Lake_Accessibility_&_Stormwater_Improvements_-_Babcock_Park.pdf
PDF 551 KB Posted
- Solicitation number
- 326028
- Issued by
- Dane County, Madison City, Wisconsin
About this file
This is a Request for Bids (RFB) document issued by Dane County, Wisconsin's Department of Public Works Engineering for Lake Accessibility & Stormwater Improvements at Babcock Park, located at 2909 US Highway 51 in McFarland, Wisconsin. The project involves excavation and grading work for stormwater facilities and user access improvements to enhance stormwater controls and improve accessibility to the boat launch and adjacent areas. The contract will be delivered as a lump sum award. A non-mandatory pre-bid meeting is scheduled for October 21, 2026, at 1:00 p.m. at the Babcock Boat Launch. All questions must be submitted electronically through the county's eProcurement portal by 5:00 p.m. on October 28, 2026, and bid packages are due by November 17, 2026, at 2:00 p.m. The project has an assumed start date of February 1, 2027, with substantial completion required by July 1, 2027.
Bids must be submitted electronically through the Dane County eProcurement Portal at https://procurement.opengov.com/portal/countyofdane. All contractors must be pre-qualified as Best Value Contractors prior to the bid due date, with subcontractors required to achieve pre-qualification ten days before commencing work. Required bid documentation includes a bid guarantee equal to 5% of the total bid price, a proposed subcontractor list, a current W9 form, and various affidavits certifying compliance with fair labor practices, emerging small business reporting requirements for projects over $100,000, and acknowledgment of all questions and answers. The pricing structure includes a base bid for all work as detailed in the construction documents on a lump sum basis, unit costs for excavation below subgrade, aggregate base course, cast-in-place concrete, and asphalt pavement, and informational unit costs for erosion and sediment control practices. Interested vendors should demonstrate experience with projects of similar size and complexity and must comply with all applicable county specifications, ordinances, and local permitting requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB_326028.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DANE COUNTY
1919 ALLIANT ENERGY CENTER WAY
MADISON, WISCONSIN 53713
Department of Public Works Engineering
Request For Bids No. 326028
LAKE ACCESSIBILITY & STORMWATER IMPROVEMENTS
- BABCOCK PARK
RFB Let Date: September 29, 2026
Deadline for Questions: October 28, 2026
Bid Due Date: November 17, 2026, 2:00 pm
Bids must be submitted electronically to:
https://procurement.opengov.com/portal/countyofdane
County of Dane
REQUEST FOR BID (RFB) – OpenGov Documents
Lake Accessibility & Stormwater Improvements - Babcock Park
Sections:
I. Project Description II. Instructions for Electronic Bid Submission
III. Bid Submission - Checklist IV. Bid Submission - Pricing
Attachments:
A - RFB 326028
Request for Bid (RFB): 326028 Lake Accessibility & Stormwater Improvements - Babcock Park
1. Project Description
1.1. Summary
Dane County is seeking bids from qualified contractors for Lake Accessibility & Stormwater
Improvements at Babcock Park , located at 2909 US Hwy 51, McFarland, WI. This project involves excavation and grading for stormwater facilities and user access improvements and is being delivered under a lump sum contract.
The goal of this project is to improve stormwater controls and improve user accessibility to the boat launch and adjacent areas and must comply with all applicable county specifications, ordinances, and local permitting requirements.
Interested vendors should have demonstrated experience in projects of similar size and complexity. A pre-bid meeting is scheduled for Wednesday, October 21, 2026 at 1:00 p.m. at Babcock Boat Launch, 2909 US Hwy 51, McFarland, WI 53558. All questions must be submitted by 5:00 p.m. Wednesday, October 28, 2026 . Bid packages are due by Tuesday, November 17, 2026 at 2:00 p.m.
1.2. Contact Information
Ryan Shore
Project Manager
1919 Alliant Energy Center Way
Madison, WI 53703
Email: shore@countyofdane.com
Phone: (608) 445-0109
Department:
Public Works Engineering
1.3. Timeline
Bid Letting Date September 29, 2026
Pre-Bid Meeting (Non-Mandatory) October 21, 2026, 1:00pm
2909 US Hwy 51, McFarland, WI 53558
Question Submission Deadline October 28, 2026, 5:00pm
Bid Due Date November 17, 2026, 2:00pm mailto:shore@countyofdane.com tel:(608)445-0109
2. Instructions for Electronic Bid Submission
2.1. General Electronic Bid Submission Process
The Project Manual and Construction Documents for this project are available for download in the
Attachments Section.
To Submit a Bid:
All interested bidders must register for free at Dane County’s eProcurement Portal:
• Go to https://procurement.opengov.com/login
• Click “Sign Up” to create a username and password, then activate your account.
