN=962.17

INV OUT=961.86

WALL

ROCK

BEDROCK

LIMIT OF PROPERTY SURVEY

E2

N1406898

E2

N1406648

E2

N1406648

T48

T49

T46 T47

T50

T44

T43

T41

T45

T37

T31

T30

T29

T27

T28

T21

T22

T23

T25

T18 T17

T16 T12

T10

T7

T6

T5 T3

T2

T1

W U

S

W U

S

W U

S

W

US

W

US

WUS

W U

S

WUS

W

US

W U

SWUS

W U

S

W U

S

WUS

W U

S W

US

W U

S

W

US

W L

WL

W L

WUS

WUS

W U

S

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

WUS

WUS

WUS

WUS

WUS

W

US

W

US

W

US

W

US

W

US

W

US

W

US

W

US

W U

S W

US

W

US

WUS

WUS

WUS

WUS

WUS

WUS

WUS

WUS

WUS

WB WB

WB

WB

WB

WB

WB

W B

W B

W B

W B

W B

W B

W B

W B

W B

WB

WB

WB

WB

WB

WB

WB

WB

WB

WB

PIEZOMETER P-6

BASE ELEV: 940.22

PIEZOMETER P-2

BASE ELEV: 960.23

PIEZOMETER P-1

BASE ELEV: 969.16

PIEZOMETER P-5

TOP ELEV: 956.88

PIEZOMETER P-4

DIRT TRAIL EX. 30" RCP T40

T20

T19

T42

T32

T39 T38

T36

T34

T35

T26 18"OAK

T24

T13

T15

T14

T11

T9 T8

T33

6"CMP TOE DRAIN

INV=937.51

30"CMP

INV=955.70

JB

TOP=960.23

INV IN=955.89

INV OUT=955.84

EXISTING 8"

TOE DRAIN

30"RCP

INV=954.19

9" STEEL STAND PIPE

TOP=965.82

T59

T60 T61

T62 T63

T64 T65

T66T67

PIEZOMETER P-3

2021 FIELD RUN SURVEY

ACURRA ENGINEERING AND

CONSULTING SERVICES, INC.

DEMOLISH AND

REMOVE EXISTING

INTAKE STRUCTURE,

30" RCP, AND 30" CMP

TOPOGRAPHIC INFORMATION AND PLANIMETRIC

INFORMATION BEYOND THE LIMITS OF SURVEY AS

SHOWN ON THIS DRAWING ARE APPROXIMATE AND

BASED ON PUBLICLY AVIALBLE GEOGRAPHIC

INFORMATION SOURCES

EXISTING DOCK TO REMAIN

EXISTING DIRT

TRAIL TO REMAIN

EXISTING SANITARY SEWER LINE

TO REMAIN. CONTRACTOR IS

RESPONSIBLE FOR

PROTECTING, IF NECESSARY.

EXISTING SANITARY SEWER

MANHOLE TO REMAIN AND

BE PROTECTED

EXISTING

PLAYGROUND

CONCRETE

EXISTING WALL

TO REMAIN

EXISTING NORMAL POOL

W.S.E. = 955.70'

DEMOLISH AND REMOVE

EXISTING 9" STEEL PIPE

STANDPIPE AND CONDUIT

DEMOLISH AND REMOVE EXISTING

STONE SLOPE PROTECTION

DEMOLISH AND

REMOVE EXISTING

WALL

EXISTING ROCK

BEDDING TO BE

ABANDONED-IN-PLACE

DEMOLISH AND

REMOVE EXISTING

TRAINING WALLS

DEMOLISH AND REMOVE

EXISTING TOE DRAINS

BOTTOM OF RESERVOIR AT

APPROXIMATELY ELEVATION 941.0 FEET

WSEL IN NATURAL CHANNEL SURVEYED

DOWNSTREAM OF THE DAM SURVEYED

APPROXIMATELY 937.0 FEET.

LOW ELEVATION FOR BOTTOM

OF NATURAL CHANNEL

SURVEYED AT 936.2 FEET

WSEL IN NATURAL CHANNEL AT TOE OF

THE DAM SURVEYED AT 937.8 FEET

HENDERSON PARK TRAIL

CLOSURE. SEE NOTE 6.

WATERS OF THE US / STATE

WATER BOUNDARY (OW 4)

25-FOOT STATE WATERS BUFFER

WATERS OF THE US

/ STATE WATER

BOUNDARY (PS 2)

25 FOOT

STREAM

BUFFER

WATERS OF THE US / STATE

WATER BOUNDARY (IS 1)

X

X

X X

REGISTRATION

CONSULTANT

AECOM

12420 MILESTONE CENTER DRIVE

SUITE 150

GERMANTOWN, MD 20876

(301) 944-2545 TEL

WWW.AECOM.COM

CLIENT

CITY OF TUCKER

1975 LAKESIDE PKWY

SUITE 350,

TUCKER, GA 30084

770-865-5645 TEL

WWW.TUCKERGA.GOV

PROJECT

LAKE ERIN DAM

REHABILITATION

DEKALB COUNTY, GEORGIA

DRAWING TITLE

AN

SI

D

2" x

4"

LA

ST

S

AV

ED

B

Y:

