Kimley-Horn_submittal_for_Plant_City_RFQ_21-020EN-FC.pdf

PDF 24 MB Posted

Attached to
Professional Consulting Services Continuing Contracts
Solicitation number
26-039EN-RFQu
Issued by
Hillsborough County, Florida

About this file

Kimley-Horn Submittal for Plant City RFQ 21-020EN-FC

This is a professional services submittal document from Kimley-Horn and Associates, Inc. to the City of Plant City, Florida, in response to a Request for Qualifications (RFQu) for continuing professional consulting services in engineering and surveying disciplines. The City seeks qualified firms to provide on-call support for planning, design, permitting, bidding, construction administration, and related services for infrastructure and capital improvement projects with estimated construction costs not exceeding $7.5 million or study costs not exceeding $0.5 million. The procurement encompasses seven discipline categories: Site Development/General Civil, Transportation, Stormwater and Flood Mitigation, Mechanical/Electrical/Plumbing, Geotechnical & Materials Testing, Environmental Contamination, and Survey/Mapping & Subsurface Utility Engineering. Firms must submit separate responses for each discipline category of interest, with submissions limited to 50 pages. The proposal deadline was May 21, 2026, at 2:00 p.m. via the City's e-Procurement Portal, with evaluation committee meetings scheduled for May 27, 2026.

The resulting continuing contracts are effective upon issuance and extend for three years with renewal options for two additional two-year periods at the City Manager's discretion. Fees remain firm for the initial contract term, with renewal period adjustments limited to a maximum 4% increase supported by Consumer Price Index documentation and written justification. Respondents must demonstrate compliance with all applicable federal, state, and local laws, including E-Verify employment verification requirements, and maintain professional liability insurance of $2 million for three years post-project completion, comprehensive liability insurance of $1 million, and workers' compensation coverage. The City offers local preference points (1.5% of total score) to respondents maintaining a physical office within Plant City with at least two full-time employees, current Florida business tax certification, required professional licenses, and six months of prior establishment. No minimum work volume is guaranteed, and the City reserves the right to select multiple firms to ensure adequate capacity and specialized expertise.

View the file

Other files

File Type Posted
Professional_Consulting_Services_Continuing_Contracts_(Addendum_#2_Revision).pdf PDF
Universal_Engineering_-RFQ_21-020EN-FC_-_Library_of_Engineering_Services.pdf PDF
Total_Scoring_and_Recap_21-020_Revised_(009).xlsx XLSX spreadsheet
Tierra.pdf PDF
Terracon_Consultants_Inc._-_RFQ_21-02EN-FC.pdf PDF
SurvTech.pdf PDF
Southeastern_Surveying.pdf PDF
SinghofenAssociates_RFQ21-020EN-FC_PlantCity.pdf PDF
SGM_Submittal_RFQ_21-020EN-FC_Library_of_Engineering_Continuing_Contracts.pdf PDF
RK_26K.pdf PDF
Reiss_-_Plant_City_RFQ_21_20_EN_FC_.pdf PDF
Ramos_Engineering.pdf PDF
Quigg_RFQ_21-020EN-FC.pdf PDF
PSI_RFQ_21-020EN-FC_submitted_by_Intertek.pdf PDF
PreproposalMeeting_042426.pdf PDF
PPM_Consultants_2C_Inc._RFQ_21-020-EN-FC_Library_of_Engineering_Services_for_Continuing_Contracts_(Cat_3).pdf PDF
Patel_2C_Greene_and_Associates.pdf PDF
OHC_Environmental_RFQ_21-020EN-FC_Plant_City.pdf PDF
OCI_Associates_2C_Inc.pdf PDF
Nova_-RFQ_21-020EN-FC_Library_of_Engineering_Services.pdf PDF
Metzger_Willard_-Submittal_for_Library_Prof_Srvs_-.pdf PDF
Mead__26_Hunt.pdf PDF
Maser_Consulting_Response_to_RFQ_21-020EN-FC_Plant_City.pdf PDF
Madrid_CPWG_Response_to_Plant_City_-_Library_of_Engineeing_Services.pdf PDF
KPI_Engineering_16-014EN-MS.pdf PDF
Kimley-Horn_submittal_for_Plant_City_RFQ_21-020EN-FC.pdf PDF
KCA_City_of_Plant_City_Library_of_Engineering_Svcs_for_Cont_Contracts_RFQ_21-020EN-FC.pdf PDF
JMTs_CoPC_Library_of_Eng_Services_21-020EN-FC.pdf PDF
Inwood_RFQ21-020EN-FC.pdf PDF
Hydro_Solutions_Consulting.pdf PDF
Hyatt_RFQ_21-020EN-FC.pdf PDF
Hazen_and_Sawyer.pdf PDF
Halff_Associates_Inc.pdf PDF
Griner_Engineering_Inc_RFQ_Response.pdf PDF
GOLDER_Plant_City_RFQ_21-020EN-FC_12-10-2020.pdf PDF
GLE_Plant_City_RFQ_21-020EN-FC_Response.pdf PDF
George_F_Young.pdf PDF
Gallagher_Bassett_BSI_RFQ_21-020EN-FC_RESPONSE-121020.pdf PDF
Florida_Transportation_Engineering.pdf PDF
EES_Submital_RFQ_21_020EN_FC_(1).pdf PDF
DTC-RFQ_21-02EN-FC_Library_of_Engineering_Services_for_Continuing_Contract.pdf PDF
DRMP_PlantCity_RFQ_21-020EN-FC.pdf PDF
Dewberry_Engineers_Inc.pdf PDF
Curtoom_Libraries_of_Engineering_Services_RFQ_21_020EF_FC.pdf PDF
CPC_RFQ_21-020EN-FC_Planty_City_Library_of_Engineering_Services.pdf PDF
Conemco_RFQ_21-020EN-FC_Library_of_Engineering_Services.pdf PDF
CivilSurv.pdf PDF
Chastain_Skillman_SOQ-Plant_City_RFQ_2321-020EN-FC.pdf PDF
Carollo_Engineers.pdf PDF
Cardno_2C_Inc.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .