Kress Facility Move PWS.docx

DOCX document 201 KB Posted

Attached to
Kress Facility Move
Solicitation number
FA330026SSmove
Issued by

About this file

This is a Performance Work Statement (PWS) for the relocation of the Eagle Institute facility at Maxwell Air Force Base in Alabama. The 42d Contracting Squadron is conducting a pre-solicitation to gather industry input on available moving services and capabilities before finalizing the acquisition strategy for this requirement.

The PWS outlines the contractor's responsibilities for executing a comprehensive facility move that includes planning, coordination, packing, transportation, and setup of equipment and materials at the new Eagle Institute location. The contractor must coordinate with Eagle Institute personnel, provide project management oversight, ensure compliance with Air Force regulations and safety requirements, and maintain detailed documentation throughout the move process. Key deliverables include a detailed move plan submitted for government approval, weekly status reports, and a post-move certification confirming that all items have been properly relocated and installed. The statement specifies that the contractor shall be responsible for any damage incurred during the move and must maintain appropriate insurance coverage. The work requires coordination with multiple Air Force organizations and adherence to base access and security procedures. This is a source sought opportunity designed to inform the government's acquisition approach rather than a formal competitive solicitation at this stage.

View the file

Other files

File Type Posted
Sources Sought SAM.gov_Kress_Fac_move.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .