Lake Cumberland Debris Removal Vessel - DRAFT RFQ.pdf
PDF 935 KB Posted
- Solicitation number
- Not on record
About this file
This is a draft request for quotation (RFQ) from the U.S. Army Corps of Engineers Engineering District Nashville for the acquisition of a push boat, two work barges, and related equipment and services for debris removal operations on Lake Cumberland, Kentucky. The contractor will be responsible for designing, fabricating, delivering, outfitting, and commissioning the vessels. The push boat must have a minimum 600 horsepower and be able to move the barges at 5 knots, while the barges must each measure approximately 75 feet long by 18 feet wide. The starboard barge will house equipment like a knuckle boom, woodchipper, and tool room, while the port barge will include a ramp, deckhouse, and fuel tanks. The contractor must submit calculations and drawings for approval and complete all work within 180 days of design acceptance. The response due date is not provided in this draft RFQ.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912P523Q0028
b. TELEPHONE NUMBER
615.736.7976
8. OFFER DUE DATE/LOCAL TIME
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912P59. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
CIERRA R MENDOZA
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, RM A680
NASHVILLE TN 37203
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
615-736-7124FAX:
TEL: 615-736-7932 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
1,300
NAICS:
336611
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF64
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
DRAFT
Section SF 1449 - CONTINUATION SHEET
30% DESIGN SPECIFICATIONS
WR Lake Cumberland Debris Removal Vessel W912P523Q0028
Performance Work Statement 30% Design Specifications
1.0 General
1.1 This contract’s objective is to acquire one (1) push boat and two (2) work barges pinned together, with the specifications stated in the Performance Work Statement (PWS).
1.2 This inland push boat and pair of pinned barges will operate within the confines of Lake Cumberland, Kentucky. On this non-navigable waterway, this tow boat will use a telescoping knuckle boom to bring aboard woody debris for chipping, or for placing in a government provided, floating, air curtain burner.
1.3 The push boat is permitted to be off the shelf, or of a completed design that meets the Corps’ criteria. The push boat shall be able to be delivered overland by truck to Burnside, KY, or Jamestown KY, depending on the time of year/lake conditions, and will be specified at a later date by the government.
1.4 The design of the barges shall include stability analysis considering equipment loading and pinned together during operations.
1.5 The barges shall be able to be delivered overland by truck. The pinning of the two (2) barges and installations of the knuckle boom and woodchipper, etc. shall occur onsite in KY.
2.0 Performance Work Statement
2.1 The Contractor will furnish all equipment, materials, labor, and completed and approved design to fabricate a push boat and two (2) barges. The contractor will also deliver, outfit, pin, and launch boat and barges. All equipment shall be fully functional and operational. Training, manuals, and drawings shall be provided.
2.2. Inland Waters Push Boat
2.2.1 Lake Cumberland is a deep, freshwater reservoir, this vessel works the shorelines and so needs to draft 4.75 feet or less.
2.2.2 The engines shall produce more than 600 hp. The push boat shall move the barges of average loading over average conditions no less than 5 knots. The propulsion system may be traditional drive diesel engines or a z-drive, azimuthing type.
2.2.3 The push boat will be approximately twenty (20) feet wide.
2.2.4 The boat shall provide a marine sanitation type II in the head. Also, a climate-controlled break room with a capacity for four (4) crewmembers shall be provided.
2.2.5 The boat shall be outfitted with USCG lighting, as well as with a depth finder, Navionics chart plotter, sonar capable with a mega 3D sonar, radar/Flir compatible and shall also have UHF/VHF and am/fm radios.
2.2.6 The boat shall have fuel tank capacity of at least 600 gallons.
2.2.7 The pilot house and breakroom shall be climate controlled.
2.3 Barges
2.3.1 The contractor shall furnish two (2) barges that will operate as one unit by being pinned together. The coupling shall be able to be uncoupled and each barge remain stable.
Note: Debris removal work will not be performed on barges that are uncoupled.
2.3.2 The barge will be approximately 18 feet wide and 75 feet long. The barges shall be truckable as stated in 1.3.
2.3.2.1 These dimensions are dependent on the contractor’s stability analysis that takes into account moment forces from a material handling grapple on a 40 – 45 feet long telescoping boom picking up 1,500 lbs. of material at full reach, as well as placement and weight of tool room, engine room and engines, fuel tanks, deckhouse, woodchipper, dumpster, and a skid steer. If these arrangements fail to be determined by calculation or modeling, the contractor may propose alternate barge dimensions.
2.3.3 The starboard barge, as viewed from the push boat, should have in-hull power unit and fuel tank, power unit access room, tool room. The starboard barge should also have the knuckle boom mounted on the starboard bow, 8 – 10 ft from the bow and sides.
2.3.4 The starboard barge will also bear some of the weight of the woodchipper.
2.3.5 The starboard barge will house a minimum 1500-gallon fuel tank that is placed at the stern and below enough to be gravity re-fueled from the bow.
2.3.6 The port barge, as viewed from the push boat, should have 100-gallon fuel tank to supply fuel for the generator. It shall also have a ramp on the bow that measures 14 feet by 14 feet. It should also have a climate-controlled deckhouse with a type II Marine sanitation system for the head. This port barge will also carry some of the weight of the woodchipper.
