This document provides details for a federal construction contract solicitation for the Kirwin National Wildlife Refuge Project in Phillips County, Kansas. The project consists of roadway rehabilitation, aggregate base installation, riprap placement, large pipe culvert replacement, ditch reconditioning, signing, and other miscellaneous work. The contract value is estimated between $1,000,000 to $5,000,000. Only certified small business concerns may submit sealed bids by the due date specified in the solicitation, which is available on www.beta.sam.gov. In addition to registration in the System for Award Management database, contractors must complete annual representations and certifications in SAM and at www.dol.gov. The solicitation number for this opportunity is 693C73-20-B-000014.

View the file

Other files for this federal contract opportunity

Other files attached to Kirwin National Wildlife Refuge, newest first.
File Type Posted
Results of Bid Opening - KS FTFW KIRW 14(1) 104(1).pdf PDF
Amendment 0001 - KS FTFW KIRW 14(1) 104(1).pdf PDF
FP14_Eng.pdf PDF
Categorical Exclusion Form (NEPA).pdf PDF
Plans - KS FTFW KIRW 14(1) 104(1).pdf PDF
Geotechnical Report - KS FTFW KIRW 14(1) 104(1).pdf PDF
ADV_Bidders Qualifications Form.doc DOC document
SWPPP - KS FTFW KIRW 14(1) 104(1).pdf PDF
Hydrology and Hydraulics Report.pdf PDF
VETS-4212 Form.pdf PDF
IFB Solicitation - KS FTFW KIRW 14(1) 104(1).pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STORM WATER POLLUTION

PREVENTION PLAN

FHWA Project: KIRW 14(1), 104(1) Phillips County, KS

Road and Parking Lot Rehabilitation, Ditch Reconditioning, Drainage Culvert Work

Roads and Parking Lots in Kirwin National Wildlife Refuge

Stormwater Pollution Prevention Plan (SWPPP) KIRW 14(1), 104(1) Phillips County i

Stormwater Pollution Prevention Plan For:

FHWA Project: KIRW 14(1), 104(1)

Phillips County, KS Road and Parking Lot Rehabilitation, Ditch Reconditioning, Drainage Culvert Work

Operators & Contact Information:

PRIME CONTRACTOR

To be determined – contract not yet awarded

GOVERNMENT PROJECT MANAGER

Yanina Kirtley

21400 Ridgetop Circle Sterling, VA 20166

(571) 434-1556 yanina.kirtley@dot.gov

SWPPP Revision Date:

5/4/2020

Estimated Project Dates:

Start of Construction: August 3, 2020

Completion of Construction: March 5, 2021 ii

Contents

SECTION 1: SITE EVALUATION, ASSESSMENT, AND PLANNING

1.1 General Site and Permit Information

1.2 Contact Information/Responsible Parties

1.3 Sequence of Construction Activity

1.4 Site Maps

1.5 Soils, Slopes and Drainage Structures

1.6 Construction Site Area Estimates

SECTION 2: EROSION AND SEDIMENT CONTROL BMPS

2.1 Erosion Control Devices

2.2 Implementation

2.3 Maintenance, Inspection, Documentation and Removal

2.4 Emergencies

SECTION 3: FINAL STABILIZATION

SECTION 4: CERTIFICATION

SWPPP APPENDICES

Appendix A – Site Map Appendix B – FHWA Plan Sheets for Drainage; Erosion and Sediment Control Appendix C – FHWA Detail Drawings for Erosion and Sediment Control Appendix D – FHWA Standard Contract Requirements for Erosion and

Sediment Control - FP 14 Section 157 Appendix E - Inspection Report Form Appendix F – Kansas KDHE NPDES General Permit Packet

LOG OF PLAN REVISIONS

Revision Date Description of Revision Revised By 5/4/2020 Initial draft completed Chris Hansen, FHWA

SECTION 1: SITE EVALUATION, ASSESSMENT, AND PLANNING

1.1 General Site and Permit Information

Project Site:

Project Name and Address

Project/Site Name: Kirwin National Wildlife Refuge Project Street/Location: 702 East Xavier Rd City: Kirwin State: Kansas ZIP Code: 67644 County or Similar Subdivision: Phillips

Project Latitude/Longitude

Latitude: 39.651458º N (decimal degrees)

Longitude: - 99.122658 º W (decimal degrees)

(Several locations within the site, this location is based on RTE 014 Southside Drive) Latitude/longitude data source:

On March 5, 2020, the Federal Highway Administration (FHWA) submitted the Construction Stormwater Notice of Intent (NOI) for coverage under the KDHE Construction Stormwater General Permit. Copy of permit application materials are available from FHWA’s office at the Eastern Federal Lands Highway Division, 21400 Ridgetop Circle, Sterling, Virginia, 20166. Upon construction commencement, the contractor will possess all pertinent permit materials on site.

1.2 Contact Information/Responsible Parties

Operators:

Construction contractor TBD

Initial SWPPP Prepared By:

Chris Hansen Environmental Protection Specialist Federal Highway Administration Eastern Federal Lands Highway Division 21400 Ridgetop Circle Sterling, Virginia 20166

(703) 404-6272 christopher.hansen@dot.gov

1.3 Sequence of Construction Activity

The scope of the project involves roadway reconditioning (aggregate surface), ditch reconditioning, rehabilitation and replacement of culverts, riprap placement, sign replacement, and miscellaneous work in Kirwin National Wildlife Refuge. Work will encompass approximately 6.5 miles of roadway plus 2 parking lots.

Phase 1: South Side Drive RTE 014 (14+12 to 144+35) Schedule A

1. Install construction traffic control devices required for full road closure at the intersection of the

South Side Drive (RTE 014) and E Cozy Cove Road and at the intersection of South Side Drive (RTE 014) and The Kiln Road (RTE 109). Maintain access for Refuge personnel and emergency vehicles at all times.

2. Perform the following:

a. Removals

b. Drainage

c. Earthwork

d. Resurfacing

Phase 2: South Side Drive RTE 014 (172+00 to 376+38) Schedule B

1. Install construction traffic control devices required for full road closure on South Side Drive

(RTE 014) at 173+00 to the intersection of South Side Drive (RTE 014) and E 1100 Road.

Maintain access for Refuge personnel and emergency vehicles at all times.

