This construction proposal document is issued by the Louisiana Department of Transportation and Development (LA DOTD) for State Project No. H.972619, a movable bridge repair project located on LA Route 27 over Bayou Kelso in Cameron Parish. The project involves removal and rebuild of both span cylinders with replacement of all seals and rods, repainting of cylinders, replacement of clevis and rod end pins, testing of cylinders, and reset of the span rotary limit switch. The work is classified as Heavy Construction, and bidders must be licensed under LA R.S. 37:2150-2165. Electronic bids and bid bonds are mandatory and must be submitted through www.bidx.com prior to September 22, 2026, at 10:00 a.m. Prospective bidders are required to register online with the project manager. The project engineer is Vicki Ponthieux (1616 Weekly Rd., Sulphur, LA 70663; 337-527-3030), and the project manager is Jason Michiels (jason.michiels@la.gov; 225-379-1962). The contract duration is thirty (30) working days, with a 30-calendar-day assembly period allowed prior to the start of contract time assessment. All plans, proposals, addenda, and amendments are available exclusively in electronic format on the LA DOTD website.
The estimated cost range for this project is $100,000.00 to $250,000.00, with the actual estimate value to be published at bid opening for award determination. A bid bond in the amount of five percent (5%) of the total bid amount is required for bids exceeding $100,000. The project is not designated for payment adjustments for asphalt cements, fuels, or steel. Specifications are governed by the 2026 Louisiana Standard Specifications for Roads and Bridges as amended by the project specifications and special provisions. Lane closures are restricted from 6:00 a.m. to 8:00 a.m. and 3:00 p.m. to 5:00 p.m. on weekdays, with full bridge closures requiring coordination with the project engineer. No work is permitted during specified holiday periods or in preparation for weather events. The contractor must furnish all necessary machinery, tools, materials, and labor, and must maintain traffic from the beginning of the assembly period through contract completion. Insurance requirements specify minimum coverage of $500,000 for Commercial General, Business Automotive, and Owner's and Contractor's Protective liability for projects valued under $500,000.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A-1 8/20/2026 1:27 PM
STATE OF LOUISIANA
DEPARTMENT OF TRANSPORTATION AND
DEVELOPMENT
CONSTRUCTION PROPOSAL
STATE PROJECT NO. H.972619
CONTROL SECTION NO. 031-03
LA 27: BAYOU KELSO MB SPAN CYL RPR
ROUTE LA 27
CAMERON PARISH
20 August 2026
TABLE OF CONTENTS
B-1
Page No.
Title Sheet A-1
Table of Contents B-1
Notice to Contractors C-1 thru C-3
Special Provisions D-1 thru D-15
Technical Special Provisions E-1 thru E-18
Construction Proposal Information:
Bid Bond F-1 thru F-2
Schedule of Items G-1
Construction Proposal Signature and Execution Form H-1 thru H-2
NOTICE TO CONTRACTORS (01-26) (LB)
C-1
Electronic bids and electronic bid bonds for the following project will be downloaded by the Louisiana
Department of Transportation and Development (LA DOTD) on Tuesday, September 22, 2026. Paper bids and paper bid bonds will not be accepted. Electronic bids and electronic bid bonds must be submitted through www.bidx.com prior to the electronic bidding deadline. Beginning at 10:00 a.m., all bids will be downloaded and posted online at http://wwwapps.dotd.la.gov/engineering/lettings/. No bids are accepted after
10:00 a.m. The electronic bid download process is held in the LA DOTD Annex Building, 1212 East Highway
Drive in Baton Rouge, LA, and is open to the public. Visitors must check-in with the project manager prior to entry.
CONTROL SECTION NO. 031-03
DESCRIPTION: LA 27: BAYOU KELSO MB SPAN CYL RPR
Non-NHS Route
ROUTE: LA 27
PARISH: CAMERON
LENGTH: 0.072 mile.
TYPE: MOVABLE BRIDGE REPAIRS AND RELATED WORK.
LIMITS: State Project No. H.972619: LOCATED ON ROUTE LA 27 OVER BAYOU KELSO.
ESTIMATED COST RANGE: $100,000.00 to $250,000.00
The estimated cost range is for informational purposes only and may be subject to change. The bid prices received from bidders will be evaluated based on the actual estimate value, which will be published at bid opening, for award determination.
PROJECT ENGINEER: PONTHIEUX, VICKI; 1616 Weekly Rd., Sulphur, LA 70663; (337) 527-3030.
PROJECT MANAGER: MICHIELS, JASON; jason.michiels@la.gov; (225) 379-1962.
PROJECT CLASSIFICATION
Bids shall be accepted from contractors who are licensed under LA R.S. 37:2150-2165 for the classification of Heavy Construction.
SPECIAL NOTICE TO CONTRACTORS: Bidders are required to certify their intent to comply with Section 102.14 of the 2026 Louisiana Standard Specifications for Roads and Bridges.
Bids must be prepared and submitted in accordance with Section 102 of the 2026 Louisiana Standard
Specifications for Roads and Bridges as amended by the project specifications, and must include all information required by the proposal.
All parties interested in bidding on this project must register with the project manager by email or phone at the contact information listed above.
C-2
ONLINE BIDDER REGISTRATION IS FOR ALL PROSPECTIVE BIDDERS AND FOR OTHERS
INTERESTED IN INFORMATION ONLY. Prior to the electronic bid submission deadline, ONLINE
BIDDER REGISTRATION for each project bid is REQUIRED. Online Bidder Registration may be accessed via the Internet at wwwsp.dotd.la.gov. Select the following options: DOING BUSINESS, then Construction
Serivces, then Bidder Registration.