2.3.7 The barges will be of an open hull design, that is water ballast capable.
2.3.8 The two (2) spuds, (one forward on the port barge, and one aft of the chipper working area, and within reach of the knuckle boom on the starboard barge) should be of a design that allows free rotation of the knuckle boom. This could include a piecewise design, telescoping, and/or with mechanical drives.
2.3.8.1 Port barge spud shall be 20 feet long. Starboard barge spud shall be 25 feet long.
2.3.9 The barges shall draft 18” and the bows shall be raked 60 degrees.
2.3.10 The hydraulic systems shall use an environmentally friendly, biodegradable oil.
Location
3.0 Delivery and Final Assembly
3.1 Off season delivery for the boat and barges is likely to General Burnside Island State Park, 8801 South Highway 27, Burnside KY, 42519 or Halcomb’s Landing, Hwy 127 in Jamestown, KY. 42629.
3.1.1 These ramps offer a large, paved area for final assembly. There is also a large boat launch ramp at this location for use to back the boat and barges down and launch them into the water.
3.1.2 Off season is the time from Labor Day until Memorial Day.
3.2 Recreation season delivery is likely to be Lakeview boat launch. This USACE boat launch is located at the coordinates:
37°00'15.08"N
84°37'22.97"W
3.2.1 Lakeview assembly location has a paved parking area and a gravel lot for final assembly; however, the ramp is too narrow and shallow to use for barge launches. The Contractor will need to provide a crane to lift and lower the barges into the water.
3.2.2 All delivery locations will require an assembly crane; however, the Lakeview location, may also require a second crane to set barges out and into the water.
4.0 Schedule
4.1 The contractor shall commence with their design proposal within fourteen (14) calendar days after the contract award.
4.2 Contractor will provide design and construction schedule within forty-five (45) calendar days.
4.2.1 Contractor shall promptly notify the Government in writing, providing detailed information about any increased lead times due to supply chain issues, the impact on lead times, and any proposed alternatives or mitigation strategies.
4.3 The government has thirty (30) days to review and comment.
4.4 Design submittals will be provided thirty (30) days after award.
4.5 The work shall be completed and boat and barges delivered within one hundred-eighty (180) calendar days of design approval.
4.6 Upon delivery, the contractor shall be completed with assembly, launch, training, and cleanup within twenty-one (21) calendar days.
4.6.1 The assembly areas will be open to the contractor Monday through Friday 6:00 AM to 6:00 PM and all work must be done during those hours unless additional hours are approved by the COR.
No work will occur on-site on Sundays or Government holidays.
4.7 Operation and Maintenance Manuals. The Contractor shall provide no less than one (1) electronic and one (1) printed sets of all installation instructions, operations manuals, service manuals and parts lists covering the operation and maintenance of all equipment provided on the vessel, once the Government has accepted the completed vessel.
4.8 Submittals:
4.8.1 Fabrication Shop Storage Plan: A plan describing in detail the proposed layout of fabricated items int eh Contractor’s plant shall be submitted within fifteen (15) calendar days after contract award.
4.8.2 Delivery Work Plan: A plan describing in detail the proposed delivery methods of the fabrications shall be submitted for approval within sixty (60) calendar days prior to the proposed delivery date.
4.8.3 Procurement Activities: Include activities associated with the critical submittals and their approvals, procurement, fabrication, and delivery of long lead materials, equipment, fabricated assemblies, and supplies. Long lead procurement activities are those with an anticipated procurement sequence of over 90 calendar days.
5.0 Safety
5.1 The contractor will comply with all pertinent provisions of the latest edition of the U.S. Army Corps of Engineers Engineer Manual Safety and Health Requirements EM 385-1-1. A copy is available for reference at the USACE project office or the manual may be viewed at the following link EM_385-1-1.pdf (army.mil) The contractor shall also comply with all OSHA work safety standards. The Government reserves the right, and can, and will, order the cessation of work at any time should the safety of employees or visitors become jeopardized. The Contractor shall not be reimbursed for work stoppage due to safety concerns.
6.0 Pre-bid Site Visit and Post-bid Conference
6.1 A formal pre-bid site visit will not be held; however, it is in the best interest of the contractors to view the potential assembly/launch area sites for both recreational season and off seasons for full visibility. Potential assembly launch sites are listed under 3.0 Delivery and Final Assembly.
6.2 Post-bid Conference
6.2.1 Prior to the start of any work, the Technical Point of Contact, Samantha Godsey, 606-679-8966, Samantha.Godsey@usace.army.mil will schedule and conduct a “Post-Bid Conference”. The Contractor’s Project Manager and Quality Control Personnel will attend this meeting. This conference will be held at the time and location agreeable to the government and contractor. No design work or analyses may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact or Contracting Officer’s Representative to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Post-Bid Conference, the contractor shall provide the name of the project manager and a telephone number for project coordination.
7.0 Permits
7.1 The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract. The contract is not considered complete until all required local permits are signed complete by those local requiring agencies and all originals are submitted to the Government.
8.0 Security
8.1 The Contractor will comply with all established security policies at Lake Cumberland HQ. Due to periods of heightened security that may affect the access to the areas covered under this contract, areas may be subject to periodic closures, that in turn may reduce or inhibit the Contractor’s ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor will be given 24- hour notice of any such closure or notice as soon as possible. The contractor shall not occupy or work on government property longer than thirty (30) calendar days.
8.1.1 The security requirements described within apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures—this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.”