2. Perform the following:

a. Removals

b. Drainage

Phase 3: South Side Drive RTE 014 (274+00 to 376+38) Schedule B

1. Install construction traffic control devices required for full road closure on South Side Drive

(RTE 014) at 274+00 to the intersection of South Side Drive (RTE 014) and E 1100 Road.

Maintain access for Refuge personnel and emergency vehicles at all times.

2. Perform the following:

a. Removals

b. Drainage

c. Earthwork

d. Resurfacing

The primary goal of the SWPPP is to keep soils and contaminants on the project site. To minimize the risks associated with the failure of any key perimeter control, soils and contaminants must be kept as close to their original location as possible. As the project progresses and vegetation and/or permanent erosion control measure are in place, the goal is to keep soils and contaminants in their original location.

1.4 Site Maps

Appendix A contains a map of the project area Appendix B contains copies of the project plan sheets that detail the Erosion Control Plan.

1.5 Soils, Slopes and Drainage Structures

Predominant soil types in the project area are Uly silt loam; Holdrege silt loam; Roxbury silt loam;

McCook silt loam; and Wakeen-Nibson complex.

The project area is generally flat with only minor changes in grades along roadways. There are, however, steeper slopes between roadway embankment and water crossings.

There are 3 drainage structures impacted by this project, all located along S Kirwin Lake Road:

To minimize sediment contamination into the waterways at the pipe replacement locations, floating turbidity curtains will be installed at all three locations using the methods described in FHWA’s standard specifications, FP-14.

There are no inlets or gutters that carry water within the construction area limits.

Station Type Diameter (ft) No. of Barrels 88+32 Reinforced Concrete Pipe 6 5 122+25 Reinforced Concrete Pipe 5 2 136+70 Reinforced Concrete Pipe 5 2

1.6 Construction Site Area Estimates

The area of disturbance, defined as clearing, grubbing, excavating, and grading that will impact the subgrade, is 2 acres.

The entire project area is approximately 10 acres, including roadway and parking lot reconditioning locations and culvert work. Most work on the roadway will not disturb the subgrade, therefore the disturbed area is much smaller than the project area.

SECTION 2: EROSION AND SEDIMENT CONTROL BMPS

2.1 Erosion Control Devices

The Federal Highway Administration (FHWA) provides payment for specific types of erosion and sediment controls as identified in the contract documents. During the course of the project and depending on site conditions, other types of devices may be utilized and a unit price established via change order. A brief description of typical controls, their purpose, installation and maintenance are included below. Item for which pay items were established on the original contract are denoted by an

a. Temporary Diversion Berms. * Use to divert storm runoff to stabilized slopes or temporary slope drains. Construct temporary berms as shown in the Contract Documents. Compact the berms until no further consolidation is observed, using a dozer track, grader wheel or other equipment.

b. Floating Turbidity Curtain. * Install floating turbidity curtains within a body of water to minimize the migration of silt laden water out of the construction area.

c. Filter Bag. * Furnish rot and mildew resistant bags composed of a non-woven geotextile fabric conforming to Table 713-5 (See FP-14 Standard Specifications).

d. Fiber Roll. * Furnish and install fiber roll in accordance with FP-14 713.12 and 157.06.

e. Stabilized Construction Exit * Maintain stabilized construction exits to minimize tracking of soil onto existing roads.

f. Temporary Soil Stabilization Apply seed and mulch for soil erosion protection at the rates shown in Table 157-1 of FP-14. Protect and care for seeded areas, including watering, until permanent turf establishment is in place.

g. Permanent Soil Stabilization * Control erosion on completed slopes in accordance with FP-14 Section 157.13.

Locations of each BMP are identified in the construction plans. Refer to Appendix B.

Additional specifications for erosion prevention and sediment control are addressed in FHWA’s standard specifications, FP-14 SECTION 157, a copy of which is located in Appendix D.

Specifications regarding materials for erosion and sediment control are in FP-14, 700 SERIES, available here: https://highways.dot.gov/federal-lands/specs

Furthermore, FHWA detail sheets for the installation of erosion control devices are included in Appendix C. These include:

E157-A Floating Turbidity Curtain E157-01 Stabilized Construction Exit

E157-04 Fiber Roll E157-08 Temporary In-Stream Diversion Berm Methods E157-10 Filter Bag https://highways.dot.gov/federal-lands/specs

2.2 Implementation

Sequencing

Phase I Establish Perimeter Controls Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment does not leave the project site. Perimeter controls include fiber rolls and other specified measures outside the construction limits.

Phase II Intermediate Controls Apply intermediate controls during rough grading operations. Install fiber rolls in areas surrounding the existing culverts as called out in the plans.

At the end of each day's grading operations, shape earthwork to minimize and control erosion from storm runoff.

Provide fiber roll around all stockpiled excavated roadway material. Apply temporary turf establishment to stockpiles remaining in place longer than 14 days within 7 days of stockpiling.

Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging areas.

Phase III Final Construction/ Stabilization After completion of roadway construction, finish grading slopes.

After completion of storm water drainage construction, remove filter bag, diversion berm, and fiber roll.

Remove all other perimeter controls when directed by the contracting officer (CO).

General Guidelines

Perimeter controls for each work area will be installed prior to removing vegetation or manipulating the earth from its current state in those areas. If the perimeter control is distanced from the active work area, it will also be installed prior to commencement of work.

Exceptions are as follows:

• If implementation of erosion and pollution control measures is precluded by snow cover, undertake such measures as soon as practical.

When construction activities on steep slopes (slopes of forty (40) percent or greater) cannot be avoided, the contractor must immediately initiate placement of appropriate erosion control BMPs in any exposed steep slope areas where construction activities have permanently or temporarily ceased, and will not resume for a period exceeding 7 calendar days. For vegetative cover areas, in addition to seeding, watering, mulching, and any other required activities related to the planting and establishment of vegetation, other appropriate erosion control practices such as geotextiles or erosion control mats shall be utilized. Diversion of concentrated or channelized stormwater flows around steep slopes or slope drains shall be utilized where feasible.

Vegetation shall be preserved where practical. The time period for soil areas to be without vegetative cover is to be minimized to the extent practical.

Clearing and grubbing within 50 feet of a defined drainage course shall be avoided, if feasible. Where changes to defined drainage courses are to occur as part of the project, clearing and grubbing within 50 feet of the defined drainage course shall be delayed until all materials and equipment necessary to complete the drainage change are on site. Changes to defined drainage courses shall be completed as quickly as possible once the work has been initiated. The area impacted by the construction of the drainage course change is to be re-vegetated or stabilized to minimize the length of time the area is exposed.

Contractor shall implement the following measures in accordance with Kansas NPDES General Permit Section 7.2.9:

(1) Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other wash waters. Wash waters must be free of detergents, soaps, or solvents and must be treated in a sediment basin or alternative control that provides equivalent or better treatment prior to discharge;

(2) Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste and other materials present on the site to precipitation and to stormwater except where the exposure to precipitation and to stormwater will not result in a discharge of pollutants, or where exposure of a specific material or product poses little risk of stormwater contamination (such as final products and materials intended for outdoor use);

(3) Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures;

(4) Require the contractor to provide solid and hazardous waste management including:

providing trash containers and regular site clean-up for proper disposal of solid waste such as scrap building material, product/material shipping waste, food containers, and cups; and providing containers and proper disposal for waste paints, solvents, and cleaning compounds;

(5) Require portable toilets for proper disposal of sanitary sewage;

(6) Require storing construction materials away from drainage courses and low areas;

(7) Require containment berms and drip pans at fuel and liquid storage tanks and containers;

2.3 Maintenance, Inspection, Documentation and Removal

Maintenance

Fiber roll – Inspect for buildup of excess sediment, undercutting, sags, and other failures. If the fabric becomes damaged, repair or replace as necessary. Remove sediment from behind the fiber roll when it becomes .5 feet deep at the fence.

Filter bags – Check the filter bags daily during dewatering operations for punctures, tears, or other damage, and check for capacity. Immediately cease pumping and replace damaged filter bags, or bags that have reached their rated capacity.

Diversion berms – Inspect and maintain the temporary diversion berm daily. Repair as needed after rainfall events or as directed by the CO.

Inspection and Documentation

The temporary erosion and pollution control devices need to maintain their effectiveness as long as required to contain sediment runoff. The temporary erosion and pollution control devices will be inspected and an inspection report completed every 7 days and within 24 hours of a rainfall event of .25 inch or more. The temporary erosion and pollution control devices will be monitored daily during prolonged rainfall. Any damaged measures shall be repaired or replaced by the end of the day.

Within 24 hours after each inspection, contractor shall submit an inspection report to the CO. Include the following:

(a) Date and time of the inspection;

(b) Names and titles of persons making the inspection;

(c) Summary of the inspection;

(d) Weather since the last inspection or since the start of work, if the first inspection. For each storm event, include the beginning date and time, duration, rainfall quantity in inches (millimeters), and whether discharge occurred;

(e) Weather and description of discharges occurring during the inspection;

(f) Locations of discharges or other pollutants from the site;

(g) Locations of erosion and sediment control measures that need maintenance;

(h) Locations of erosion and sediment control measures that failed to operate as designated or proved inadequate for a particular location;

(i) Locations where additional erosion and sediment control measures are needed; and

(j) Other necessary corrective actions including action taken, locations, dates, and times.

Contractor shall maintain temporary erosion and sediment control measures in working condition until the project is complete or the measures are no longer needed. Remove sediment trapped in perimeter protection control measures before deposits reach 50 percent of the above ground height. Remove sediment from sediment retention structures when their capacity is reduced to 50 percent of design capacity. Use removed sediment in the work if acceptable or dispose of it according to Subsection

204.14 of FP-14.

Replace erosion and sediment control measures that cannot be maintained and those that are damaged by construction operations.

Removal

Remove and dispose of temporary erosion and sediment control measures when vegetation is satisfactorily established and drainage ditches and channels are lined and stabilized. Remove and dispose of erosion and sediment control measures according to Subsection 203.05 of FP-14.

Restore the ground to its natural or intended condition and provide permanent erosion control measures.

2.4 Emergencies

In case of a spill emergency call:

FHWA Contracting Officer

U.S. EPA National Response Center:

(24 hours a day) (800) 424-8802

Kansas Division of Emergency Management: (KDEM) (24 hours a day) (785) 291-3333 Website:

www.ksready.gov

KDHE Spill Report Hotline:

(24 hours a day) (785) 296-1679

SECTION 3: FINAL STABILIZATION

Final Stabilization will include the installation of aggregate ditch liners slope protection, rip rap, and permanent seeding. Aggregate and concrete protection will be constructed during the course of the project in conjunction with its respective phase and in unison with temporary erosion control measures being implemented at the same time. Permanent seeding and vegetation of the project will be performed as soon as possible upon completion of the earthwork, but within established planting seasons

SECTION 4: CERTIFICATION

This SWPPP was prepared to meet all state and federal requirements. Any requirement not realized at the time of the original plan development will be included via amendment(s) at the time of realization.

Appendix A - Site Map

Appendix B - FHWA Plan Sheets for Drainage, Erosion and Sediment Control i ii" ij

RIPPRAP LOCATION DATA

Sidi.' P-Oln S 1,on Offsf.'I ft!, Cl s.s 3 IIT 1 87•37 10

2 87•10 32 3 87174 29 4 88+61 29 s a8+97 21 6 89.00 1S

' 88•96 11 CliS.S 3 LT 8 8!h00 11

!) 88•?2 27 10 88+56 27

88•09 27 12 87•90 27 13 8h3G 12

Cl » S LT 10 88+69 27 11 gg._09 27 14 88+78 60

15 88+00 60

----- Install placed riprap, method A, class 5.

88+32 Remove 40 feet of 72 inch diameter CMP culvert.

PROJECT SHEET

NUMBER

KS KS FTFW KIRW 14(1)104(1) K01

1. Place riprap according to detail E251-50A.

2. Submit the subgrade material to the CO for approval prior to the installation of culverts.

install 40 feet of 5-72 inch class 4 reinforced concrete pipe.

Install 10-72 inch FES LT/RT.

. I . . . I . . • t

] 48 inch min __ ,_·m ____ u_·=-, m thickness. [_•_•_•_•_•_•_:_:,,-------------- + J · J J l L ; L ; l l t--------+ I' :+LttLLttL!::ti . . . . . . . . . . . . . . . . . . . . . . I+++!+++ ' ~::!::~!~!~~!:~:::. 1725 l l lf!Stall geotextile, c~ass 1, type C . . • > i J > ; ; . ; i J SCAI..E l ;;;,,,;zo 1 1 i insfai1 -;{oieei:oi's~72/ncfdass4relniorcer:j . . . CROSS SECTION 1------1 ........ · ........ : ......... · ........ · ........ : ........ · ........ : .......... ........ · ........ : ......... · ........ · ........ : ........ · ........ : .......... ........ · ........ : ......... · ........ · ........ : ........ · ........ : .......... ........ · ........ : .......... ........ · ........ : ........ · ........ : .................. · ........ : .......... ·concrete pipe ....... · .................. · ........ : .................. · ........ : ........ · ........ · .......... ·

70 60 so 40 30 20 10 0 10 20 30 40

ROUTE 014

88+32

" I I i':

ij

Cl ass 3

Cl ass 5

Notes:

1.

2.

RIPPRAP LOCATION DATA

Sid e Point Station

LT 1 121+58

2 123+10

3 122+64

4 122+38

5 122+35

6 122+15

7 122+12

8 121+97

LT 5 122+35

6 122+15

9 122+49

10 122+00

Offset (ft )

11 ~ 11

Unknown size, material, and length of existing pipe culvert.

122+25 Install 52 feet of 2-60 inch class 4 reinforced concrete pipe.

Insta/14-60 inch FES LT/RT.

PROJECT

1 · · ·r · · · 1 · · ·r · · · 1 · · ·r · · · 1 · · ·r · · · 1 · · ·r · · · i · · · t · · · 1 · · ·t · · · 1

••••••••i··························••••t···························•••••••i••························••••t···························•••••••i••························•••••••t···························•••••••l··························•••• f ···························•••••••l··························•••••••t••······•········•···········•••••••l···············•···········•••••••t••······•········•···········•••••••: ................... ········•·•••••••: ........................... ·•••••••: ..... . --------:---------:---------:--------:---------=---------:---------:---------:---------=---------:---------:--------:---------=---------:---------:---------:---------=---------:---------:--------:---------:---------:---------:---------:---------=-- : : : --------i---------:---------:---------:---------=---------:---------:--------:---------:- : : --------:---------=---------:---------:---------:---------=- : : --------:---------= : : : -------= : : : -------=-- 1750 ] • ; • l • ; • 1lnStallr{Pjf;ibi~~~~;g~gicf%!tfd(1:F'tr!5x.) i • • • l • • • j • • • l • • • 1 • • • l • • • 1 • • • l • • • t • • • T

---- ---- : ---- ----:- --- ---- :--- ---- -~- ---- ---- T--- --- --{- ---- ----:--- ---- --T- ---- --- ~--- ---- --~- --- ---- :--- --- --~- ---- ----T-- ---- --{ --- ---- ! --- --- -!- --- ---- ! ---- --- -:- --- ---- : ---- --- -!- --- ---- :- -- - --- -:- - --- ---- :--

SHEET

NUMBER

K02

1-------+ __ : _: _: _: ----, -~~-••·· ~~~~~f%;~%;;Lri~~tA'. f':s':~~'••••:••····••1••••1··••l•;i . . . . ~;f ~1~•;~•~•*=+=\=;~=l;t.1 ....... t ••••• 1••···••f ••••i••····••i••···••i•·····••i••····-=1~7=3=5---1

, . , , . J . L Invert= 1_733.5' L l . _;__:::::.J::::::, ...... , r_:::J::: . c , • L L 23' RT J l J ! L L l L ; 1 --c.- r + ,::::J

1730 1730 t-------+

1 ; > ; j > < f 1 ; > ; j > < f 1 ; > ; j > ; f 1 j V~C~[Et "==iO'~ f 1 ; f ; j > ; f I ; f ; J > ; f K::IN:;~; ;I~:~E =~U~E ········]···············>··········· + ........ •.·······>······•·········i···············>··········· + ........ •.·······>······•·········i···············>··········· + ........ •.·······1 ······•·········!····j·HSCAlEf"=J:O' J ......•......... ; ................................. + ........ • .......... ········•·········i···············•··················+ ........ • ........ • ......... •. CROSS SECTION

1------1 ROUTE 014

40 30 20 10 0 10 20 30 40 122+25

Cll-ss s T

! 1740 §?

t,§ ij s s s g u;.90

1~71 1)6+.71

40 30 20 10 0 10 20 30 40

STATE PROJECT

SHEET

NUMBER

KS KS FTFW KIRW 14(1)104(1) K03

Notes:

1. Place riprap according to detail E251-50A.

2. Submit the subgrade material to the CO for approval prior to the installation of culverts.

ROUTE 014

136+70

Note:

1. ~ace riprap according to detail E251-50A o toe protectection required for embank t men.

192+77 Install placed riprap me~hod A, class 3. ' 24 mch thickness.

I ;

] I ;

oo+z ] 1

Existing travel way (typ.) j ;

Construction CL

36" CMP culvert

174+95 Begin placed riprap method A, class 3 ' 5 feet wide.

36 inch minimum thickness.

209+32 Install placed riprap method A, class 3 ' 24 inch thickness."

L ._~~~-~2~5•~~~50, SCALE IN FEET

o._w~~~-~2~5•iiiiii=~sp·

SCALE IN FEET

0 0 - -

1/) r-...

.-I

176+95 End placed riprap method A, class 3 5 feet wide.

36 inch minimum thickness.

. .. I

~-==-"~ ~ ,- --t, Construction ~ ~ \ . ~~ \ Ex1stm~ vel way (ty~ ~ oo+orz l

00+6Ll

342+84 Install placed riprap method A, class 3. ' 24 inch thickness.

