Kis install seedling cooler SOW.docx

DOCX document 511 KB Posted

Attached to
12444221Q0041 Install Seedling Cooler Kisatchie Ranger Federal contract opportunity
Solicitation number
1034366
Issued by
Department of Agriculture Forest Service R8-Southern Region

View the file

Other files for this federal contract opportunity

Other files attached to 12444221Q0041 Install Seedling Cooler Kisatchie Ranger, newest first.
File Type Posted
1034366 - Install Cooler E-Buy Solicitation Beta Sam.docx DOCX document
Beta Sam Spreadsheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

PROJECT LOCATION

The project is located at the Kisatchie Ranger District Work Center in Natchitoches Parish, Louisiana. The site is approximately three miles South of Bellwood, Louisiana. Latitude 31.491, longitude -93.193.

Payment bond required.

Existing Conditions

Concrete slab that is 19’x 25’ with electrical lines in place. Cooler will fit in this footprint.

General

The project involves:

Install a refrigeration seedling cooler on the existing site where the old seedling cooler was located. Electrical wiring and refrigeration work.

1. The contractor shall supply all material, labor, tools, equipment, cranes, vehicles, supplies, incidentals, supervision and safety measures to complete the project.

2. The contractor shall be responsible to verify the necessary quantities of materials to be supplied and square feet measurements of the building.

3. Hours of work shall be anytime between the hours of 0630am to 0530pm Monday thru Friday. Potable water, electrical power, water, and toilet facilities are available at the project site.

4. All work shall be done in accordance with manufacturer specifications, OSHA and this document.

Products

1. Government furnished property: None.

2. Contractor furnished products: All. Including but not limited to the following:

a. All required fasteners.

b. Install a prefabricated outdoor seedling cooler with non-skid floor constructed in accordance with N.S.F. International, Standard No. 7. All refrigeration units installed and connected to electrical according to code and installed by licensed electrician, plumbing and refrigeration contractors.

c. Seedling cooler size will be 18’ x 24’ with door size a minimum of 34” x 76” hinged.

d. Exterior will be a minimum of 0.040 stucco aluminum with a weather cap on the roof.

e. Insulation will be a minimum 4” to 5” thick rigid.

f. Digital thermometer.

g. Led interior light.

h. All joints will be sealed to manufacturers specifications.

Execution: Contractor coordination

1. The Contractor shall schedule a pre-conference meeting a minimum of two weeks prior to starting their operations.

2. The Contractor shall provide shop drawings and tentative schedule of operations for review by the Contracting Officer during the pre-construction meeting.

3. The Contractor shall coordinate with the Government to minimize interruptions of Forest Service operations.

4. The Contractor shall cordon off an area of 20’ around the building to protect government traffic from tire laceration hazards.

5. The Contractor shall coordinate with the Government to have any vehicles moved which may hinder contractor operations.

6. The contractor shall police for tire laceration hazards with a magnet daily.

7. The contractor will remove all debris, rags, waste material; tools etc. from the project site at the end of each workday and properly dispose of offsite.

Execution:

1. Contractor shall provide product submittals complete with manufacturer’s specifications for installation on the existing buildings to Contracting Officer for approval.

2. Contractor shall execute coordination requirements above.

3. Contractor shall maximize manufacturer’s pre-cut and pre-finish capabilities by providing shop drawings to Contracting Officer and manufacturer.

4. Contractor shall be mindful of associated weather risks and schedule staff, material delivery and equipment to minimize risk of weather damage.

5. Contractor shall perform all electrical work under the supervision of a licensed electrician and In Accordance With (IAW) National Electric Code.

6. Contractor shall perform all refrigeration work IAW EPA section 608.

7. Contractor shall perform all welding operations IAW OSHA and consistent with standard industry practice.

Prefabricated outdoor walk in cooler

Total $ image1.jpg

File details come from the government source that posted it. Updated .