8.1.2 Any Contractor(s) that will be working off government property is exempt. Contractors where work is performed (e.g. training >8hrs.) but NOT in a restricted area and does not require access to a Government Systems/Network, nor Government funds, the background investigation requirements fall under Category A for US Citizens, and if applicable Category C for Foreign Nationals. Guidance and forms for the security requirements are available on the Nashville District Public Website: (https://www.lrn.usace.army.mil/Business-With-Us/Contracting/)
8.1.3 (Pre-Screen Candidates Using E-Verify): “Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements.
Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.”
9.0 PAYMENTS
9.1 Payment Schedule:
Fabricated items stored at the Contractor’s shop will be considered for payment as provided in Contract Clause 52.212-4(i) Payments, and Contract Clause 52.246-2 Inspection of Supplies-Fixed-Price:
a. All payments would follow inspection and approval by Contracting Officer Representative and invoice.
b. The Contractor shall provide and maintain an inspection system acceptable to the Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires.
c. The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.
9.2 Progress Payments:
In accordance with FAR 32.007, progress payments can be made on the basis of costs incurred, or on the basis of completed work. Per FAR 32.501-1, the customary progress payment rate is 80% (85% for a small business) of allowable and allocable costs based on a request for a progress payment or based upon completion of specific work objectives.
Progress payments based on percentage or stage of completion are authorized only for contracts for construction (as defined in FAR 36.102), shipbuilding, and ship conversion, alteration, or repair. Payments must be commensurate with work accomplished and meet quality standards established under the contract. If the contractor’s performance is not satisfactory, the Contracting Officer may suspend or withhold up to 10% of the progress payment until corrective action is implemented (FAR 32.103).
9.3 PRICE SCHEDULE
Item # Description QTY UNIT PRICE TOTAL
BASE ITEMS
Grapple Barge, Delivery, Testing & Training
1 Ea
Equip Barge Delivery, Testing & Training
1 Ea
0003 Knuckle Boom Grapple 1 Ea
0004 Push Boat 1 Ea
100% Design & Stability Models & Calculations (Push Boat)
1 Job
100% Design & Stability Models & Calculations (Both Barges)
1 Job
TOTAL BASE AMOUNT:
OPTION ITEMS
1001 Vermeer Wood Chipper 1 Ea
Additional Crane Rental for Lakeview Delivery Location
1 Ea
TOTAL BASE + OPTION AMOUNT:
9.4 Payment(s) shall be made on a per job basis. Complete and signed permits from City, County, or State agencies are part of the necessary work to be completed for payment to be considered and for the Government to accept the project. After final inspection and acceptance by the Government, the Contractor must submit an invoice to the Technical Point of Contact. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, process, and total amount due per line item. For jobs greater than 30 days the Contractor may request progress payment.
9.4.1 All invoices will be mailed to: USACE – Lake Cumberland 855 Boat Dock Road Somerset, KY 42501, and emailed to Samantha.Godsey@usace.army.mil
9.4.2 All approved invoices will be forwarded to the Millington Finance Center for payment.
10.0 Technical requirements
10.1 Push Boat or Inland Towboat
10.1.1 Overview
10.1.1.1 General Information
The Pride of the Cumberland is an integrated floating plant consisting of one (1) towboat and two (2) sectional barges (18’ X 75’). Principal characteristics of the towboat are as follows:
Beam 20’ Working Draft 4’8” Fuel Capacity At least 600 gallons
W912P523Q0028
10.1.1.2 Engine Room Equipment Overview
Main Engines Two (2) American made (IMO) Transmission American made Generator 15 kw, (American made) diesel Charging System Engine Mounted Fuel Filtration System Engine Mounted Fire Suppression System Automatic System MSD model 400 USCG approved type II Batteries - starting (4) 12 volt w/boxes & covers disconnects Bilge Pumps Two (2), 1500 gph Engine Controls Two lever Hydraulic System Two (2) Eaton w/filter sys Rudder angle indicators Wash down pump 1.5” minimum diameter
10.1.1.3 The boat shall have safety railing and chains.
10.1.2 Hull Specifications
10.1.2.1 Hull Plating (USACE standard)
BOTTOM PLATE 3/8" A-36 PLATE
SIDEPLATE 3/8" A-36 PLATE
DECKPLATE 3/8" A-36 PLATE
HEADLOG 1/2" A-36 PLATE
STERNLOG 1/2" A-36 PLATE
10.1.2.1.1 A quantity of anodes must be prescribed and installed by industry best practices.
10.1.2.2 Bulkheads
10.1.2.2.1 There will be two (2) ¼” plate transverse bulkheads and longitudinal will be in line with engine stringers with water-tight hatches.
10.1.2.3 Propulsion/Driveline/Rudder Guards
10.1.2.3.1 There will be 3” schedule 120 pipe guards on the outer edge (port and starboard of the stern to the bottom of the hull. These shall guard drive components from coming in contact with the ground.
10.1.2.4 In-Hull Keel Coolers
10.1.2.4.1 There will be 8” channel coolers
10.1.2.4.2 The keel coolers shall be designed and place with consideration of operating environment. The water surrounding the boat and barges commonly contains floating wood chips of varying and decreasing buoyancy.
10.1.2.4.3 Design for trailering and/or drydocking conditions so that the coolers are no closer than 18” to edge of hull bottom/side”
10.1.2.5 There shall be rub rails made of 3” schedule 80 pipe.
10.1.2.6 Drive Line Components
10.1.2.6.1 There shall be stern tubes made from a minimum of schedule 80 with dripless packing gland.
10.1.2.6.2 Tail-shafts shall be stainless steel
10.1.2.6.3 Rudder Stocks shall be stainless steel.
10.1.2.6.4 Stern tube bearings are to be cutless rubber or better
10.1.2.7 There will be steering rudders per engine.
10.1.2.8 There will be two (2) flanking rudders per engine (contoured blade)
10.1.3 Power
10.1.3.1 Main engines & powertrain
10.1.3.1.1 The vessel main propulsion is provided by two (2) American manufactured (IMO), turbo-charged, diesel engines, each generating a minimum of 300 horsepower at 1,800 RPM.
10.1.3.1.2 The engines are coupled to American manufactured reduction gears.
10.1.3.1.3 Output from the gears is through stainless steel propeller shafts. The shafts run through schedule 80 stern tubes with Cutlass Rubber Bearings or better.
10.1.3.1.4 Draft tube shaft seals shall be Lasdrop Gen II, or better.
10.1.3.1.5 The propellers are to be bronze. Propellers are counter (outboard) rotating. The starboard propeller turns CW ahead, the port propeller turns CCW ahead.
10.1.3.1.6 Engines should have independent control panels, and the pilot house shall also have control panels.
10.1.3.2 Generator
10.1.3.2.1 AC electrical power is provided by a 15 KW single-phase generator diesel engine. With dual monitor and control panels (at engine and pilot house). Output from the generator is routed through a double-throw disconnect to a load center which in tum feeds the Pilot House distribution panel, upper engine room receptacles, galley air conditioning and receptacle, marine sanitation device, wash-down pump, and engine room blower. Direct feed is provided from the generator to two (2) GFCI receptacles mounted in waterproof enclosures on the front of deck house. Generator should have independent control panels, and the pilot house have instrument panels.
10.1.3.2.2 Generators will be American Made.
10.1.3.3 Fuel Tanks
10.1.3.3.1 The fuel tank (tanks) are non-integral tanks There should be a 4" space between the side of the engine room.
10.1.3.3.2 Tank(s) shall be equipped with a sight glass and digital monitoring gauge at tanks and in pilot house. All outlets shall have corrosion resistant shutoffs.
10.1.3.3.3 Tank(s) shall have a drain/transfer valve in the lowest point with corrosion resistant ball valve.
10.1.3.4 Water supply system and associated equipment
10.1.3.4.1 The pressure set for the toilet and wash basin. The system consists of a 20-gallon pressure tank and a pump.
10.1.3.4.2 Water supply is from a stainless-steel sea chest. A removable screen and shutoff ball valve will be inline before the sea chest. Supply from 'the sea chest is valved and piped through to feed the wash- down pump and the pressure set. An in-line filter is mounted between the sea chest and the pump.
10.1.3.4.3 A clear flexible hose connects the pressure tank to a manifold mounted under the deck of the Deck House which supplies both the sink and the toilet in the Deck House head. Discharge from the sink is common with the discharge line from the effluent pump, both of which are equipped with an in-line check valve.
10.1.3.4.4 The wash-down pump is mounted above the pressure tank. Supply is from the sea chest located in the forepeak. An in-line strainer is mounted between the sea chest and the pump. Discharge is piped to a valved fitting located on the main deck forward of the Deck House. This pump is equipped with a pressure switch and is powered by a motor operating on 120 VAC current
10.1.3.4.5 The marine sanitation device is a model 400 MSD, which is sized to handle a four-man crew. The system consists of the main tank where the wastes are treated through an aerobic biological action, the chlorine contact tank, aeration blower, and the effluent pump. The treated effluent is pumped overboard through a hull fitting above the starboard side.
10.1.3.5 The stern seals/glands shall be dripless, which normally require no adjustment (Lasdrop Gen II or better).
They shall be vented through a common discharge with the bilge pumps. These discharge ports are located above the waterline on either side of the engine room just forward of the aft engine room bulkhead. These discharge ports are also equipped with check valves.
10.1.3.6 The engine room is equipped with two (2) automatic 1500 GPH direct wired bilge pumps. They are powered by the battery banks and are wired to a float switch. With pilot house bilge activation warning indicator.
10.1.3.7 Rudders
10.1.3.7.1 The steering rudders, one per propeller, are blade rudders attached by flange to stainless steel rudder shafts. The lower end of the rudder shafts rest in bronze pintle bearings pressed into the rudder shoes. A positive stop is provided at the 45-degree angle on each side by a rudder stop welded to the main deck in way of the tiller arms.
10.1.3.7.2 The flanking rudders, two per propeller, are contoured to follow the curvature of the hull and are connected by palm flange to stainless steel rudder shafts. Hard over rudder angle is approximately 45 degrees. A positive stop is provided at the 45-degree angle on each side by a rudder stop welded to the main deck in way of the tiller arms.
10.1.3.7.3 Steering and flanking rudder cylinders to be double acting cylinders.
10.1.4 Steering Pumps
10.1.4.1 There are two (2) hydraulic pumps for the steering system; one mounted on each engine.
10.1.4.2 Pump flow is routed to the selector The DC controlled selector valve directs flow from either the port steering pump or the starboard steering pump to the directional valves for the steering and flanking rudders.