W

EI

SA

(2

4-

T

PL

O

TT

ED

: 2

4-

-1

FI

LE

N

AM

E:

L

:\D C

S\

PR

O

JE

C

TS

\W

TR

\6

1_

LA

KE

ER

IN

D

AM

EN

G

IN

EE

R

IN

G

\9

_C

AD

_G

IS

\9

_C

AD

\0 4_

SH

EE

TS

\P

EC

-C

2-

LA

KE

ER

IN

.D W

G

NO. DATE DESCRIPTION

REVISIONS

DESIGNED BY:

DRAWN BY:

AECOM PROJECT NO:

PLOT DATE:

APPROVED BY:

CHECKED BY:

ACAD VER:

SCALE:

60727041

AS SHOWN

9/18/2024

SHEET OF

ISSUED FOR CONSTRUCTION ______________

DATE BY

ISSUED FOR BIDDING ______________

DATE BY

SHEET NUMBER

AJW/JES

JBB

JCG

RDP

C102

EXISTING CONDITIONS

AND DEMOLITION PLAN

05 47

EXISTING CONDITIONS AND DEMOLITION NOTES:

1. EXISTING TREE TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION.

2. REMOVE EXISTING TREE AND STUMP. SEE TREE TABLE SHEET G002 FOR DETAILS.

3. CUT EXISTING TREE FLUSH AND GRIND THE STUMP TO A DEPTH AS SPECIFIED BY THE ENGINEER. SEE TREE TABLE

SHEET G002 FOR DETAILS.

4. LOCATION OF TOE DRAIN AND/OR CONDUIT SHOWN ON THE PLAN IS APPROXIMATED. CONTRACTOR TO FIELD VERIFY

LOCATION PRIOR TO REMOVAL.

5. DEMOLISH EXISTING PIEZOMETER WITHIN LIMITS OF WORK AND ABANDON ANY PORTION OF THE PIZEZOMETER BELOW

THE LOWEST EXCAVATION ELEVATION. SEE GROUTING AND ABANDONMENT NOTES ON SHEET NO. G002.

6. PRIOR TO CONSTRUCTION, CONTRACTOR TO PROVIDE CHAIN LINK FENCE AND TRAIL CLOSURE SIGNS AT THE LIMITS OF

THE CONSTRUCTION SITE FOR HENDERSON PARK TRAIL.

40'0 20'

SCALE:1"=20'

N

AD

/2

1 G

EO

R G

IA

C

O O

R D

IN

AT

E

SY

ST

EM

KEY:

SEE CORRESPONDING EXISTING CONDITIONS AND DEMOLITION NOTE FOR EXISTING FEATURE IDENTIFIED ON THE PLAN.

DI

RT

T

RA

IL

DIR

T

TR

AI

L

DIRT TRAIL

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SS

SSMH TOP=974.51

INV IN=962.17

INV OUT=961.86

LIMIT OF PROPERTY SURVEY

E2

N1406898

E2

N1406648

E2

N1406648

T48

T49

T46 T47

T50

T44

T41

T45

T37

T21

T23

T25

T12

T10

T7

T6

T2

T1

W U

S

W U

S

W U

S

W

US

W

US

WUS

W U

S

WUS

W

US

W U

SWUS

W U

S

W U

S

WUS

W U

S W

US

W U

S

W

US

W L

WL

W L

WUS

WUS

W U

S

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

WUS

WUS

WUS

WUS

WUS

W

US

W

US

W

US

W

US

W

US

W

US

W

US

W

US

W U

S W

US

W

US

WUS

WUS

WUS

WUS

WUS

WUS

WUS

WUS

WUS

WB WB

WB

WB

WB

WB

WB

W B

W B

W B

W B

W B

W B

W B

W B

W B

WB

WB

WB

WB

WB

WB

WB

WB

WB

WB

T59

T60 T61

T62 T63

T64 T65

T66T67

18 251 04 024

MATTHEW JOSEPH

HATHAWAY & VIRGINIA

ELIZABETH HATHAWAY

D.B. 27119 / PG. 476

P.B. 45 / PG. 102

18 251 04 251

RAYMOND L. KUNIANSKY &

PAULA B. KUNIANSKY

D.B. 5849 / PG. 194

P.B. 45 / PG. 131

18 251 04 017

ANDREW L BOUTWELL &

JANE BOUTWELL

D.B. 21124/ PG. 210

P.B. 43 / PG. 71

18 251 04 023

UNITY REALITY COMPANY

INC.

D.B 31223 / PG. 00241

P.B 11 / PG. 0

18 251 01 022

CITY OF TUCKER

D.B. 29133 / PG. 00090

TEMPORARY

EASEMENT 3,905 SF

PERMANENT

EASEMENT 4,488 SF

6" HDPE PRIM

ARY DRAIN

X

X

X X

965960955950945940

NO STEEPER THAN 2H:1V SLOPE

NO STEEPER THAN 2H:1V SLOPE

48" RCP PRINCIPAL SPILLW

AY

15" RCP

6" HDPE STRIP DRAIN

FILTER DIAPHRAGM, SEE

SHEETS C205 - C206

← 6" HDPE

6" H

D

PE

IB

HW

IT

HW

DP-3, EAST TOE DRAIN,

SEE SHEETS C207 - C208

DP-4, WEST TOE DRAIN,

SEE SHEETS C207 - C208

DP-1, FILTER DIAPHRAGM

PRIMARY DRAIN, SEE

SHEETS C205 - C206

DP-2, FILTER DIAPHRAGM

STRIP DRAIN,

SEE SHEET C205 - C206

EXISTING GROUND

SLOPE NOT STEEPER

THAN 2H:1V

EXCAVATION LIMITS

BENCH SLOPE PRIOR TO

PLACING BACKFILL

APPROVED SUBGRADE

16 INCHES MIN

16 INCHES MAX

C103

EXCAVATION PLAN

06 47

EXCVATION NOTES:

