Kirksville Metal Siding MainSpec.docx

DOCX document 127 KB Posted

Attached to
FY27 NE Kirksville Maintenance Building Metal Siding Project
Solicitation number
300000266927276
Issued by
Missouri

About this file

Kirksville Metal Siding MainSpec

This is a specifications document for the Missouri Department of Transportation (MoDOT) FY27 Northeast Kirksville Maintenance Building Metal Siding Project. The project involves the removal of existing vinyl siding and installation of new 26-gauge prefinished metal siding on MoDOT's Kirksville Maintenance Building. Site visit attendance is mandatory for all bids to be accepted. Bids will be received electronically through MissouriBUYS, via mail, UPS, or FedEx. Bidders intending to submit hard copy bids must contact the buyer of record, Logan Wilbers, via email at logan.wilbers@modot.mo.gov at least five business days prior to the bid closing date.

The specifications document establishes technical requirements and standards for the metal siding materials, installation methods, and quality assurance procedures to ensure proper performance and durability of the new exterior cladding system on the maintenance facility.

View the file

Other files

File Type Posted
MODOT 0000000395SL_SUPPLIER.pdf PDF
Kirksville Project Office Metal Siding.pdf PDF
section 01300 and 01700.pdf PDF
AWO 33.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

DIVISION PAGE

DIVISION 1 – GENERAL REQUIREMENTS (BROAD SCOPE)

01019CONTRACT REQUIREMENTS2
01039COORDINATION AND MEETING REQUIREMENT4
01300SUBMITTAL REQUIREMENTS7
01400QUALITY CONTROL REQUIREMENTS11
01500CONSTRUCTION FACILITIES AND TEMPORARY CONTROL REQUIREMENTS13
01600MATERIAL AND EQUIPMENT REQUIREMENT15
01700CONTRACT CLOSEOUT REQUIREMENT17

DIVISION 2 - SITEWORK

02050 DEMOLITION 20

DIVISION 6 - WOOD AND PLASTIC

06112 FRAMING AND SHEATHING 21

DIVISION 7 – THERMAL AND MOISTURE PROTECTION

07411METAL ROOF AND WALL PANELS23
07600FLASHING AND SHEET METAL28
07900JOINT SEALERS33

DIVISION 8 - DOORS AND WINDOWS

01019

CONTRACT REQUIREMENTS

PART 1 GENERAL

1.1 SECTION INCLUDES

A.Schedule of values.
B.Application for payment.
C.Change procedures.
D.Alternatives.

1.2 RELATED SECTIONS

A. Section 01600 - Material and Equipment: Product substitutions.

1.3 SCHEDULE OF VALUES

A. Submit a printed schedule on Contractor's standard form. Electronic media printout will be considered.

B. Submit Schedule of Values in duplicate within 20 days after date of Owner-Contractor Agreement.

C. Revise schedule to list approved Change Orders, with each Application For Payment.

1.4 APPLICATIONS FOR PAYMENT

A.Submit four copies of each application on Contractor's electronic media driven form.
B.Content and Format: Utilize Schedule of Values for listing items in Application for Payment.
C.Payment Period: 30 days.
D.Include an updated construction progress schedule.
E.Certified payroll records.

1.5 CHANGE PROCEDURES

A. The Architect/Engineer/Designer may issue a Notice of Change that includes a detailed description of a proposed change with supplementary or revised Drawings and specifications, a change in Contract Time for executing the change with a stipulation of any overtime work required.

B. The Contractor may propose changes by submitting a request for change to the Architect/Engineer/Designer describing the proposed change and its full effect on the Work. Include a statement describing the reason for the change, the effect on the Contract Sum/Price and Contract Time, and a statement describing the effect on Work by the MoDOT District or other Contractors.

C. Stipulated Sum/Price Change Order: Based on Notice of Change and Contractor's fixed price quotation or Contractor's request for a Change Order as approved by Architect/Engineer/Designer.

D. Construction Change Directive: Architect/Engineer/Designer may issue a directive instructing the Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order. Document will describe changes in the Work, and designate method of determining any change in Contract Sum/Price or Contract Time. Promptly execute the change.

E. Time and Material Change Order: Submit itemized account and supporting data after completion of change, within time limits indicated in the Conditions of the Contract. Architect/Engineer/Designer will determine the change allowable in Contract Sum/Price and Contract Time as provided in the Contract Documents.

F. Maintain detailed records of work done on Time and Material basis. Provide full information required for evaluation of proposed changes, and to substantiate costs for changes in the Work.

G. Execution of Change Orders: Architect/Engineer/Designer will issue Change Orders for signatures of parties as provided in the Conditions of the Contract.

1.6 DEFECT ASSESSMENT

A. Replace the Work, or portions of the Work, not conforming to specify requirements.

B. If, in the opinion of the Architect/Engineer/Designer, it is not practical to remove and replace the Work, the Architect/Engineer/Designer will direct an appropriate remedy or adjust payment.

1.7 ALTERNATIVES

A. Accepted Alternatives will be identified in Owner-Contractor Agreement.

END OF SECTION

01039

COORDINATION AND MEETING REQUIREMENT

PART 1 GENERAL

1.1 SECTION INCLUDES

A.Coordination and project conditions.
B.Field engineering.
C.Preconstruction meeting.
D.Site mobilization meeting.
E.Progress meetings.
F.Preinstallation meetings.
G.Equipment electrical characteristics and components.
H.Examination.
I.Preparation.
J.Cutting and Patching.
K.Alteration project procedures.

1.2 COORDINATION AND PROJECT CONDITIONS

A. Coordinate scheduling, submittals, and Work of the various sections of the Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements.