Mounted in pilot house.
10.1.4.3 Bypass fluid from the selector valve and the steering directional valve, along with flow from the pressure relief valves is returned to the hydraulic reservoir via two hydraulic lines.
10.1.4.4 The hydraulic fluid reservoir will be fitted with sight glass and filtration system.
10.1.4.5 Check valves shall be on each pump.
10.1.4.6 Selector switch in plot house -The dual-pump steering system offers backup steering in case of engine shutdown. The system has been designed to be low maintenance. All hydraulic components are contained within the hull, so there will be no hydraulic disassembly when preparing the boat for transport. 12V DC directional valve switch to indicate flow.
10.1.5 Deck Items
10.1.5.1 Two (2) deck winches are mounted on the bow of the boat. They are minimum five-ton. They are mounted between the push knees and the bulwarks on each side of the boat.
10.5.1.2 The lashing wires from the deck winches are wound around an 8" teardrop roller chock on each side before leading to the barges.
10.5.1.3 Lifting eyes are welded to the side shell of the hull on each side approximately outboard of the comers of the Deck House. These four eyes are used for lifting of the hull only, unless a spreader bar is used.
10.5.1.4 Fuel fill port with cross feed line. Fuel tank vents
10.1.6 Deckhouse
10.1.6.1 The engine room blower shall be mounted and wired completely within the Deck House and, therefore, requires no mechanical or electrical disconnection when disassembling the boat for transport.
10.1.6.2 The fire suppression system shall be an automatic system with a shutdown circuit for the main engines and generator, and a manual pull cable located in the Pilot House. FM 200 gas, an alternative system may be proposed.
10.1.7 Power
10.1.7.1 The main AC electrical panel shall be in the upper engine room. It is wired in series with a double throw selector that allows switching between on-board power and shore power.
10.1.7.2 The main DC electrical panel shall be in the upper engine room. It is supplied by the onboard battery bank.
It distributes DC current to all of the DC system.
10.1.7.3 The boat is equipped with a heavy duty, double-throw safety switch in the upper engine room to select between on-board generator power and shore power. The current from both sources is wired through the double-throw switch panel. The switch panel is labeled for GENERATOR and SHORE POWER
10.1.7.4 The shore power cable shall be 30 Amp, 125 Volt, 50' shore cable. The stainless-steel waterproof shore power cable receptacle is located just forward of the engine room door on the exterior starboard Deck House bulkhead.
10.1.7.5 The cable trunk for the AC and DC electrical supply to the Pilot House, the port and starboard main engine clutch and throttle cables, the rudder angle indicator wires, the depth sounder transducer wire, the manual pull cable for the fire suppression system, the shut-down circuit wiring for the fire suppression system, and the control wiring for the steering system
10.1.7.6 All of the galvanized safety grating on the boat is removable if used. It is located on the stern of the boat over the steering gear, in the upper engine room.
10.1.7.7 The upper engine room shall be equipped with an extendable trolley rail with trolley for use in the removal of the engines or generator in the event they have to be removed for overhaul or replacement.
10.1.7.8 Main Engine and Generator control sys. Stop circuits for the main engines shall be actuated from either the pilot house or the engine room. There are no "emergency" stops.
10.1.8 Pilot House
10.1.8.1 Electrical
10.1.8.1.1 Pilot House AC and DC electrical systems. The AC panel is supplied through a cable fed from the Deck House distribution panel. The DC panels are fed through from the engine room battery bank.
10.1.8.1.1.1 DC current from both the port and starboard battery banks shall be routed through battery disconnect switches. The only systems powered directly from the batteries, without first passing through the switch, is the bilge pumps.
10.1.8.1.2 The AC electrical supply cable is routed into the Pilot House.
10.1.8.1.3 Steering and Pilot House controls will include Selector switch, Steering rudder jog lever, and Flanking rudder jog lever
10.1.8.1.4 Instrument and monitoring panel shall be angled for easy viewing standing or sitting at pilot’s seat.
10.1.8.1.5 Pilot House Mounted Electronics
10.1.8.1.5.1The VHF radio antenna shall be mounted on a swivel mount on the Pilot House top.
10.1.8.1.5.2 Loudhailer
10.1.8.1.5.3 Installation point wired and terminated under the console for Government provided/installed UHF Corps radio
10.1.8.1.5.4 The AM/FM radio shall be mounted in Pilot House interior.
10.1.8.1.5.5 Chart Plotter GPS, with mega 3-dimensional sonar, Depth sounder, and Flir/Radar
10.1.8.1.5.6 Rudder Angle Indicators
10.1.8.1.5.7 Air Conditioner/Heater
10.1.8.1.5.8 The fathometer. The display unit is mounted in the instrument panel in the Pilot House. The transducer is mounted through the hull approximately midship. The unit displays water depth in either feet or meters, can be adjusted for offset to calibrate for hull depth, and will allow you to define alarm thresholds for shallow water and deep water.
10.1.8.1.5.9 There shall be separate rudder angle indicator for the steering rudders and the flanking rudders.
10.1.8.2 Lighting
10.1.8.2.1 USCG LED Navigation Lights
10.1.8.2.1.1 Port (red) running light; mounted on front corner of Pilot House
10.1.8.2.1.2 Starboard (green) running light; mounted on front corner of Pilot House
10.1.8.2.1.3 White towing lights, two (2); mounted forward on mast, vertical arrangement
10.1.8.2.1.4 Amber towing lights, two (2); mounted aft on mast, vertical arrangement
10.1.8.2.1.5 Anchor light; mounted on top of mast
10.1.8.2.2 Flood Light: The Pilot House is equipped with one (1) 500 watt minimum or equivalent flood light. It shall be mounted on the forward edge of the Pilot House top, and is directed downward to light the foredeck of the boat and the aft end of the barges. It is powered by 120 VAC current from the Pilot House AC distribution panel.
10.1.8.2.3 The boat shall be equipped with a searchlight mounted on a short mast on top of the Pilot House, with a control in the Pilot House for vertical and rotational movement.
10.1.9 Paint System
10.1.9.1 The paint system on the hull shall be two-part epoxy. The first coat is gray in color and minimum 6 mils dry film thickness (dft). The second coat is black in color and is also 6 mils dft. Total coverage is 12 mils dft.
10.1.9.2 The deck shall be coated with deck red Federal color #10076. The black paint on the bulwarks and push knees shall be black.
10.1.9.3 The paint system on the Deck House and Pilot House shall be Federal colors Old Ivory 1785S, and striping red 11136, as specified with a minimum coverage exceeding 12 mils dft.
10.2 Starboard Barge
10.2.1 Hull Specifications
10.2.1.1 Dimensions
10.2.1.1.1 Length: 75 feet
10.2.1.1.2 Width: 18 feet
10.2.1.1.3 Hull Depth: 5 feet
10.2.1.2 Compartments
10.2.1.2.1 There should be 3 or 4 watertight compartments with minimal internal framework and bracing.
10.2.1.2.2 Each compartment shall have an 18’ watertight hatch with ladder.
10.2.2 Materials
10.2.2.1 All materials used in construction of the barge shall be new, from defects, and imperfections. No previously used or salvaged material shall be used in the construction of the barge.
10.2.2.2 Barge shall be made of 3/8” thick, A-36 steel.
10.2.2.3 All welds shall be to American Welding Society (AWS) with welds being contiguous inside and out.
10.2.2.4 Bilge, top, sides and rake shall be double plated with 4”x4” edges.
10.2.3 The bow of the barge shall be raked 60 degrees unless it adversely effects stability.
10.2.4 Structural Supports
10.2.4.1 Structural supports shall be designed to carry loads specified below in 10.2.5
10.2.4.2 Framing shall be per fabricators requirements while adopting an open hull type design.
10.2.5 Loads (including equipment)
10.2.5.1 Material Handler with a minimum ASME Hoist classification of H3-B4.
10.2.5.1.1 The contractor shall furnish one (1) telescoping knuckle boom, top seat controlled (joystick control preferred), with a minimum vertical reach of 40’ to 45’, with continuous 360° rotation, and a minimum capacity of 2,200 pounds at full reach (including grapple and saw attachment). (Prentice 124, HS Marine AKC for example).
10.2.5.1.2 The location of the material handler specified in 10.2.5.1.1 will be centered 10’ off the starboard bow.
10.2.5.1.3 Note that an imperative design consideration is the position of the operator’s seat. If the material handler is on the starboard barge as described in 10.2, then the seat must be on the right side of boom for maximum visibility when utilizing the woodchipper. If the contractor designs the material handler for the port barge then the operator must sit on the left side of the boom.
10.2.5.2 Woodchipper
10.2.5.2.1 The contractor shall furnish the woodchipper. The calculations for stability, etc, must include the size and weight of a chipper as described in 10.2.5.2.2
10.2.5.2.2 Woodchipper will have an opening of 26.25”x24.5” and a weight of approximately 16,250 lbs, and dimensions approximately 20’x8’and10.5’. With removable tongue. (Vemeer BC2100XL or equal)
10.2.5.3 Deck House and Tool Room
10.2.5.3.1 deckhouse and tool room compartment(s) will be aft of the woodchipper, over the in-hull engine room opening, and be of an approximate size of 10’ wide x 14’ length, and 7’ high that shall be bolted to the riser.
10.2.5.3.2 A Four (4) feet perimeter shall be provided around the deck house.
10.2.5.3.3 There shall be an entrance door and stairs to an engine room that will also contain fuel, hydraulic oil, and storage shelving. This room will contain the power unit for the material handler, a 100-gallon fuel tank and fill station with a thru-hull vent and cover. The hydraulic oil reservoir shall be sized for the material handler.
10.2.5.3.4 A door will be provided to access the tool room side and it shall be furnished with shelving.
10.2.6 Deck Penetrations
10.2.6.1 Sounding Tubes shall be located on port side, adjacent to manhole, and one in each compartment.
10.2.6.2 Manholes/Hatches will be located (1) per compartment, be fabricated of stainless steel and flush mounted with stainless steel bolts. The manholes/hatches shall be watertight, 18” in diameter, each with a removable ladder that can be affixed with stainless steel bolts.
10.2.7 There shall be 12’ x 20’ bulwarks starboard aft 2’ from the corner.
10.2.8 Bitts
10.2.8.1 There shall be seven (7) bitts fabricated of schedule 80, 1-1/2”, round cross bar steel and 5/8” steel plate cap.