When completed, a registration confirmation notice will be displayed and may be printed by the bidder. When approved for bidding, the bidder’s name will be placed on the “List of Prospective Bidders” located on the
LA DOTD Internet website. It is the bidder’s responsibility to review the “List of Prospective Bidders” to ensure approval to bid. If a bidder does not register for a project, the bid will not be accepted by LA
DOTD. As per 102.4 e) of the 2026 edition of the Louisiana Standard Specifications for Roads and Bridges, no bidders will be approved for bid registration within 24 hours before the bid opening. All bidders must register to bid before that deadline. If further information is required, please contact Mr. Alfonzo Simon, email: Alfonzo.Simon@la.gov, (225) 379-1111, fax : (225) 379-1857.
Plans and bid proposals are available in electronic format ONLY. All Plans, Proposals, Addenda, Amendments, Letters of Clarification, and Withdrawal Notices will be posted online. Paper notices will not be distributed.
Construction bid proposals (includes specifications) and plans may be accessed via the Internet at wwwsp.dotd.la.gov. To receive update notifications on specific projects, ONLINE BIDDER
REGISTRATION is required. From the LA DOTD home page, select the following options: DOING
BUSINESS, then Construction Services, then Construction Letting Info. Once the Construction Letting
Information page appears, find the Notice to Contractors box. From the drop down menu, select the appropriate letting date and press the “Go To” button to open the page, which provides a listing of all projects to be let and a Construction Proposal Documents link for each project. All project specific notices are found here. It will be the responsibility of the bidder to check for updates. Additionally, plans and specifications may be seen at the Project Engineer's office. Upon request, the Project Engineer will show the project site.
All questions concerning the plans shall be submitted via the Electronic Plans Distribution Center known as
Falcon. All submitted questions will be forwarded by email to the Project Manager and the Project Engineer.
Questions submitted within a period of 96 hours prior to the advertised time for the opening of bids, excluding
Saturdays, Sundays, and any other legal holidays, may not be answered prior to bidding. Falcon may be accessed via the Internet at wwwsp.dotd.la.gov. From the home page, select DOING BUSINESS, then
Construction Services, then select Construction Letting Info. On the Construction Letting Information page, select the link, DOTD Plans Room (Falcon); Login to Falcon (or request an ID if a first-time user). Once logged in, you will have access to view Project Information, submit a question concerning the project, and view the plans. To avoid any suggestion that a potential bidder is using the Falcon system to communicate with other potential bidders, DOTD will not post any question or any statement of fact or opinion not made for the purpose of seeking clarification of plans and/or specifications. Any non-questions posted on Falcon will be limited to the statement of an issue considered unresolved by a previous DOTD response.
Bidders assume the responsibility for accessing the Apparent Bid Results and final Bid Results on the
Construction Letting Information web page located at wwwapps.dotd.la.gov/engineering/lettings/ to confirm whether they are the apparent low bidder for any given project. The award of the contract will be electronically submitted to the successful low bidder on each project.
C-3
The U. S. Department of Transportation (DOT) operates a toll free "Hotline" Monday through Friday, 8:00 a.m. to 5:00 p.m., Eastern Time. Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should call 1-800-424-9071. All information will be treated confidentially and caller anonymity will be respected.
D-1
S.P. CONTRACT TIME (01-26):
The entire contract shall be completed in all details and ready for final acceptance in accordance with
105.17.020 within thirty (30) working days.
Prior to assessment of contract time, the contractor will be allowed 30 calendar days from the date stipulated in the Notice to Proceed to commence with portions of the contract work including but not limited to assembly periods, preparatory work for materials fabrications such as test piles, or other activities which hinder progress in the beginning stages of construction. Prior to issuance of the Notice to Proceed, the
Department will consider extending the assembly period upon written request from the contractor justifying the need for additional time.
The contractor shall be responsible for maintenance of traffic from the beginning of the assembly period.
During the assembly period, the contractor will be allowed to do patching and other maintenance work necessary to maintain the roadway with no time charges when approved by the engineer.
If the contractor begins regular construction operations prior to expiration of the assembly period, the assessment of contract time will commence at the time construction operations are begun.
S.P. GENERAL BIDDING REQUIREMENTS (01-26):
The specifications, contract and bonds governing the construction of the work are the 2026 Edition of the
Louisiana Standard Specifications for Roads and Bridges, together with any supplementary specifications and special provisions attached to this proposal.
Bids shall be prepared and submitted in accordance with Section 102 of the Standard Specifications.
The plans herein referred to are the plans approved and marked with the project number, route and Parish, together with all standard or special designs that may be included in such plans.
The bidder declares that the only parties interested in this proposal as principals are those named herein;
that this proposal is made without collusion or combination of any kind with any other person, firm, association, or corporation, or any member or officer thereof; that careful examination has been made of the site of the proposed work, the plans, Standard Specifications, supplementary specifications and special provisions above mentioned, and the form of contract and payment, performance, and retainage bond; that the bidder agrees, if this proposal is accepted, to provide all necessary machinery, tools, apparatus and other means of construction and will do all work and furnish all material specified in the contract, in the manner and time therein prescribed and in accordance with the requirements therein set forth; and agrees to accept as full compensation therefore, the amount of the summation of the products of the quantities of work and material incorporated in the completed project, as determined by the engineer, multiplied by the respective unit prices herein bid.
It is understood by the bidder that the quantities given in this proposal are a fair approximation of the amount of work to be done and that the sum of the products of the approximate quantities multiplied by the
D-2 respective unit prices bid shall constitute gross sum bid, which sum shall be used in comparison of bids and awarding of the contract.
The bidder further agrees to perform all extra and force account work that may be required on the basis provided in the specifications.
The bidder further agrees that within 15 calendar days after the contract has been transmitted to him, he will execute the contract and furnish the Department satisfactory surety bonds.
If this proposal is accepted and the bidder fails to execute the contract and furnish bonds as above provided, the proposal guaranty shall become the property of the Department; otherwise, said proposal guaranty will be returned to the bidder; all in accordance with 103.4.
