KEYS BID 24-26: Line-9 Marker Ball Replacement

This is a sealed bid specification document issued by Keys Energy Services (KEYS), the municipal electric utility operator for the City of Key West, Florida. KEYS solicits proposals for the replacement of marker balls on Line-9, a 138 kilovolt transmission static wire over the Key Haven Bridge between poles T9-13 through T9-21. The scope of work includes helicopter-based removal and installation of approximately 15 marker balls at former locations, with work limited to two days commencing on January 8, 2027 and completing no later than January 10, 2027. If time permits after completion of the primary scope, contractors shall remove and replace marker balls on Line-9 between spans T9-33 through T9-41. Sealed electronic proposals via VendorLink or DemandStar are due by 10:00 a.m. on Monday, November 2, 2026; paper submittals may be delivered via FedEx, UPS, or in-person to Keys Energy Services at 6900 Front Street Extended, Key West, Florida 33040. Questions must be submitted in writing by Friday, October 16, 2026 at noon. The bid opening committee will convene virtually on November 2, 2026 at 10:00 a.m. to publicly open and read proposals. Tentative contract award is anticipated by November 18, 2026, with notice to proceed by November 25, 2026. The contract term extends through March 31, 2027, and KEYS reserves the right to terminate without cause with 30 days' written notice or with cause upon 10 days' notice.

Bids shall be submitted as firm lump-sum prices in U.S. dollars for all labor, materials, equipment, and services required to complete the project. Each proposal must include a certified check or bid bond equal to five percent of the total proposal amount as security. Bidders must demonstrate at least two years of experience performing similar services on commercial projects and must be properly licensed and insured. All equipment and materials shall be manufactured in the United States. The contractor assumes full responsibility for disconnection and disposal of existing equipment, site cleanup, environmental compliance, all permitting and FAA coordination, safety program implementation per the American Public Power Association Safety Manual, and temporary grounding of structures and equipment. Insurance requirements include Commercial General Liability ($2,000,000 general aggregate, $1,000,000 each occurrence), Business Automobile Liability ($1,000,000 combined), and Workers' Compensation consistent with applicable law. KEYS will provide all marker balls prior to work commencement. Liquidated damages of $1,000 per day apply for failure to substantially complete work by January 11, 2027. A one-year warranty covers all materials and labor from the installation date. Contractor personnel must communicate fluently in English, all employees must be U.S. citizens or legally authorized to work in the United States, and background checks are mandatory.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEYS BID 24-26 SPECIFICATIONS FOR MARKER BALL REPLACEMENT LINE-9

STATIC

CALL FOR BIDS

THE UTILITY BOARD OF THE CITY OF KEY WEST, FLORIDA, operator of Keys Energy Services (KEYS), hereby gives notice to prospective bidders that sealed proposals will be received by KEYS electronically until 10:00 a.m. on Monday, November 02, 2026 for:

KEYS BID 24-26

SPECIFICATIONS FOR MARKER BALL REPLACEMENT LINE-9 STATIC

KEYS has instituted VendorLink and DemandStar systems to provide current information to potential bidders. These systems will allow you to receive bid information quickly and at your convenience 24 hours a day, 7 days a week. Specifications may be obtained from their websites at www.myvendorlink.com or www.DemandStar.com. Registered vendors will be notified automatically of all Requests for Proposals. You may also visit www.KeysEnergy.com for links and download information for all KEYS bid specifications.

It shall be the sole responsibility of each bidder to have their bid electronically delivered on or before the time for opening proposals last announced to bidders. Emailed proposals will not be accepted. Should a vendor not be able to submit via VendorLink or DemandStar, paper submittals will be accepted. Paper submittals must be received prior to the opening date and time in order to be considered. Paper submittals, if applicable, are to be delivered via FedEx, UPS, or in-person to:

Keys Energy Services Bid Opening Committee – KEYS Bid 24-26 6900 Front Street Extended Key West, FL 33040 Note: This address does not receive US Postal Service.

Any proposal received after the time last announced for opening proposals may be retained by KEYS or returned to the bidder, but such proposal may be rejected as not responsive.

Vendors with questions pertaining to this bid specification must submit them in writing via email to purchasing@keysenergy.com no later than Friday, October 16, 2026 at noon. Any questions received after noon on October 16, 2026 will not be addressed.

Each proposal should be accompanied by a Certified Check or Bid Bond payable to the UTILITY BOARD OF THE CITY OF KEY WEST in an amount not less than five (5%) percent of the amount of the proposal as security.

Each proposal should constitute an offer to KEYS, as outlined therein, and should be irrevocable after the time announced for the opening thereof.

At a meeting of the BID OPENING COMMITTEE to be held virtually on Monday, November 02, 2026 at 10:00 a.m.

Proposals will be opened and vendor names will be publicly read aloud.

KEYS reserves the right to reject any or all proposals, to waive irregularities and informalities in any or all proposals, and to separately accept or reject any item, items, bid schedule or bid schedules of the proposal which KEYS deems to be in the best interest of the Utility Board.