10.2.8.2 There shall be on located on each corner and 3 located, equidistantly on the starboard side.
10.2.8.3 The bitts shall be 17” in height by 18” in length and welded to a 14” doubler plate.
10.2.8.4 Height of the round cross bar shall be 11” above the deck.
10.2.9 Protective Coating
10.2.9.1 Preparation: Exterior hulls and decks shall be sandblasted prior to application of protective coating.
10.2.9.2 Materials:
10.2.9.2.1 Marine grade two (2) part epoxy
10.2.9.2.2 The hull exterior below the waterline shall be coated with an anti-fouling paint.
10.2.9.2.3 Deck coating shall be skid resistant.
10.2.9.2.4 Coats:
10.2.9.2.4.1 Three (3) total, one (1) primer coat and two (2) topcoats.
10.2.9.2.4.2 Thickness (Minimum): Six (6) mil dry film thickness (dft) for each coat, total coating thickness not less than eighteen (18) mils dft.
10.2.9.2.5 Color:
10.2.9.2.5.1 Hull Exterior and Appurtenance Structures shall be black.
10.2.9.2.5.2 Hull Interior shall be gray
10.2.9.2.5.3 The Deck shall be Federal Code Red 10076 with non-skid additive
10.2.10 Anodes
10.2.10.1 A quantity of ten (10) zinc anodes shall be welded to the following locations: 2 to the bow, 2 to the stern, and 3 along each the port and starboard sides.
10.2.11 Davit Arm
10.2.11.1 A davit, swing arm, with powered winch all be provided at each front outside corner of deck house that is capable of lifting and swinging a skiff weighing 3,000 pounds onto, and off of the barge deck.
10.2.12 Markings
10.2.12.1 Safety Striping
10.2.12.1.1 Location: Hull perimeter, Top
10.2.12.1.2 Width: Twelve (12) inches
10.2.12.1.3 Color: Safety Yellow, Reflective
10.2.12.2 Owner Signage
10.2.12.2.1 “US ARMY CORPS OF ENGINEERS”
10.2.12.2.2 Color: White
10.2.12.2.3 Location: Between the Safety Striping, Centered on Port and Starboard sides
10.2.12.2.4 Size: Twelve (12) inches
10.2.12.3 Warning Signage
10.2.12.3.1 “Warning: Stay Back 600 Feet”
10.2.12.3.2 Color: Red
10.2.12.3.3 Location: Below Owner Signage
10.2.12.3.4 Size: Six (6) inches
10.2.12.4 Draft Gauge Markings
10.2.12.4.1 Markings: “1’ through 4’ numbers”
10.2.12.4.2 Location: Bottom of numbers at the foot mark.
10.2.12.4.3 Color: White
10.2.12.4.4 Location: 6” inward on forward and aft corners from bottom of hull
10.2.12.4.5 Size: 6”
10.3 Port Barge
10.3.1 Overview
10.3.1.1 Dimensions
10.3.1.1.1 Length: 75 feet
10.3.1.1.2 Width: 18 feet
10.3.1.1.3 Hull Depth: 5 feet
10.3.1.2 Compartments
10.2.1.2.1 There should be 3 or 4 watertight compartments
10.2.1.2.2 Each compartment shall have an 18’ hatch with ladder
10.3.1.3 Materials
10.3.1.3.1 All materials used in construction of the barge shall be new, from defects, and imperfections. No previously used or salvaged material shall be used in the construction of the barge.
10.3.1.3.2 Barge shall be made of 3/8” thick, A-36 steel.
10.3.1.3.3 All welds shall be to American Welding Society (AWS) with welds being contiguous inside and out.
10.3.1.3.4 Bilge, top, sides and rake shall be double plated with 4”x4” edges.
10.3.1.4 Shape
10.3.1.4.1 The bow of the barge shall be raked 60 degrees unless it adversely affects stability.
10.3.1.5 Structural Supports
10.3.1.5.1 Structural supports shall be designed to carry loads specified below in 10.2.1.6
10.3.1.5.2 Framing shall be per fabricators requirements while adopting an open hull type design.
10.3.1.6 Loads
10.3.1.6.1 Ramp
10.3.1.6.1.1 The contractor shall furnish one (1) 14’ x 14’ ramp with electric over hydraulic, self-contained winches.
10.3.1.6.2 Dumpster (Gov’t Provided)
10.3.1.6.2.1 The design must also consider the weight and placement of a 30-yard dumpster (7.5’ by 22’), empty, full, or off of the barges completely. At times the dumpster will be full of wet, woody debris.
10.3.1.6.2.2 Deck mounted guide rails shall be provided for the dumpster described above.
10.3.1.6.3 Heavy Equipment
10.2.1.6.3.1 The stability and draft of the coupled barge unit shall be calculated and provided to include the consideration of the weight and placement of government provided heavy equipment such as a compact track loader.
The compact track loader may be fully loaded, using the ramp, and other locations partially or fully on the port barge.
10.3.1.6.3.2 The weight and placement of the woodchipper in 10.2.5.2, may include locations partially on the port barge and must be accounted for in the design for its impact on stability and draft.
10.3.1.6.4 Deck House and Crew Room
10.3.1.6.4.1 Near the stern of the port barge, and in line with the deck house/tool room on the starboard barge, the contractor shall locate a deckhouse and crew room compartment(s) of an approximate size of 10’ wide x 14’ length and 7’ high that shall be bolted to the riser.
10.3.1.6.4.2 There shall be an exterior entrance door and stairs to a generator, fuel storage tank and MSD unit area.
10.3.1.6.4.3 A climate-controlled galley shall be provided with an entry door, 3 windows, a table or bar-height table, seating and a small sink, and a microwave.