S.P. MANDATORY ELECTRONIC BIDS
AND ELECTRONIC BID BONDS SUBMISSION (01-26):
This project requires mandatory electronic bidding. All Specifications, whether Standard, Supplemental or
Special Provisions, are hereby amended to delete any references regarding paper bids and the ability to submit paper bid forms.
The contractor shall register online to be placed on the Louisiana Department of Transportation and
Development (LA DOTD) prospective bidders list or for information only list.
Modifications to proposal documents will be posted on the Department’s website at the following URL address: http://wwwapps.dotd.la.gov/engineering/lettings/.
LA DOTD shall not be responsible if the bidder cannot complete and submit a bid due to failure or incomplete delivery of the files submitted via the internet.
S.P. MAINTENANCE OF TRAFFIC (01-26)
Section 104.3 of the 2026 Louisiana Standard Specifications for Roads and Bridges is amended to include the following:
Lane closure and work hour restrictions shall be as follows:
No lane closures allowed from 6:00 am to 8:00 am and 3:00 pm to 5:00 pm weekdays. Coordinate full bridge closures with the project engineer.
No work shall be allowed and all lanes shall be open during New Year’s, Mardi Gras, Easter, Memorial
Day, Independence Day, Labor Day, Thanksgiving, Christmas holiday periods, and other events as
D-3 directed by the Engineer. No work shall be allowed and all lanes shall be open in preparation for weather events such as hurricanes, ice storms, etc, as deemed necessary, or during hurricane evacuation and contra flow operations. These periods shall be considered excusable, non-compensable.
S.P. Plans and Submittals (06-26)
Section 105.2 of the 2026 Louisiana Standard Specifications for Roads and Bridges has been amended to delete and replace the first paragraph as follows:
105.2 PLANS AND SUBMITTALS
Conform to 801.3.010 for format of plans and submittals.
S.P. PERMITS, LICENSES, TAXES, AND INSURANCE
(Letter Bid) (01-26)
107.2 of the 2026 Louisiana Standard Specifications for Roads and Bridges is amended as follows:
107.2 PERMITS, LICENSES, TAXES AND INSURANCE
Proof of insurance meeting the requirements of 107.2, with the following exceptions, must be supplied with the executed contract.
1) The minimum insurance requirement for Commercial General, Business Automotive, and Owner’s and Contractor’s Protective (OCP) liability for projects valued under $500,000.00 is $500,000.00.
2) The minimum insurance requirement for Commercial General, Business Automotive, and Owner’s and Contractor’s Protective (OCP) liability for projects valued between $500,000.00 and $1,000,000.00 is $1,000,000.00 as specified in Table 107.2-1 of the latest version of the Louisiana Standard Specifications for Roads and Bridges.
3) For non-highway/bridge contracts under $100,000.00, an OCP policy is not required. For these instances, the State of Louisiana, Louisiana Department of Transportation and Development must be added as additional insured to all Commercial General Liability policies.
The policies shall be in effect during the anticipated period of work. The contracting authority shall maintain the insurance certificate in the project records. The A.M. Best rating of the insurance companies can be checked at www.ambest.com/.
D-4
S.P. DETERMINATION AND
EXTENSION OF CONTRACT TIME (01-26):
Subsection 108.7 of the 2026 Louisiana Standard Specifications for Roads and Bridges is deleted and replaced with the following:
108.7 DETERMINATION AND EXTENSION OF CONTRACT TIME
The number of days allowed for completion of the work will be stated in the contract.
When the contract time is a fixed calendar date, it shall be the date on which all work on the project shall be completed.
The contract time for the work as awarded is based on the original quantities as defined in 102.5 and includes time to procure material, equipment and an adequate labor force to complete the work. If satisfactory fulfillment of the contract requires performance of work in greater quantities than those specified, or requires performance of extra work in accordance with 104.2 and the contractor requests additional contract time, the document authorizing or ordering alterations will show the number of additional days justified.
If the contractor finds it impossible, for reasons beyond the contractor's control, to complete the work within the contract time as specified or as extended in accordance with the provisions of this subsection, the contractor shall, at the time the delay occurs make written request to the engineer for an extension of time setting forth therein the reasons which justify granting the request. Such written request shall include an explanation of circumstances where delays resulted from action or inaction of the Department, plan errors, disagreements with the Department’s interpretation of the plans and specifications, or other verifiable causes. Submit an adjusted project schedule demonstrating the impact on contract time. The adjusted schedule must include all previously approved extensions of contract time. If the request does not so conform, the contractor hereby agrees to and shall be deemed to have expressly waived any claim for such additional time. The contractor's plea that insufficient time was specified is not a valid reason for extension of time. If the engineer finds that the work was delayed because of conditions beyond the control and without the fault of the contractor, the engineer may extend the contract time in such amount as conditions justify.
Upon satisfactory final inspection, daily time charges will cease.
D-5
S.P. COMPENSATION FOR
ALTERATIONS OF THE CONTRACT (07-26)
109.4 of the 2026 Louisiana Standard Specifications for Roads and Bridges is amended as follows:
109.4.030.B. is deleted and replaced with the following:
B. Direct Materials
For materials accepted by the engineer and used, the contractor shall receive the actual cost of such materials delivered to the work, including transportation charges if applicable and sales taxes subject to the requirements of 107.2.
109.4.030.C.3. is deleted and replaced with the following:
3. Operating Cost
When internal rates are used for cost recovery, equipment operating cost will be reimbursed for the actual hours used in work. Intermittent breaks throughout the day will not be deducted while the equipment is dedicated solely to the force account work. When using guide book rental rates, only the operating cost will be reimbursed at an hourly rate over 8-hours per day. Reimbursement will stop when the equipment is no longer needed.
Pickups for superintendents and employee transport are non-compensable; when directly used in performance of the work, pickups will be reimbursed at $150/day with no markup.
The cost of service trucks and other support equipment will be considered compensable.