• Select relevant project categories to receive notifications (e.g., 91200 – Public Works Projects).
• Use the RFB Number, Organization Name, or Proposal Title to locate the solicitation.
• Subscribe to “New Project Updates” to stay informed.
• Note that Unacknowledged addenda will not preclude a Bidder from submitting a Bid. Please ensure that Bidder is aware of all addenda prior to the unsealing of Bids.
For help setting up or navigating your account, contact: procurementsupport@opengov.com
Questions & Inquiries:
• All inquiries related to this Request for Bids (RFB) must now be submitted electronically through
Dane County’s eProcurement Portal.
• Questions must be submitted before 5:00p.m. Wednesday, October 28, 2026. Bidders are responsible for raising any questions, exceptions, or suggested changes during this period.
• If a bidder identifies any ambiguity, error, conflict, omission, or inconsistency in the RFB, they must immediately notify the designated County contact to request clarification or a revision.
• Direct communication with Dane County employees is strictly prohibited, except as outlined in this
RFB. Only the designated County contacts listed in the RFB are authorized to provide information or respond to inquiries.
• Bidders are responsible to check back regularly for Addenda or Updates.
For questions about this RFB, contact:
Ryan Shore, Project Manager Phone: 608.445.0109 Email: shore.ryan@danecounty.gov
Dane County is an Equal Opportunity Employer.
https://procurement.opengov.com/portal/countyofdane/projects/305327/document?section=2930139 https://procurement.opengov.com/login
2.2. Bid Submittal Requirements
Bidders submitting on this project must adhere to the following:
Best Value Contracting (BVC):
• All contractors are required to be pre-qualified as a Best Value Contractor prior to bid due date.
o Subcontractors must become pre-qualified ten (10) days prior to commencing work.
• To avoid delays, Bidders are urged to become pre-qualified as early as possible.
• Additional information can be found at https://publicworks.danecounty.gov/bvc o For a list of current contractors, visit https://publicworks.danecounty.gov/bvc/current o To submit an application for BVC certification, visit https://publicworks.danecounty.gov/bvc/application
Bid Submittal Documentation:
• Bidders shall upload ALL required documentation and answer ALL questions in the Bid
Submission - Checklist Section. Omission of any required documentation/information may result in rejection of Bid.
• Bidders shall provide their electronic bid pricing in the Bid Submission - Pricing Section.
Definition(s) of Base Bid, Alternate Bids, Allowances, Unit Pricing and another pricing items can be found in this section.
https://publicworks.danecounty.gov/bvc https://publicworks.danecounty.gov/bvc/current https://publicworks.danecounty.gov/bvc/application https://procurement.opengov.com/portal/countyofdane/projects/305327/document?section=2930143 https://procurement.opengov.com/portal/countyofdane/projects/305327/document?section=2930143 https://procurement.opengov.com/portal/countyofdane/projects/305327/document?section=2930138
3. Bid Submission - Checklist
3.1. CONTACT INFORMATION
3.1.1. Contact Name*
*Response required
3.1.2. Title or Position*
*Response required
3.1.3. Telephone No.*
*Response required
3.1.4. Email Address*
*Response required
3.2. BID SUBMISSION
Upload the following required documents.
3.2.1. Bid Guarantee*
Each bid shall be accompanied by a bank certified check, cashier’s check, or bid bond in the amount of
5% of the total bid price, made payable to Dane County.
Please scan and upload a copy of your bid bond/cashier's check. DO NOT UPLOAD ANY FILES OTHER
THAN BID BOND.
*Response required
3.2.2. Proposed Subcontractor List *
Please download the below documents, complete, and upload.
• 00_43_36-Proposed_Subcontra...
*Response required
3.3. BIDDER'S AFFIDAVITS
3.3.1. Acknowledgment of Start & Completion Dates*
Assuming a start date of February 1, 2027, Dane County Public Works requires this project to be substantially completed by July 1, 2027. Are you able to complete this project within this timeframe?
☐ Yes
☐ No
*Response required
When equals "No"
3.3.2. Enter the date your firm can substantially complete this project:* *Response required https://government-project.s3.us-west-2.amazonaws.com/43477/b2435a03-5e90-4774-bd48-68ca17c2b8d8_00_43_36-Proposed_Subcontractor_Form_2025-04-04.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4LHFLUMAB%2F20260929%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260929T190003Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEIv%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCICZZHjHAW8fk0b5dL7NjotWxyhkmNqZF2yYD8YVtb%2FyuAiEAvwVwZQFAPykLIX9HbAtenbO3v65K9IyRd3yEHC6vVZoqjAUIUxACGgw4OTIzNjQ2ODc2NzIiDFXQQMZkgCIurkKSxyrpBF%2BJHZQxogNtJkyd5xg0AeIBooDwtXJsZbqwbimU7Pt9aGlaRVAk0QzI1XrL7M30N9%2BO4dvQjc9zbGq4yODIf5vNTX%2Beq7O7KrdEYBwz50qrduaNH4VZupQUMLz42s7FB7fOEU%2BJkyGRNr4U21SEufj%2F3GQJSpikQickmHCuAdQkB4D4c9mlNIYy3s%2BHrNKz7hl4KNFetd0HPRvr%2FU9U%2FtKM7wwcdxDRtVFzHwdn%2Bw31rqqwjaH5yyalk4aoC%2BXoWWKCn6GsEcD95NsLTRx0SMNF1UORsVkkPNR7rF1ZXiO51dbT6CocqEwJM1pdVy4f4qV2o5YaTbKpbr93VxF3KOC54jb%2BvVBuSg%2FbsUY%2FO8dInlXknhhRnP8uJSDpDKyxEevX%2FHGrK8sHrxm2bRzAJ7z7cz6aVsqkvVM2%2BATVdZnsFjTvtdrLuEe%2BWOjLJZzrXVcQnXxZjkaA5YVsqyfIE6XTqMhlyuBpY%2BnUr64o7C14YWZLMtGwZz%2BWmpE1xIC4r0sRdOY5sUMZRuwu4fVvujFYeoUsxJbizFt2a4cgowPn%2Bntseca17AwFeYqEZP%2BoUn2LoPyd1mPg7m2yHbyfuEvkix%2F0ght2nz5vfqvIygAo6ttuwFQCgAuAYrx56xpymABwa1UAb88dH7RilCh6U6Z2ZdMxTA5UAFziCV5t2cLQA8wkM0qql4gPgMvfcHWnu%2FSpkF1%2BGqAtmtiQEdbnxJw9h4ppFpJxCYxLpKoYK05Ox7MS%2Bb%2BXxRaUqn5plgtRh1gGZxL3q3B%2BvhUnvfJmbg7mgex8DYqWk%2BRZLW8vYMl97KPTucu9vd%2B8MN6N8NUGOpkBZubtXofvuCC9OxZJQnjch%2BDYqtP%2F4Gz1EWMkYq9YpFuHsPgIboKR7tl9NpwI6EeCxFkK%2BOVh2oXpZUWF6%2FgTrXaaZsibcM3AweEqNiDAJ%2BPkhG31b6YpTs20urXN0AGpoCFmBrRH54%2F534dRXxw68tzPYOefFUGaBz5zgMKUWv60DG648i1tlKDBR7TsNDka3G9yeB6LhsCW&X-Amz-Signature=1b76d8b786ecf0c4c2c2f790d62ba1e74bb31a643f0337e7cdc10a983551b207&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%2200_43_36-Proposed_Subcontractor_Form_2025-04-04.pdf%22&x-id=GetObject
3.3.3. BVC-Does your company meet Dane County's Best Value Contracting requirements for this project?*
General Contractors and subcontractors shall meet all applicable Best Value Contractor requirements.
BVC applies to contracts over $50,000 single trade and $100,000 multiple trade. For additional information: https://publicworks.danecounty.gov/bvc
Failure to be properly and accurately certified as a Dane County Best Value Contractor will result in an automatic rejection of a bid submission.
☐ Yes
☐ No
*Response required
When equals "Yes"
3.3.4. Enter the date (MM-DD-YY) in which your company was approved as a Dane County Best Value Contractor.* Your status can be viewed/confirmed at:
https://publicworks.danecounty.gov/bvc/current
Maximum response length: 10 characters
*Response required
3.3.5. Fair Labor Practice Certification*
Has your company been found by the National Labor Relations Board ("NLRB") or the Wisconsin
Employment Relations Commission ("WERC") to have violated any statute or regulation regarding labor standards or relations in the seven years prior to the date this bid submission is signed?
If yes is answered, a copy of any relevant information regarding such violation is required to be uploaded with your bid submission.
Additional information about the NLRB and WERC can be found using the following links:
www.nlrb.gov and http://werc.wi.gov.
• No, our company has NOT been found by the NLRB or the WERC to have violated any statute or regulation regarding labor standards or relations in the seven years prior to the date this bid submission is signed.
• Yes, our company HAS been found by the NLRB or the WERC to have violated any statute or regulation regarding labor standards or relations in the seven years prior to the date this bid submission is signed.
☐ Yes
☐ No
*Response required https://publicworks.danecounty.gov/bvc https://publicworks.danecounty.gov/bvc/current http://www.nlrb.gov/ http://werc.wi.gov/
When equals "Yes"
3.3.6. Please supply your supplemental documents in the file upload.
3.3.7. Emerging Small Business Report*
For projects over $100,000, Bidder has already or will submit Emerging Small Business Report to the Civil Rights Department within 10 business days of Bid Due Date. For more information refer to 00 21 13 - Instruction to Bidders or contact:
Dane County Contract Compliance Specialist
City-County Building, Room 356
210 Martin Luther King, Jr. Blvd.
Madison, WI 53703
DCCRD@DaneCounty.gov
608/266-4192
☐ Please confirm
*Response required
3.3.8. Bidder has reviewed and acknowledges all Q&A.*
☐ Yes
☐ No
*Response required
3.3.9. I understand that if any addendum is issued, I will have to acknowledge the posted addendum.*
☐ Please confirm
*Response required
3.3.10. W9 Upload*
Please upload your company's most recent W9 form signed within the past 12 months.
*Response required
3.4. SIGNATURE DECLARATION
3.4.1. RFB Solicitation Response Declaration *
In submitting and confirming this solicitation response, we certify that we have not, either directly or indirectly, entered into any agreement or participated in any collusion or otherwise taken any action in restraint of free competition; that no attempt has been made to induce any other person or firm to submit or not to submit a solicitation response; that this solicitation response has been independently arrived at without collusion with any other vendor competitor or potential competitor; that this solicitation response has not been knowingly disclosed prior to the opening of bids to any other vendor or competitor; that the above statement is accurate under penalty of perjury.
Further, by submitting this solicitation response, firm agrees with all the terms, conditions, and specifications required by the County in this solicitation and declares that the corresponding solicitation response and pricing are in conformity therewith.
mailto:DCCRD@DaneCounty.gov
I have read and understood the entire document.
I declare under penalty of false swearing under the law of Wisconsin that the foregoing is true and correct.
☐ Please confirm
*Response required
3.4.2. Electronically signed by:*
Provide First Name, Last Name and Title
*Response required
3.4.3. Signed on: *
Write in month, day, year and city/state in which the submission occurred.Example: June 27, 2025 in Madison, WI
*Response required
4. Bid Submission - Pricing
Additive items shall be entered as positive numbers.
Deductive items must be entered as negative numbers using a minus sign (example: -5,000).
Failure to enter deductive amounts as negative numbers may result in miscalculation of the bid total.
BASE BID
Line Item Description Unit of Measure Cost
1 Perform all work as detailed in the construction documents.
LUMP SUM
UNIT COST
Unit Costs establish price for work beyond the project scope (if needed)
Line Item Description Unit of Measure Unit Cost
1 Excavation Below Subgrade (EBS) cu. yd
2 Aggregate Base Course cu. yd
3 Cast-in-Place Concrete sq. ft
4 Asphalt Pavement ton
INFORMATIONAL BID
Dane County Water Resource Engineering is gathering average cost information for erosion & sediment control practices. Costs provided for these items are for informational purposes only and should be priced as installed.
Line Item Description Unit of Measure Unit Cost
1 Silt Sock lin. ft.
2 Silt Fence lin. ft.
3 Erosion Mat - Class 1, Type B - Urban sq. yd.
4 Turf Seed w/ Straw Mulch sq. yd.
5 Construction Egress - Stone Tracking Pad ea.
| 1. Project Description |
| 1.1. Summary |
| 1.2. Contact Information |
| 1.3. Timeline |
| 2. Instructions for Electronic Bid Submission |
| 2.1. General Electronic Bid Submission Process |
| 2.2. Bid Submittal Requirements |
| 3. Bid Submission - Checklist |
| 3.1. CONTACT INFORMATION |
| 3.1.1. Contact Name* |
| 3.1.2. Title or Position* |
| 3.1.3. Telephone No.* |
| 3.1.4. Email Address* |
| 3.2. BID SUBMISSION |
| 3.2.1. Bid Guarantee* |
| 3.2.2. Proposed Subcontractor List * |
| 3.3. BIDDER'S AFFIDAVITS |
| 3.3.1. Acknowledgment of Start & Completion Dates* |
| 3.3.2. Enter the date your firm can substantially complete this project:* |
| 3.3.3. BVC-Does your company meet Dane County's Best Value Contracting requirements for this project?* |
| 3.3.4. Enter the date (MM-DD-YY) in which your company was approved as a Dane County Best Value Contractor.* |
| 3.3.5. Fair Labor Practice Certification* |
| 3.3.6. Please supply your supplemental documents in the file upload. |
| 3.3.7. Emerging Small Business Report* |
| 3.3.8. Bidder has reviewed and acknowledges all Q&A.* |
| 3.3.9. I understand that if any addendum is issued, I will have to acknowledge the posted addendum.* |
| 3.3.10. W9 Upload* |
| 3.4. SIGNATURE DECLARATION |
| 3.4.1. RFB Solicitation Response Declaration * |
| 3.4.2. Electronically signed by:* |
| 3.4.3. Signed on: * |
4. Bid Submission - Pricing