1. THIS SHEET DEPICTS THE ESTIMATED COMPOSITE LIMITS OF EXCAVATION NECESSARY TO INSTALL THE PRINCIPAL SPILLWAY. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE ULTIMATE LIMITS AND GEOMETRY OF THE EXCAVATION NECESSARY TO COMPLETE THE WORK IN COMPLIANCE WITH THE REQUIREMENTS OF THE CONTRACT

DOCUMENTS.

2. THE LIMITS OF EXCAVATION SHOWN HEREON ARE APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ALL FINAL LIMITS OF EXCAVATION BASED ON THE CONTRACTOR'S MEANS AND METHODS OF CONSTRUCTION.

3. EXCAVATIONS AND THE WORK TO CREATE THEM SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL LAWS, ORDINANCES, AND REGULATIONS. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING COMPLIANCE.

4. NO EXCAVATION SIDE SLOPES SHALL BE SLOPED OR BENCHED STEEPER THAN A RATE OF TWO (2)-HORIZONTAL-TO-ONE(1)-VERTICAL (2H:1V) UNLESS OTHERWISE SPECIFIED BY THE CONSTRUCTION DOCUMENTS OR UNLESS THE EXCAVATION IS SHALLOWER THAN 16 INCHES DEEP MEASURED FROM THE EXISTING GROUND SURFACE TO

THE BOTTOM OF THE EXCAVATION.

5. ALL SIDE SLOPES SHALL BE BENCHED AT A SLOPE NOT STEEPER THAN A RATE OF 2H:1V PRIOR TO PLACING BACKFILL MATERIALS. THE MINIMUM BENCH WIDTH IS 16 INCHES AND THE MAXIMUM BENCH HEIGHT IS 16 INCHES. SEE DETAIL 1 THIS

SHEET.

6. FINAL EXCAVATION DIMENSIONS INCLUDING SUBGRADE CONDITION SHALL BE REVIEWED AND APPROVED BY THE

ENGINEER BEFORE INSTALLING FEATURES OR PLACING BACKFILL WITHIN THE EXCAVATION.

7. BACKFILL OF EXCAVATIONS SHALL BE PERFORMED UNDER SUPERVISION OF THE ENGINEER AND AS SPECIFIED BY THE

CONTRACT DOCUMENTS.

N

AD

/2

1 G

EO

R G

IA

C

O O

R D

IN

AT

E

SY

ST

EM

40'0 20'

SCALE:1"=20'

REGISTRATION

CONSULTANT

AECOM

12420 MILESTONE CENTER DRIVE

SUITE 150

GERMANTOWN, MD 20876

(301) 944-2545 TEL

WWW.AECOM.COM

CLIENT

CITY OF TUCKER

1975 LAKESIDE PKWY

SUITE 350,

TUCKER, GA 30084

770-865-5645 TEL

WWW.TUCKERGA.GOV

PROJECT

LAKE ERIN DAM

REHABILITATION

DEKALB COUNTY, GEORGIA

DRAWING TITLE

AN

SI

D

2" x

4"

LA

ST

S

AV

ED

B

Y:

W

EI

SA

(2

4-

-0 4)

T

PL

O

TT

ED

: 2

4-

-1

FI

LE

N

AM

E:

L

:\D C

S\

PR

O

JE

C

TS

\W

TR

\6

1_

LA

KE

ER

IN

D

AM

EN

G

IN

EE

R

IN

G

\9

_C

AD

_G

IS

\9

_C

AD

\0 4_

SH

EE

TS

\P

EX

-C

3-

LA

KE

ER

IN

.D W

G

NO. DATE DESCRIPTION

REVISIONS

DESIGNED BY:

DRAWN BY:

AECOM PROJECT NO:

PLOT DATE:

APPROVED BY:

CHECKED BY:

ACAD VER:

SCALE:

60727041

AS SHOWN

9/18/2024

SHEET OF

ISSUED FOR CONSTRUCTION ______________

DATE BY

ISSUED FOR BIDDING ______________

DATE BY

SHEET NUMBER

AJW/JES

JBB

JCG

RDP

1 BENCHING DETAIL

C103 Scale 1" = 5'

DI

RT

T

RA

IL

DIR

T

TR

AI

L

DIRT TRAIL

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SS

SSMH TOP=974.51

INV IN=962.17

INV OUT=961.86

LIMIT OF PROPERTY SURVEY

E2

N1406898

E2

N1406648

E2

N1406648

T48

T49

T46 T47

T50

T44

T41

T45

T37

T21

T23

T25

T12

T10

T7

T6

T2

T1

W U

S

W U

S

W U

S

W

US

W

US

WUS

W U

S

WUS

W

US

W U

SWUS

W U

S

W U

S

WUS

W U

S W

U S

W U

S

W

US

W L

WL

W L

WUS

WUS

W U

S

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

SB

WUS

WUS

WUS

WUS

WUS

W

US

W

US

W

US

W

US

W

US

W

US

W

US

W

US

W U

S W

US

W

US

WUS

WUS

WUS

WUS

WUS

WUS

WUS

WUS

WUS

WB WB

WB

WB

WB

WB

WB

W B

W B

W B

W B

W B

W B

W B

W B

W B

WB

WB

WB

WB

WB

WB

WB

WB

WB

WB

T59

T60 T61

T62 T63

T64 T65

T66T67

18 251 04 024

MATTHEW JOSEPH

HATHAWAY & VIRGINIA

ELIZABETH HATHAWAY

D.B. 27119 / PG. 476

P.B. 45 / PG. 102

18 251 04 251

RAYMOND L. KUNIANSKY &

PAULA B. KUNIANSKY

D.B. 5849 / PG. 194

P.B. 45 / PG. 131

18 251 04 017

ANDREW L BOUTWELL &

JANE BOUTWELL

D.B. 21124/ PG. 210

P.B. 43 / PG. 71

18 251 04 023

UNITY REALITY COMPANY

INC.

D.B 31223 / PG. 00241

P.B 11 / PG. 0

18 251 01 022

CITY OF TUCKER

D.B. 29133 / PG. 00090

X

X

X X

48" RCP PRINCIPAL SPILLW

AY

D

C203

F

C203

B C2

CC202

AC202

G

C

3H:1V

3H:1V

USBR TYPE VI IMPACT BASIN,

SEE SHEETS S201 - S204

48" RCP PRINCIPAL

SPILLWAY CONDUIT,

SEE SHEET S101

15" RCP LOW LEVEL OUTLET

CONDUIT, SEE SHEET S101

GDOT STANDARD 1001-B,

U TYPE WING LOW LEVEL

OUTLET HEADWALL, SEE

SHEET S301

INTAKE TOWER,

SEE SHEETS

S101 - S108

RR-1:

STONE DUMPED GDOT TYPE 1

RIPRAP OUTLET PROTECTION,

D50 = 12", SEE SHEET C203

PROPOSED TRAIL,

SEE SHEET C202

PIEZOMETER (TYP.), SEE

SHEETS O102 - O103

DP-3, EAST TOE DRAIN,

SEE SHEETS C207 - C208

FILTER DIAPHRAGM,

SEE SHEETS C205 - C206

DP-4, WEST TOE DRAIN,

SEE SHEETS C207 - C208

DP-1, FILTER DIAPHRAGM

PRIMARY DRAIN, SEE

SHEETS C205 - C206

DP-2, FILTER DIAPHRAGM

STRIP DRAIN,

SEE SHEET C205 - C206

GDOT STANDARD

1001-B, U TYPE

WING HEADWALL,

SEE SHEET S302

TEMPORARY EASEMENT,

SEE NOTE 4

PERMANENT EASEMENT,

SEE NOTE 4

24+50

+0

21+00

22+00

23+00

24+00

10+00

11+00

12+00

+0

P-25-4

P-25-3

P-25-2

P-25-1

IB

EMBANKMENT ℄,

SEE NOTE 1

PRINCIPAL SPILLWAY ℄

HW

IT

HW

15" RCP

6" HDPE

6" HDPE

6" H

D

PE

RR-2:

STONE DUMPED GDOT TYPE 1

RIPRAP OUTLET PROTECTION LATERAL

CHANNEL, D50 = 12", SEE SHEET C204

RR-3:

STONE DUMPED GDOT TYPE 1

RIPRAP SLOPE PROTECTION

D50 = 12", SEE SHEET C202

AND NOTE 2

NORMAL POOL

W.S.E. = 955.70'

3 PMF W.S.E. = 968.90'

2H:1V 2H:1V

EXISTING DOCK

EXISTING

PLAYGROUND

SEE NOTE 3

0.35%

10.0%

90° BEND

E

C203

OVERBUILD ZONE 1,

1" OVERBUILD. SEE NOTE 5.

OVERBUILD ZONE 2, SLOPE

FROM 1" TO 0". SEE NOTE 6. 970

OVERBUILD ZONE 2, SLOPE

FROM 1" TO 0". SEE NOTE 6.

2%

SLOPE

2%

SLOPE

2%

SLOPE

END OVERBUILD

END OVERBUILD

SITE PLAN NOTES AND CROSS-REFERENCES:

1. RAISE AND LEVEL EMBANKMENT CREST TO ELEVATION 970.0 FEET, SEE SHEET C201 FOR PROPOSED EMBANKMENT CENTERLINE PROFILE.

2. RIPRAP FOR UPSTREAM SLOPE PROTECTION TO BE SET FROM ELEVATION 952.0 FEET TO 958.0 FEET, SEE SHEET C202 FOR DETAILS.

3. WHERE THE TRAIL ALIGNMENT DEVIATES FROM THE CENTER LINE OF THE EMBANKMENT, THE CONTRACTOR IS TO FIELD FIT THE PROPOSED TRAIL CONNECTION TO THE EXISTING TRAILS.

