Kodiak N21 Repair Main Fuel Pump SOW 12-1-2023.pdf
PDF 344 KB Posted
- Attached to
- USCG BASE KODIAK GOULDS PUMP INSTALLATION AND VIBRATION TESTING Federal contract opportunity
- Solicitation number
- 70Z04524QKODI0041
About this file
This combined synopsis and solicitation requests quotations for a pump installation and vibration testing project at the U.S. Coast Guard Base in Kodiak, Alaska. The contractor will install a main fuel pump, commission the pump, and test its stop and pressure relief functions. The solicitation number is 70Z04524QKODI0041. Quotes are due by January 31, 2024 and shall be submitted electronically to Dustin Rife. The project is set aside exclusively for small businesses. The contractor must provide all labor, equipment, materials, and transportation to complete the scope of work, which includes inspecting the old pump, installing and commissioning the new pump per manufacturer instructions, testing the fuel stop mechanism, and reporting findings. The performance period is two weeks from award. The place of performance is the U.S. Coast Guard Base in Kodiak, Alaska.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 3-Field Service Installation and Start-up Checklist (Horizontal Pump) SC-044-2.pdf | ||
| 2-Goulds_3316iom.pdf.pdf | ||
| 1-N221H305-PUMP-D-0849.pdf | ||
| Wage Determination - 70Z04524QKODI0041.pdf | ||
| RFQ-SF18.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PN: xxxxxxxx PR Nr: 31140PR230000041
N21 Fuel Pump Installation
Page 1 | 2
GENERAL REQUIREMENTS
Contractor will provide all supervision, labor, equipment, materials, and transportation to install the main fuel pump (ITT Goulds 3316M 3x4x11H), commission pump, and prove pump stop and pressure relief work in tandem.
The contractor is responsible to provide a complete and usable facility upon completion of this project. Items in this scope of work are considered the major items of work required to complete the work effort, and in no way limits details & work not specified included that the contractor is responsible for and required to be installed. This may include requirement in referenced documents, code requirements, and workmanship details. The contractor is responsible for a high level of workmanship in the execution of work.
POINTS OF CONTACT
-The Contracting Officer (KO) is Jaqueline Robinson (907) 487-5180.
-The Contracting Officer’s Representative (COR) is Logan Creelman (907) 306-9292.
SCOPE
The following items comprise the scope of work for this project. Items will not necessarily be completed in the order listed.
1. Inspect old Pump to determine reason for misalignment in N21 and report findings.
2. Confirm pump dimensions are the same as old pump in both size and capabilities.
3. Install and commission new pump per manufacturer’s instructions. To maintain manufactures warranty, Attachment 3, IPG Pro Field service installation and start up requires Gould’s Pumps Representative approval and signature. Submit proof of approval from Gould’s pumps representative to maintain manufacturer’s warranty.
4. Test fuel stop mechanism and run a test with air station operations.
5. Report findings to COR.
Unsatisfactory performance shall result in work being re-accomplished at no cost to the government.
The Contractor shall keep the COR or KO fully informed on the daily progress of the work; from the start through completion of this inspection. The government shall use a 100% surveillance method. Inspection of work shall be performed periodically while work is being performed and prior to contractor leaving the site. The COR will conduct these inspections and provide final acceptance of the work.
PERFORMANCE PERIOD
Work to be completed within 2 weeks of award.
WORK HOURS
Normal working hours for this project shall Monday through Friday 0800-1700 excluding all Federal holidays. Work outside these hours shall require verbal or written approval of the Contracting Officer or his/her authorized representative.
ATTACHMENTS
The following is a list of attachments to this procurement request:
PN: xxxxxxxx PR Nr: 31140PR230000041
N21 Fuel Pump Installation
Page 2 | 2
1) N221H305-PUMP-D-0849.pdf
2) Goulds_3316iom.pdf
3) Field Service Installation and Start-up Checklist (Horizontal Pump) SC-044-2.pdf
WORK RESTRICTIONS
The work area must be free of hazards, materials and equipment during non working hours. The contractor will erect barricades closing the work area off to traffic during work performance and remove the barriers before the end of each work period, unless the work requires barriers to remain overnight for safety.
PERMITS/NOTIFICATIONS
Burn permits will be obtained from the Base Fire Department prior to all hot work such as welding, torch cutting, etc. Call 487-5808 three days before work to schedule.
Dig Permit not required for this work.
Government Furnished Equipment ITT Goulds 3316M 3x4x11H Pump
SUBMITTALS REQUIREMENTS
- Detailed product information data for all additional materials (besides gov’t furnished pump) and equipment items to be installed
- Submit proof of approval from Gould’s pumps representative to maintain manufacturer’s warranty.
CLEANUP
Remove rubbish and debris from the project site daily; do not allow accumulations inside or outside the buildings. The work includes demolition, and removal of resulting rubbish and debris.
Store materials that cannot be removed daily in areas specified by the Contracting Officer. The Contractor is responsible for the security of all materials stored onsite. No materials may be stored at the work area unless approved by the Contracting Officer.
The Contractor is responsible for proper disposal and any associated fees to the local landfill operated by the Kodiak Island Borough. The on-base dumpsters will not be used to dispose of construction generated waste.
File details come from the government source that posted it. Updated .