Tyler Randolph, Purchasing Supervisor

TABLE OF CONTENTS

Table of Contents

TABLE OF CONTENTS

SECTION 1 GENERAL INFORMATION

1.01. DEFINITIONS

1.02. INTENT OF SPECIFICATION

1.03. SERVICE CONDITIONS

SECTION 2 GENERAL REQUIREMENTS

2.01. PROPOSALS

2.02. STANDARDS

2.03. STANDARD OF DESIGN AND WORKMANSHIP

2.04. ACCEPTANCE

2.05. EXCEPTIONS

2.06. RIGHT TO USE EQUIPMENT REQUIRING CORRECTIONS

2.07. COMPLIANCE WITH LAWS, ORDINANCES, RULES AND REGULATIONS

2.08. DOCUMENTATION REPRODUCTION

2.09. INTERFERENCE WITH OPERATION

2.10. SCHEDULE

2.11. DISPOSAL OF MATERIAL

2.12. PERMITTING

2.13. OWNER INSPECTIONS/MEETINGS

2.14. SAFETY AND PROTECTION

2.15. CONTRACTOR’S RESPONSIBILITIES

2.16. GENERAL

2.17. CONSTRUCTION FACILITIES

2.18. CONSTRUCTION SUPPORT SERVICES

2.19. ENVIRONMENT

SECTION 3 – BIDDING REQUIREMENT

3.01. SITE REVIEW

3.02. CLARIFICATION

3.03. SUBCONTRACTORS

3.04. AVIATION SERVICE DOCUMENTATION

3.05. PROPOSAL ARRANGEMENT

3.06. PROPOSAL PREPARATION

3.07. BASIS OF AWARD

3.08. QUALIFICATIONS/EXPERIENCE

3.09. SECURITY/BACKGROUND CHECK

3.10. PERSONNEL

SECTION 4 - BIDDING DATA

4.01. GENERAL

4.02. SUBCONTRACTORS

4.03. EQUIPMENT & MATERIAL

4.04. ORGANIZATIONAL CHART

4.05. PROJECT MANAGEMENT

4.06. PROJECT SCHEDULE

4.07. BLACK OUT DATES

SECTION 5 - BID PRICES

5.01. FIRM LUMP SUM PRICE

5.02. ADDITION & DELETION OF WORK

5.03. SUBCONTRACTORS

5.04. VENDOR’S ENVIRONMENTAL IMPAIRMENT RESPONSIBILITY

SECTION 6 - SCOPE OF WORK

6.01. LINE-9 MARKER BALL REPLACEMENT

ATTACHMENTS SECTION – 1

DOCUMENTATION

TITLE WARRANTY

SECTION 1 GENERAL INFORMATION

Keys Energy Services (KEYS) is a municipal electric utility supplying power to residents of the lower Florida Keys. KEYS is located in the extreme southern tip of peninsular Florida, situated in Monroe County, Florida, primarily what is considered the “Lower Keys”, which extends eastwardly from Key West to the west end of the Seven-Mile Bridge. Corporate Offices are located at 1001 James Street, Key West, Florida and the Transmission and Distribution (T&D) Facility is located on Stock Island at 6900 Front Street Extended, Key West, Florida 33040.

KEYS and its representatives have exercised due care in preparing this Request for Proposals (RFP). All information contained herein is believed to be substantially correct. However, bidders should verify information independently if desired. KEYS and its representatives do not warrant the accuracy of information contained herein.

This proposal is for: Line 9, 138kV Static Marker Ball Replacement

All Equipment must be manufactured in the U.S.

Please refer to the specification herein for the complete scope of work.

1.01. DEFINITIONS

• Owner - Utility Board of the City of Key West

• Bidder - The party or parties submitting a proposal for performing the work and/or furnishing the equipment/system specified herein.

• Contractor- The successful bidder who accepts a purchase order from the Owner.

• Date of Commercial Operation - The date established by the Owner following the period of preliminary operations of the equipment during which necessary corrections, adjustments and/or alterations may be made to ensure the equipment's safe and reliable operation.

• Equipment/System - Any and all equipment, machinery, material, transportation, accessories and supplies complete with all usual and appropriate fittings, attachments, appurtenances, appliances and special tools necessary for erection, installation, operation and maintenance unless specifically excluded herein.

1.02. INTENT OF SPECIFICATION

KEYS is seeking to secure a Utility Service Contract with a contractor to perform a general upgrade to its transmission system. This will include:

1. By the use of helicopter only, replacement of marker balls on line-9 static wire over the Key Haven Bridge between poles T9-13 thru T9-21.

2. Limit to 2 days of work to perform services where work may start on 08 Jan 2027 and is to be completed no later than 10 Jan 2027.

The Bidder shall make his/her proposal with the understanding that the Specifications and applicable drawings are intended to cover all the requirements for the design, equipment procurement, construction and documentation for the complete and reliable Transmission Static line described herein.

Unless expressly excluded, any and all labor and materials not indicated herein, but which may be necessary to complete any part of the system in a proper, substantial and workman-like manner are to be furnished by the contractor without additional charge or cost to the Owner.

Any intended omissions or exceptions to the requirements of the Specification must be stated in writing in the proposal. Otherwise, it will be understood that all work is included.

1.03. SERVICE CONDITIONS

Bidder shall understand that the 138kV Transmission Tie Line and equipment specified herein will be used in and is part of an electric utility Transmission system. Bidder shall make himself knowledgeable of the problems that may arise during the design, construction, and operation of the 138kV Transmission Tie line, and shall make his/her proposal consistent with such problems.

The completed system shall be of industrial grade and shall be required to perform properly at the ratings specified herein when installed outdoors in a residential area with the following ambient conditions:

• Altitude: Less than 100 feet above sea level

• Outdoor ambient temperature range: 20F - 110F

• Atmosphere: Humid, marine environment (tropical climate)

• Wind speed: 150 MPH during hurricane

• Seismic coefficient: 0

• Isokeraunic level: 100

• Shock & Vibration: Bidder shall describe the system's resistance to shock and vibration

SECTION 2 GENERAL REQUIREMENTS

2.01. PROPOSALS

Proposals must be complete with all required details including Fill-in data if specified. The proposal and its supplements such as drawings, documents, and other information submitted shall be the property of the Owner and will be used only for the purpose of evaluation of the proposal and the execution of any resulting contract.

2.02. STANDARDS

The design, fabrication, testing, and performance of all the equipment & material furnished, and all construction & installation work under this specification shall conform to the requirements of latest editions of ANSI, NFPA, NEMA, IEEE, ASTM, UL, NEC, EIA, ICEA, NESC, FDOT, OSHA and all other applicable local and national codes and standards.

Any conflict between the above-mentioned documents and this specification shall be referred to the Owner for clarification before proceeding with the work.

2.03. STANDARD OF DESIGN AND WORKMANSHIP

The system shall be complete in all respects and shall fully conform to the requirements set forth in the specifications and proposal. The intent of the specification is to secure for the Owner a transmission system of first-class workmanship in all respects, and in accord with the best of recognized modern practice. All equipment/material shall be new, U.S. manufactured, and suitable for the service and conditions described herein.

2.04. ACCEPTANCE

Acceptance of work will be confirmed in writing by the Owner's representative, indicating that sufficient tests have been made to determine that all requirements have been met.

Acceptance shall not waive any claim, which Owner may have for delay in completion.

2.05. EXCEPTIONS

The Bidder shall include in the proposal a section entitled "Exceptions to the Specifications". If no exceptions are taken, the Bidder shall indicate "None". If exceptions are taken, the Bidder shall list the paragraph number of this specification where the exception is taken, propose substitutions/alterations, and explain fully, the reasons for taking the exceptions. Any exception listed elsewhere in the proposal will not be considered and the proposal may be considered non-responsive.

2.06. RIGHT TO USE EQUIPMENT REQUIRING CORRECTIONS

If, after installation, it is discovered that the equipment or any part thereof or its performance may require correction, adjustment, or replacement the Owner shall have the right to use such equipment until such time as it is convenient to the Owner to remove said equipment from service.

2.07. COMPLIANCE WITH LAWS, ORDINANCES, RULES AND REGULATIONS

The work performed by the Contractor shall comply with the applicable requirements of all statutes, ordinances, codes and standards of legally constituted authorities having jurisdiction.

The Contractor shall obtain certificates of compliance where required. If the proposed work varies from said statutes, ordinances, codes and standards, the Contractor shall notify the Owner's representative in writing before the work is performed. If the Contractor performs any of the work contrary to such statutes, ordinances, codes and standards, the Contractor shall bear any expense arising there from.

2.08. DOCUMENTATION REPRODUCTION

Owner reserves the right to reproduce all documentation received from the contractor after award of the Contract, which is considered necessary for Owner's purposes despite any notice to contrary appearing on the documentation.

2.09. INTERFERENCE WITH OPERATION

Interference with normal operation of Owner's facility or equipment, and that of all Contractors or Subcontractors on the work site shall be avoided. Owner's representative will determine in advance whether such interference is unavoidable and will establish the necessary procedures under which the interference will be allowed.

2.10. SCHEDULE

The work will be planned and scheduled by the Contractor subject to the limitations of the transmission and distribution system and electrical load. Limitations are the result of electrical load during peak hours in the summer months. In addition, system switching shall not be done during the following blackout periods (see attached schedule):

• January – 1st & 2nd

2.11. DISPOSAL OF MATERIAL

The contractor shall be responsible for disconnection, removal and disposal of old equipment that is being replaced. At a minimum:

• The job site shall be cleaned and restored.

• All old equipment shall be disposed of in accordance with all applicable federal, state and local laws and regulations.

2.12. PERMITTING

The contractor shall be required to obtain all applicable permits, approvals, authorizations, aviation regulatory compliance, and required coordination with FAA, City of Key West, FDOT, Environmental Agencies, Monroe County, and local agencies applicable to its operations.

2.13. OWNER INSPECTIONS/MEETINGS

The Owner will make inspections and/or meetings as deemed necessary to ensure that all work is being performed in compliance with these specifications and guarantees. KEYS’ inspector will make sure work is performed as per the specifications before any approval to pay is made.

Failure to obtain inspector’s acceptance of work will result in noncompliance and therefore no payment will be made until corrected.

2.14. SAFETY AND PROTECTION

Safety requirements: Contractor shall do whatever work is necessary for safety and be solely and completely responsible for conditions of the job site, including safety of all persons (including employees) and property during the project period. This requirement shall apply continuously and not be limited to normal working hours.

Safety provisions shall conform to Federal and State Departments of Labor, Occupational Safety and Health Act (OSHA), and other applicable Federal, State, County, and Local Laws, Ordinances, Codes, requirements set forth herein, and regulations that may be specified in other parts of these specifications. Where these are in conflict, the more stringent requirement shall be followed. Contractor shall become thoroughly familiar with governing safety provisions and shall comply with the obligations set forth therein.

Contractor shall develop and maintain, for the duration of the project, a safety program that will effectively incorporate and implement required safety provisions. The Contractor must furnish Keys Energy Services Environmental/Safety Officer with a written copy of vendor’s company Safety Program. Contractor shall appoint a qualified employee who is authorized to supervise and enforce compliance with the safety program.

KEYS duty to conduct review of the Contractor’s performance is not intended to include a review or approval of the adequacy of Contractor’s safety supervisor, safety program, or safety measures taken in, on, or near the site.

The importance of safety to all workers on the project shall be recognized, and accident prevention shall be an integral part of the Contractor’s operations. The Contractor shall cooperate with the Owner’s safety programs. Material Safety Data Sheets shall be provided by the manufacturer of each product and must be conspicuously posted at work site.

2.15. CONTRACTOR’S RESPONSIBILITIES

Contractor shall be responsible for all loss, damage, vandalism, theft, etc. for all equipment, tools, materials, etc. left on the job site.

Contractor shall be responsible for maintaining the site in a clean condition during installation.

Contractor and Owner at which time the site should be cleaned up will make a final walk down of the sites.

Prior to completion of demobilization, Contractor shall remove all construction materials, waste, demolition debris, excess materials, temporary installation, etc. that have not been specifically turned over and accepted by Owner.

Contractor shall be responsible for all costs for cleanup of oil or gasoline spills which result from his equipment or from any work performed as part of this contract.

Permit violations or environmental damage caused by the Contractor shall be mitigated or repaired by the Contractor, at the Contractor’s expense, to the satisfaction of the governing authority citing such damage.

Items discussed in this section are not intended to be all-inclusive of Federal, State, and Local Laws and Regulations. Information is provided as anticipated minimum requirements.

Contractor shall be familiar and comply with all requirements of applicable laws and regulations.

The Contractor will assume total responsibility for materials, delivery to/from job site, installation, and testing of system.

2.16. GENERAL

All construction work shall be performed in strict accordance with the design documents prepared by the Contractor and approved by the Owner. The Contractor shall be responsible for any damages resulting from any work done in violation of the above requirement.

Manufacturers' installation, testing and calibration instructions shall be followed very closely.

Services of manufacturer's field technicians shall be used extensively. For KEYS purchased material, manufacturer’s field technicians or an authorized manufacturer’s representative shall be used.

The substations are located in residential areas. The working hours shall be limited to 07:00- 17:00 Monday through Saturday and the construction noise shall be kept to a minimum. Only required commercial Contractor vehicles will be allowed on the construction site. Construction of road crossings shall be performed in stages such that the traffic flow shall not be completely blocked at any time. The Contractor shall take other temporary measures at his own expense to maintain the flow of traffic around the substation site.

2.17. CONSTRUCTION FACILITIES

The following construction facilities shall be furnished/provided by the Contractor:

• Telephone/communication

• Sanitary facilities

• All construction signs

The above facilities shall be properly maintained during the construction work and shall be completely removed upon completion of the construction by the Contractor.

The Contractor may furnish other facilities he/she may deem necessary subject to the approval by the Owner.

2.18. CONSTRUCTION SUPPORT SERVICES

The Contractor shall provide the construction support services including, but not limited to, the following:

• Safety

• Security

• Fire protection

• First Aid

• Trash Disposal

2.19. ENVIRONMENT

The Contractor shall exercise all possible precautions required to leave the area outside the construction site in the same condition as it was prior to construction and shall comply with all local, state and federal Environmental & Pollution Control Laws both inside and outside the substation area. The Contractor shall be responsible for violations of any of the above referred laws which he/she and/or any of his/her subcontractors commit, including payment of fines, penalties and litigation costs.

SECTION 3 – BIDDING REQUIREMENT

3.01. SITE REVIEW

Each bidder is expected to familiarize himself/herself with all the pertinent local conditions & work sites. By submitting a bid, each bidder certifies that the above sites were reviewed, and his/her bid is prepared in accordance therewith.

3.02. CLARIFICATION

Bidders shall immediately notify the Owner of any error and/or inconsistency, which they may discover in the Bidding Documents. Bidders requiring clarifications and/or interpretation of the Bidding Documents must submit a request to the Owner in writing not later than three weeks prior to the bid submittal date. If no such written request is made by this date, the bidder waives the right to any future consideration and accepts the Bidding documents as published and/or revised by the Owner.

Any interpretation, correction or change of the Bidding Documents will be made by written Addendum. Interpretations, corrections or changes of the Bidding Documents made in any other manner will not be acceptable and Bidders shall not rely upon such interpretations, corrections or changes.

3.03. SUBCONTRACTORS

Each bidder shall submit with his/her bid a list of equipment/material Vendors and Subcontractors including Surveying, testing, inspecting and other organizations and/or persons he expects to use for this project. The Owner shall notify the Bidder of objection to, or non-acceptability of any potential organization or person prior to award of this Contract. Bidder shall then replace such organization or person with an acceptable organization or person in order to be considered responsive. The Contractor shall not contract with any organization or person rejected by the Owner. The Contractor shall not be required to contract with any organization or person against whom the Contractor has a reasonable objection. After award of the contract, substitutions shall not be made for any proposed Subcontractor accepted by the Owner unless the Owner accepts the substitution in writing.

3.04. AVIATION SERVICE DOCUMENTATION

Each bidder utilizing its own aircraft or third-party aviation provider shall submit sufficient documentation demonstrating the qualifications, experience, regulatory compliance, and safety record of the proposed aviation operation. At a minimum, the Bidder shall include:

• Aircraft make, model, registration and proposed configuration

• Pilot Total flight hours

• Pilot external-load/vertical-reference/long-line experience

• Experience performing utility transmission line or comparable aerial work

• Applicable FAA certificates, authorizations, and operating approvals

• Aviation operator safety record and EMR

• Proposed flight crew and ground crew qualifications

3.05. PROPOSAL ARRANGEMENT

Each bidder shall arrange his/her proposal in the following manners:

• Part 1 Technical Proposal

• Part 2 Commercial Proposal

• Appendix Supplemental information as may be required to enhance the description of the proposal.

• Exhibits Drawings, Catalog data, etc.

Pricing and related information shall be shown only in Part 2.

3.06. PROPOSAL PREPARATION

Each bidder shall submit complete and definitive information on his/her proposal in enough detail to permit a complete analysis and evaluation of his/her proposal. Each bidder shall assemble all drawings, catalog data and any other supplementary information necessary to completely describe all the work he/she is proposing to perform.

3.07. BASIS OF AWARD

The award will be made by the Owner based on the Proposal from the lowest responsive*, responsible**, Bidder which, in the Owner's sole and absolute judgment, will best serve the interest of the Owner. The Owner reserves the right to accept or reject any or all Proposals, and to waive any informalities and irregularities in said Proposals.

*RESPONSIVE BIDDER: Any person, firm, or corporation submitting a bid for the Work contemplated whose Bid Form is complete and regular, free of excisions or special conditions and has no alternative bids for any item unless requested in the technical specifications.

