2. DATE ISSUED 3. DATE OPENED

25-Feb-21 30-Mar-21

DATE SIGNED

X C. REASONABLE CONTRACT

7A. 7B. 7C. 7D. 7E. 7F. 7E. F. E. F.

ITEM # DESCRIPTION EST. QTY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT

CLIN Basic Items

All work to complete the supply and install Riprap as specified in the specifications and drawings. 3,515 TON 59.25$ 208,263.75$ 87.44$ 307,351.60$ 45.00$ 158,175.00$

All work to complete the supply and install Geotextile Fabric as specified.

3,085 SY 2.65$ 8,175.25$ 31.70$ 97,794.50$ 3.00$ 9,255.00$

All work to complete the supply, haul, place, and compact embankment

(Cut/Fill) for bank stabilization as specified. 875 CY 19.55$ 17,106.25$ 68.93$ 60,309.38$ 25.00$ 21,875.00$

All work to complete the supply, haul, place, maintain and remove a work platform as specified. 1 Job 72,100.00$ 72,100.00$ 74,164.28$ 74,164.28$ 60,000.00$ 60,000.00$

All labor and materials to remove and replace fencing as specified.

1 Job 14,900.00$ 14,900.00$ 71,578.60$ 71,578.60$ 15,000.00$ 15,000.00$

All remaining work including but not limited to: mobilization, demobilization, clearing, grubbing, traffic control, construction access, and all other work except the work listed in the items above and below. 1 Job 85,200.00$ 85,200.00$ 66,473.71$ 66,473.71$ 51,500.00$ 51,500.00$

405,745.25$ 677,672.07$ 315,805.00$

I CERTIFY THAT I HAVE OPENED, READ AND

AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE

TO THIS SOLICITATION

OMAHA, NE 68102-1618

1616 CAPITOL AVENUE

CONTRACTING DIVISION (CENWO-CT)

US ARMY CORPS OF ENGINEERS

l PAGE 2

9. OFFERS

SIGNATURE

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

Dean P. Matuszewski

NO. 1 NO. 2

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER

W9128F21B0006

4. ISSUING OFFICE

8. GOVERNMENT ESTIMATE

(Check A, B or C AND COMPLETE D, E AND F)

5. PROJECT TITLE

A. OFFEROR A. OFFEROR

201 NE 135th St. PO Box 1162

A. HIRED LABOR

KEU, Inc. Morris, Inc

Vancouver, WA 98685 Pierre, SD 57501

B. BID SECURITY (Type & Amount)B. REASONABLE CONTRACT

6. NUMBER OF AMENDMENTS ISSUED

20%

B. BID SECURITY (Type & Amount)

0%

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

OAHE LITTLE PUMPKIN BANK STABILIZATION

BASE TOTAL AMOUNT (Items 0001 through 0006)

(Without Profit)

(Including Profit)

X C. REASONABLE CONTRACT

7A. 7B. 7C. 7D. 7E. 7F. 7E. F. E. F. E. F.

ITEM # DESCRIPTION EST. QTY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT

Basic Items

All work to complete the supply and install Riprap as specified in the specifications and drawings. 3,515 TON 67.77$ 238,211.55$ 64.50$ 226,717.50$ 52.00$ 182,780.00$ 70.00$ 246,050.00$

All work to complete the supply and install Geotextile Fabric as specified. 3,085 SY 4.02$ 12,401.70$ 3.05$ 9,409.25$ 3.00$ 9,255.00$ 4.00$ 12,340.00$

All work to complete the supply, haul, place, and compact embankment (Cut/Fill) for bank stabilization as specified. 875 CY 6.70$ 5,862.50$ 14.60$ 12,775.00$ 6.00$ 5,250.00$ 20.00$ 17,500.00$

All work to complete the supply, haul, place, maintain and remove a work platform as specified. 1 Job 108,452.32$ 108,452.32$ 112,200.00$ 112,200.00$ 30,000.00$ 30,000.00$ 250,000.00$ 250,000.00$

All labor and materials to remove and replace fencing as specified.

1 Job 10,668.71$ 10,668.71$ 12,700.00$ 12,700.00$ 2,000.00$ 2,000.00$ 3,000.00$ 3,000.00$

All remaining work including but not limited to: mobilization, demobilization, clearing, grubbing, traffic control, construction access, and all other work except the work listed in the items above and below. 1 Job 46,678.45$ 46,678.45$ 186,100.00$ 186,100.00$ 20,000.00$ 20,000.00$ 75,000.00$ 75,000.00$

422,275.23$ 559,901.75$ 249,285.00$ 603,890.00$ BASE TOTAL AMOUNT (Items 0001 through 0006)

Sharpe Enterprises, Inc.

B. BID SECURITY (Type & Amount)

20%

C. AMENDMENTS ACKNOWLEDGED

20%

A-G-E Corporation

A. OFFEROR

B. REASONABLE CONTRACT

Moltron Meyer, LLC

424 winnetka Ave N

Minneapolis, MN 55427

INSTRUCTIONS: Attach this form to Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation

1. SOLICITATION NUMBER

W9128F21B0006 sheet will accommodate 24 contract items to conform the number of items which can be entered . Use additional forms and continuation sheets as needed.

ABSTRACT OF OFFERS -

CONTINUATION SHEET

CONSTRUCTION

OAHE LITTLE PUMPKIN BANK STABILIZATION

2. PROJECT TITLE 4. OFFERS (Continued)

NO. 3

A. OFFEROR

2972 25th St. NE

NO. 5

A. OFFEROR

NO. 6

A. OFFEROR

NO. 4

HSG Park JV LLC

C. AMENDMENTS ACKNOWLEDGED

704 W Highway 14 & 34

Fort Pierre, SD 57532

B. BID SECURITY (Type & Amount)

20%

3500 East SD Highway 34

Pierre, SD 57501

B. BID SECURITY (Type & Amount)

20%

C. AMENDMENTS ACKNOWLEDGED6. NUMBER OF AMENDMENTS ISSUED

Harvey, ND 58341

W9128F21B0006 Little Pumpkin - Bid Abstract
W9128F21B0006 Little Pumpkin pg 2- Bid Abstract
2021-03-31T06:55:04-0500
MATUSZEWSKI.DEAN.P.1100724550

File details come from the government source that posted it. Updated .