Standby will be reimbursed as follows, with a maximum reimbursement of 8-hours per day, 40-hours per week, and 22-days per month:
∗ (𝑎𝑔𝑟𝑒𝑒𝑑 𝑟𝑎𝑡𝑒 − 𝑜𝑝𝑒𝑟𝑎𝑡𝑖𝑛𝑔 𝑐𝑜𝑠𝑡𝑠)
Standby will not be reimbursed for periods when the equipment would ordinarily be idle
(weekends, holidays, adverse weather, periods of repair and maintenance)
S.P. PAYMENT FOR STOCKPILED
OR STORED MATERIAL (01-26)
Section 109 of the 2026 Louisiana Standard Specifications for Roads and Bridges is amended as follows:
D-6
109.6.010 is deleted and replaced with the following:
109.6.010 GENERAL
Payment for stockpiled or stored material will be considered only for materials anticipated to be stored for periods in excess of 30 calendar days. When approved, advance payments may be made for fabricated or natural materials that are to be incorporated in the project when stockpiled materials are stored on the project or in a dedicated stockpile at an approved site outside the limits of the project within the State of Louisiana. Payments shall be limited to durable materials described herein and shall represent a significant portion of the project cost. Perishable articles and small warehouse items are not included. These materials shall meet the requirements of the specifications. Payment for stockpiled or stored materials will not constitute acceptance. It shall be the contractor's responsibility to protect the material from damage while in storage.
Payment for materials stored outside the State of Louisiana will be considered, subject to approval of the Chief Engineer. This will generally be limited to adjacent states, except in cases where it will be in the best interest of the Department to pay for these materials. If payment for stockpiled materials outside the State will affect the bid price for an item, the contractor shall submit a written request to the
Chief Engineer prior to bidding.
Payment may be made for the invoice price for the materials, which shall not exceed 85 percent of the contract price for the items where the materials are to be incorporated. For fabricated materials purchased from commercial sources and delivered to approved storage, partial payment may be the invoice price plus freight and taxes subject to the requirements of 107.2. The quantity of material for payment will not exceed the total estimated quantity required to complete the project.
The amounts advanced on stockpiled or stored materials will be recovered by the Department through deductions made on payments as the materials are incorporated in the work.
Partial payment for stockpiled materials shall be requested by the contractor in writing and the following documents shall be furnished:
a) A copy of the invoices from supplier or manufacturer verifying the cost and quantity of material.
b) If storage is on private property, a copy of the lease or agreement granting the Department right of entry to property.
Within 30 calendar days after payment by the Department, the contractor shall submit a certified copy of invoices from the supplier for each item for which payment has been made. All such invoices submitted shall state the amount received by the supplier as payment in full for the materials. If this certification of payment is not presented within the 30 day period, the advanced payment will be deducted from future progress payments.
Title and ownership of materials for which advancements have been made by the Department shall not vest in the Department until such materials are incorporated in the work and the work accepted by the
Department. The making of advancements by the Department shall not release the contractor from the responsibility for any portion thereof.
D-7
S.P. NOT DESIGNATED FOR
PAYMENT ADJUSTMENTS (01-26):
Section 109 of the 2026 Louisiana Standard Specifications for Roads and Bridges is amended to add the following:
109.9 PAYMENT ADJUSTMENTS
This project is not designated for payment adjustments for asphalt cements, fuels, or steel.
S.P. TEMPORARY TRAFFIC CONTROL (06-26)
Section 713 of the 2026 Louisiana Standard Specifications for Roads and Bridges is revised as follows:
Section 713.1 is deleted and replaced as follows:
713.1 DESCRIPTION
Furnish, install, maintain, and remove temporary construction barricades, precast concrete barriers, lights, signals, pavement markings, curb ramp devices, pedestrian audible direction devices, channelizing devices, and signs; provide flaggers; and comply with all other requirements regarding the protection of the work, workers, and safety of the public. Unless otherwise noted in the plans or special provisions, this work also provides for traffic control management in compliance with the Manual On Uniform Traffic
Control Devices (MUTCD), including the installation, inspection, maintenance, and removal of all traffic control devices relative to work on the project. Signs, barricades, barriers, channelizing devices, pavement markings, curb ramp devices, pedestrian audible direction devices, or any other temporary traffic control measures shall comply with plan details, Temporary Traffic Control Standard Plans, the MUTCD, and these specifications.
Signs, barricades, barriers, channelizing devices, pavement markings, and arrangements thereof, as shown on the plans, are minimum requirements. Furnish and install appropriate signs for special conditions as directed. Requirements for proper signs, barricades, barriers, channelizing devices, or other safety precautions promulgated by the contractor’s insurers are not negated by these specifications.
These specifications shall not be construed to relieve the contractor of responsibilities for the safety of the public, for liability in connection therewith, or compliance with state and local laws or ordinances.
Furnish and install Temporary Pedestrian Longitudinal Channelizing Devices (TPLCD) that are fully compliant with the MUTCD and ADA for use on temporary pedestrian access routes. The TPLCD shall have continuous detectable edging and be capable of creating a continuous pedestrian path via connection points. The TPLCDs are to be installed per the plans. The TPLCD shall comply with all MASH requirements.
D-8
Furnish and install Temporary Curb Ramp Devices (TCRD) that are fully ADA compliant for temporary pedestrian access where a pedestrian facility and the roadway intersect per the plans. . The TCRD is only to be installed where curbing is 9 inches or less.
Furnish and install Temporary Pedestrian Audible Direction Devices (TPADD) that are fully MUTCD and
ADA compliant per the plans. TPADDs are intended to provide guidance for pedestrian through Temporary
Traffic Control zones.
Assign one or more authorized Traffic Control Supervisors (TCS) to provide traffic control management for the project. If assigning more than one TCS, then submit a weekly schedule identifying who will be in charge of providing traffic control management on a daily basis to the engineer. The TCS shall have a set of all contract documents relating to traffic control (and traffic staging if applicable), a current copy of the
MUTCD, and a current copy of Temporary Traffic Control Standard Plans readily available at all times.
If a subcontractor provides traffic control management, the subcontractor’s TCS shall meet all the requirements set forth herein.
The contractor may assign one or more Traffic Control Technicians (TCT) to assist the TCS in inspection and maintenance of Traffic Control Devices.
Section 713.2 is amended to include:
713.2.030 TEMPORARY CURB RAMP DEVICES
The TCRD shall be made from a weather resistant material. The TCRD shall not be made of wood. The
TCRD shall match the width of the connecting pedestrian facility once fully installed. The walking surface of the TCRD shall be slip-resistant. Once installed the TCRD shall not have a running slope greater than 1:12 (8.3%) or a cross-slope greater than 1:48 (2%). The TCRD shall be designed to have a detectable edges to help provide guidance for mobility aids per ADA. The TCRD shall have a detectable warning surface per ADA.
713.2.040 TEMPORARY PEDESTRIAN AUDIBLE DIRECTION DEVICE
The Temporary Pedestrian Audible Direction Device (TPADD) shall be capable of recording a message to direct the pedestrian along the detour path as shown on the plans. At a minimum, the TPADD shall be able to store a message of 60 seconds. All messages are to be clear and direct for the pedestrian to understand the directions being provided. The TPADD shall have a non-volatile storage for the message. The message on the TPADD activation shall be either via passive actuation or by actuating an ADA compliant button, per MUTCD. If provided, the passive actuation shall have a minimum range of
10 feet from the TPADD with an 8 feet wide detection cone. The speaker system on the TPADD shall be capable of automatically adjusting volume levels based on ambient noise.
The TPADD shall have a minimum NEMA4 rating or equivalent. The housing shall be tamper resistant.
All electrical components are to be stored within the TPADD housing. The TPADD shall be capable to play a 60 second message a minimum of 3,000 times on a single battery charge. Installation of the
TPADD shall be on Temporary Pedestrian Channelizing Devices or on a provided ADA compliant support per the manufacturer’s recommendation.
D-9
713.2.050 TEMPORARY PEDESTRIAN LONGITUDINAL CHANNELIZING DEVICES
The TPLCD shall have both a hand-trailing edge and a detection plate. The hand-trailing edge shall have smooth, rounded edging where pedestrians may touch. The hand-trailing edge shall be between
32 inches and 38 inches above the walkway. The detection plate shall be a maximum of 2 inches above the walkway. The TPLCD shall have a minimum length of 48 inches per section. TPLCD shall be capable of interlocking to form longer runs.
Reflective sheeting on the TPLCD shall meet the requirements of ASTM D4956, Type III. Stripes on
TPLCDs shall consist of alternating orange and white retroreflective diagonal stripes, located at the top and/or bottom of the device to enhance visibility. The TPLCD shall be constructed of polycarbonate or another non-conductive material at locations where pedestrians’ hands may be placed. The TPLCD shall also be capable of accommodating signage.
Section 713.3 is amended to delete and replace 713.3.070.C. 2) as follows:
2) Full size original contract drawings. Submit change order drawings on high quality, 4-mil, double-matte film using a plotting or reproduction process that fuses the graphics to ensure durability. Repeated handling and friction due to stacking of plans shall not smear, flake or rub off the graphics. Improper plotter settings and plotter wear may cause inconsistent durability of the drawings. Test samples of the submitted drawings for durability. Advance samples of matte films may be submitted for approval; however, the contract plans will be tested separately. Failures will result in rejection of the submittal. Drawing sizes shall comply with 801.3.010.
Section 713.3 is amended to include:
713.3.090 TEMPORARY PEDESTRIAN FACILITIES
All installations shall meet the requirements stated in PROWAG and in the Americans with Disabilities
Act Accessibility Guidelines (ADAAG).
A. Temporary Curb Ramp Devices
The Contractor shall install TCRD per the manufacturer’s recommendation. The TCRD shall have a 48 inch by 48 inch turn space present once installed. The Contractor shall submit the manufacturer’s technical data, specifications and installation instructions for the temporary curb ramp to the Engineer for record.
B. Temporary Pedestrian Audible Direction Device
The Contractor shall install the TPADD per the manufacturer’s recommendation at the locations noted on the plans. The Contractor shall submit the manufacturer’s technical data, specifications, and installation instructions for TPADD to the Engineer for record.
C. Temporary Pedestrian Longitudinal Channelizing Devices
The Contractor shall install TPLCD per the manufacturer recommendation; this may include counter weights or other hardware to keep the device upright. Any counter weights used by the
D-10
TPLCD shall not be placed within a pedestrian path. The supports of the TPLCD shall not protrude into the temporary pedestrian facilities. The TPLCD shall be placed so that the stripes slope downward in the direction road users are to pass. Connection hardware between interlocking devices shall provide a continuous detectable edge and prevent gaps that could allow pedestrians to leave the designated path. This edging shall be continuous throughout the length of the temporary pedestrian facility, except at locations where pedestrians are turning or crossing. TPLCD shall be placed in accordance with the plans.
The Contractor shall submit the manufacturer’s technical data, specifications, and installation instructions for the devices to the Engineer for record.
Section 713.4 is amended to include:
713.4.060 TEMPORARY PEDESTRIAN FACILITIES
TCRD will be measured per each and shall include any incidentals required for installation.
TPADD will be measured per each.
TPLCD will be measured per linear foot and shall include any incidentals required for installation.
Section 713.5 is amended to include:
Payment for TCRD will be made at the contract unit price per each.
Payment for TPADD will be made at the contract unit price per each.
Payment for TPLCD will be made at the contract unit price per linear foot.