**RESPONSIBLE BIDDER: Any person, firm, or corporation submitting a bid for the Work contemplated who maintains a permanent place of business, has adequate manpower and equipment to do the Work properly and within the time limit that is established, has adequate financial status to meet his obligations contingent to the Work and has a history of performance of like contracts (acceptable to the Owner).

Occasionally, in offering their Proposals, certain Bidders take exception to or offer to substitute their own commercial conditions or engineering specifications for part or all of the Contract Documents. Each such proposed exception or substitution shall be clearly described. The Owner reserves the right in its sole judgment to determine the materiality of such proposed exceptions or substitutions in evaluating the Proposal to determine which has previously failed to perform satisfactorily or to deliver on time material and equipment of any nature.

KEYS reserve the right to accept and/or reject any proposal or any portion of a proposal.

Bidder shall submit the bid with proposal constraints (if any). The bidder shall assume the entire Scope of Work described in Section 6 shall be performed by them, unless clearly stated as “optional”. KEYS will not subdivide the work. The proposal schedules are solely for understanding how the costs and timelines subdivide. KEYS reserve the sole right to award the bid based on experience, equipment, manpower cost, etc.

3.08. QUALIFICATIONS/EXPERIENCE

The successful bidder must be in business for at least two (5) years performing requested services on commercial projects. Contractor shall demonstrate their capabilities (i.e. sample projects, equipment list, and company history). Bidder must be licensed and insured in order to satisfactorily perform the job scopes.

3.09. SECURITY/BACKGROUND CHECK

KEYS require all bidders to include a complete listing of owners/employees’ names, valid driver’s license and/or social security numbers of all individuals will perform work at the various sites. In addition to the D.M.V. references, KEYS will run mandatory felony and misdemeanor background checks due to security reasons. The successful bidder must expressly agree to the right for KEYS to run the D.M.V. references and the various criminal history background checks.

KEYS reserve the right to perform background checks during the entire duration of the contractual agreement. The contractor will advise KEYS Energy Services immediately of any employee staff changes before they are permitted onsite.

Non-compliance of security/background check portion of the bid specifications will result in rejection of the proposal or termination of awarded contractual agreement.

3.10. PERSONNEL

• The project supervisor for the company must always be capable of communicating in fluent

English.

• On a project, the foreman must be capable of communicating in fluent English.

• All employees of company must be United States Citizens or legally authorized to reside and work in the United States.

• KEYS may request at any time throughout the contract the following within 8 hours:

• Proof of citizenship for all employees

• Proof of employees' salary is at or above state and federal minimum requirements

• Proof of eligibility to legally work in United States

SECTION 4 - BIDDING DATA

4.01. GENERAL

Each bidder should submit complete and definitive information on his offering in sufficient detail to permit a complete analysis of the bid. The requirements stated in the Instructions to Bidders relative to information submittal should be followed.

The requirements for information contained in this section are basic requirements. Additional information should be provided as requested by the Owner.

The Bid Proposal Pages should be completely filled in and submitted with the Bid (three copies).

The data listed therein shall not relieve the Contractor of his responsibility for meeting the requirements of the detailed specifications.

Unless otherwise stated herein, it will be assumed that the bidder's intention is to meet all specifications and job requirements and that to his/her best knowledge and belief the materials and equipment described in this Bid Data will meet all specifications and job requirements.

If any materials and equipment listed by the successful bidder are later found, either before or after contract award, to be unsuitable, materials and equipment, which are suitable, shall be substituted. Substitutions shall be made only if acceptable to the Owner, and such substitutions shall not be cause for additional financial compensation nor shall they invalidate this Contract in any way.

4.02. SUBCONTRACTORS

Each bidder shall list the names, addresses, telephone numbers of the subcontractors he/she will retain for the performance of surveying, testing, calibration, measuring and any other work related to this project. A brief description of the work and percentage of total job shall also be given for each subcontractor.

4.03. EQUIPMENT & MATERIAL

Each bidder shall submit a list of Equipment & Material, which will be used for this project including those which may be furnished by his/her subcontractors. The Equipment & Material list shall include, as a minimum, the name of the supplier/manufacturer and the type/catalog number for each item on the list. All material lists need to be approved by KEYS engineering. All material shall be manufactured in the U.S. Each bidder may submit additional descriptive material to enhance his/her proposal. The Contractor shall provide any information as required and/or requested by the Owner. Material to be provided by KEYS is outlined in Section 6. No other material other than that specified in Section 6 will be provided by KEYS.

The Equipment and Material list shall be arranged as shown below if applicable:

• 138kV Section

• Miscellaneous

All electrical, mechanical, structural equipment and material shall be grouped together in their respective sections as much as possible.

4.04. ORGANIZATIONAL CHART

Each bidder shall provide a company organizational chart and identify the interface for this project and describe their functional responsibility & administrative authorities.

4.05. PROJECT MANAGEMENT

Each bidder shall submit the names, resumes and job descriptions of Project Manager and his assistant(s) that will manage this project and regularly interface with Owner's representatives.

4.06. PROJECT SCHEDULE

The Contractor shall submit a project schedule with their bid showing all activities and major milestones. The project schedule shall include the milestones to enable the Owner to schedule his activities such as approvals, field inspections, witnessing tests, etc. No schedule revision shall be made unless approved by the Owner. Any anticipated schedule change shall be reported to the Owner with no intentional time delay. The Bid award is expected to be made in XXXXX, 2026.

Work shall be completed by January 10th, 2027 or within proposed completion date if specified within bid.