4. PERMANENT AND TEMPORARY EASEMENTS AT THE HATHAWAY PROPERTY ARE TO BE PROCURED BY THE CITY OF TUCKER PRIOR TO THE START OF CONSTRUCTION.

5. OVERBUILD ZONE 1. PROVIDE 1 INCH OF OVERBUILD ALONG THE CREST FOR THE EXTENT OF THE MAXIMUM EXCAVATION CUT. SEE SHEET C101 FOR LIMIT OF OVERBUILD ZONE 1.

6. OVERBUILD ZONE 2. PROVIDE OVERBUILD SLOPING FROM 1 INCH AT THE INTERFACE OF OVERBUILD ZONE 1 AND 2 TO 0 INCHES AT THE EXTENT OF OVERBUILD ZONE 2 WHERE THE

OVERBUILD ENDS. SEE SHEET C101 FOR LIMITS OF OVERBUILD ZONE 2.

C104

SITE AND GRADING

PLAN

07 47

N

AD

/2

1 G

EO

R G

IA

C

O O

R D

IN

AT

E

SY

ST

EM

40'0 20'

SCALE:1"=20'

REGISTRATION

CONSULTANT

AECOM

12420 MILESTONE CENTER DRIVE

SUITE 150

GERMANTOWN, MD 20876

(301) 944-2545 TEL

WWW.AECOM.COM

CLIENT

CITY OF TUCKER

1975 LAKESIDE PKWY

SUITE 350,

TUCKER, GA 30084

770-865-5645 TEL

WWW.TUCKERGA.GOV

PROJECT

LAKE ERIN DAM

REHABILITATION

DEKALB COUNTY, GEORGIA

DRAWING TITLE

AN

SI

D

2" x

4"

LA

ST

S

AV

ED

B

Y:

W

EI

SA

(2

4-

T

PL

O

TT

ED

: 2

4-

-1

FI

LE

N

AM

E:

L

:\D C

S\

PR

O

JE

C

TS

\W

TR

\6

1_

LA

KE

ER

IN

D

AM

EN

G

IN

EE

R

IN

G

\9

_C

AD

_G

IS

\9

_C

AD

\0 4_

SH

EE

TS

\P

SP

-C

4-

LA

KE

ER

IN

.D W

G

NO. DATE DESCRIPTION

REVISIONS

DESIGNED BY:

DRAWN BY:

AECOM PROJECT NO:

PLOT DATE:

APPROVED BY:

CHECKED BY:

ACAD VER:

SCALE:

60727041

AS SHOWN

9/18/2024

SHEET OF

ISSUED FOR CONSTRUCTION ______________

DATE BY

ISSUED FOR BIDDING ______________

DATE BY

SHEET NUMBER

AJW/JES

JBB

JCG

RDP

HATCH LEGEND

OVERBUILD ZONE 2

OVERBUILD ZONE 1

ELEVATIO

N

STATION

20+00 20+25 20+50 20+75 21+00 21+25 21+50 21+75 22+00 22+25 22+50 22+75 23+00 23+25 23+50 23+75 24+00

STA:20+02.40

ELEV:970.00

STA:20+37.30

ELEV:968.88

STA:20+98.33

ELEV:939.00

STA:21+07.36

ELEV:939.00

STA:21+42.43

ELEV:939.00

STA:23+71.85

ELEV:970.00

STA:20+68.67

ELEV:955.27

STA:21+27.09

ELEV:937.98

STA:21+54.62

ELEV:965.82

EXISTING 6' CMP TOE

DRAIN TO BE REMOVED

TEMPORARY 48-INCH

HDPE BYPASS CONDUITS

TO BE INSTALLED DURING

PHASE 2 AND REMOVED

DURING PHASE 3A

TEMPORARY

EXCAVATION LIMITS

EXISTING 9" STEEL STAND

PIPE TO BE REMOVED

TOP = 965.82' PROPOSED

GRADE

EXISTING GROUND

2H:1V2H:1V

ABANDONED BEDROCK IN PLACE

EXISTING 30" RCP CONDUIT

TO BE REMOVED

STA:21+54.62

ELEV:950.00

PROPOSED 48-INCH PRINCIPAL

SPILLWAY CONDUIT ENCASED IN

CONCRETE, SEE SHEET S101

OVERBUILD ZONE 1,

1" OVERBUILD

OVERBUILD ZONE 2,

SLOPING OVERBUILD FROM 1" TO 0"

END

OVERBUILD OVERBUILD ZONE 2,

SLOPING OVERBUILD FROM 1" TO 0"

END OVERBUILD

ELEVATIO

N

STATION

10+25 10+50 10+75 11+00 11+25 11+50 11+75 12+00 12+25 12+50 12+75 13+00

STA:10+59.93

ELEV:941.01

STA:12+14.50

ELEV:951.50 STA:12+39.08

ELEV:943.83

STA:12+25.58

ELEV:951.50

STA:12+16.50

ELEV:939.00 STA:12+37.83

ELEV:939.00

STA:12+39.08

ELEV:936.33

STA:10+77.64

ELEV:940.83

STA:10+81.51

ELEV:955.70

STA:10+77.64

ELEV:961.00

STA:10+76.14

ELEV:965.00

STA:10+88.13

ELEV:965.00

STA:10+88.14

ELEV:951.88

STA:10+86.64

ELEV:940.00

PROPOSED IMPACT BASIN,

SEE SHEET S201

PROPOSED LOW STAGE WEIR AT

ELEVATION 955.7'

PROPOSED 48" RCP PRINCIPAL

SPILLWAY CONDUIT ENCASED IN

CONCRETE, SEE SHEET S101

PROPERTY LINE

PROPOSED HIGH STAGE WEIR AT

ELEVATION 961.0'

MANUAL GATE OPERATOR

EXISTING GROUND

RR-1. PROPOSED RIPRAP LINED

OUTLET CHANNEL @ 0.35%

SLOPE (D50 = 12", L = 50 FT),

SEE SHEET C203

PROPOSED FILTER DIAPHRAGM,

SEE SHEET C205 FOR DETAILS

DAM CREST

15'-0"

3 PMF WSEL = 968.9'

NORMAL POOL WSEL = 955.7'

3H:1V 3H:1V

PROPOSED LOW LEVEL OUTLET

HEADWALL, SEE SHEET S301

PROPOSED 15-INCH RCP LOW LEVEL

OUTLET CONDUIT WITH CONCRETE

CRADLE, SEE SHEET S101 PROPOSED 20-INCH BY

20-INCH SLIDE GATE

PROPOSED INTAKE TOWER

STRUCTURE, SEE SHEET S101

PROPOSED CHAIN LINK FENCE,

SEE SHEETS S205 - S206

TRAIL ON CREST,

SEE SHEET C202

RR-3. PROPOSED UPSTREAM SLOPE

PROTECTION FROM ELEVATION 958.0

TO 952.0, SEE SHEET C202 STA:12+14.50

ELEV:951.00

2'-3"

2'-0"

SEE DETAIL 1,

SHEET C203

IT

HW

IB

RIPRAP KEY

TIE INTO EXISTING

GRADE DOWNSTREAM

PERMANENT

EASEMENT

SLOPE @ 0.77%

GRADE BREAK

STA:11+41.54

ELEV:969.68 2% SLOPE

PROPOSED GRADE

STA:12+89.09

ELEV:936.15

2'-3" 2'-0"

STA:11+57.50

ELEV:970.00

STA:11+42.50

ELEV:969.70

OVERBUILD ZONE 1,

1" OVERBUILD

1'-3"

REGISTRATION

CONSULTANT

AECOM

12420 MILESTONE CENTER DRIVE

SUITE 150

GERMANTOWN, MD 20876

(301) 944-2545 TEL

WWW.AECOM.COM

CLIENT

CITY OF TUCKER

1975 LAKESIDE PKWY

SUITE 350,

TUCKER, GA 30084

770-865-5645 TEL

WWW.TUCKERGA.GOV

PROJECT

LAKE ERIN DAM

REHABILITATION

DEKALB COUNTY, GEORGIA

DRAWING TITLE

AN

SI

D

2" x

4"

LA

ST

S

AV

ED

B

Y:

W

EI

SA

(2

4-

1)

T

PL

O

TT

ED

: 2

4-

-1

FI

LE

N

AM

E:

L

:\D C

S\

PR

O

JE

C

TS

\W

TR

\6

1_

LA

KE

ER

IN

D

AM

EN

G

IN

EE

R

IN

G

\9

_C

AD

_G

IS

\9

_C

AD

\0 4_

SH

EE

TS

\P

PP

-C

1-

LA

KE

ER

IN

.D W

G

NO. DATE DESCRIPTION

REVISIONS

DESIGNED BY:

DRAWN BY:

AECOM PROJECT NO:

PLOT DATE:

APPROVED BY:

CHECKED BY:

ACAD VER:

SCALE:

60727041

AS SHOWN

9/18/2024

SHEET OF

ISSUED FOR CONSTRUCTION ______________

DATE BY

ISSUED FOR BIDDING ______________

DATE BY

SHEET NUMBER

AJW/JES

JBB

JCG

RDP

C201

PRINCIPAL SPILLWAY AND

EMBANKMENT PROFILE

08 47

20'0 10'

SCALE:1"=10'

30'0 15'

SCALE:1"=15'

1 PRINCIPAL SPILLWAY CENTERLINE PROFILE

C201 Scale 1"=10'

2 EMBANKMENT CENTERLINE PROFILE

C201 Scale 1"=15'

STATION

0+00 0+25 0+50

DAM CREST

15'-0"

TRAIL

WIDTH 5'-0"

TRAIL MATERIAL TO BE TRAIL

SURFACE AGGREGATE

EXISTING GROUND

PROPOSED GRADE

3H:1V

5'-0"

6"

2% SLOPE

ELEVATIO

N

STATION

0+00 0+25 0+50

ELEV:952.00

ELEV:958.00

SEE DETAIL 1

THIS SHEET

RR-3. UPSTREAM RIPRAP

PROTECTION WITH BEDDING LAYERS

EXISTING

GROUND

PROPOSED GRADE

3H:1V

NORMAL POOL WSEL = 955.7'

1/3 PMF WSEL = 968.9'

2'-3"

2'-3"

2'-3"

DEPTH VARIES, 2'-3" MIN

9"

STAGE 3 BEDDING

MATERIAL

APPROVED

SUBGRADE

STAGE 2 BEDDING

MATERIAL

STAGE 1 BEDDING

MATERIAL

RIPRAP

9"

9"

ELEVATIO

N

STATION

0+25 0+50 0+75 1+00 1+25 1+50 1+75 2+00 2+25 2+50 2+75

STA:0+28.48

ELEV:955.00

PROPOSED GRADE

EXISTING GROUND SEE DETAIL 1

THIS SHEET

STA:2+71.87

ELEV:955.00

REGISTRATION

CONSULTANT

AECOM

12420 MILESTONE CENTER DRIVE

SUITE 150

GERMANTOWN, MD 20876

(301) 944-2545 TEL

WWW.AECOM.COM

CLIENT

CITY OF TUCKER

1975 LAKESIDE PKWY

SUITE 350,

TUCKER, GA 30084

770-865-5645 TEL

WWW.TUCKERGA.GOV

PROJECT

LAKE ERIN DAM

REHABILITATION

DEKALB COUNTY, GEORGIA

DRAWING TITLE

AN

SI

D

2" x

4"

LA

ST

S

AV

ED

B

Y:

W

EI

SA

(2

4-

T

PL

O

TT

ED

: 2

4-

-1

FI

LE

N

AM

E:

L

:\D C

S\

PR

O

JE

C

TS

\W

TR

\6

1_

LA

KE

ER

IN

D

AM

EN

G

IN

EE

R

IN

G

\9

_C

AD

_G

IS

\9

_C

AD

\0 4_

SH

EE

TS

\P

PP

-C

1-

LA

KE

ER

IN

.D W

G

NO. DATE DESCRIPTION

REVISIONS

DESIGNED BY:

DRAWN BY:

AECOM PROJECT NO:

PLOT DATE:

APPROVED BY:

CHECKED BY:

ACAD VER:

SCALE:

60727041

AS SHOWN

9/18/2024

SHEET OF

ISSUED FOR CONSTRUCTION ______________

DATE BY

ISSUED FOR BIDDING ______________

DATE BY

SHEET NUMBER

AJW/JES

JBB

JCG

RDP

C202

TYPICAL SECTIONS AND

DETAILS (1 OF 3)

09 47

C TYPICAL UPSTREAM RIPRAP SECTION

C104 Scale 1"=5'

1 RIPRAP AND BEDDING LAYERS DETAIL

C202 Scale 1"=1'

A TYPICAL TRAIL ON CREST SECTION

C104 Scale 1"=5'

B UPSTREAM RIPRAP CENTERLINE

C104 Scale 1"=10'

NOTES:

1. STAGE 1 BEDDING MATERIAL TO BE ASTM C33 No. 3.

2. STAGE 2 BEDDING MATERIAL TO BE ASTM No. 8 OR GDOT No. 8.

3. STAGE 3 BEDDING MATERIAL TO BE C33 SAND OR GDOT 10 NS SAND.

STATION

0+00 0+25 0+50 0+75 1+00 1+19

RR-1. PROPOSED OUTLET

CHANNEL @ 0.35%

2'-3" THICK

RIRAP LAYER

PROPOSED GRADE

EXISTING GROUND

2H:1V 2H:1V

6' BOTTOM WIDTH

PR

O

PO

SE

D S

ER

VI

C E

SP

IL

LW

AY

TOP OF RIPRAP

ELEV. = 941.50 (TYP.)

TOP OF RIPRAP

ELEV. = 941.50 (TYP.)

~5'-9"

CHANNEL

DEPTH

TIE-IN PROPOSED GRADE

WITH EXISTING GROUND

TIE-IN PROPOSED GRADE

WITH EXISTING GROUND

~1'-5" CHANNEL

DEPTH

~3'-9" CHANNEL

DEPTH

1.0%

ELEVATIO

N

STATION

0+00 0+25 0+50 0+75 1+00 1+25 1+50 1+75

EXISTING OUTLET

CHANNEL

PROPOSED GRADE

2'-3" THICK

RIRAP LAYER RR-1. PROPOSED OUTLET

CHANNEL @ 0.35%

2H:1V 2H:1V

6' BOTTOM WIDTH

PR

O

PO

SE

D S

ER

VI

C E

SP

IL

LW

AY

EXISTING GROUND

TIE-IN PROPOSED GRADE

WITH EXISTING GROUND

TIE-IN PROPOSED GRADE

WITH EXISTING GROUND

TOP OF RIPRAP ELEV. = 941.50 (TYP.)

TYPICAL BEDDING LAYERS.

SEE DETAIL 1 SHEET C202.