Payment will be made under:
Item No. Pay Item Pay Unit
713-12 Temporary Pedestrian Facilities Each
713-13 Temporary Pedestrian Longitudinal Channelizing Devices Linear Foot
S.P. FABRICATION OF ALUMINUM SIGN PANELS (05-26)
Section 729.3.020 of the 2026 Louisiana Standard Specifications for Roads and Bridges has been deleted and replaced with the following:
729.3.020 FABRICATION OF ALUMINUM SIGN PANELS
A. General
Complete metal fabrication including shearing, cutting, and punching of holes prior to surface treatment of metal and application of sheeting. Cut metal panels to size and shape; free of buckles, warps, dents, cockles, burrs, and defects resulting from fabrication. Surface of sign panels shall be flat.
D-11
Splice plates joining sign panels shall not extend behind horizontal sills. Flat aluminum panels shall be a nominal 0.080 inch thick. Extruded aluminum panels shall be 12 inches wide and have a nominal face thickness of 0.125 inches.
The completed product shall have a surface free of cracks, blisters, blemishes, and wrinkles. Finished signs with defects or defect repairs via patching, taping, or marker concealment will not be accepted.
B. Aluminum Surface Treatment
Provide surface treatment as specified herein or in accordance with approved recommendations of the retroreflective sheeting manufacturer.
1. Degreasing
a. Vapor Degreasing
Immerse panels in a saturated vapor of organic solvent. Remove trademark printing with lacquer thinner or a controlled alkaline cleaning system.
b. Alkaline Degreasing
Immerse panels in a tank containing alkaline solutions, controlled and titrated to the solution manufacturer’s specifications. Immersion time shall depend upon amount of contaminants present and thickness of metal.
2. Etching
a. Acid Etch
Etch the panels in a 6 to 8 percent phosphoric acid solution at 100°F. Rinse the panels thoroughly with running cold water followed by hot water tank rinse.
b. Alkaline Etch
Etch pre-cleaned aluminum surface in an alkaline etching material controlled by titration, using time, temperature, and concentration specified by solution manufacturer. Rinse thoroughly. Remove smut with an acidic, chromium compound solution specified by solution manufacturer and thoroughly rinse.
3. Drying Panels
Dry panels with a forced hot air drier. Handle panels with clean canvas gloves or other approved methods between cleaning and etching operations and sheeting application. Protect cleaned panels from grease, oil or other contaminants prior to application of retroreflective sheeting.
D-12
C. Sheeting Application
Apply retroreflective sheeting in accordance with the accepted written recommendations of the sheeting manufacturer. Apply retroreflective sheeting directly to extruded panels with no more than two splices per sign. Carefully match sign faces comprised of two or more pieces of retroreflective sheeting for color at the time of sign fabrication to provide uniform appearance and brilliance, both day and night. Apply legend by one of the following methods:
1. Direct Applied
Legend shall be adhesive coated retroreflective sheeting as specified in 1015.5.
Apply legend so as to provide a wrinkle-free surface.
2. Screened
Apply legend to sign faces by an approved screening process in accordance with the retroreflective sheeting manufacturer’s recommendations. Completed screen surface shall be uniform in color, have sharp edges, be free of bubbles, show good workmanship, and be free of blemishes, streaks, or spotted areas. Screening on sheeting may be accomplished either before or after application of sheeting to panels.
3. Overlay Film
Apply legend to the sign faces by an approved transparent electronic cuttable overlay film compatible with the retroreflective sheeting to which it is applied. Apply in accordance with the recommendations of the manufacturer(s) of both the film and the retroreflective sheeting. Areas covered by film shall have sharp edges, be free of bubbles and blemishes, and show good workmanship.
4. Digital Printing
Produce digitally printed signs using a digital printing system as described in Section
1015.7.030 and in accordance with the recommendations of the manufacturer of the retroreflective sheeting.
Finished signs shall have a UV-protective clear overlay film applied to the entire face of the sign as recommended by the manufacturer.
Completed printed surface shall have sharp edges, be free of bubbles, blemishes, streaks or spotted areas, and show good workmanship.
Fabricators shall conduct operations in accordance with the recommendations of the manufacturer of the retroreflective sheeting being used to produce the signs. Sign fabricators using digital imaging methods to produce regulated traffic signs must be certified by the retroreflective sheeting manufacturer whose materials are used to
D-13 produce the delivered signs. Certified sign fabricators must undergo an audit process by the sheeting manufacturer to ensure they have the proper equipment, manufacturing capabilities, manufacturing application processes and the materials required to fulfill the sheeting manufacturer’s warranty obligations. Sign fabricators must recertify annually with retroreflective sheeting manufacturers or utilize a 3rd party certifier approved by the retroreflective sheeting manufacturer. Fabricator shall provide proof of certification with the sign design submittals.
D. Packaging
Before being packed, allow signs to dry according to manufacturer’s recommendations.
Slip sheet signs and pack to ensure arrival at their destination in an undamaged condition. Do not allow packaged signs to become wet during storage or shipment.
E. Sheeting Contrast Requirements
Signs fabricated using retroreflective sheeting must meet the contrast requirements in Table 729.3.020-1.
Table 729.3.020-1
Permanent Signs Retroreflective Sheeting Contrast Requirements1
Sign Background Legend
All Permanent Signs except for Overhead
Mounted and Regulatory (Stop, Yield, and
Pedestrian)
Type IV2 Type IV2
Overhead Mounted Signs Type IV2,3 Type
XI2,4
Regulatory Signs (Stop, Yield, and Pedestrian)5 Type XI Type XI
1Does not apply to digitally printing, silk screen paste, or overlay film.
2ASTM D4956.
3Sign sheeting used for backgrounds of overhead mounted signs shall meet but not exceed an ASTM D4956 type with retroreflectivity performance of Type IV.
4Use a uniform sheeting type for legends on signs of the same support.
5R1-1; R1-2; R1-2aP; R1-2bP; R1-2cP; R1-3P; R1-5; R1-5b; R1-5d,5e; R1-6,6a;
R1-6d,6e; R1-9,9a; R1-9d,9e; R1-10P
S.P. Bridge Operation Manuals (06-26)
Section 820 of the 2026 Louisiana Standard Specifications for Roads and Bridges has been amended as follows:
Section 820.3.020.B.1 is deleted and replaced as follows:
D-14
1. Bridge Operation Manual
Prepare and submit a Bridge Operation Manual to the Bridge Engineer for review.