Line 4 Static Wire Replacement Schedule Task By Description Start Date

1 KEYS Project Advertised 10/01/2026 2 KEYS Question Period 10/16/2026 3 KEYS Bid Opening 11/02/2026 4 KEYS Tentative Contract Award By 11/18/2026 5 KEYS Tentative Notice to Proceed 11/25/2026 6 CONTRACTOR Commencement Date (on-site) 01/08/2027 7 CONTRACTOR Project Deliverables 01/10/2027 8 KEYS Project Acceptance and Sign off 01/19/2027 9 CONTRACTOR Final Payment and Project Close-Out 01/26/2027

4.07. BLACK OUT DATES

January – 1st & 2nd Feb – All Dates OK March – All Dates OK April – All Dates OK May – All Dates OK June – All Dates OK July – Mini Season Week August – All Dates OK September – All Dates OK October – Goombay through Fantasy Fest November – Election Day November – Week of Thanksgiving December – Week of Christmas December – New Year’s Eve

SECTION 5 - BID PRICES

5.01. FIRM LUMP SUM PRICE

Each bidder shall submit his/her Firm Lump Sum Price in U.S. $ for furnishing all equipment, material, services, labor, etc. required for the design, construction and start-up of the equipment listed in Section 6.

5.02. ADDITION & DELETION OF WORK

Each bidder shall give the unit adjustment prices, which shall be used to calculate addition and deletion of work up to 10% of the lump sum contract price, stated in Section 6. Any addition and deletion of work shall be initiated by the Owner or subject to his prior approval in writing. The unit for each work item and the corresponding unit adjustment prices for the equipment/material and labor shall be clearly shown. The unit adjustment price for labor shall include the cost of any construction equipment, tools and supervision.

5.03. SUBCONTRACTORS

Each Bidder shall list on the Proposal form the name of each construction subcontractor who will furnish in excess of 10% of the Project. Failure to do so shall entitle the Owner, at its option, to reject the bid and award the Contract to the lowest responsive Bidder furnishing a satisfactory list of subcontractors.

5.04. VENDOR’S ENVIRONMENTAL IMPAIRMENT RESPONSIBILITY

A. The Vendor acknowledges that the performance of this contract is, or may be, subject to Federal, State, and Local laws and regulations enacted for the purpose of protecting, preserving, or restoring the environment. The Vendor shall, at his sole cost, will be responsible for full compliance with any such laws or regulations.

B. The Vendor’s performance under this contract shall include, but not be limited to:

• Performance in a manner to minimize disturbance of or damage to the environment.

• To the extent caused by the performance of this contract by or on behalf of the Vendor, the cleanup, repair or restoration of the environment to the extent required by any Federal, State, or Local laws or regulations.

C. The Vendor shall be responsible for any fines, penalties, damage, or assessments made against the Vendor or the owner resulting from the performance of this contract by or on behalf of the Vendor.

D. The Vendor’s obligation under paragraph B and C above shall survive the contract and shall not be limited in any manner by acceptances of final payments.

SECTION 6 - SCOPE OF WORK

6.01. LINE-9 MARKER BALL REPLACEMENT

The Contractor shall install and replace marker balls on Line-9 static wire between transmission poles T9-13 and T9-21 via helicopter. Line-9 is a 138kV Transmission which will be deenergized for the duration of the work. Line-9 static wire is alumoweld 7 no.7.

Line-9 also has 13.8kV underbuild which will remain energized.

KEYS is allotting only 2 days to perform this work due to outage schedules.

All work must be completed by January 10th, 2027.

INSTALLATION OF MARKER BALLS.

Marker Balls are to be installed in place of existing units and restored at all former locations along Key Haven Bridge. Approximately 15 marker balls in total.

The contractor shall have on hand shunts/line guards that shall be installed in the event surface rust or degradation is found on the static wire where the old marker balls were removed. Document where shunts were used. Any Shunts not used at the end of the work shall be surrendered to KEYS along with the documentation of the shunts that were used.

If time remains on the 2 days of allocated service and all marker balls are installed along the Key Haven bridge between spans T9-13 thru T9-21 then the remaining time shall be spent to remove and replace marker balls on other sections of Line-9, specifically between span T9-33 through T9-41.

During the work, the Contractor shall take all necessary steps to ensure proper temporary grounding of structures, cable, and equipment. All applicable Federal, State, and local safety regulations must be strictly followed.

A record of all temporary conductor grounds must be kept ensuring that all are removed, and the line can be safely energized at the end of the construction period.

KEYS PROVIDED MATERIAL

KEYS will supply all marker balls to contractors prior to the commencement of work.

ATTACHMENTS SECTION – 1

DOCUMENTATION

Please use the following link to access all reference material.

https://keysenergy0.sharepoint.com/sites/Purchasing/Shared%20Documents/Forms /AllItems.aspx?id=%2Fsites%2FPurchasing%2FShared%20Documents%2FKEYS%2 0Bid%2024%2D26%20%2D%20Line%209%20Marker%20Ball%20and%20Static% 20Repairs&sortField=Modified&isAscending=false&viewid=f3aa4df5%2D8365%2D4 fec%2D8949%2Ded5cdd723665&p=true&ga=1

1) PDF “Line 9 Plan and Profile Drawings”

2) Line 9 KMZ

3) PDF “KEYS Transmission One-Line”

TITLE WARRANTY

The manufacturer shall unconditionally warranty all materials and labor for a period of one

(1) year from the installation date.

BID SUBMITTAL

Proposals shall be submitted electronically via VendorLink or DemandStar prior to the opening date and time. Emailed proposals will not be accepted. Should a vendor not be able to submit via VendorLink or DemandStar, paper submittals will be accepted. Paper submittals must be received before the opening date and time to be considered.

Paper submittals can be sent via FedEx, UPS, or In-Person to:

Keys Energy Services Bid Opening Committee – Bid 24-26 6900 Front Street Extended Key West, Florida 33040 Note: This address does not receive US Postal Service.

Bidders shall submit the following:

1. Bid Bond or Cashier’s Check for 5% of Total

2. Proposal Page

3. Insurance Agent’s Statement

4. Bidder’s Statement

5. Safety Compliance Affidavit

6. Drug-Free Workplace Statement

7. Public Entity Crimes Sworn Statement

KEYS BID 24-26 SPECIFICATIONS FOR MARKER BALL REPLACEMENT LINE-9 STATIC

KEYS ENERGY SERVICES

GENERAL TERMS & CONDITIONS

ADDITIONS/DELETIONS

KEYS reserves the right to add or delete any item from this bid or resulting contract when deemed to be in the best interest of KEYS.

ALTERATIONS IN PROPOSAL

Except as otherwise provided herein, Proposals which are conditional in any way, or which contain erasures or interlineations not authenticated as provided herein, or which contain items not called for, items not in conformity with applicable laws, changes, additions, recapitulations, alternative Proposals, or any other modifications of the Proposal forms which are not specifically called for in the Contract Documents, will be rejected as not responsive unless specifically agreed to in writing by KEYS. Erasures, interlineations or other corrections shall be authenticated by affixing in the margin immediately opposite the correction, the handwritten initials of each person executing the Proposal.

APPLICABLE LAW

This Contract shall be interpreted in accordance with the law of the State of Florida.

ASSIGNMENT

No contract awarded under these terms, conditions, and specifications, may be sold, transferred or assigned in full or part without the written permission of KEYS. Such written permission shall not relieve contractor from its obligations and liabilities.

ATTORNEY FEES

The prevailing party in any litigation or mediation relating to the contract shall be entitled to recover it reasonable attorney fees and costs from the other party for all matters, including, but not limited to, appeals.

BASIS OF AWARD

A. The award will be made by KEYS on the basis of the Proposal from the lowest responsive* responsible**, Bidder which, in KEYS’ sole and absolute judgment, will best serve the interest of KEYS.

B. KEYS reserves the right to accept or reject any or all Proposals, and to waive any informalities and irregularities in said Proposal.

*Responsive Bidder: Any person, firm, or corporation submitting a bid for the work contemplated whose bid form is complete and regular, free of excisions or special conditions and has no alternative bids for any item unless requested in the technical specifications.

**Responsible Bidder: Any person, firm, or corporation submitting a bid for the work contemplated who maintains a permanent place of business, has adequate manpower and equipment to do the work properly and within the time limit that is established, has adequate financial status to meet his obligations contingent to the work and has a history of performance of like contracts (acceptable to KEYS).

C. Evaluation: The lowest evaluated price shall be determined from an analysis which assesses the impact of the contract price, operational and maintenance costs.

BID BOND/CERTIFIED CHECK

Each proposal should be accompanied by a Bid Bond or Certified Check payable to the UTILITY BOARD OF THE CITY OF KEY WEST, FLORIDA in an amount not less than five (5%) percent of the amount of the proposal as security.

BID PROPOSAL PRICING

All bid proposals must remain firm for 120 days minimum.

BIDDER QUALIFICATIONS

Please provide this information in your bid response.

CITY/COUNTY LICENSING

For the term of the contract, Contractor shall maintain City of Key West and Monroe County licenses and/or other requirements to work within the City or County limits. Contractor should provide KEYS with a copy of all licenses.

COMPLETENESS OF PROPOSAL

A. Each Bidder shall respond to all items on Proposal Page. When quoting on all items including optional items, bidders shall insert the words

“No Bid” in the space provided for any item for which no offer is made. Failure to do so may result in the Proposal being rejected as not responsive.

B. KEYS will consider alternative, additive, or deductive options with no initial pricing.

C. Each Proposal shall include specific acknowledgment of receipt of all Addenda issued during the bidding period. Failure to do so may result in the Proposal being rejected as not responsive.

D. Each Bidder shall furnish information relating to its experience, facilities, material, equipment and business as is required by the Proposal form. Failure to do so may result in the Proposal being rejected as not responsive.

E. Additional technical data furnished by a Bidder, but not required by the Request for Proposal (RFP), may at KEYS’ option be considered part of the Proposal to the extent that it is supplementary to, is consistent with and not contrary to the RFP.

CONTACT REFERENCES

KEYS contact for bidding requirements and technical specifications: Tyler Randolph, Supervisor of Purchasing, Tyler.Randolph@keysenergy.com or purchasing@keysenergy.com.

CONTRACT DURATION

The duration of the base contract shall be from the date of execution by the Utility Board through March 31, 2027. KEYS reserve the right to cancel this contract without cause with 30 days written notice and with cause within 10 days.

CONTRACT CHANGES

No changes, over the contract period, shall be permitted unless prior written approval is given by the Utility Board of the City of Key West, Florida. No Contractor shall assign the contract or any rights or obligations there under without the written consent of KEYS. In the event of such approved subcontracting, contractor agrees to provide KEYS with written documentation relative to the Subcontractor(s) employed in this contract.

CONTRACT COMPLIANCE

All contracts are subject to the terms and conditions of the Fair and Accurate Credit Transactions Act of 2003. The said provisions and compliance therewith are expressly made part of the contract and are binding covenants on the party contracting with KEYS.

CONTRACTOR LIABILITY

In the event of default by Contractor, KEYS reserves the right to utilize the next lowest Bidder as the new Contractor. In the event of this occurrence, the next lowest Bidder, if it wishes the award, shall be required to provide the bid items at the prices as contained on its proposal or bid for this specification.

CONTRACTOR’S RESPONSIBILITIES

A. Contractor shall be responsible for all loss, damage, vandalism, theft, etc. for all equipment, tools, materials, etc. left on the job site.

