KS FLAP KIN 50(1) Cheney Reservoir Presolicitation.pdf

PDF 124 KB Posted

Attached to
KS FLAP KIN 50(1) Cheney Reservoir Access Road
Solicitation number
6982AF22B000035
Issued by

About this file

This pre-solicitation notice describes a planned federal contract for road improvement work. The project involves rehabilitating a 2-mile section of road in Kingman County, Kansas that provides access to Cheney Reservoir recreational facilities. Scope of work includes shoulder widening, asphalt overlay, and other items like clearing, grading, and seeding. Estimated quantities are provided for items including aggregate, cement, asphalt, and erosion control measures. The anticipated schedule has advertising in November 2022, award in January 2023, notice to proceed in January 2023, and completion in September 2023. The engineer's estimated bid range is between $2 million to $5 million. Funding will be provided by the Federal Land Access Program and Kingman County. The solicitation number is 6982AF22B000035 and will be issued by the Department of Transportation Federal Highway Administration.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NAME: KS FLAP KIN 50(1) Cheney Reservoir Access

PROJECT DESCRIPTION:

The project is located within the Cheney Reservoir in Kingman County in the State of Kansas. RS 607 (NE 50 St) provides access to the West Shore Area of the Cheney Reservoir. The West Shore Area includes camp sites, boat ramps, jetties and other recreational facilities. These types of facilities generate increased truck and trailer traffic.

The project is for the rehabilitation of RS 607 (NE 50 St) from RS 1428 (NE 150 Ave) east for 2.0 miles to the Kingsman County Line (N 407th St W).

SCOPE OF THE WORK:

The project scope includes shoulder regrading and widening to improve the existing roadway condition and safety and provide improved public access to Cheney State Park and Cheney Reservoir (USBR). The project includes the widening of the roadway to provide 26’ from edge of pavement to edge of pavement plus 4’ gravel shoulders on each side for the length of the project. It also includes 2.5” Asphalt Concrete Overlay of the existing overlay.

PRINCIPAL WORK ITEMS:

Principal work items include:

Line Item Unit Estimated Quantity

CENTERLINE, VERIFICATION AND STAKING MILE 2

CLEARING AND GRUBBING ACRE 5

ROADWAY AGGREGATE, METHOD 2 TON 850

SHOULDER AND DITCH RECONDITIONING MILE 2

FULL DEPTH RECLAMATION WITH CEMENT, 8-INCH DEPTH MILE 2

CEMENTITIOUS MATERIAL TON 450

ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 7,800

FOG SEAL TON 15

PRIME COAT, METHOD 1 TON 48

TACK COAT TON 15

CLEANING CULVERT IN PLACE EACH 18

GENERAL LABOR HOUR 200

SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 20

SPECIAL LABOR, HIRED TECHNICAL SERVICES (BIOLOGIST) HOUR 20

DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 20

BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY

BUCKET, 24-INCH WIDTH HOUR 20

WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 20

BULLDOZER, 350HP MINIMUM FLYWHEEL POWER HOUR 20

MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 20

PLACING CONSERVED TOPSOIL, 4-INCH DEPT SQYD 13,000

SEEDING, HYDRAULIC METHOD ACRE 3

MULCHING, HYDRAULIC METHOD ACRE 3

SIGN SYSTEM EACH 16

DELINEATOR, TYPE 1 EACH 68

PAVEMENT MARKINGS, TYPE D, SOLID MILE 9

ANTICIPATED SCHEDULE:

Advertise: November 2022 Award: January 2023 Notice to Proceed: January 2023 Construction Completion: September 2023

ENGINEER’S ESTIMATE:

Estimated Bid Range: Between $2,000,000 and $5,000,000

FUNDING SOURCE:

Federal Land Access Program and Kingman County

File details come from the government source that posted it. Updated .