This manual is a reference for the Bridge Operator, and it shall include a written description of span operation under normal conditions, a written description of span operation under all possible fault conditions, and a troubleshooting guide. The Engineer of Record will supply the information in this manual to the contractor as a single PDF file.
Print and provide two paper reproductions of the Bridge Operation Manual to the Bridge
Engineer for review. For bidding purposes, allow a review period of 21 calendar days.
Format shall be letter size sheets of high quality, opaque, white bond paper with a minimum
20 pound weight, minimum 95 percent brightness, and an outside edge measuring 8.5 inch x
11 inch.
Provide each manual with a white, premium, heavy duty, 3 D-ring binder with title sleeve.
Binders shall be appropriately sized to hold enclosed material, and shall be extra wide to accommodate sheet protectors. Binders shall not be larger than 3 inches. Use multiple binders if necessary.
Provide each sheet with a top loading, 8 ½ inch x 11 inch, standard weight, clear, sheet protector. Fold half-scale plan sheets in half with printed material facing out, and insert in sheet protectors.
Provide a top loading, 8 ½ inch x 11 inch, standard weight, clear, tab index sheet protector with labeled tab to delineate sections.
If the paper reproductions of the Bridge Operation Manual are rejected after review, the title sheet of both copies will be stamped “Returned for Correction,” and both copies will be returned to the contractor with instructions for corrections. Correct errors and resubmit to the
Bridge Engineer for review. This process will repeat until the Department has no comments.
The title sheet will then be stamped “Accepted in accordance with LSSRB 105.2,” initialed and dated by the reviewer, and distributed by the Department.
S.P. Deliverables (06-26)
Section 821 of the 2026 Louisiana Standard Specifications for Roads and Bridges has been amended as follows:
Section 821.3.050.F.2. is deleted and replaced as follows:
2. Deliverables
After the electronic submittal process has been completed, provide two paper reproductions of the mechanical operation and maintenance manual to the Bridge Engineer for review. For bidding purposes, allow a review period of 14 calendar days.
D-15
Format shall be letter size sheets of high quality, opaque, white bond paper with a minimum
20 pound weight, minimum 95 percent brightness, and an outside edge measuring 8.5 inch x
11 inch.
Provide each manual with a white, premium, heavy duty, 3 D-ring binder with title sleeve.
Binders shall be appropriately sized to hold enclosed material, and shall be extra wide to accommodate sheet protectors. Binders shall not be larger than 3 inches. Use multiple binders if necessary.
Provide each sheet with a top loading, 8 ½ inches x 11 inches, standard weight, clear, sheet protector. Fold half-scale sheets in half with printed material facing out, and insert in sheet protectors.
Provide a top loading, 8 ½ inches x 11 inches, standard weight, clear, tab index sheet protector with labeled tab to delineate sections.
If the paper reproduction of the manual is rejected after review, the title sheet of both copies will be stamped “Returned for Correction,” will be initialed and dated by the reviewer, and both copies will be returned to the contractor with instructions for corrections. Correct errors and resubmit to the Bridge Engineer for review. This process will repeat until the Department has no further comments. The title sheet will then be stamped “Accepted in accordance with
LSSRB 105.2,” initialed and dated by the reviewer, and distributed by the Department.
TS-ITEMS:
These items are described in the Technical Special Provisions as included elsewhere in the construction proposal and in the plans.
Payment will be at the contract unit price under the following:
TS-821-01100 Swing Span Bridge Machinery (Span Cylinder Repair)
STATE OF LOUISIANA
DEPARTMENT OF TRANSPORTATION AND
DEVELOPMENT
MECHANICAL
TECHNICAL SPECIAL PROVISIONS
STATE PROJECT NO. H.972619
LA 27: BAYOU KELSO MB SPAN CYL RPR
CAMERON PARISH
JULY 22, 2026
E-1
TECHNICAL SPECIAL PROVISIONS
TABLE OF CONTENTS
Division Section Title Pages
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
000107 SEALS PAGE 1
DIVISION 01 – GENERAL REQUIREMENTS
011000 BRIDGE REPAIRS 1
DIVISION 09 – FINISHES
099713.26 MACHINERY COATINGS 10
DIVISION 34 – TRANSPORTATION
348100 BRIDGE MACHINERY 2
END OF TABLE OF CONTENTS
E-2
LA 27: BAYOU KELSO MB SPAN CYL RPR TECHNICAL SPECIAL PROVISIONS
STATE PROJECT NO. H.972619 BRIDGE MAINTENANCE
SEALS PAGE 000107 - 1
DOCUMENT 000107 - SEALS PAGE
1.1 DESIGN PROFESSIONALS OF RECORD
A. SPECIFICATIONS: The following specification sections were prepared by me or under my direct personal supervision:
1. Jason Michiels, License No. 36010.
END OF DOCUMENT 000107
22 July 2026
E-3
LA 27 BAYOU KELSO MB SPAN CYL RPR TECHNICAL SPECIAL PROVISIONS
BRIDGE REPAIRS 011000 - 1
SECTION 011000 - BRIDGE REPAIRS
KELSO BAYOU/HACKBERRY
Recall Number 033602
Control Section 031-03
30.0042, -93.3435
Route LA 27
Mechanical Repair #1 – Span Cylinders
1. Description of Work:
a. Remove both span cylinders and rebuild. Replace all seals per 348100.
b. Replace both rods per Section 348100.
c. Repaint cylinders according to Section 099713.26.
d. Replace both clevis and both rod end pins in-kind.
e. Test cylinders per Section 348100.
f. Reset span rotary limit switch per as-builts.
2. Pay Item: TS-821-01100 Swing Span Bridge Machinery (Span Cylinder Repair), per lump sum.
E-4
MACHINERY COATINGS 099713.26 - 1
SECTION 099713.26 - MACHINERY COATINGS
PART 1 - GENERAL
1.1 REFERENCES
A. The following Sections of the 2026 Louisiana Standard Specifications for Roads and Bridges
(LSSRB) are referenced in this specification:
Abrasives 811.2.010
Abrasive Blast Cleaning 811.3.030.D.6
Protection of the Environment, Public, and Workers 811.3.060
1.2 SUMMARY
A. This Work consists of painting of all machinery items as described herein in addition to the plans and details and will be included under the respective repair pay items, per lump sum.
B. Related Requirements:
1. SAE International AMS-STD-595A for color codes listed in this Section.
1.3 DEFINITIONS
A. AMPP: The Association for Materials Protection and Performance (formerly The Society for
Protective Coatings); www.ampp.org.
B. MPI Gloss Level 6: 70 to 85 units at 60 degrees, according to ASTM D 523.
1.4 SUBMITTALS FOR REVIEW
A. Product Data: For each type of product. Include preparation requirements and application instructions, allowable atmospheric conditions, mixing instructions, pot life at application temperature, shelf life, and Material Safety Data Sheets (MSDS).
1. Indicate VOC content.
B. Quality Control Plan: Submit a quality control plan with the following as a minimum:
1. For shop painting, submit a quality control plan conforming to AMPP-QP 3 to the
Department's Fabrication Inspector.
2. For field painting, submit a current Corporate Quality Control Plan conforming to
AMPP-QP 1.
3. Submit a plan to protect adjacent surfaces from damage by direct or indirect blasting and coating operations, including, but not limited to, wire ropes, machinery with seals, cables, E-5
MACHINERY COATINGS 099713.26 - 2
electrical conduits and conductors, grating, platforms, galvanized metals, aluminum or machined surfaces, vehicles, building exterior elements, and other surfaces that may be damaged.
C. Samples: For each type of coating system and each color and gloss of topcoat indicated.
1. Submit samples on rigid backing, 8 inches square.
2. Apply coats on samples in steps to show each coat required for system.
3. Label each coat of each sample.
4. Label each sample for location and application data.
1.5 QUALITY ASSURANCE
A. Submit documentation for record to the Project Engineer showing the Contractor performing field cleaning and painting work is certified by AMPP to the requirements of QP 1.
B. Submit documentation for record to the Project Engineer showing the Contractor performing shop cleaning and painting work is certified by AMPP to the requirements of QP 3.
C. Submit documentation for record to the Project Engineer showing the name and qualifications of the personnel performing quality control. The Quality Control Supervisor shall be certified as a NACE CIP (Coating Inspector Program) Level 3. Additional inspectors shall report directly to the Quality Control Inspector and shall be certified as a NACE CIP Level 1 or an AMPP BCI
(Bridge Coating Inspector) Level 1.
D. If the certifications expire or become invalid during cleaning and painting operations, do not perform work until reissuance of certifications.
E. Notify the Project Engineer of any change in certification status.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Store materials not in use in tightly covered containers in well-ventilated, indoor areas with ambient temperatures continuously maintained at not less than 45 deg F and relative humidity no greater than 80 percent.
1. Clearly indicate the name and address of manufacturer, manufacturer's brand name, trade name or trademark, color batch number, date of manufacture, shelf life, and special directions on each container. If the material dating is in code, provide Project Engineer the key to interpret the code.
2. Maintain containers in clean condition, free of foreign materials and residue.
3. Immediately remove materials from the job site that are damaged, rejected, deteriorated, or that have exceeded specified shelf life or storage temperatures.
4. Remove rags and waste from storage areas daily.
1.7 FIELD CONDITIONS
A. Apply coatings only when temperature of surfaces to be coated and ambient air temperatures are between 50 and 95 deg F.
E-6
MACHINERY COATINGS 099713.26 - 3
B. Do not apply coatings when relative humidity exceeds 85 percent; at temperatures less than 5 deg F above the dew point; or to damp or wet surfaces.
C. Do not spray coatings when the measured wind speed in the immediate coating area is above 15 miles per hour.
D. Do not apply coatings in snow, rain, fog, or mist.
PART 2 - PRODUCTS
2.1 GENERAL REQUIREMENTS
A. Material Compatibility:
1. Materials for use within each paint system shall be compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.
2. For each coat in a paint system, products must be recommended in writing, by topcoat manufacturer for use in paint system and on substrate indicated.
3. Provide products of the same manufacturer for each coat in a coating system.
B. Volatile organic compound (VOC) content must not exceed 3.5 pounds per gallon as applied.
2.2 METAL PRIMERS
A. High-Solids, Epoxy Mastic Primer: Aluminum-pigmented, low-stress, high-solids epoxy mastic primer, dry film thickness (DFT) of 5.0 mils per coat; suitable for application on marginally-prepared steel surfaces; minimum 80 percent volume-solids content.
1. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following:
a. The Sherwin-Williams Company; Epoxy Mastic Aluminum II.
b. Carboline Company; Carbomastic 15.
2. Gloss Level: Flat.
B. Vinyl Wash Primer: Two-component, vinyl butyral/phosphoric acid-wash primer; for use over cleaned metal surfaces and zinc rich primers as a tie coat for subsequent priming with corrosion-resistant primers or intermediate and topcoat coatings; MPI #80.
1. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following:
a. The Sherwin-Williams Company; DTM Wash Primer.
b. PPG Industries, Inc.; Spectracron 701/702.
E-7
MACHINERY COATINGS 099713.26 - 4
2.3 POLYURETHANE COATINGS
A. Polyurethane, Two-Component, Pigmented, gloss: Solvent-based, two-component polyurethane, pigmented coating with a gloss finish formulated for resistance to abrasion, weathering, chemical and solvent exposure, for use on metal surfaces, where is required.
1. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following:
a. The…