B. Contractor shall be responsible for maintaining the site in a clean condition during installation. Contractor and KEYS at which time the site should be cleaned up will make a final walk down of the sites.

C. Prior to completion of demobilization, Contractor shall remove all construction materials, waste, demolition debris, excess materials, temporary installation, etc. that have not been specifically turned over and accepted by KEYS.

D. Contractor shall be responsible for any and all costs for cleanup of oil or gasoline spills which result from his equipment or from any work performed as part of this contract.

E. Permit violations or environmental damage caused by contractor shall be mitigated or repaired by contractor, at contractor’s expense, to the satisfaction of the governing authority citing such damage.

F. Items discussed in this section are not intended to be all-inclusive of Federal, State, and Local Laws and Regulations. Information is provided as anticipated minimum requirements. Contractor shall be familiar and comply with all requirements of applicable laws and regulations.

G. Contractor will assume total responsibility for materials, delivery to/from job site, installation, and testing of system.

DELIVERY

A. Delivery, inspection and acceptance - delivery, inspections and acceptance will be at destination, F.O.B. Key West as specified in the RFP, KEYS Warehouse, unless otherwise provided. Until delivery and acceptance and after any rejections, risk of loss will be on the Vendor, unless loss results from negligence of KEYS.

B. Notwithstanding the requirements for any KEYS inspection and test contained in the specifications applicable to this proposal, except where specialized inspections or tests are specified for performance solely by KEYS, contractor shall perform or have performed the inspections and tests required to substantiate that the supplies and services provided under this proposal conform to the drawings, specifications and proposal requirements listed herein, including if applicable, the technical requirements for the manufacturer’s part numbers specified herein.

C. Delivery of Excess Quantities – Contractor is responsible for the delivery of each item quantity within allowable variations, if any.

If contractor delivers and KEYS receives quantities of any item in excess of the quantity called for (after considering any allowable variations of quantity) such excess quantities will be treated as being delivered for the convenience of contractor. KEYS may retain such excess quantities without compensating the interests herein. Quantities in excess, will at the option of KEYS, either be returned at contractor’s expense, or retained and paid for by KEYS at the contract unit price.

D. Deliveries – In the event of failure to deliver material of the quality or within the time specified, KEYS may cancel the order and buy elsewhere. Contractor will be responsible for any cost differences encountered in the procurement of materials. Failure of KEYS to exercise this option with respect to any installment shall not be deemed a waiver with respect of future installments, if any.

E. Delivery tickets – All shipments under this agreement shall be accompanied with delivery tickets, or packing slips, in triplicate, which shall contain the following minimum information: name of supplier, purchase order number, date of order, date of delivery or shipment, itemized list of supplies or services furnished, quantity, unit price, and extension of each line item. Upon delivery, the Warehouse will retain a copy of the related delivery ticket.

F. Inspection, Acceptance and Title – Inspection and acceptance will be at destination, unless otherwise provided. Title and risk of loss or damage to all items shall be the responsibility of the contract supplier until accepted by KEYS in writing.

ENTIRE AGREEMENT

The terms, specifications and/or drawings included in a duly executed contract will constitute the entire agreement between the parties. No modification or waiver of terms of this agreement shall be binding, unless in writing, signed by a duly authorized representative of KEYS.

ERROR IN BID CALCULATION

In the event there is a mathematical error in the bid, KEYS will recalculate using the line items and correct the total.

EXECUTION OF PROPOSAL

If a Proposal is made by a partnership, it shall contain the name and address of each partner and shall be executed in the partnership name, followed by the handwritten signature of a partner authorized to execute the Proposal for the partnership. If a Proposal is made by a corporation, it shall be executed in the name of the corporation, followed by the handwritten signature of an officer authorized to execute the Proposal for the corporation, and the printed or typewritten designation of the office he holds in corporation. Another partner of the partnership or official of the corporation shall attest to the authority of the person executing the Proposal. KEYS may require any Bidder to furnish certified copies of extracts of the minutes of meetings of the governing body of the Bidder authorizing execution of the Proposal and Contract Documents.

FORCE MAJEURE

KEYS shall not be liable in any way to contractor as a result of an event, circumstance or act of a third party that is beyond a party’s reasonable control (e.g. an act of God, and act of the public enemy, an act of a government entity, strikes or other labor disturbances, hurricanes, earthquakes, fires, floods, epidemics, embargoes, war and riots).

LITIGATION SEARCH

KEYS reserve the right to conduct a litigation search on contractor’s history of past litigation.

LIQUIDATED DAMAGES

In the event the Scope of Work is not substantially complete on or before January 11, 2027 liquidated damages shall be payable by Contractor to KEYS in the amount of $1,000 per day for each day the Scope of Work is not substantially complete.

The parties recognize that the damages to be incurred by KEYS as a result of delay in completion of the Scope of Work are difficult to estimate at this time and would be difficult for KEYS to prove. The parties intend that the payment of Liquidated Damages set forth above would serve to compensate KEYS for its damages resulting from such delay in completion, and constitutes a reasonable, good faith approximation of such damages. The liquidated damages set forth herein are not intended to, nor shall be construed to, function as a penalty, and shall not preclude other remedies available to KEYS at law or in equity.

MATERIAL

No goods or materials provided pursuant to the proposal shall consist of or contain any equipment which has been manufactured or supplied by persons or entities owned by, controlled by, or subject to the jurisdiction or direction of the government of the People’s Republic of China.

MODIFICATION OF PROPOSAL

A modification of a proposal already received will be considered only if the modification is received prior to the time last announced for opening Proposals. All modifications shall be made in writing, executed and submitted in the same form and manner as the original proposal, fax or E-mail.

Phone modifications will not be considered.

NOTICE TO PROCEED

KEYS will issue the successful bidder a Notice to Proceed after the following activities have been completed: 1) the…