10.3.1.6.4.4 Head and sink area with separate outside entry door.
10.3.1.7 Fueling
10.3.1.7.1 There shall be a steel enclosed fuel filling station with a vent, located between the ramp king post and the corner bitt, gravity feeding the main fuel tank.
10.3.1.7.2 A 75’ x 1-1/2” fuel line and reel shall be provided to transfer fuel located at forward corner of the deckhouse, fed from the main fuel tank transfer pump.
10.3.1.7.3 A fuel tank with 1500-gallon capacity and transfer pump shall be provided.
10.3.1.8 The contractor shall provide a keel cooled, 15kW diesel generator. With power supply feeding starboard barge.
10.3.1.9 There shall be 12’ x 20’ bulwarks port aft 2’ from the corner.
10.3.1.10 Deck Penetrations
10.3.1.10.1 Sounding Tubes shall be located on port side, adjacent to manhole, and one in each compartment.
10.3.1.10.2 Manholes/Hatches will be located (1) per compartment, be fabricated of stainless steel and flush mounted with stainless steel bolts. The manholes/hatches shall be watertight, 18” in diameter, each with a removable ladder that can be affixed with stainless steel bolts.
10.3.1.11 Safety Cable Railing
10.3.1.11.1 A safety cabling system shall be installed on the port side from bulwarks to two (2) feet from bow bitt.
10.3.1.11.2 The system will be designed and installed by industry best practices and EM 385 1-1 requirements for the intention of preventing a person from falling overboard.
10.3.1.12 Bitts
10.3.1.12.1 There shall be six (7) bitts fabricated of schedule 80, 1-1/2”, round cross bar steel and 5/8” steel plate cap.
10.3.1.12.2 There shall be on located on each corner and 3 located, equidistantly on the port side.
10.3.1.12.3 The bitts shall be 17” in height by 18” in length and welded to a 14” doubler plate.
10.3.1.12.4 Height of the round cross bar shall be 11” above the deck.
10.3.1.13 Protective Coating
10.3.1.13.1 Preparation: Exterior hulls and decks shall be sandblasted prior to application of protective coating.
10.3.1.13.2 Material:
10.3.1.13.2.1 Marine grade two (2) part epoxy
10.3.1.13.2.2 The hull exterior below the waterline shall be coated with an anti-fouling paint.
10.3.1.13.2.3 Deck coating shall be skid resistant.
10.3.1.13.3 Coats:
10.3.1.13.3.1 Three (3) total, one (1) primer coat and two (2) topcoats.
10.3.1.13.3.2 Thickness (Minimum): Six (6) mil dry film thickness (dft) for each coat, total coating thickness not less than eighteen (18) mils dft.
10.3.1.13.4 Color:
10.3.1.13.4.1 Hull Exterior and Appurtenance Structures shall be black.
10.3.1.13.4.2 Hull Interior shall be gray
10.3.1.13.4.3 The Deck shall be Federal Code Red 10076 with non-skid additive
10.3.1.14 Anodes
10.3.1.14.1 A quantity of ten (10) zinc anodes shall be welded to the following locations: 2 to the bow, 2 to the stern, and 3 along each the port and starboard sides.
10.3.1.15 Davit Arm with Wench
10.3.1.15.1 A davit, swing arm, with powered winch shall be provided at front outside corner of deck house that is capable of lifting and swinging a skiff weighing 3,000 pounds onto, and off of, the barge deck.
10.3.1.16 Markings
10.3.1.16.1 Safety Striping
10.3.1.16.1.1 Location: Hull perimeter, Top
10.3.1.16.1.2 Width: Twelve (12) inches
10.3.1.16.1.3 Color: Safety Yellow, Reflective
10.3.1.16.2 Owner Signage
10.3.1.16.2.1 “US ARMY CORPS OF ENGINEERS”
10.3.1.16.2.1.2 Color: White
10.3.1.16.2.1.3 Location: Between the Safety Striping, Centered on Port and Starboard sides
10.3.1.16.2.1.4 Size: Twelve (12) inches
10.3.1.16.3 Warning Signage
10.3.1.16.3.1 “Warning: Stay Back 600 Feet”
10.3.1.16.3.2 Color: Red
10.3.1.16.3.3 Location: Below Owner Signage
10.3.1.16.3.4 Size: Six (6) inches
10.3.1.16.4 Draft Gauge Markings
10.3.1.16.4.1 Markings: “1’ through 4’ numbers”.
10.3.1.16.4.2 Bottom of numbers at the foot mark.
10.3.1.16.4.3 Color: White
10.3.1.16.4.4 Location: 6” inward on forward and aft corners from bottom of hull
0710.3.1.14.4.5 Size: 6”
10.3.1.16.5 The contractor shall provide for a screened, and filtered washdown pump located in-hull and under the deckhouse.
10.3.1.16.6 The contractor will provide a cover plate to cover the gap between the two barges that will prevent debris and items from collecting.
11.0 SUBMITTALS
11.1 Although the Government technically reviews submissions required by this scope of work, it is emphasized that the Contractor’s work must be executed using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted to the Technical Point of Contact for review and accepted by the Government prior to the commencement of any field activities.
11.1.1 Product Specification Sheets – Provide prior to ordering components.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .