Kitchen Modernization Project at Beechwood School_ Orangethorpe Elementary School_ and Robert C. Fisler School.pdf

PDF 79 KB Posted

Attached to
Kitchen Modernization Project at Beechwood School, Orangethorpe Elementary School, and Robert C. Fisler School
Solicitation number
FSD 2026-2027-BOND-03
Issued by
Orange County, California

About this file

This is a Request for Qualifications and Proposals (RFQ/P) issued by the Fullerton School District in California for construction and preliminary/preconstruction services related to kitchen modernization projects at three elementary schools: Beechwood School, Orangethorpe Elementary School, and Robert C. Fisler School. The District is utilizing the lease-leaseback delivery method for project execution. Prospective contractors must prequalify through the District's Prequalification Questionnaire on or before November 17, 2026, and maintain a current, valid Class B Contractors License in good standing with the California Contractor's State License Board. A mandatory job walk is scheduled for November 18, 2026, at 9:00 a.m., beginning at Orangethorpe Elementary School (1400 S. Brookhurst Rd., Fullerton, CA 92833), followed by Robert C. Fisler Elementary School (1350 Starbuck St., Fullerton, CA 92833), and concluding at Beechwood Elementary School (780 Beechwood Ave., Fullerton, CA 92835). Attendance at all three job walks is mandatory; failure to attend will result in bid disqualification. Responses must be submitted by 12:00 p.m. on December 6, 2026.

The successful contractor must furnish a 100% Performance Bond and a 100% Payment Bond upon contract award. All workers on the project must be paid not less than the general prevailing wage rates as determined by the Director of the Department of Industrial Relations for the type of work and locality, in accordance with California Labor Code sections 1770 et seq. Contractors and subcontractors must comply with registration and qualification requirements under California Labor Code sections 1725.5 and 1771.1, as well as all provisions of the Project Labor Agreement implemented by the District. Contractors are responsible for acknowledging receipt of any addenda issued by the District. The RFQ/P documentation is available on the Planwell/E-ARC website or through Mike McAdam at Mike_McAdam@myfsd.org.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUALIFICATIONS AND PROPOSALS FOR CONSTRUCTION SERVICES

RFQ/P # FSD 2026-2027-BOND-03

Kitchen Modernization Project at Beechwood School, Orangethorpe Elementary School, and Robert C. Fisler School

The Fullerton School District issues a Request for Qualifications and Proposals to invite contractors to perform construction and preliminary/preconstruction services for the above District project (“Project”) pursuant to the lease-leaseback delivery method. (Ed. Code, § 17406.) Any contractor that may seek to contract with the District to perform construction services on this Project must respond to this RFQ/P.

Contractors that intend to submit a response to the RFQ/P must: (1) prequalify with the District by submitting the District’s Prequalification Questionnaire located at the following link: https://www.qualitybidders.com/, on or before, November 17, 2026; and (2) hold a Class B Contractors License that is current, valid, and in good standing with the California Contractor's State License Board.

The RFQ/P can be found on the Planwell/E-ARC website at https://customer.e-arc.com/arcEOC/PWELL_Main.asp?mem=29 or by contacting Mike McAdam at Mike_McAdam@myfsd.org for support.

Responses must be received by 12:00pm on December 6, 2026 pursuant to the process in the RFQ/P.

The successful contractor shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if awarded a contract for the Project. The successful contractor(s) and its subcontractors shall pay all workers on the Project not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations (DIR), State of California, for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to sections 1770 et seq. of the California Labor Code. Prevailing wage rates are available from the District or on the Internet at:

<http://www.dir.ca.gov>. Contractors shall comply with the registration and qualification requirements pursuant to sections 1725.5 and 1771.1 of the California Labor Code. The successful contractor and its subcontractors must also comply with all provisions in the Project Labor Agreement that the District is implementing on this Project.

If the District issues addenda to this RFQ/P, contractors are solely responsible for and must acknowledge receipt of addenda in the contractor’s response.

Mandatory Job Walk: November 18, 2026 @ 9:00am Site Visit at 1st stop 1st Orangethorpe Elementary School, 1400 S.

Brookhurst Rd., Fullerton, CA 92833, 2nd Robert C. Fisler Elementary School, 1350 Starbuck St., Fullerton, CA 92833, 3rd Beechwood Elementary School 780 Beechwood Ave Fullerton CA 92835. MUST attend all three above job walks in order to submit a bid or will be disqualified. Job walk could take several hours.

NOTE: Contractors should arrive at the Front Office of Orangethope Elementary School parking lot at least 10 minutes before the scheduled commencement of the Site Visit.

FULLERTON SCHOOL DISTRICT

By: Orange County Register Publication Dates: (1) November 6, 2026 (2) November 13, 2026 mailto:Mike_McAdam@myfsd.org

File details come from the government source that posted it. Updated .