6' CHANNEL

DEPTH

ELEVATIO

N

STATION

0+00 0+25 0+50 0+75 1+001+00

6' BOTTOM

WIDTH

RR-1. PROPOSED

OUTLET CHANNEL

@ 0.35%

EXISTING GROUND

PR

O

PO

SE

D S

ER

VI

C E

SP

IL

LW

AY

TIE-IN PROPOSED GRADE

WITH EXISTING GROUND

TIE-IN PROPOSED GRADE

WITH EXISTING GROUND

2H:1V2H:1V

2H:1V

~1'-8"

CHANNEL

DEPTH

~10"

CHANNEL

DEPTH

~4'-7"

CHANNEL

DEPTH

2.1%

PROPOSED

GRADE

REGISTRATION

CONSULTANT

AECOM

12420 MILESTONE CENTER DRIVE

SUITE 150

GERMANTOWN, MD 20876

(301) 944-2545 TEL

WWW.AECOM.COM

CLIENT

CITY OF TUCKER

1975 LAKESIDE PKWY

SUITE 350,

TUCKER, GA 30084

770-865-5645 TEL

WWW.TUCKERGA.GOV

PROJECT

LAKE ERIN DAM

REHABILITATION

DEKALB COUNTY, GEORGIA

DRAWING TITLE

AN

SI

D

2" x

4"

LA

ST

S

AV

ED

B

Y:

W

EI

SA

(2

4-

T

PL

O

TT

ED

: 2

4-

-1

FI

LE

N

AM

E:

L

:\D C

S\

PR

O

JE

C

TS

\W

TR

\6

1_

LA

KE

ER

IN

D

AM

EN

G

IN

EE

R

IN

G

\9

_C

AD

_G

IS

\9

_C

AD

\0 4_

SH

EE

TS

\P

D E-

C

3-

LA

KE

ER

IN

.D

W G

NO. DATE DESCRIPTION

REVISIONS

DESIGNED BY:

DRAWN BY:

AECOM PROJECT NO:

PLOT DATE:

APPROVED BY:

CHECKED BY:

ACAD VER:

SCALE:

60727041

AS SHOWN

9/18/2024

SHEET OF

ISSUED FOR CONSTRUCTION ______________

DATE BY

ISSUED FOR BIDDING ______________

DATE BY

SHEET NUMBER

AJW/JES

JBB

JCG

RDP

C203

TYPICAL SECTIONS AND

DETAILS (2 OF 3)

10 47

E SECTION - OUTLET CHANNEL

C104 Scale 1"=10'

D SECTION - OUTLET CHANNEL

C104 Scale 1"=10'

F SECTION - OUTLET CHANNEL

C104 Scale 1"=10'

STRUCTURE SCHEDULE

STRUCTURE ID TYPE TOP ELEVATION NORTHING EASTING REMARKS

HW-1 GDOT STANDARD 1001-B, U TYPE WING 942.75' 1406679.5723 2277269.1367 15" Ø, MODIFIED TO ACCOMODATE TRASH RACK, SEE STRUCTURAL SHEET S301

IT-1 INTAKE TOWER 965.00' 1406700.3192 2277257.6533 SEE STRUCTURAL DETAIL SHEETS S101 - S108

IB-1 USBR TYPE VI IMPACT BASIN 951.50' 1406826.8978 2277187.6176 48" Ø, SEE STRUCTURAL DETAIL SHEETS S201 - S204

HW-2 GDOT STANDARD 1001-B, U TYPE WING 943.69' 1406818.0086 2277148.8380 12" Ø, NON-SHRINK GROUT ANNULUS BETWEEN 12" Ø OPENING AND 6" Ø HDPE PIPE, SEE STRUCTURAL SHEET S302

PRINCIPAL SPILLWAY PIPE SCHEDULE

FROM STRUCTURE TO STRUCTURE SIZE MATERIAL CLASS PIPE LENGTH UPSTREAM INV. DOWNSTREAM INV. SLOPE %

HW-1 IT-1 15" Ø RCP ASTM C361 17.71 FT 941.00' 940.83' 0.96

IT-1 IB-1 48" Ø RCP ASTM C361 129.53 FT 940.00' 939.00' 0.77

DRAIN PIPE SCHEDULE

DRAIN ID SIZE MATERIAL STYLE PIPE LENGTH REMARKS

DP - 1

6" Ø HDPE SLOTTED 90 FT SEE SHEET C101 FOR PRIMARY DRAIN ALIGNMENT. SEE SHEET

C206 FOR PRIMARY DRAIN PROFILE.6" Ø HDPE SOLID 17.5 FT

DP - 2

6" Ø HDPE SLOTTED 13.5 FT SEE SHEET C101 FOR STRIP DRAIN ALIGNMENT. SEE SHEET

C206 FOR STRIP DRAIN PROFILE.6" Ø HDPE SOLID 11 FT

DP - 3

6" Ø HDPE SLOTTED 67 FT SEE SHEET C101 FOR EAST TOE DRAIN ALIGNMENT. SEE

SHEET C207 FOR EAST TOE DRAIN PROFILE.6" Ø HDPE SOLID 30 FT

DP - 4

6" Ø HDPE SLOTTED 27 FT SEE SHEET C101 FOR WEST TOE DRAIN ALIGNMENT. SEE

SHEET C207 FOR WEST TOE DRAIN PROFILE.6" Ø HDPE SOLID 12 FT

STATION 12+39 TO 12+53.5

STATION 12+53.5 TO 12+90 STATION 12+90

STATION

100+00 100+25 100+50 100+75 101+00

GRADE BREAK

STA:100+24.66

ELEV:936.17

STA:100+93.34

ELEV:943.00

SEE DETAIL 1 SHEET C202

FOR BEDDING LAYERS.

RR-2.