STATE

KS

PROJECT SHEET

NUMBER

KS FTFW KIRW 14(1)104(1) K04

N

L 2~·

SCALE IN FEET

50' I

N Existing travel way (typ.) -

L 25'

SCALE IN FEET

50'

U.S. DEPARTMENT OF TRANSPORTATION

EAS FEDERAL HIGHWAY ADMINISTRATION

TERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

KIRWIN NATIONAL WILDLIFE REFUGE

DRAINAGE PLAN

RTE 014

174+95 TO 176+95

192+77,209+32,342+84

Project Description

Project KS FTFW KIRW 14(1)104(1) consists of roadway rehabilitation and parking area improvements. Roadway reconditioning, aggregate surface, ditch reconditioning, drainage culverts, riprap, signing, and other miscellaneous work. The project includes the routes as follows:

Schedule A:

(1) South Side Drive (South Section) (Route 014)

(2) Silver Bridge North Parking (Route 940)

(3) Silver Bridge Road (Route 106)

(4) Silver Bridge Parking A & B (Route 914)

(5) The Kiln Road End Parking (Route 909)

(6) The Kiln Road (Route 109) Schedule B:

(7) South Side Drive (North Section) (Route 014)

Soil disturbing activities include drainage construction and 1 foot on each side of the roadway was included to account for the varying width of the existing roadway. The total disturbed area for the project is approximately 2 acres.

The receiving water is Bow Creek.

Prohibited Discharges

The following discharges are prohibited:

Wash-water from concrete, paint, curing compounds, and other construction materials Fuels, oils, equipment-related compounds Soaps, solvents used for vehicle washing Waste, garbage, sanitary waste

Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to prevent contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.

Solid waste generated from the project will consist of construction debris, garbage, and empty containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.

Hazardous waste will not be generated from normal construction activities. Equipment fueling and maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water. Store all hazardous waste materials in appropriate and clearly marked containers away from other non-waste materials. Do not dispose of hazardous waste materials into the on-site dumpsters. Dispose of material according to Federal, State, and local regulations.

Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National Response Center at 1-800-424-8802.

General Guidelines

The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment. The work consists of applying measures throughout the life of the project to control erosion and to minimize the sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and the Special Contract Requirements.

Do not modify the type, size, or location of any control or practice without prior approval from the Contracting Officer (CO).

No construction access will be permitted through a wetland or waterway.

Do not allow construction vehicles to track sediment outside the project limits.

Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control measures.

Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.

STATE PROJECT SHEET

NUMBER

KS KS FTFW KIRW 14(1)104(1) M01

Sequence of Construction

Phase I Establish Perimeter Controls

Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment does not leave the project site. Perimeter controls include fiber rolls and other specified measures outside the construction limits.

Phase II Intermediate Controls

Apply intermediate controls during rough grading operations. Install fiber rolls in areas surrounding the existing culverts as called out in the plans.

At the end of each day's grading operations, shape earthwork to minimize and control erosion from storm runoff.

Provide fiber roll around all stockpiled excavated roadway material. Apply temporary turf establishment to stockpiles remaining in place longer than 14 days within 7 days of stockpiling.

Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging areas.

Phase III Final Construction/ Stabilization

After completion of roadway construction, do the following as directed by the CO:

Finish grading slopes.

After completion of storm water drainage construction, do the following as directed by the CO:

Remove filter bag, diversion berm, and fiber roll.

Remove all other perimeter controls when directed by the CO.

Maintenance and Inspection Procedures

Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices according to Section 157, the details shown in the plans, and the individual permitting requirements.

Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of

0.25 inches or more, and daily during wet weather. Repair or replace any damaged measures by the end of the day.

Fiber roll - inspect for buildup of excess sediment, undercutting, sags, and other failures. If the fabric becomes damaged, repair or replace as necessary. Remove sediment from behind the fiber roll when it becomes 0.5 feet deep at the fence.

Filter bags - check the filter bags daily during de watering operations for punctures, tears, or other damage, and for capacity. Immediately cease pumping and replace damaged filter bags, or bags that have reached their rated capacity.

Diversion berms - inspect and maintain the temporary diversion berm daily. Repair as needed after rainfall events or as directed by the CO.

Stabilized Construction Exit - Inspect the exit area weekly after heavy rains and/or heavy use. Remove and sediment tracked or washed onto public roads immediately. Reshape pad as needed for proper drainage runoff control.

Turbidity Curtain - Inspect the curtain and floats weekly. Repair any deficiencies as needed to ensure turbid water is not flowing into the larger body of water.

Record the inspection date and summary of findings within 24 hours of completing a site inspection.

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

KIRWIN NATIONAL WILDLIFE REFUGE

EROSION & SEDIMENT

CONTROL NARRATIVE

!t

I

I l

CL ,..,

Note:

@ Install filter bags at location approved by the CO.

O'I ,-j

,-j b 25'

SCALE IN FEET

50' I

Ln

CX)

CX)

P, Install 130 feet of turbitity curtain

Install 111 feet of diversion berm 11111 ~ / / I '- ', Install 1~ ,uro;d;dty curta;n I

STATE PROJECT SHEET

NUMBER

KS KS FTFW KIRW 14(1)104(1) M02

b 2~· 50' I

SCALE IN FEET

X -9~

.I'

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

KIRWIN NATIONAL WILDLIFE REFUGE

EROSION CONTROL PLAN

88+32, 122+25

Note:

@ Install filter bags at location approved by the CO.

M M

V M

Lt) M

~ 100 feet oftu,bfdfty curtain

0 o--r--.

Install 250 feet of fiber roll

/I Insta£L,,2:? feet gt turpidity curtain

Jnsr•r' ~ t of "'C dlve,s/on benn

STATE PROJECT SHEET

NUMBER

KS KS FTFW KIRW 14(1)104(1) M03

L

L

25'

SCALE IN FEET

N

25'

SCALE IN FEET

50' I

50' I

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

KIRWIN NATIONAL WILDLIFE REFUGE

EROSION CONTROL PLAN

136+70, 174+95 TO 176+95

I

Install 117 feet of fiber roll

L 25'

50' I

SCALE IN FEET

Install 121 feet of fiber roll b 25'

50'

SCALE IN FEET

Install 156 feet of fiber roll

STATE PROJECT SHEET

NUMBER

KS KS FTFW KIRW 14(1)104(1) M04

0 25' 50'

.. w~~sc~lr~E 'ii-IN'!!!FE~ET=-''

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

KIRWIN NATIONAL WILDLIFE REFUGE

EROSION CONTROL PLAN

192+77,209+32,342+84

L--------------------------------....1...-------------------....i...------------

;1 "" I I l

I l ii"

I ;,, (V') I'-.

N

Install stabilized construction exit

Install stabilized construction exit

,;:t- T-1

,;:t-r-..

N

LI)

I'-.

N

N

L li=~~-""12siii· ..... iiiii.~sp·

SCALE IN FEET

N b lii-""'""'iiiii'----t~25iii' .iii.iiiiiiiiilSO'

SCALE IN FEET

\.0 iv

I-"

OO+SL£

STATE PROJECT SHEET

NUMBER

KS KS FTFW KIRW 14(1)104(1) MOS

Install stabilized construction exit

L 1i=~--~2siii· ...... iiiiiiisp·

SCALE IN FEET

N

Install stabilized construction exit b 2~· 50'

I

SCALE IN FEET

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

KIRWIN NATIONAL WILDLIFE REFUGE

14+12, 144+35,274+00,376+38

Install 221 feet of fiber roll

L

N

25'

SCALE IN FEET

50' I

Inst.II 91 feet of fibe, roll j

Install 176 feet of fiber roll

STATE PROJECT

KS KS FTFW KIRW 14(1)104(1)

N

L 25' 50' ..... I

SCALE IN FEET

N

L 2~· 50' I

SCALE IN FEET

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

KIRWIN NATIONAL WILDLIFE REFUGE

SHEET

NUMBER

M06

14+12, 144+35,274+00,376+38

Appendix C - FHWA Detail Drawings for Erosion and Sediment Control

FLOATING TURBIDITY CURTAINS

5/8-inch polypropylene rope and grommits connection

Closed cell solid plastic foam flotation (6-inch equivalent)

Synthetic fabric skirt

1/4-inch galvanized chain (typ.)

TYPE1

Slotted connector pipe or polypropylene rope and grommet connection

5/16-inch vinyl sheathed EA W steel cable (9800 lbs.

breaking strength) with galvanized connectors

Closed cell solid plastic foam flotation (8-inch equivalent)

Synthetic fabric skirt

TYPE2

5/16-inch galvanized chain (typ.)

Slotted PVC connector pipe (metal collar reinforced)

2 each 5/16-inch vinyl sheathed EAW steel cables (18,400 lbs. breaking strength) with galvanized connectors (tool free disconnect)

Closed cell solid plastic foam flotation (12-inch equivalent)

Synthetic fabric skirt

3/8-inch galvanized chain (typ.)

See Note 7 Channel bottom

TYPE3

USAGE CHART

FLOATING MAXIMUM

TURBIDITY CURRENT ADDITIONAL

CURTAIN (ft/s) CONDTIONS

TYPE

1 0.0 No Wave\Wind\Tidal Action

2 3.5 Moving Water (one direction)

3 5.0 Increased Tidal Action

Existing shoreline (typ.)

Stake (typ.)

See note 9

Turbidity_ curtain section (typ.)

Anchor (typ.)

See Note 9

Flow

Turbid water

Clear water

Construction area

Mooring line with flotation (typ.)

PLAN VIEW - INSTALLATION FOR SHORELINE WORK

Anchor (typ.)

See Note 9

Turbidity curtain sections (typ.)

Flow

Turbid water

Clear water

STATE PROJECT SHEET

NUMBER

KS KS FTFW KIRW 14(1)104(1) S01

NOTES:

1. Install the turbidity curtain before construction activities begin.

2. Do not install the turbidity curtain where the flow of water will remove accumulated sediment or significantly move the curtain.

3. Select a turbidity curtain type to suit the site conditions and meet erosion control and water quality requirements.

4. Install turbidity curtain stakes in a vertical position unless otherwise directed by the CO.

5. Provide 3 inches of freeboard to the top of the turbidity curtain.

6. For Types 1 and 2, extend the synthetic fabric skirt through the entire depth of the water (to the channel bottom) unless tidal conditions are present.

7. For a Type 3 turbidity curtain, vary the length "D" of the synthetic fabric skirt depth to provide a ± 12-inch gap between the end of the skirt and the channel bottom at mean low water.

8. Remove captured sediment behind the curtain prior to removing the floating turbidity curtains. Do not disperse sediment into the water.

9. Install anchors made of wooden stakes (2-inch by 4-inch rectangular or 2.5-inch minimum diameter) or metal stakes (1.33 pounds per linear foot) for Type 1 applications.

Install anchors that are either weighted or that dig into the bottom of the water body for Type 2 and 3 applications.

Install anchors and stakes with a 50-foot maximum spacing

Mooring line with flotation (typ.)

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

PLAN VIEW - INSTALLATION FOR PILE WORK

NO SCALE

U.S. CUSTOMARY DETAIL

FLOATING TURBIDITY

CURTAINS

DETAIL

E157-A

Temporary 18" pipe culvert (if required)

Aggregate, AASHTO M 43, Size Number 3

(6" minimum depth)

NO SCALE

STATE

KS

NOTES:

PROJECT

KS FTFW KIRW 14(1)104(1)

SHEET

NUMBER

S02

1. Construct drainage ditches along the stabilized construction exit when required.

Install temporary 18-inch pipe culverts where the stabilized construction exit crosses existing drainage ditches.

2. Place Geotextile, Class 2, Type C, over the entire area prior to placing the aggregate.

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

U.S. CUSTOMARY DETAIL

STABILIZED CONSTRUCTION

EXIT

DETAIL APPROVED FOR USE

APPROVED: MARCH 2015

REVISED: MARCH 2018

E157-01

I i I I

Wood mulch or compost to ½ height of roll

UNTRENCHED INSTALLATION

Wood stake (typ.)

See Note 6

Fiber roll, 8" dia. (min.)

Trench into ground ½ the diameter of the roll (max.)

ENTRENCHED INSTALLATION

FIBER ROLL ISOMETRIC VIEW

Gravel bag weights at ends and 36" o.c. (typ.)

See Note 11

Flow

Fiber roll, _j 12" dia. (min.)

Flow

INLET PROTECTION

Downslope stake (typ.)

Upslope stake (typ.) Fiber roll, 8" dia. (min.)

Fiber roll, 8" dia. (min.)

Undisturbed Area

PLAN VIEW

Downslope stake (typ.)

8" dia. (min.) [ Fiber roll, Wood stake (typ.)

See Note 6

Fiber roll, 8" dia. (min.)

MAXIMUM ALLOWABLE SLOPE

LENGTH ABOVE FIBER ROLLS

SLOPE

1V:4H or Flatter 1V:4H - 1V:2H

1 V: 2H or Steeper

MAX INTERVAL

20 ft 15 ft 10 ft

Fiber roll (typ.) 1' /m;n.J ••

Wood stake (typ.)

See Note 6 ~+--_.L_--~

FIBER ROLL OVERLAP

Wood stake (typ.)

See Note 6

Flow

Flow

STATE

KS

NOTES:

PROJECT SHEET

NUMBER

KS FTFW KIRW 14(1)104(1) S03

1. Provide fiber rolls meeting the requirements of Subsection 713.12.

2. Use fiber rolls with a minimum 8-inch diameter.

For drain inlet protection, use fiber rolls with a minimum 12-inch diameter.

3. Prior to installation, clear all obstructions including rocks, clods, and debris greater than 1-inch that may interfere with proper function of the fiber roll.

4. For untrenched installation, blow or hand place mulch or compost on uphill side of the slope along the fiber roll.

5. Place fiber rolls on level grade and parallel to contours. Extend both ends of the fiber roll at least 8 feet upslope at 45 degrees to the main alignment.

6. Use wood stakes with a minimum nominal cross section of 2-inch x 2-inch and of sufficient length to attain a minimum of 12 inches into the ground and 3 inches protruding above the roll.

Furnish wood stakes meeting the requirements of Subsection 713.08(a).

7. When more than one fiber roll is needed, overlap ends 12 inches minimum and stake.

8. Remove sediment deposits when accumulation is one-half the height of the exposed fiber roll.

9. Replace biodegradable fiber rolls 6 months after installation and photodegradable fiber rolls 12 months after installation.

10. When fiber rolls are required on paved surfaces, use gravel bags to support them as shown on the inlet protection detail.

11. Provide gravel bag weights meeting the requirements of Subsection 713.13.

Wood stake (typ.)

See Note 6

FIBER ROLL CHECK DAM

SPACING TABLE

CHECK DAM

DITCH SPACING (SJ**

GRADE*

8" HIGH 12" HIGH

2% 33 ft 50 ft

3% 22 ft 33 ft

4% 16 ft 25 ft

5% 13 ft 20 ft

* Do not install check dams on grades below 2% ** Adjust spacing as approved based on site conditions

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Upslope stake, place equidistant between

Downslope stake (typ.)

U.S. CUSTOMARY DETAIL

V-DITCH TRAPEZOIDAL DITCH downslope stakes

FIBER ROLL CHECK DAM CROSS SECTIONS FIBER ROLL CHECK DAM

PLAN VIEW

NO SCALE

FIBER ROLL

DETAIL APPROVED FOR USE

APPROVED: MAY 2016

REVISED: MARCH 2018

E157-04

Existing abutment or pier

Limit of work zone

Min. Top of berm elevation

Waterproof membrane (anchoring method to be approved by the CO)

Concrete barrier

STATE PROJECT SHEET

NUMBER

KS KS FTFW KIRW 14(1)104(1)

NOTES:

1. The options shown are suggested configurations for diverting the stream during construction operations. The Contractor may choose an alternate means of diverting the stream (including any approved prefabricated or portable diversion berms, dams, etc.). As a minimum, provide a temporary diversion berm with a minimum height equivalent to the water surface elevation with 6" minimum freeboard. Submit plans for temporary stream diversion to the CO for approval prior to installation.

S04

------J,-------======-r-- water surface elevation 2. Construct temporary diversion according to Subsection 157.10.

Sandbag (typ.)

4'- 6"

Diverted water level at time of contsruction

Existing ground J - - Sandbag (typ.)

Waterproof membrane

3. Place sandbags to form a pyramid by laying equal numbers of rows on the bottom as there are vertical course. Upper rows of sandbags should overlap the joints in lower rows.

4. Place a maximum of one diversion in the stream at any given time.

5. While in use, inspect and maintain the temporary diversion berm daily. Repair as needed after rainfall events or as directed by the CO. Remove sediment when deposits reach half the height of the sandbag barrier.

6. Coordinate with U.S. Bureau of Reclamation for historic

Limit of work zone information on anticipated diverted water level based on the freeboard depth at Kirwin Dam and time of construciton . OPTION A

Waterproof membrane (anchoring method to be approved by the CO)

Concrete barrier

• I.O

,--------==:::::::===--.--- water surface elevation

OPTIONC

Diverted water level at time of construction

-J-;-- Existing ground

Um;t of worl< zone l Min. Top of berm elevation

Sandbag (typ.)

• I.O

--~f-- Min. Top of berm elevation

;:--->=-......--'-"'-=--"""'-------.------r------======-•- water surface elevation

~~"----'=v=~'\"";-----"-"v--""""'--,'--r--"i-'--v--=Ll 1

OPTIONS

Waterproof membrane (anchoring method to be approved by the CO)

Concrete barrier

I.O

-----r-------==::::'.'.:===-•-water surface elevation

OPTIOND

Diverted water level at time of construction

'~T __ _ Existing ground

NO SCALE

Diverted water level at time of construction

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

U.S. CUSTOMARY DETAIL

TEMPORARY IN-STREAM

DIVERSION BERM METHODS

DETAIL APPROVED FOR USE

APPROVED: MARCH 2015

REVISED: MARCH 2018

E157-08

WELL

VEGETATED

AREA

(typ.)

VEGETATED

AREA

Place Geotextlle, Class 2, Type A prior~ \\\:;;\\\;:'.

placing aggregate only when leveling is required

See Note 1

WELL

VEGETATED

AREA

Filter bag

TOP VIEW

SIDE VIEW

Heavy duty lifting straps

WELL

VEGETATED

AREA

Place 6" minimum depth AASHTO No. 57 coarse aggregate only when leveling is required See Note 1

Sewn in spout

Clamp

Pump discharge hose

Insert hose as specified by manufacturer and securely fasten it with metal clamps

Clamp

Pump

Intake hose

Insert hose as specified by manufacturer and securely fasten it with metal clamps

Pump discharge hose

Clamp Clamp

Intake hose

STATE

KS

PROJECT SHEET

NUMBER

KS FTFW KIRW 14(1)104(1) SOS

NOTES:

1. Locate filter bags in level areas (less than 5% grade) or as approved by the CO. When level areas are not available, place geotextile and coarse aggregate to level the filter bags.

2. Locate filter bags in areas accessible by equipment for maintenance and removal.

3. Insert a maximum of one hose in each filter bag at any given time.

4. Inspect filter bags daily. Replace filter bags when 50% of the sediment capacity has been reached or when there is a failure. Have spare filter bags on site for replacement.

5. Do not permit discharge from the filter bags to drain back into work or access areas of the project.

Discharge onto stable and erosion resistant areas.

6. Do not cut or empty filter bags on site. Restore the area according to Subsection 157.15.

NO SCALE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

U.S. CUSTOMARY DETAIL

FILTER BAG

DETAIL APPROVED FOR USE

APPROVED: FEBRUARY 2013

REVISED: MARCH 2018

E157-10

Appendix D - FHWA Standard Contract Requirements for Erosion and Sediment Control - FP 14 Section 157

Section 157

Section 157. — SOIL EROSION AND SEDIMENT CONTROL

Description

157.01 This work consists of furnishing, constructing, and maintaining soil erosion and sediment control devices to eliminate or minimize pollutants in stormwater discharges from the project.

Material

157.02 Conform to the following Subsections:

Backfill material 704.03 Concrete masonry unit 725.07(c) Fertilizer 713.03 Fiber rolls and socks 713.12 Floating turbidity curtains 713.21 Gravel bags 713.13 Mulch 713.05 Plastic lining 725.12 Prefabricated filter insert 713.20 Riprap 705.02 Rock mulch 705.07 Sandbags 713.14 Sediment filter bags 713.19 Seed 713.04 Separation and stabilization geotextile and geotextile filter 714.01(a) Silt fence 713.16 Tackifiers 713.11(a) Temporary culvert pipe 713.15 Temporary plastic fence 710.11 Temporary rolled erosion control products 713.17 Turf reinforcement mats 713.18 Water 725.01(b)

Construction Requirements

157.03 Qualifications. Submit the following for approval at least 14 days before earth disturbing operations begin:

(a) Names of personnel responsible for soil erosion and sediment control; and

(b) A résumé for each individual describing their knowledge and experience providing erosion and sediment control and pollution prevention on highway or road construction projects for at least 5 years.

Include certifications in those states where applicable.

157.04 General. Provide soil erosion and sediment control measures according to the contract erosion and sediment control plan, contract permits, Section 107, and this Section. Contract permits amend the requirements of this Section. Do not modify the type, size, or location of controls or practices without approval.

The erosion and sediment control plan reflects special concerns and measures to protect resources. An alternate erosion and sediment control or stormwater pollution prevention plan, with necessary permits, may be submitted for approval according to Subsection 104.03. Submit alternate erosion and sediment control proposals at least 30 days before their intended use.

When soil erosion and sediment control measures are not functioning as intended, take corrective action to eliminate or minimize pollutants in stormwater discharges from the project.

If wood chips are used, do not import without approval from the CO.

157.05 Controls and Limitations on Work. Before grubbing or grading construct sediment controls around the perimeter of the project including filter barriers, diversion, and settling structures.

Limit the combined grubbing and grading operations areas to 8 acres (3.2 hectares) of exposed soil at one time.

Construct and implement soil erosion and sediment control measures as follows:

(a) Construct temporary controls in incremental stages as construction proceeds;

(b) Construct temporary slope drains, diversion channels, and earth berms to protect disturbed areas and slopes;

(c) When a soil disturbing activity within a portion of the project is complete, apply permanent measures to the finished slopes and ditches within 14 days;

(d) When a soil disturbing activity within a portion of the project has temporarily ceased, apply temporary measures within 14 days;

(e) Construct outlet protection as soon as culverts or other structures are complete;

(f) Construct and maintain soil erosion and sediment controls on and around soil stockpiles;

(g) Following each day’s grading operations, shape earthwork to minimize and control erosion from stormwater runoff; and

(h) Maintain stabilized construction exits to minimize tracking of soil onto existing roads.

157.06 Filter Barriers. Construct silt fence, berms, and fiber rolls and socks to reduce the velocity of runoff to allow sediment to settle.

157.07 Sediment Retention Structures. Construct sediment retention structures of the following types:

(a) Temporary sediment traps. Construct temporary sediment traps to detain runoff from disturbed areas and settle out sediment. Provide outlet protection.

(b) Sediment basins. Construct sediment basins to store runoff and settle out sediment for large drainage areas. Excavate and construct sediment basins according to Section 204. Construct riser pipes according to Section 602. Provide outlet protection.

157.08 Outlet Protection. Construct riprap aprons or basins to reduce water velocity and prevent scour at the outlet of permanent and temporary erosion and sediment control measures. Construct riprap according to Section 251.

157.09 Water Crossings. Construct temporary culvert pipe at temporary crossings where construction vehicles cross a live waterway.

157.10 Diversions. Construct temporary channels, temporary culverts, earth berms, or sandbags to divert water around disturbed areas and slopes. Use temporary channels, temporary culverts, pumps, sandbags, or other methods to divert the flow of live streams for permanent culvert installations and other work.

Stabilize channels according to Subsection 157.11. Provide outlet protection.

157.11 Waterway and Slope Protection and Stabilization. Use the following:

(a) Plastic lining. Use plastic lining to protect underlying soil from erosion. Place the plastic lining loosely on a smooth soil surface free of projections or depressions that may cause the liner to puncture or tear. Lap transverse joints at least 3 feet (1 meter) in the direction of flow. Do not use longitudinal joints. Anchor the lining in place using riprap, gravel bags, or sandbags.

(b) Riprap. Construct riprap for channel lining according to Section 251.

(c) Check dams. Construct riprap, gravel bags, sandbags, fiber rolls and socks, or earth berms for temporary check dams to reduce the velocity of runoff in ditches and swales.

(d) Rolled erosion control products. Use rolled erosion control products to stabilize waterways and slopes before or after temporary or permanent seeding. Install according to Section 629.

(e) Temporary slope drains. Use drainpipe, riprap, or plastic lined waterway for temporary slope drains to channel runoff down slopes. Channel water into the slope drain with an earth berm, gravel bag, or sandbag headwall constructed at the top of a cut or fill. Anchor slope drains to the slope.

Provide outlet protection.

(f) Floating turbidity curtains.