B. Verify utility requirements and characteristics of operating equipment are compatible with building utilities. Coordinate work of various sections having interdependent responsibilities for installing, connecting to and placing in service, such equipment.

C. Coordinate space requirements, supports, and installation of mechanical and electrical Work, which are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit, as closely as practicable; place runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.

D. In finished areas, except as otherwise indicated, conceal pipes, ducts and wiring within the construction. Coordinate locations of fixtures and outlets with finish elements.

E. Coordinate completion and clean up of Work of separate sections in preparation for Substantial Completion.

F. After Owner occupancy of premises, coordinate access to site for correction of defective Work and Work not in accordance with Contract Documents, to minimize disruption of Owner's activities.

1.3 FIELD ENGINEERING

A.Employ a Land Surveyor registered in the State of Missouri and acceptable to Architect/Engineer/Designer.
B.Owner will locate and protect survey control and reference points.
C.Control datum for survey is that established by Owner provided survey.
D.Verify setbacks and easements; confirm drawing dimensions and elevations.
E.Provide field engineering services. Establish elevations, lines and levels, utilizing recognized engineering survey practices.

1.4 PRECONSTRUCTION MEETING

A.Architect/Engineer/Designer will schedule a meeting after Notice of Award.
B.Attendance Required: District engineer or representative, Architect/Engineer/Designer and Contractor.
C.Record minutes and distribute copies within 5 days after meeting to participants, with two copies to District Engineer, Architect/Engineer/Designer, participants and those affected by decisions made.

1.5 SITE MOBILIZATION MEETING

A. Architect/Engineer/Designer will schedule a meeting at the Project site prior to Contractor occupancy.

B. Architect/Engineer/Designer will record minutes and distributes copies within 5 days after meeting to participants, with two copies to Architect/Engineer/Designer, participants and those affected by decisions made.

1.6 PROGRESS MEETINGS

A. Schedule and administer meetings throughout progress of the Work at when arranged by Architect/Engineer/Designer.

B. Architect/Engineer/Designer will make arrangements for meetings, prepare agenda with copies for participants, and preside at meetings.

C. Attendance Required: Job superintendent, major Subcontractors and suppliers, District engineer representative, Architect/Engineer/Designer, as appropriate to agenda topics for each meeting.

D.Agenda:
1.Review of Work progress.
2.Field observations, problems, and decisions.
3.Identification of problems, which impede planned progress.
4.Maintenance of progress schedule.
5.Corrective measures to regain projected schedules.
6.Coordination of projected progress.
7.Effect of proposed changes on progress schedule and coordination.

E. Record minutes and distributes copies within 5 days after meeting to participants and those affected by decisions made.

1.7 PREINSTALLATION MEETING

A.When required in individual specification sections, convene a pre-installation meeting at the site prior to commencing work of the section.
B.Notify Architect/Engineer/Designer seven days in advance of meeting date.
C.Prepare agenda and preside at meeting:
1.Review conditions of installation, preparation and installation procedures.
2.Review coordination with related work.
D.Record minutes and distributes copies within 5 days after meeting to participants and those affected by decisions made.

PART 2 PRODUCTS

Not used

PART 3 EXECUTION

3.1 CUTTING AND PATCHING

A. Employ skilled and experienced installer to perform cutting and patching.

B.Submit written request in advance of cutting or altering elements, which affect:
1.Structural integrity of element.
2.Integrity of weather-exposed or moisture-resistant elements.
3.Work of Owner or separate contractor.
C.Execute cutting, fitting, and patching to complete Work, and to:
1.Uncover Work to install or correct ill-timed Work.
2.Remove and replace defective and non-conforming Work.
3.Provide openings in elements of Work for penetrations of mechanical and electrical Work.

D. Cut masonry and concrete materials using masonry saw or core drill.

E. Fit Work tight to pipes, sleeves, ducts, conduit and other penetrations through surfaces.

F. Maintain integrity of wall, ceiling, or floor construction; completely seal voids.

G. Refinish surfaces to match adjacent finishes. For continuous surfaces, refinish to nearest intersection; for an assembly, refinish entire unit.

H. Identify hazardous substances or conditions exposed during the Work to the Architect/Engineer/Designer for decision or remedy.

3.2 ALTERATION PROJECT PROCEDURES

A. Materials: As specified in Product sections; match existing Products and work for patching and extending work.

B. Close openings in exterior surfaces to protect existing work from weather and extremes of temperature and humidity.

C. When finished surfaces are cut so that a smooth transition with new Work is not possible, terminate existing surface along a straight line at a natural line of division and submit recommendation to Architect/Engineer/Designer for review.

D. Patch or replace portions of existing surfaces that are damaged, lifted, discolored or showing other imperfections.

E. Finish surfaces as specified in individual Product sections.

01300

SUBMITTAL REQUIREMENTS

PART 1 GENERAL

1.1 SECTION INCLUDES

A.Submittal procedures.
B.Construction progress schedules.
C.Proposed Products list.
D.Product Data.
E.Shop Drawings.
F.Samples.
G.Design data.
H.Test reports.
I.Certificates.
J.Manufacturer's instructions.
K.Manufacturer's field reports.
L.Erection drawings.
M.Construction photographs.

1.2 RELATED SECTIONS

A.Section 01300 - Submittals
B.Section 01400 - Quality Control: Manufacturers' field services and reports.
C.Section 01700 - Contract Closeout: Contract warranties, bonds, manufacturers' certificates and closeout submittals.

1.3 REFERENCES

A. AGC Associated General Contractors of America publication "The Use of CPM in Construction - A Manual for General Contractors and the Construction Industry".

1.4 SUBMITTAL PROCEDURES

A. Submit five (5) hard copies of each submittal with Architect/Engineer/Designer accepted form.

B. Identify Project, Contractor, Subcontractor or supplier; pertinent drawing and detail number and specification section number, as appropriate.

C. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of Products required, field dimensions, adjacent construction Work and coordination of information is in accordance with the requirements of the Work and Contract Documents.

D. Schedule submittals to expedite the Project, and deliver to Architect/Engineer/Designer at business address. Coordinate submission of related items.

E. For each submittal for review, allow 15 days excluding delivery time to and from the contractor.

F. Identify variations from Contract Documents and Product or system limitations, which may be detrimental to successful performance of the completed Work.

G. Submittals not requested will not be recognized or processed.

1.5 CONSTRUCTION PROGRESS SCHEDULES

A.Submit initial schedule in duplicate within 15 days after date established in Notice to Proceed.
B.Revise and resubmit as required.
C.Submit revised schedules with each Application for Payment, identifying changes since previous version.
D.Submit a horizontal bar chart with separate line for each major portion of Work or operation, identifying first workday of each week.

1.6 PROPOSED PRODUCTS LIST

A.Within 15 days after date of Notice to Proceed, submit list of major products proposed for use, with name of manufacturer, trade name and model number of each product.
B.For products specified only by reference standards, give manufacturer, trade name, model or catalog designation and reference standards.

1.7 PRODUCT DATA

A.Product Data for Review:
1.Submitted to Architect/Engineer/Designer for review for the limited purpose of checking for conformance with information given and the design concept expressed in the contract documents.
2.After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article above and for record documents purposes described in Section 01700 - CONTRACT CLOSEOUT.
B.Product Data for Information:
1. Submitted for the Architect/Engineer/Designer’s knowledge as contract administrator or for the Owner.
C.Product Data for Project Closeout:
1. Submitted for the Owner's benefit during and after project completion.

D. Submit the number of copies, which the Contractor requires, plus two copies that will be retained by the Architect/Engineer/Designer.

E. Mark each copy to identify applicable products, models, options and other data. Supplement manufacturers' standard data to provide information specific to this Project.

F. After review distribute in accordance with the Submittal Procedures article above and provide copies for record documents described in Section 01700 - CONTRACT CLOSEOUT.

1.8 SHOP DRAWINGS

A.Shop Drawings for Review:
1.Submit five (5) hard copies to Architect/Engineer/Designer for review for the limited purpose of checking for conformance with information given and the design concept expressed in the contract documents.
2.After review, produce copies and distribute in accordance with SUBMITTAL PROCEDURES article above and for record documents purposes described in Section 01700 - CONTRACT CLOSEOUT.
B.Shop Drawings for Information:
1.Submitted for the Architect/Engineer/Designer’s knowledge as contract administrator or for the Owner.
C.Shop Drawings For Project Closeout:
1.Submitted for the Owner's benefit during and after project completion.

D. Indicate special utility and electrical characteristics, utility connection requirements and location of utility outlets for service for functional equipment and appliances.

E. Submit in the form of one reproducible transparency and one opaque reproduction.

1.9 SAMPLES

A.Samples for Review:
1.Submitted to Architect/Engineer/Designer for review for the limited purpose of checking for conformance with information given and the design concept expressed in the contract documents.
2.After review, produce duplicates and distribute in accordance with SUBMITTAL PROCEDURES article above and for record documents purposes described in Section 01700 - CONTRACT CLOSEOUT.
B.Samples for Information:
1.Submitted for the Architect/Engineer/Designer’s knowledge as contract administrator or for the Owner.
C.Samples for Selection:
1.Submitted to Architect/Engineer/Designer for aesthetic, color, or finish selection.
2.Submit samples of finishes for Architect/Engineer/Designer selection.
3.After review, produce duplicates and distribute in accordance with SUBMITTAL PROCEDURES article above and for record documents purposes described in Section 01700 - CONTRACT CLOSEOUT.

1.10 DESIGN DATA

A.Submit for the Architect/Engineer/Designer’s knowledge as contract administrator or for the Owner.
B.Submit for information for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents.

1.11 TEST REPORTS

A.Submit for the Architect/Engineer/Designer’s knowledge as contract administrator or for the Owner.
B.Submit test reports for information for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents.

1.12 CERTIFICATES

A.When specified in individual specification sections, submit certification by the manufacturer, installation/application subcontractor, or the Contractor to Architect/Engineer/Designer, in quantities specified for Product Data.
B.Indicate material or Product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits and certifications as appropriate.
C.Certificates may be recent or previous test results on material or Product but must be acceptable to Architect/Engineer/Designer.

1.13 MANUFACTURER'S INSTRUCTIONS

A.When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, and start-up, adjusting and finishing, to Architect/Engineer/Designer for delivery to owner in quantities specified for Product Data.
B.Indicate special procedures, perimeter conditions requiring special attention and special environmental criteria required for application or installation.
C.Refer to Section 01400 - Quality Control, Manufacturers' Field Services article.

1.14 MANUFACTURER'S FIELD REPORTS

A.Submit reports for the Architect/Engineer/Designer's benefit as contract administrator or for the Owner.
B.Submit for information for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents.

1.15 ERECTION DRAWINGS

A.Submit drawings for the Architect/Engineer/Designer’s benefit as contract administrator or for the Owner.
B.Submit for information for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents.
C.Data indicating inappropriate or unacceptable Work may be subject to action by the Architect/Engineer/Designer or Owner.

01400

QUALITY CONTROL REQUIREMENTS

PART 1 GENERAL

1.1 SECTION INCLUDES

A.Quality assurance - control of installation.
B.Tolerances
C.References and standards.
D.Mock-up.
E.Inspecting and testing laboratory services.
F.Manufacturers' field services.

1.2 RELATED SECTIONS

A.Section 01300 - Submittals: Submission of manufacturers' instructions and certificates.
B.Section 01600 - Material and Equipment: Requirements for material and product quality.
C.Section 01650 - Starting of Systems.

1.3 QUALITY ASSURANCE - CONTROL OF INSTALLATION

A. Monitor quality control over suppliers, manufacturers, Products, services, site conditions and workmanship, to produce Work of specified quality.

B. Comply with manufacturers' instructions, including each step in sequence.

C. Should manufacturers' instructions conflict with Contract Documents, request clarification from Architect/Engineer/Designer before proceeding.

D. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes or specified requirements indicate higher standards or more precise workmanship.

E. Perform Work by persons qualified to produce required and specified quality.

F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.

G. Secure Products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, or disfigurement.

1.4 TOLERANCES

A.Monitor fabrication and installation tolerance control of Products to produce acceptable Work. Do not permit tolerances to accumulate.
B.Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract Documents, request clarification from Architect/Engineer/Designer before proceeding.
C.Adjust Products to appropriate dimensions; position before securing Products in place.

1.5 REFERENCES AND STANDARDS

A. For Products or workmanship specified by association, trade or other consensus standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.

B.Conform to reference standard by date of issue current on date for receiving bids or date specified in the individual specification sections, except where a specific date is established by code.
C.Neither the contractual relationships, duties or responsibilities of the parties in Contract nor those of the Architect/Engineer/Designer shall be altered from the Contract Documents by mention or inference otherwise in any reference document.

1.6 TESTING SERVICES

A.Contractor to provide all testing services as called out in these specifications.
B.Testing and source quality control may occur on or off the project site. Perform off-site testing as required by the Architect/Engineer/Designer or the Owner.
C.Testing does not relieve Contractor to perform Work to contract requirements.
D.Re-testing required because of non-conformance to specified requirements shall be performed by the same MoDOT personnel on instructions by the Architect/Engineer/Designer.

1.7 INSPECTION SERVICES

A.Owner will employ MoDOT Personnel to perform inspection.
B.Inspecting may occur on or off the project site. Perform off-site inspecting as required by the Architect/Engineer/Designer or the Owner.
C.Inspecting does not relieve Contractor to perform Work to contract requirements.

1.8 MANUFACTURERS' FIELD SERVICES

A.When specified in individual specification sections, require material or Product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, test, adjust and the balancing of equipment as applicable and to initiate instructions when necessary.
B.Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions.
C.Refer to Section 01300 - SUBMITTALS, MANUFACTURERS' FIELD REPORTS article.

PART 2 EXECUTION

2.1 EXAMINATION

A.Verify that existing site conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions.
B.Verify that existing substrate is capable of structural support or attachment of new Work being applied or attached.

2.2 PREPARATION

A.Clean substrate surfaces prior to applying next material or substance.
B.Seal cracks or openings of substrate prior to applying next material or substance.
C.Apply manufacturer required or recommended substrate primer, sealer or conditioner prior to applying any new material or substance in contact or bond.

01500

CONSTRUCTION FACILITIES AND TEMPORARY CONTROL REQUIREMENTS

PART 1 GENERAL

1.1 SECTION INCLUDES

A.Temporary Utilities: Electricity, telephone service, facsimile service and sanitary facilities.
B.Temporary Controls: enclosures and fencing, protection of the Work and water control.
C.Construction Facilities: progress cleaning and temporary buildings.

1.2 TEMPORARY ELECTRICITY

A. Cost: By Contractor; pay for temporary power service furnished by MoDOT.

1.3 TELEPHONE SERVICE

A. Provide, maintain, and pay for telephone service to field office and Architect/Engineer/Designer’s field office at time of project mobilization.

1.4 TEMPORARY WATER SERVICE

A.Connect to existing water source as directed for construction operations at time of project mobilization.
B.Contractor will reimburse Owner for water used in construction as agreed upon at time of project mobilization.

1.5 TEMPORARY SANITARY FACILITIES

A. Provide and maintain required facilities and enclosures. Provide at time of project mobilization.

1.6 FENCING

A.Construction: Use plastic mesh safety fencing or better.
B.Provide 48” high fence around construction site; equip with vehicular and pedestrian gates with locks.

1.7 WATER CONTROL

A.Grade site to drain. Maintain excavations free of water. Provide, operate and maintain pumping equipment.
B.Protect site from puddling or running water. Provide water barriers as required to protect site from soil erosion.

1.8 EXTERIOR ENCLOSURES

A. Provide temporary weather tight closure of exterior openings to accommodate acceptable working conditions and protection for Products, to allow for temporary heating and maintenance of required ambient temperatures identified in individual specification sections, and to prevent entry of unauthorized persons. Provide access doors with self-closing hardware and locks.

1.9 PROTECTION OF INSTALLED WORK

A. Protect installed Work and provide special protection where specified in individual specification sections.

B.Provide temporary and removable protection for installed Products. Control activity in immediate work area to prevent damage.
C.Provide protective coverings at walls, projections, jambs, sills and soffits of openings.
D.Protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage or movement of heavy objects, by protecting with durable sheet materials.
E.Prohibit traffic or storage upon waterproofed or roofed surfaces. If traffic or activity is necessary, obtain recommendations for protection from waterproofing or roofing material manufacturer.
F.Prohibit traffic from landscaped areas.

1.10 SECURITY

A.Provide security and facilities to protect Work and existing facilities and Owner's operations from unauthorized entry, vandalism or theft.
B.Coordinate with Owner's security program.

1.11 ACCESS ROADS

A.Provide and maintain access to fire hydrants, free of obstructions.
B.Provide means of removing mud from vehicle wheels before entering streets.
C.Designated existing on-site roads may be used for construction traffic.

1.12 PROGRESS CLEANING AND WASTE REMOVAL

A.Maintain areas free of waste materials, debris and rubbish. Maintain site in a clean and orderly condition.
B.Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces and other closed or remote spaces, prior to enclosing the space.
C.Broom and vacuum clean interior areas prior to start of surface finishing and continue cleaning to eliminate dust.
D.Collect and remove waste materials, debris and rubbish from site periodically and dispose off-site.
E.Open free-fall chutes are not permitted. Terminate closed chutes into appropriate containers with lids.

1.13 FIELD OFFICES AND SHEDS

A.Office: Weather tight, with lighting, electrical outlets, heating and ventilating equipment and equipped with drawing rack and drawing display table.
B.Provide space for Project meetings, with table and chairs to accommodate 6 persons.

1.14 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS

A.Remove temporary utilities, equipment, facilities and materials prior to Final Application for Payment inspection.
B.Clean and repair damage caused by installation or use of temporary work.
C.Restore existing facilities used during construction to original condition. Restore permanent facilities used during construction to specified condition.

01600

MATERIAL AND EQUIPMENT REQUIREMENT

PART 1 GENERAL

1.1 SECTION INCLUDES

A.Products.
B.Transportation and handling.
C.Storage and protection.
D.Product options.
E.Substitutions.

1.2 RELATED SECTIONS

A.Instructions to Bidders: Product options and substitution procedures.
B.Section 01400 - Quality Control: Product quality monitoring.

1.3 PRODUCTS

A.Do not use materials and equipment removed from existing premises, except as specifically permitted by the Contract Documents.
B.Provide interchangeable components of the same manufacture for components being replaced.

1.4 TRANSPORTATION AND HANDLING

A.Transport and handle Products in accordance with manufacturer's instructions.
B.Promptly inspect shipments to ensure that Products comply with requirements, quantities are correct and products are undamaged.
C.Provide equipment and personnel to handle Products by methods to prevent soiling, disfigurement or damage.

1.5 STORAGE AND PROTECTION

A. Store and protect Products in accordance with manufacturers' instructions.

B. Store with seals and labels intact and legible.

C. Store sensitive Products in weather tight, climate controlled, enclosures in an environment favorable to Product.

D. For exterior storage of fabricated Products, place on sloped supports above ground.

E. Provide bonded off-site storage and protection when site does not permit on-site storage or protection.

F. Cover Products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of Products.

G. Store loose granular materials on solid flat surfaces in a well-drained area. Prevent mixing with foreign matter.

H. Provide equipment and personnel to store Products by methods to prevent soiling, disfigurement or damage.

I. Arrange storage of Products to permit access for inspection. Periodically inspect to verify Products are undamaged and are maintained in acceptable condition.

1.6 PRODUCT OPTIONS

A.Products Specified by Reference Standards or by Description Only: Any Product meeting those standards or description is acceptable.
B.Products Specified by Naming One or More Manufacturers: Products of manufacturers named and meeting specifications, no options or substitutions allowed.
C.Products Specified by Naming One or More Manufacturers with a Provision for Substitutions: Submit a request for substitution for any manufacturer not named in accordance with the following article.

1.7 SUBSTITUTIONS

A. Architect/Engineer/Designer will consider requests for Substitutions only within 15 days after date established in Notice to Proceed.

B. Substitutions may be considered when a Product becomes unavailable through no fault of the Contractor.

C. Document each request with complete data substantiating compliance of proposed Substitution with Contract Documents.

D.A request constitutes a representation that the Contractor:
1.Has investigated proposed Product and determined that it meets or exceeds the quality level of the specified Product.
2.Will provide the same warranty for the Substitution as for the specified Product.
3.Will coordinate installation and make changes to other Work that may be required for the Work to be complete with no additional cost to Owner.
4.Waives claims for additional costs or time extension that may subsequently become apparent.
5.Will reimburse Owner for review or redesign services associated with re-approval by authorities.

E. Substitutions will not be considered when they are indicated or implied on shop drawing or product data submittals, without separate written request or when acceptance will require revision to the Contract Documents.

F.Substitution Submittal Procedure:
1.Submit three copies of request for Substitution for consideration. Limit each request to one proposed Substitution.
2.Submit shop drawings, product data and certified test results attesting to the proposed Product equivalence. Burden of proof is on proposer.
3.The Architect/Engineer/Designer will notify Contractor in writing of decision to accept or reject request.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

Not Used.

01700

CONTRACT CLOSEOUT REQUIREMENT

PART 1 GENERAL

1.1 SECTION INCLUDES

A.Closeout procedures.
B.Final cleaning.
C.Adjusting.
D.Project record documents.
E.Operation and maintenance data.
F.Spare parts and maintenance Products.
G.Warranties.

1.2 RELATED SECTIONS

A.Section 01500 - Construction Facilities and Temporary Controls: Progress cleaning.
B.Section 01650 - Starting of Systems: System start-up, testing, adjusting and balancing.

1.3 CLOSEOUT PROCEDURES

A.Submit written certification that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with Contract Documents and ready for Architect/Engineer/Designer’s review.
B.Provide submittals to Owner that is required by governing or other authorities.
C.Submit final Application for Payment identifying total adjusted Contract Sum, previous payments and sum remaining due.
D.Owner will occupy portions of the building as specified in Section 01010.
E.Projects shall not be accepted by MoDOT until the vendor has completed all punch list items. The vendor will then have 30 days to submit all required paperwork necessary to close the project. Failure to submit the required paperwork within 30 days could result in the debarment or suspension of the contractor from future projects

1.4 FINAL CLEANING

A. Execute final cleaning prior to final project assessment. Clean interior and exterior glass, surfaces exposed to view; remove temporary labels, stains and foreign substances, polish transparent and glossy surfaces, vacuum carpeted and soft surfaces.

B. Clean equipment and fixtures to a sanitary condition with cleaning materials appropriate to the surface and material being cleaned.

C. Clean or replace filters of operating equipment used during construction and/or adjustment.

D. Clean debris from roofs, gutters, downspouts and drainage systems.

E. Clean site; sweep paved areas, rake clean landscaped surfaces.

F. Remove waste and surplus materials, rubbish and construction facilities from the site.

1.5 ADJUSTING

A. Adjust operating Products and equipment to ensure smooth and unhindered operation.

1.6 PROJECT RECORD DOCUMENTS

A. Store record documents separate from documents used for construction.

B. Record information concurrent with construction progress.

C.Specifications: Legibly mark and record at each Product section description of actual Products installed, including the following:
1.Manufacturer's name and product model and number.
2.Product substitutions or alternates utilized.
3.Changes made by Addenda and modifications.
D.Record Drawings and Shop Drawings: Legibly mark each item to record actual construction including:
1.Measured depths of foundations in relation to finish main floor datum.
2.Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements.
3.Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible and accessible features of the Work.
4.Field changes of dimension and detail.
5.Details not on original Contract drawings.

E. Submit documents to Architect/Engineer/Designer’swith claim for final Application for Payment.

1.7 OPERATION AND MAINTENANCE DATA

A.Submit data bound in 8-1/2 x 11 inch (A4) text pages, three D side ring binders with durable plastic covers.
B.Prepare binder cover with printed title "OPERATION AND MAINTENANCE INSTRUCTIONS", title of project and subject matter of binder when multiple binders are required.
C.Internally subdivide the binder contents with permanent page dividers, logically organized; with tab titling clearly printed under reinforced laminated plastic tabs.
D.Submit 1 draft copy of completed volumes 15 days prior to final inspection. This copy will be reviewed and returned with Architect/Engineer/Designer comments. Revise content of all document sets as required prior to final submission.
E.Submit two sets of revised final volumes, within 10 days after final inspection.

1.8 SPARE PARTS AND MAINTENANCE PRODUCTS

A. Provide spare parts, maintenance, and extra Products in quantities specified individual specification sections.

B.Deliver to Project site; obtain receipt prior to final payment.
C.Examine system components at a frequency consistent with reliable operation. Clean, adjust and lubricate as required.
D.Include systematic examination, adjustment, and lubrication of components. Repair or replace parts whenever required. Use parts produced by the manufacturer of the original component.
E.Maintenance service shall not be assigned or transferred to any agent or Subcontractor without prior written consent of the Owner.

1.9 WARRANTIES

A.Execute and assemble transferable warranty documents from Subcontractors, suppliers and manufacturers.
B.Submit prior to final Application for Payment.
C.For items of Work delayed beyond date of Final Completion, provide updated submittal within 10 days after acceptance, listing date of acceptance as start of the warranty period.
PART 2PRODUCTS

Not Used.

PART 3 EXECUTION

Not Used.

02050

DEMOLITION

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

A. The work to be done under these Specifications shall include all labor, materials, equipment and services necessary to complete all demolition of roofing materials as shown on Construction Documents.

PART 2 PRODUCTS

This Section not used.

PART 3 EXECUTION

3.1 PROTECTION OF EXISTING FACILITIES

A. The contractor shall, as soon as he receives a Notice to Proceed with work, enter the premises and do any and all things necessary to protect the premises from damage by unauthorized persons. The contractor shall protect all existing equipment, pavements, tracks, poles, pipes, utilities, etc., which are not affected by demolition work. The contractor shall provide all shoring, bracing, tarps, temporary partitions, barricades, and/or other safety devices deemed necessary for protection.

3.2 OWNERSHIP OF PROPERTY

A. No right, title property or interest of any kind whatsoever in or to the land or premises upon which such buildings or structures stand, is created, assigned, conveyed, granted, or transferred to the contractor, or any other person or persons, except only the right on entry to remove such buildings and structures in strict accordance with the Contract.

B. Only such property may be salvaged by contractor as is owned by MoDOT, and in the event of any doubt respecting the ownership of any particular property, the contractor shall request from MoDOT a written statement respecting its ownership.

3.3 DEMOLITION REQUIREMENTS

The work under this contract shall consist of the following:

A. Demolition and removal of all roofing materials and passage doors as shown on Construction Documents.

B. Provide, erect, and maintain temporary barriers and security devices.

C. Protect existing landscaping and/or paving that are not to be demolished.

D. Perform all other incidental work necessary to fully complete the contract.

E. All rubbish, non-reusable fill, debris, equipment, etc., resulting from demolition work shall be removed from the premises during and-or upon completion of work, leaving the site area acceptable to the satisfaction of the owner.

F. The contractor shall furnish the disposal site for all demolition materials.

G. The contractor shall take whatever steps necessary to control dust during demolition and removal. The contractor will monitor the haul road for debris.

END OF SECTION

06112

FRAMING AND SHEATHING

PART 1 GENERAL

1.1 SECTION INCLUDES

A.Roof framing.
B.Roof sheathing.
D.Miscellaneous framing and sheathing.

1.2 REFERENCES

A.AHA (American Hardboard Association) A135.4 - Basic Hardboard.
B.ALSC (American Lumber Standards Committee) - Softwood Lumber Standards.
C.ANSI A208.1 - Mat-Formed Wood Particleboard.
D.APA (American Plywood Association).
E.NFPA (National Forest Products Association).
F.SPIB (Southern Pine Inspection Bureau).
G.WCLIB (West Coast Lumber Inspection Bureau).
H.WWPA (Western Wood Products Association).

1.3 QUALITY ASSURANCE

A.In lieu of grade stamping exposed to view lumber and plywood, submitmanufacturer's certificate certifying that products meet or exceed specified requirements.
B.Design structural shop fabricated trusses under direct supervision of a Professional Structural Engineer experienced in design of this Work and licensed in the State of Missouri.

1.4 DELIVERY, STORAGE AND PROTECTION

A.Section 01600 - Material and Equipment: Transport, handle, store and protect products.
B.Protect trusses from warping or other distortion by stacking in vertical position, braced to resist movement.

PART 2 PRODUCTS

2.1 2x MATERIALS

A. Number 2 or better.

2.2 SHEATHING MATERIALS

A. Sloped Roof Sheathing: ½” thick (verify), 48 x 96 inch sized sheets, square edges.

2.3 ACCESSORIES

A.Fasteners and Anchors:
1.Fasteners: Hot dipped galvanized steel for high humidity and treated wood locations, unfinished steel elsewhere.
B.Synthetic Roof Deck Protection: GAF Shingle-Mate. ASTM D226, D4869, and is UL classified or equal.
C.GAF - Ice and Water protection WeatherWatch or equal.

PART 3 EXECUTION

3.1 FRAMING

A.Set structural members level and plumb, in correct position.
B.Make provisions for erection loads and for sufficient temporary bracing to maintain structure safe, plumb and in true alignment until completion of erection and installation of permanent bracing.
C.Place horizontal members, crown side up.

3.2 SHEATHING

A.Secure roof sheathing with longer edge perpendicular to framing members and with ends staggered and sheet ends over bearing.
B.Secure sheathing with longer edge perpendicular to framing and with end joints staggered and sheet ends over bearing. Attach with glue and screws.

3.3 TOLERANCES

A. Framing Members: 1/4 inch from true position, maximum.

07411

METAL ROOF AND WALL PANELS

PART 1 GENERAL

1.1 SUMMARY

A. Factory-formed metal roof and wall panels, including fascia, soffit and liner panels and includes:

1. Factory-formed panels in vertical installation.

2. Factory-formed panels in horizontal installation.

3. Metal flashings and trim.

1.2 REFERENCES

A. American Society for Testing and Materials (ASTM):

1. ASTM A653/A653M Standard specification for steel sheets, zinc-coated (galvanized) or zinc-iron alloy-coated (galvannealed) by the hot-dip process.

2. ASTM A792/A792M Standard specification for steel sheet, 55% aluminum-zinc alloy coated by the hot-dip process.

3. ASTM B209 Standard specification for aluminum and aluminum-alloy sheet and plate.

4. ASTM D2247 Standard practice for testing water resistance of coatings in 100% relative humidity.

5. ASTM E1680 Standard test method for determining the rate of air leakage through exterior metal roof systems under specified pressure differences across the specimen.

6. ASTM E1646 Standard test method for water penetration of metal roof systems by uniform static air pressure difference.

7. ASTM G90 Standard practice for performing accelerated outdoor weathering of non-metallic materials using concentrated natural sunlight.

1.3 SYSTEM DESCRIPTION

A. Panel Performance requirements: Provide panels, which have been manufactured, fabricated and installed to withstand structural and thermal movement, wind loading and weather exposure to maintain manufacturer’s performance criteria without defects, damage, failure or infiltration of water.

B. Finish Performance Requirements:

1. Color change and fade resistance: No cracking, peeling, blistering or loss of adhesion when tested in accordance with ASTM G23; color change, after removal of surface deposits sucha s dirt or chalk, maximum 5 Hunter units.

2. Humidit resistance: No blistering peeling, or loss of adhesion after 2000 hours testing in accordance with ASTM D2247.

1.4 SUBMITTALS

A. General: Submit listed submittals in accordance with Conditions of the Contract and Division 1 submittal procedures section.

B. Product Data: Submit manufacturer’s product data for specified products.

C. Shop Drawings: Submit shop drawings showing layout, profiles, and product components, including anchorage, accessories, finish colors and textures.

1. Indicate layout of panels and panel sizes, including custom-fabricated panels if indicated: indicate each item of trim and accessories.

2. Indicate in detailed drawings profile and gauge of interior and exterior sheets, and location and types of fasteners; indicate locations, gauges, shapes and methods of attachment of panels, trim and accessory items.

3. Indicate products/materials required for construction activities of this section not supplies by manufacturer of products of this section.

D. Samples: Submit selection and verification samples for finishes, colors and textures.

1. Selection Samples: For each product requiring color selection, 2 sets of manufacturer’s sample chips representing full range of colors and finishes available.

2. Verification Samples: For each color and finish selected, 2 chips indicating match to selected color and finish.

E. Quality Assurance Submittals: Submit the following

1. Contractor Certificates: Contractor’s certification that:

a. Manufacturer of products of this section meets specified qualifications.

b. Installer of products of this section meets specified qualifications.

2. Manufacturer Certificates: Product certificates signed by manufacturer certifying materials comply with specified performance characteristics and physical requirements.

3. Manufacturer’s Instructions: Manufacturer’s installation instructions.

F. Closeout Submittals: Submit the following

1. Warranty: Warranty documents specified herein.

2. Record Documents: Project record documents for installed materials in accordance with Division 1 Closeout submittals (project record documents) section.

1.5 QUALITY ASSURANCE

A. Installer Qualifications: Installer experienced in performing work of this section who has specialized in the installation of work similar to that required for this project.

1. Certificate: When requested, submit certificates indicating qualification.

B. Sheet Metal Industry Standard: Comply with Sheet Metal and Air Conditioning Contractors National Association (SMACNA) Architectural Sheet Metal Manual.

C. Preinstallation Meetings: Conduct preinstallation meeting to verify project requirements, substrate conditions, manufacturer’s installation instructions and manufacturer’s warranty requirements. Comply with Division 1 Project Management and Coordination, Project Meetings Section.

1.6 DELIVERY, STORAGE & HANDLING

AGeneral: Comply with Division 1 Product Requirements Sections.
1.Ordering: Comply with manufacturer’s ordering instructions and lead time requirements to avoid construction delays.
B.Deliver: Deliver materials in manufacturer’s original, unopened, undamaged containers with identification labels intact. Indentify fabricated components with UL 90 label where appropriate.
C.Packing, Shipping, Handling, and Unloading:
1.Bundle panels in waterproof wrapping paper when nested, or wooden crates when panels cannot be nested.
2.Package trim and accessories in waterproof wrapping paper.
D.Storage and Protection: Store materials protected from exposure to harmful conditions. Store material in dry, above-ground location.
1.Stack prefinished material to prevent twisting, bending, abrasion, scratching and denting. Elevate one end of each skid to allow for moisture run off.
2.Store products of this section in manufacturer’s unopened packaging until installation of products.
3.Maintain dry, heated storage area for products of this section until installation of products.

1.7 PROJECT CONDITIONS

A. Field Measurements: Verify actual measurements/openings by field measurement before fabrication; show recorded measurements on shop drawings. Coordinate field measurements, fabrication schedule with construction progress to avoid construction delays.

1.8 WARRANTY

A. Project warranty: Refer to conditions of the contract for project warranty provisions.

B. Manufacturer’s Warranty: Submit for Owner’s acceptance manufacturer’s standard warranty document executed by authorized company official. Manufacturer’s warranty is in addition to and not a limitation of other rights Owner may have under the Contract Documents.

1. Warranty Period: one year commencing on Date of Completion.

PART 2 PRODUCTS

2.0 METAL WALL AND ROOF PANELS

2.1 MANUFACTURES

A. Central States or equal; Toll Free 1-800-356-2733.

Local supplier- Mac Steel Inc., 17982 Elder Road, Diamond MO 64840. macstell@jscomm.net
Phone: 1-677-209-0886.

2.2 METAL PANELS

A. Specs for Prime Panel-Loc Plus for wall panels & Horizon Loc for roof panels or equal:

1.26 Gauge/.020 thickness.
2.Paint Thickness Top Coat Paint: .80 mils.
3.Top Coat Primer: .20 mils.
4.Bottom Coat backer: .35 mils.
5.Bottom Coat Primer: .35 mils.
6.Rust Protectant Substrate Galvalume AZ50, Painted.
7.Galvalume AZ55, Acrylic Bare.
8.Steel Strength 80,000 PSI min.
9.Paint System CentralGuard, powered by Valspar’s WeatherX.
10.Warranty 40 year paint adhesion.
11.30 year chalk and fade.
12.20 year galvalume perforation warranty.
13.UL Ratings UL580, Class 90 for Wind Uplift resistance
14.UL2218, Class 4 for Impact Resistance
15.UL790 for Fire Resistance
16.Panel Height: 3/4-inch minimum.
17.Color: As selected by Architect from Manufacture’s standard colors.
B.Trim
1.Manufacturer’s standard 26 gauge sheet metal matching panel material and finish, break-formed, to profiles indicated on drawings, and including, but not limited to:
a.Copings.
b.Gravel stops.
c.Gutters and downspouts.
d.Termination and transition strips.
2.Color: Match panel finish.
3.Color: Selected from full range of manufacturer’s standard color.
C.Clips and Fasteners: Supply items required for installation of panels in accordance with manufacturer’s installation instructions and other indicated items; supply galvanized clips and fasteners.
2.3MATERIALS
A.Galvanized Steel Sheet: ASTM A653, G90 steel sheet, zinc coated (galvanized) by hot dip process, structural quality.
2.4RELATED MATERIALS
A.General: Coordinate use of related materials:
1.Sealants: Refer to Division 7 Joint Sealants Section.
2.5SOURCE QUALITY
A.Source Quality: Obtain metal panel products from a single manufacturer.

2.6 A. Closure Strips/Rat Guard: Equal to Midwest Manufacturing Economy Vented Closure Strips.

PART 3 EXECUTION

3.1MANUFACTURER’S INSTRUCTIONS
A.Compliance: Comply with manufacturer’s product data, recommendations and installations instructions for substrate verification, preparation requirements and installation.
1.Verification of Conditions:
a.Panel support systems are ready for construction activities of this section and within specified tolerances.
b.Rough-in utilities are in correct locations.
2.Installer’s Examination:
a.Have installer of this section examine conditions under which construction activities of this section are to be performed, then submit written notification if such conditions are unacceptable.
b.Transmit 2 copies of installer’s report to Architect within 24 hours of receipt.
c.Delay construction activities of this section until unacceptable conditions have been corrected.